It is recommended that,

1. Pile workers should start the work with full spirit as they did before Eid
Vacation.
2. Number of workers on the site should be adequate.
3. Both two machine should work at a time.
4. Pile depth below 30’ it is hardly accepted for very critical situations, but
this much frequent cases will not be granted. So 30’ depth is must for
every single pile.
5. In which case, a clear bore hole is not formed or appears very moist clay
coming from circumferential area which is difficult to drive the casing, fill
it with sand and try here after doing surrounding piles of this point. This
operation will not be counted as a pile. It will be counted when a 30’
casing is properly driven and filled with sand with adequate hammering.
6. It is obvious that soil property will vary from one place to another. So in
different point duration to drive the casing will be different. Workers
should be patience and should try to drive the casing 30’ though it takes
some extra time or fire some extra mobile.