You are on page 1of 1

KETERANGAN

penutup atap metal berpasir ex.UNION t= 0.3 mm


nok metal berpasir t = 0.3 mm TCT ex. UNION
Kuda-kuda existing
Gording existing
listProfil plafond gypsum 20 cm
+8.40 penutup plafond gypsum 9 mm ex. jayaboard
+ rangka hollow galvanis 40 x 40 mm

Rangka plafond hollow Profil GRC


20x40x0.4 mm+40x40x0.4 mm PEMBERI TUGAS / OWNER

plafond +6.20
Balok eksisting LEMBAGA PENJAMINAN MUTU PENDIDIKAN (LPMP)
PROVINSI JAWA BARAT
plafond +5.60 Jl. Raya Batujajar Km. 2 No. 90 Kec. Padalarang Kab. Bandung, Jawa Barat

1450
Telp. (022)68866152 Fax. (022) 6864282

plafond +4.80
Balok eksisting
+3.50 plafond +4.42
MENGETAHUI
plafond +4.08 plafond +3.90
plafond +3.95 KEPALA LPMP JAWA BARAT

plafond +3.35 plafond +3.50


plafond +3.50

+0.75
Drs. H. TOTOH SANTOSA, MM
NIP. 1959.1125.198403.1.001
+0.40 MENYETUJUI
PEJABAT PEMBUAT KOMITMEN
LPMP JAWA BARAT

-1.50

Drs. Aos Firdaus, MP


NIP. 196101311985031003
PENGELOLA TEKNIS
1525 2025
3550 4300 3700 4000 4000 4000 4000 3650 3200
34400
UTANG RUSMANA SST. M. SULFAN MATAUCH, ST. MT
NIP. 19620611.198903.1.014 NIP. 19800514.201101.1.001

1 2 3 4 5 6 7 8 9 10 PEKERJAAN

07 POTONGAN B PEKERJAAN REHABILITASI


GEDUNG LPMP JAWA BARAT
AR-07 1 : 150

JUDUL GAMBAR

POTONGAN B

KONTRAKTOR PELAKSANA

1450

1. :
2. :
3. :
4. :
5. :

6. :

plafond +3.90 1200 DIHITUNG / CALCULATION


NO. TANGGAL DIGAMBAR DIPERIKSA DISETUJUI
1.
plafond +3.50 2.
plafond +3.35 3.
4.
SKALA NO. PROYEK NO. GAMBAR
SCALE PROJECT NO. DRAWING NO.

1: 150 AR - 07

You might also like