TASK: CHANGING FUEL OIL FILTERS DURING OIL FIRE HEAT UP. ............................................................................................................................................41
2
TASK: START UP #6 FUEL OIL DISPENSING PUMP. ............................................................................................................................................................................50
TASK: PREPARE SULFURIC ACID TANK FOR SERVICE AFTER CLEANING. ..............................................................................................................................70
3
TASK: START UP SULFUR PUMPS. ...........................................................................................................................................................................................................75
4
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/19/92
Revised: 6/30/97
Written By: London
Reviewed By: MEB
Procedure Number: NWF-JSA-001
5
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/1/89
Revised: 6/30/97
Written By: A. Taylor
Reviewed By: MEB
Procedure Number: NWF-JSA-002
6
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/24/89
Revised: 6/30/97
Written By: P. Iannone
Reviewed By: M.E.B.
Procedure Number: NWF-JSA-003
7
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/11/89
Revised: 6/30/97
Written By: K. Anderson
Reviewed By: MEB
Procedure Number: NWF-JSA-004
8
Job Safety Analysis
Sulfuric Acid Plants
Date: 1/9/90
Revised: 7/1/97
Written By:
Reviewed By: MEB
Procedure Number: NWF-JSA-005
9
Job Safety Analysis
Sulfuric Acid Plants
Date: 8/23/90
Revised: 7/1/97
Written By:
Reviewed By: MEB
Procedure Number: NWF-JSA-006
10
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/15/93
Revised: 7/1/97
Written By: K. Sams
Reviewed By: MEB
Procedure Number: NWF-JSA-007
11
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/10/89
Revised: 7/1/97
Written By: K. Sams
Reviewed By: MEB
Procedure Number: NWF-JSA-008
12
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/14/92
Revised: 7/1/97
Written By: O. Jennings
Reviewed By: MEB
Procedure Number: NWF-JSA-009
13
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/13/92
Revised: 7/1/97
Written By: O. Jennings
Reviewed By: MEB
Procedure Number: NWF-JSA-0010
14
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/16/89
Revised: 7/1/97
Written By: K. Taylor/Rick Rice
Reviewed By: MEB
Procedure Number: NWF-JSA-011
5. Climb ladder to each tower stick test valve. Slipping/falling. Same as three.
6. Open stick test valve, insert stick, time for one Acid mist, chemical burns. Wear acid jacket, face shield, goggles, and rubber
minute, remove stick, and close valve. gloves.
7. Rope sticks to ground. Rope burns, falling sticks. Same as four.
8. Climb down from tower. Slipping/falling, chemical burns. Same as three.
15
Job Safety Analysis
Sulfuric Acid Plants
Date: 4/18/89
Revised: 7/1/97
Written By: L. Spell
Reviewed By: MEB
Procedure Number: NWF-JSA-012
16
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/11/89
Revised: 7/1/97
Written By: K. Anderson
Reviewed By: MEB
Procedure Number: NWF-JSA-013
17
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/11/90
Revised: 7/1/97
Written By: C- Shift
Reviewed By: MEB
Procedure Number: NWF-JSA-014
18
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/14/89
Revised: 7/1/97
Written By: T. Mc Bride
Reviewed By: MEB
Procedure Number: NWF-JSA-015
19
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/12/92
Revised: 7/18/97
Written By: Kent Anderson
Reviewed By: MEB
Procedure Number: NWF-JSA-016
20
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/11/90
Revised: 7/1/97
Written By: C- Shift
Reviewed By: MEB
Procedure Number: NWF-JSA-017
21
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/11/90
Revised: 7/2/97
Written By: C-Shift
Reviewed By: MEB
Procedure Number: NWF-JSA-018
22
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/8/89
Revised: 7/2/93
Written By: Willie Edwards
Reviewed By: MEB
Procedure Number: NWF-JSA-019
23
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/1/90
Revised: 7/2/97
Written By: Ron Pierce
Reviewed By: MEB
Procedure Number: NWF-JSA-020
24
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/14/92
Revised: 7/2/97
Written By: C. Walker
Reviewed By: MEB
Procedure Number: NWF-JSA-021
25
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/9/90
Revised: 7/1/97
Written By: D-shift
Reviewed By: MEB
Procedure Number: NWF-JSA-022
26
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/1/90
Revised: 7/2/97
Written By: A-shift
Reviewed By: MEB
Procedure Number: NWF-JSA-023
27
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/14/89
Revised: 7/1/97
Written By: T. McBride
Reviewed By: MEB
Procedure Number: NWF-JSA-024
28
Job Safety Analysis
Sulfuric Acid Plants
Date: 3/26/90
Revised: 7/2/97
Written By: A-shift
Reviewed By: MEB
Procedure Number: NWF-JSA-025
29
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/10/90
Revised: 7/2/97
Written By: C-shift
Reviewed By: MEB
Procedure Number: NWF-JSA-026
30
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/14/89
Revised: 7/2/97
Written By: T. McBride
Reviewed By: MEB
Procedure Number: NWF-JSA-027
31
Job Safety Analysis
Sulfuric Acid Plants
Date: 3/28/91
Revised: 7/7/97
Written By: J. Ragoonanan
Reviewed By: MEB
Procedure Number: NWF-JSA-028
32
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/16/89
Revised: 7/8/97
Written By: R. Rice
Reviewed By: MEB
Procedure Number: NWF-JSA-029
33
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/8/89
Revised: 7/8/97
Written By: K. Anderson
Reviewed By: MEB
Procedure Number: NWF-JSA-030
34
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/13/89
Revised: 7/8/97
Written By: S. Henry
Reviewed By: MEB
Procedure Number: NWF-JSA-031
35
Job Safety Analysis
Sulfuric Acid Plants
Date: 3/26/90
Revised: 7/8/97
Written By: A shift
Reviewed By: MEB
Procedure Number: NWF-JSA-032
36
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/22/89
Revised: 7/10/97
Written By: J. Ragoonanan
Reviewed By: MEB
Procedure Number: NWF-JSA-033
37
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/3/89
Revised: 7/10/97
Written By: Holcomb
Reviewed By: MEB
Procedure Number: NWF-JSA-034
38
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/3/89
Revised: 7/10/97
Written By: London
Reviewed By: MEB
Procedure Number: NWF-JSA-035
39
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/11/90
Revised: 7/1/97
Written By: C shift
Reviewed By: MEB
Procedure Number: NWF-JSA-036
40
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/11/93
Revised: 7/10/97
Written By: C shift
Reviewed By: MEB
Procedure Number: NWF-JSA-037
Task: Changing fuel oil filters during oil fire heat up.
41
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/1/89
Revised: 7/10/97
Written By: G. London
Reviewed By: MEB
Procedure Number: NWF-JSA-038
42
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/14/89
Revised: 7/10/97
Written By: Kent Anderson
Reviewed By: MEB
Procedure Number: NWF-JSA-039
43
Job Safety Analysis
Sulfuric Acid Plants
Date: 8/23/90
Revised: 7/10/97
Written By:
Reviewed By: MEB
Procedure Number: NWF-JSA-040
44
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/1/90
Revised: 7/10/97
Written By: Ron Pierce
Reviewed By: MEB
Procedure Number: NWF-JSA-041
45
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/1/89
Revised: 7/10/97
Written By: London
Reviewed By: MEB
Procedure Number: NWF-JSA-042
46
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/13/89
Revised: 7/10/97
Written By: T. McBride
Reviewed By: MEB
Procedure Number: NWF-JSA-043
47
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/21/89
Revised: 7/10/97
Written By: B. English
Reviewed By: MEB
Procedure Number: NWF-JSA-044
48
Job Safety Analysis
Sulfuric Acid Plants
Date: 12/25/92
Revised: 7/10/97
Written By: T. McBride
Reviewed By: MEB
Procedure Number: NWF-JSA-045
49
Job Safety Analysis
Sulfuric Acid Plants
Date: 1/12/90
Revised: 7/14/97
Written By: GGR
Reviewed By: MEB
Procedure Number: NWF-JSA-046
50
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/14/92
Revised: 7/14/97
Written By: Oliver Jennings.
Reviewed By: MEB
Procedure Number: NWF-JSA-047
51
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/12/90
Revised: 7/14/97
Written By: GGR
Reviewed By: MEB
Procedure Number: NWF-JSA-048
52
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/14/97
Revised:
Written By: K. Eldridge
Reviewed By: MEB
Procedure Number: NWF-JSA-049
53
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/12/90
Revised: 7/14/97
Written By:
Reviewed By: MEB
Procedure Number: NWF-JSA-050
54
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/6/89
Revised: 7/17/97
Written By: G. Nichols
Reviewed By: MEB
Procedure Number: NWF-JSA-051
55
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/3/89
Revised: 7/17/97
Written By: London
Reviewed By: MEB
Procedure Number: NWF-JSA-052
56
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/17/93
Revised: 7/17/97
Written By:
Reviewed By: MEB
Procedure Number: NWF-JSA-053
57
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/3/89
Revised: 7/17/97
Written By: G. London
Reviewed By: MEB
Procedure Number: NWF-JSA-054
58
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/22/89
Revised: 7/17/97
Written By: S. Henry
Reviewed By: MEB
Procedure Number: NWF-JSA-055
59
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/1/89
Revised: 7/21/97
Written By: G. Holcomb
Reviewed By: MEB
Procedure Number: NWF-JSA-056
60
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/1/89
Revised: 7/21/97
Written By: G. London
Reviewed By: MEB
Procedure Number: NWF-JSA-057
61
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/13/89
Revised: 7/21/97
Written By: JAW
Reviewed By: MEB
Procedure Number: NWF-JSA-058
62
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/14/92
Revised: 7/21/97
Written By: M. Adams
Reviewed By: MEB
Procedure Number: NWF-JSA-059
63
Job Safety Analysis
Sulfuric Acid Plants
Date: 0/14/92
Revised: 2/9/93
Written By: C Walker
Reviewed By: MEB
Procedure Number: NWF-JSA-060
64
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/13/92
Revised: 7/21/97
Written By: Kent Anderson
Reviewed By:
Procedure Number: NWF-JSA-061
65
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/14/92
Revised: 7/21/97
Written By: C. Walker
Reviewed By: MEB
Procedure Number: NWF-JSA-062
66
Job Safety Analysis
Sulfuric Acid Plants
Date: 9/14/92
Revised: 7/21/97
Written By: M. Adams
Reviewed By: MEB
Procedure Number: NWF-JSA-063
67
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/12/90
Revised: 7/22/97
Written By: GGR
Reviewed By: MEB
Procedure Number: NWF-JSA-064
68
Job Safety Analysis
Sulfuric Acid Plants
Date: 8/10/89
Revised: 7/21/97
Written By: Walker/ Bussell
Reviewed By: MEB
Procedure Number: NWF-JSA-065
69
Job Safety Analysis
Sulfuric Acid Plants
Date: 8/10/89
Revised: 7/22/97
Written By: Walker/Bussell
Reviewed By: MEB
Procedure Number: NWF-JSA-066
70
Job Safety Analysis
Sulfuric Acid Plants
Date: 5/22/89
Revised: 7/22/97
Written By: K. Sams
Reviewed By: MEB
Procedure Number: NWF-JSA-067
71
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/3/89
Revised: 9/9/93
Written By: Holcomb
Reviewed By: MEB
Procedure Number: NWF-JSA-068
72
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/3/89
Revised: 7/25/97
Written By: A. Taylor
Reviewed By: MEB
Procedure Number: NWF-JSA-069
73
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/1/89
Revised: 7/10/97
Written By: K. Taylor
Reviewed By: MEB
Procedure Number: NWF-JSA-070
74
Job Safety Analysis
Sulfuric Acid Plants
Date: 6/5/86
Revised: 7/14/97
Written By: Rice/Herbolsheimer
Reviewed By: MEB
Procedure Number: NWF-JSA-071
1. Make sure steam traps are working and sulfur Thermal burns. Wear gloves.
pump and lines are hot.
2. Start pump. Thermal burns. Sulfur leaks. Wear acid jacket, face shield, goggles and gloves.
3. Contact chief by radio. Open discharge valve. Same as 2. Same as 2.
75
Job Safety Analysis
Sulfuric Acid Plants
Date: 2/4/90
Revised: 7/14/97
Written By:
Reviewed By: MEB
Procedure Number: NWF-JSA-072
76
Job Safety Analysis
Sulfuric Acid Plants
Date: 7/24/89
Revised: 7/25/97
Written By: R. Thompson
Reviewed By: MEB
Procedure Number: NWF-JSA-073
77
Job Safety Analysis
Sulfuric Acid Plants
Date: 8/10/89
Revised: 7/22/97
Written By: Walker/Bussell
Reviewed By: MEB
Procedure Number: NWF-JSA-074
78
pump suction. Install blank on pump suction
line.
14. Check that acid levels in adjacent tanks are Acid in lines. Same as 1.
well below over flows. Remove spool piece, or
90 in over flow lines and blank over flow lines
from adjacent tanks.
15. Open manway on tank. Acid in tank. Weight of manway. Same as 1. Use crane or boom truck.
16. Open manway on top of tank. Weight of manway cover. Use crane. Wear safety belt.
17. Install fan on top manway. Weight of fan. Same as 16.
79