TOTAL EFFECTIVE AREA OF BASEMENT: 6,350 SQ.

HEIGHT OF BASEMENT: 3.5 M

TOTAL VOLUME: 22,225 CU.M

FOR COMPARTMENT 1, EFFECTIVE AREA: 3,600 SQ.M

HEIGHT OF BASEMENT: 3.5 M

TOTAL VOLUME: 12,600 CU.M

FOR NORMAL MODE, AIR CHANGE VALUE: 6

THEREFORE, TOTAL VOLUME OF AIR TO BE EXHAUSTED IN ONE HOUR:

= VOLUME X ACV

=12,600 X 6

= 75,600 CU.M/HOUR

FOR PER MINUTE: 75,600/60

= 1,260 CU.M/MINUTE

1CU.M = 35.314CU.FT

I.E 1260 X 35.314

=44,495.64 (CFM VALUE)

FOR FIRE MODE, AIR CHANGE VALUE: 12

THEREFORE, TOTAL VOLUME OF AIR TO BE EXHAUSTED IN ONE HOUR:

= VOLUME X ACV

= 12,600 X 12

= 1, 51,200 CU.M/HOUR

FOR PER MINUTE: 151200/60

= 2,520 CU.M/MINUTE

1CU.M = 35.314CU.FT

I.E 2520 X 35.314

= 88,991.28 (CFM VALUE)

CFM VALUE RECEIVED: 88,250


FOR COMPARTMENT 2, EFFECTIVE AREA: 2,750 SQ.M

HEIGHT OF BASEMENT: 3.5M

TOTAL VOLUME: 9,625 CU.M

FOR NORMAL MODE, AIR CHANGE VALUE: 6

THEREFORE, TOTAL VOLUME OF AIR TO BE EXHAUSTED IN ONE HOUR:

= VOLUME X ACV

= 9625 X 6

= 57,750 CU.M/HOUR

FOR PER MINUTE: 57,750/60

= 962.5 CU.M/MINUTE

1CU.M = 35.314CU.FT

I.E 962.5 X 35.314

=33,989.72 (CFM VALUE)

FOR FIRE MODE, AIR CHANGE VALUE: 12

THEREFORE, TOTAL VOLUME OF AIR TO BE EXHAUSTED IN ONE HOUR:

= VOLUME X ACV

= 9625 X 12

= 1, 15,500 CU.M/HOUR

FOR PER MINUTE: 115500/60

= 1,925 CU.M/MINUTE

1CU.M = 35.314CU.FT

I.E 1925 X 35.314

= 67,979.45 (CFM VALUE)

CFM VALUE RECEIVED: 68,800