E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Elektrownia „Be³chatów” S.A.

Power Station „Be³chatów” S.A.

1
ENERGETYCZNY POTENTAT
ŒRODKOWEJ POLSKI
OD PRZEDSIÊBIORSTWA PAÑSTWOWEGO DO SPÓ£KI AKCYJNEJ

POWER GENERATION POTENTATE


IN CENTRAL POLAND
TRANSITION FROM A STATE-OWNED COMPANY TO A JOINT STOCK
COMPANY

Z gór¹ æwieræ wieku temu, w roku 1975 In 1975, over a quarter century ago,
powo³ana zosta³a do ¿ycia firma pod na- a company „Be³chatów Power Station un-
zw¹ „Elektrownia Be³chatów w budowie”, der construction” was brought into being
która wkrótce mia³a staæ siê najwiêksz¹ and would soon become the largest power
elektrowni¹ w Europie. plant in Europe.
Odkrycie w latach szeœædziesi¹tych bo- The discovery of abundant brown coal
gatych z³ó¿ wêgla brunatnego szacowa- deposits in the 1960s, estimated at 2 thou-
nych na oko³o 2 miliardy ton by³o podsta- sand million tons, led to the decision to
w¹ decyzji odnoœnie budowy Zespo³u Gór- build the Be³chatów Mining and Power
niczo-Energetycznego Be³chatów. W kon- Plant Complex. As a result of a Cabinet Res-
sekwencji Uchwa³y nr 14/75 Rady Mini- olution no 14/75 relating to construction of
strów w sprawie budowy Zespo³u Górni- the Be³chatów Mining and Power Plant
czo-Energetycznego Be³chatów, uznaj¹cej Complex, and recognizing the project to be
tê inwestycjê za szczególnie wa¿n¹ dla go- of particular importance for the national
spodarki narodowej, projekt wprowadzo- economy, it was introduced into a central
2 ny zosta³ do planu centralnego. government plan.
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

W ten sposób w pobli¿u geometrycz- Thus very swiftly, on 29 December 1981,


nego œrodka Polski, nieopodal £odzi, na six years after groundbreaking a first pow-
drodze tranzytowej ³¹cz¹cej wschód i za- er unit located close to the geometric cen-
chód kraju, w iœcie b³yskawicznym tempie tre of Poland, not far from the city of £ódŸ
- w ci¹gu 6 lat od rozpoczêcia prac budow- and east-west highway, was synchronised
lanych - 29 grudnia 1981 roku zsynchroni- with the national grid
zowano z sieci¹ krajow¹ pierwszy blok „Be³chatów ” started producing the
energetyczny. cheapest electricity in Poland. The first pow-
Z „Be³chatowa” pop³ynê³a najtañsza er unit was synchronised with the national
energia elektryczna w Polsce. Z chwil¹ osi¹- grid on 29 December 1981. When the full
gniêcia pe³nej projektowanej mocy zainsta- installed capacity as designed was reached
lowanej, wraz z przekazaniem do eksplo- on 12 October 1988 on the commissioning
atacji w dniu 12 paŸdziernika 1988 ostat- of the last power unit, the Power Station
niego bloku energetycznego, Elektrownia „Be³chatów” took an absolute leadership in
„Be³chatów ” objê³a absolutny prymat the domestic power generating sector.
w krajowej produkcji energii elektrycznej. A dozen 360-MW units with a total capaci-
Dwanaœcie 360 MW-owych bloków o ³¹cz- ty of 4320-MW gave „Be³chatów” a lead not
nej mocy 4320 MW da³o jej pierwszeñstwo only in Poland but also in Europe. Today that
nie tylko w Polsce, ale i w Europie. Dziœ capacity is a history. Due to the modernisa-
wielkoœæ ta nale¿y ju¿ do przesz³oœci. Dziê- tion programme, which was undertaken in
ki podjêtemu w roku 1997 programowi 1997, the power station will soon reach
modernizacji, moc elektrowni osi¹gnie a total capacity of nearly 4500-MW.
wkrótce bez ma³a 4500 MW. Annually the „Be³chatów” Power Sta-
Roczna produkcja energii w be³chatow- tion generates 28 TWh of electric energy,
skiej elektrowni wynosi 28 miliardów kWh, which represents 20% of the total domes-
co stanowi oko³o 20% produkcji krajowej. tic production.
Przekszta³cenia w³asnoœciowe zacho- Privatisation transformations going on
dz¹ce w kraju nie ominê³y równie¿ Elek- in Poland do not omit the „Be³chatów”
trowni „Be³chatów”, która do 30 kwietnia Power Station, which operated as a state-
1999 roku dzia³a³a jako przedsiêbiorstwo owned company until 30 April 1999.
pañstwowe. On 19 March 1999, the Minister of the
W dniu 19 marca1999 roku Minister Skar- State Treasury signed the commercialisation
bu Pañstwa podpisa³ akt komercjalizacji act of the state-owned company and in con-
przedsiêbiorstwa pañstwowego, na podsta- sequence the company, in which the Sate
wie którego do Rejestru Handlowego S¹du Treasury is a sole Shareholder, under the
Rejonowego w Piotrkowie Trybunalskim name „Elektrownia Be³chatów S.A.”, was
wpisana zosta³a Jednoosobowa Spó³ka Skar- entered into the Commercial Register of the
bu Pañstwa pod nazw¹ Elektrownia „Be³- Regional Court in the town of Piotrków Try-
chatów” S.A. bunalski.
Od 1 maja 1999 roku be³chatowski po- Since 1 May 1999, the Be³chatów pow-
tentat energetyczny dzia³a jako Spó³ka Ak- er generating potentate operates as a Joint
cyjna. Stock Company.

Procentowy udzia³ w produkcji energii elektrycznej w Polsce w 2000 r.


Percentage share in production of electric energy in Poland in year 2000

Elektrownia „Be³chatów” S.A.


Power Station „Be³chatów ” S.A.
elektrownie wodne
hydro–power stations
elektrownie przemys³owe
industrial power stations
19,1%
2,8%
5,3%

15,3%

inne elektrownie 57,5%


wêgla brunatnego
other brown coal
fired power
3
stations
elektrownie
wêgla kamiennego
hard coal fired power stations
Z KRONIKARSKIEGO OBOWI¥ZKU
HISTORIA MINIONEGO ÆWIERÆWIECZA

CHRONICLE
HISTORY OF PAST QUARTER-CENTURY

Jedna z najm³odszych polskich One of the newest Polish power


elektrowni obchodzi³a w roku 2000 plants celebrated its 25-th
jubileusz 25-lecia. Rok 2001 to rok anniversary in year 2000. Year
kolejnej wa¿nej rocznicy. 29 grudnia 2001 is another important
mija bowiem 20 lat od momentu anniversary. On 29 December, 20
synchronizacji z sieci¹ pierwszego years will have passed since a first
bloku energetycznego. power units was synchronized with
the national grid.

4
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

09.12.1960 12.09.1975
Odkrycie w rejonie wsi Piaski pok³adu Uchwa³a nr 168 Rady Ministrów w spra-
wêgla brunatnego o mi¹¿szoœci 127 m. wie budowy ZGE Be³chatów okreœlaj¹-
Discovery of brown coal deposits; 127 ca zadania i terminy uzyskania efektów
m thick, in the area of the village Piaski. budowy.
Decree no. 168 issued by the Cabinet
22.06.1971 concerning construction of the
Be³chatów Mining and Power Complex
Decyzja nr 143/71 Prezydium Rz¹du zo-
determining tasks and schedules of con-
bowi¹zuj¹ca ministra Górnictwa i Ener-
struction.
getyki do wykonania Za³o¿eñ Technicz-
no-Ekonomicznych Kombinatu Paliwo-
wo Energetycznego Be³chatów. 18.10.1975
Decision no. 143/71 issued by the Pre- Uzyskanie pozwolenia na budowê.
sidium of the Government obligating
Received permission for construction.
the Minister of Mining and Power In-
dustry to carry out Technical and Busi-
ness Assumptions for the Be³chatów 06.04.1977
Mining and Power project. Pocz¹tek cyklu podstawowego budowy.
Began the basic phase of construction.
19.03.1974
Pierwsze zamówienie maszyn i urz¹- 29.12.1981
dzeñ dla Elektrowni „Be³chatów”.
Synchronizacja 1-go bloku z sieci¹ kra-
First order for machines and equipment jow¹.
for the „Be³chatów” Power Station.
Synchronised the power unit no. 1
01.01.1975 •
Synchronizacja 2-go bloku z sieci¹ kra-
Powo³anie Zespo³u Elektrowni Be³cha-
jow¹ (2.03.1983), 3-go bloku (12.12.1983),
tów w budowie.
4-go bloku (29.06.1984), 5-go bloku
Formed the Corporation Be³chatów (17.12.1984), 6-go bloku (5.07.1985), 7-go
Power Station under construction. bloku (12.12.1985), 8-go bloku
(26.05.1986), 9-go bloku (13.07.1986),
17.01.1975 10-go bloku (14.06.1987), 11-go bloku
Uchwa³a nr 14/75 Rady Ministrów (2.06.1988), 12-go bloku (24.08.1988).
w sprawie budowy Zespo³u Górniczo Unit 2 synchronised with national grid
- Energetycznego Be³chatów uznaj¹ca (2.03.1983), unit 3 (12.12.1983), unit 4
tê inwestycjê za szczególnie wa¿n¹ dla (29.06.1984), unit 5 (17.12.1984), unit 6
gospodarki narodowej i wprowadza- (5.07.1985), unit 7 (12.12.1985), unit 8
j¹ca j¹ do planu inwestycyjnego na (26.05.1986), unit 9 (13.07.1986), unit 10
1975 r. (14.06.1987), unit 11 (2.06.1988), unit 12
Decree no. 14/75 issued by the Cabinet (24.08.1988).
concerning construction of the
Be³chatów Mining and Power Complex 12.10.1988
recognising a particular importance of
that project for the national economy Przekazanie 12-go bloku do eksploatacji.
and introducing it into the 1975 invest- Commissioned the 12th unit.
ments plan.
18.10.1988
21.07.1975
Elektrownia osi¹ga po raz pierwszy
Rozpoczêcie robót makroniwelacyj- moc 4320 MW.
nych w rejonie budynku g³ównego.
For the first time, the power station
Started macrolevelling of the ground in reached a capacity of 4320 MW.
the area of the main building.
5
15.06.1991 19.03.1999
Podpisanie kontraktu z holendersk¹ fir- Minister Skarbu Pañstwa podpisa³ akt
m¹ HTS E&E na budowê pierwszych komercjalizacji, na podstawie którego
w Polsce, instalacji odsiarczania spalin. Jednoosobowa Spó³ka Skarbu Pañstwa
W ramach kontraktu wybudowano in-
pod nazw¹ Elektrownia „Be³chatów”
stalacje na blokach 8,10,11,12.
S.A. zosta³a wpisana do Rejestru Han-
Signed the contract with the Dutch
dlowego S¹du Rejonowego w Piotrko-
company HTS E&E for construction of
wie Trybunalskim.
the first Polish, Flue Gas Desulphurisa-
tion installations (FGD) at units Minister of the State Treasury signed
8,10,11,12. a commercialisation act based on which
the company, in which the Sate Treas-
31.12.1993 ury is a sole Shareholder, under the
Zamkniêcie finansowania inwestycji name „Elektrownia Be³chatów S.A.”
centralnej „Budowa Elektrowni Be³cha- (Be³chatów Power Station Joint Stock
tów 12x360 MW” i rozpoczêcie sp³aty Company), was entered into the Com-
kredytu. mercial Register of the Regional Court
Financial Close of the central govern- in the town of Piotrków Trybunalski.
ment project „Construction of the
Be³chatów Power Station 12x360 MW”
and start of loan repayment. 1.05.1999

29.09.1994 Rozpoczêcie funkcjonowania spó³ki


prawa handlowego pod nazw¹ Elek-
Przekazanie do eksploatacji pierwszej in- trownia „Be³chatów” S.A.
stalacji odsiarczania spalin na bloku nr 10.
Put into operation the first FGD instal- Started operation of the Commercial
lation at unit 10. Code company under the name „Ele-
ktrownia Be³chatów S.A.”
12.08.1996
Powo³anie spó³ki z ograniczon¹ odpowie- 27.09.1999
dzialnoœci¹ „Elektrownia Be³chatów II”
Set up the limited liability company Pierwszy etap w procesie prywatyzacji
„Be³chatów II Power Station” spó³ki - z³o¿enie w Ministerstwie Skar-
bu Pañstwa wniosku o prywatyzacjê
22.11.1997 przedsiêbiorstwa.
Mija 1.000.000 godzin pracy wszystkich First stage of privatisation - filing appli-
bloków energetycznych zainstalowa- cation at the Ministry of Treasury to pri-
nych w Elektrowni „Be³chatów”. vatise the company.
All power units, which had been in-
stalled at the Be³chatów Power Station
worked for 1.000.000 hours. 16.02.2000

12.10.1998 Powo³anie do ¿ycia Niepublicznego Za-


k³adu Opieki Zdrowotnej „MegaMed”
Prezes Urzêdu Regulacji Energetyki sp. z o.o. Spó³ka powsta³a na bazie Za-
udzieli³ Elektrowni „Be³chatów” konce- k³adu Przychodnia Zdrowia Elektrow-
sje na: wytwarzanie energii elektrycz-
ni „Be³chatów” S.A.
nej, wytwarzanie ciep³a, przesy³anie
i dystrybucjê ciep³a. Established a Non-public Health Cen-
President of the Power Sector Regula- tre „MegaMed” Ltd., based on former
tion Office granted the Be³chatów Pow- Health Care Division of the Power Sta-
er Station with a licence for: generation tion „Be³chatów” S.A.
of electricity, production of heat, trans-
6 mission and distribution of heat.
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

15.04.2000 23.12.2000
Ministerstwo Skarbu Pañstwa poinfor- Oœrodek Certyfikacji Wyrobów i Syste-
mowa³o, ¿e Konsorcjum KPMG Polska mów Zarz¹dzania Centralnego Instytu-
i Credit Suisse First Boston bêdzie do- tu Ochrony Pracy poinformowa³
radza³o ministrowi skarbu przy prywa- o przyznaniu certyfikatu Systemu Za-
tyzacji Elektrowni „Be³chatów” i Kopal- rz¹dzania BHP w zgodzie z wymaga-
ni Wêgla Brunatnego „Be³chatów”. niami normy PN-N-18001:1999 w Wy-
Ministry of State Treasury informed that dziale Ciep³ownictwa WG oraz Dziale
a consortium of companies KPMG Pol- Warsztatów Remontów Urz¹dzeñ Elek-
ska and Credit Suisse First Boston trycznych RE1.
would be an advisor of the Ministry of
Products and Management Systems
Treasury at privatisation of the
Certification Centre of the Central Work
„Be³chatów” Power Station and the
Safety Institute informed that a certifi-
„Be³chatów” Brown Coal Mine.
cate of Work Safety Management Sys-
tem was granted in accordance with
requirements of standard PN-N-
sierpieñ - paŸdziernik 2000
18001:1999 for Heat Department WG
August - October 2000 and for Electrical Appliances Overhaul
Prowadzenie analizy przedprywatyza- Workshop RE1.
cyjnej przez Konsorcjum KPMG Polska
i Credit Suisse First Boston zakoñczone
02.02.2001
przed³o¿eniem w grudniu 2000 r. w Mi-
nisterstwie Skarbu Pañstwa raportu
Przekazanie do eksploatacji rozdzielni
z analizy.
110 kV, umo¿liwiaj¹cej sprzeda¿ ener-
Pre-privatisation study conducted by gii na rynku lokalnym.
the consortium KPMG Polska and Cred-
The 110 kV switching station commis-
it Suisse First Boston resulted in a re-
sioned which allowed selling electrici-
port submitted at the Ministry of the
State Treasury in December 2000. ty at a local energy market.

20.10.2000 12.04.2001

Konferencja podsumowuj¹ca obchody Podpisanie aktu notarialnego zawi¹-


25-lecia Elektrowni „Be³chatów”. zania spó³ki z ograniczon¹ odpowie-
dzialnoœci¹ ELBEST. Spó³kê utworzo-
A conference summarising the 25th an-
no na bazie maj¹tku i pracowników
niversary of the „Be³chatów" Power Sta-
Oddzia³u ZST - Restauracje, Hotele,
tion.
Turystyka oraz czêœci Zak³adu Us³ug
Wewnêtrznych Elektrowni „Be³cha-
13.12.2000 tów” S.A.

Skreœlenie Elektrowni „Be³chatów” S.A. Signed a deed recorded by a notary es-


z listy zak³adów najbardziej uci¹¿li- tablishing a limited liability company
wych dla œrodowiska w skali kraju - tzw. ELBEST. The company was spin-off
„Listy 80-ciu” based on assets and human resources
Power Station „Be³chatów” S.A. put off of the Division Social Services - Restau-
the list of domestic plants most burden- rants, Hotels, Tourism, using partly re-
some to the environment - so called sources of the Division of Internal
„List of the 80”. Services of the Power Station
„Be³chatów” S.A.
7
TECHNOLOGIA
JAK WÊGIEL STAJE SIÊ PR¥DEM

TECHNOLOGY
ELECTRICITY DERIVED FROM COAL

Projekt techniczny budowy The design of the „Be³chatów” Power


Elektrowni „Be³chatów” opracowany Station that had been worked out in
zosta³ w latach 70-tych, zgodnie the 1970s envisaged the most
z najnowoczeœniejszymi wówczas modern engineering solutions
rozwi¹zaniami technicznymi applied in the power generation
stosowanymi w energetyce. industry at that time. The installed
Zainstalowane tu najnowszej state-of-the-art equipment and
generacji urz¹dzenia i uk³ady process systems come from
technologiczne pochodz¹ od reputable domestic and foreign
renomowanych producentów power generating equipment
urz¹dzeñ energetycznych krajowych suppliers.
i zagranicznych.

8
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Cykl produkcji energii elektrycznej roz- The electricity generation cycle begins
poczyna siê w pobliskiej Kopalni Wêgla Bru- with handling brown coal from the neigh-
natnego. W³aœnie stamt¹d lub z placu sk³a- bouring opencast mine or storage area (av-
dowego, zwanego placem uœredniania, eraging plant) to the station. The coal is
wêgiel trafia do elektrowni. Dostarczany jest supplied via belt conveyors and goes
przenoœnikami taœmowymi, a nastêpnie, through a distributing unit located on site.
poprzez wêze³ rozdzielczy znajduj¹cy siê na By means of the three coal handling gal-
terenie elektrowni, za pomoc¹ trzech gale- leries it is delivered to boilers.
rii nawêglania przekazywany jest do kot³ów. The steam boilers installed in the power
Kot³y parowe produkcji RAFAKO Raci- station were made by RAFAKO Racibórz Co.
bórz S.A. (na licencji firmy Sulzer) zainsta- (licensed by Sulzer). They are equipped with
lowane w elektrowni, wyposa¿one s¹ w in- slag removal hydraulic devices and ash re-
stalacje hydraulicznego od¿u¿lania i hy- moval hydraulic or pneumatic devices.
draulicznego oraz pneumatycznego odpo- The high parameter (pressure and tem-
pielania. perature) reheated steam, generated in
Wytworzona w kotle para przegrzana a boiler flows through pipelines to the tur-
o wysokich parametrach (ciœnienia i tem- bine made by Zamech Elbl¹g (licensed by
peratury), przep³ywa ruroci¹gami do tur- BBC). Reheated steam expands in the tur-
biny wyprodukowanej przez Zamech El- bine resulting in the conversion of heat into
bl¹g (na licencji firmy BBC). W turbinie mechanical energy. The mechanical ener-
para rozprê¿a siê, czemu towarzyszy prze- gy generated in the turbine is sent through
kszta³cenie energii cieplnej w mechanicz- a shaft to the generator, made by Dolmel
n¹. Energia mechaniczna wytworzona Wroc³aw, where it is converted into electri-
w turbinie, przekazywana jest poprzez cal power. In order to make more efficient
sprzêg³o na wa³ wirnika generatora pro- use of heat being a by-product of electrici-
dukcji Dolmel Wroc³aw i nastêpuje prze- ty generation, combined heat and power
tworzenie energii mechanicznej w elek- generation is applied and the last three
tryczn¹. W celu efektywniejszego wyko- power units have been adapted for district
rzystania ciep³a powstaj¹cego przy pro- heating operations. The heat bleeding from
dukcji energii elektrycznej, w ramach tzw. turbines is used to heat the town of
produkcji skojarzonej, trzy ostatnie bloki Be³chatów and the neighbouring industri-
energetyczne pracuj¹ jako bloki ciep³ow- al plants.
nicze. Ciep³o z upustów turbin wykorzysty- Production of electricity is associated
wane jest do ogrzewania miasta Be³chato-
wa i pobliskich zak³adów przemys³owych.
with emission of flue gas and wastes such
as ash and slag. Ash and slag (limited 9
W procesie produkcji energii elektrycz- amounts) are transported through hydrau-
nej powstaj¹ spaliny oraz popió³ i ¿u¿el. lic system into the „Lubieñ” wet storage
¯u¿el oraz popió³ (w ograniczonych ilo- yard for furnace wastes, while dry ash from
œciach) transportowany jest hydraulicznie hoppers under precipitators is transport-
na sk³adowisko mokre odpadów paleni- ed to the mine and, after being mixed with
skowych „Lubieñ”, zaœ suchy popió³ z le- mine strippings, is disposed of into an ex-
jów popio³owych pod elektrofiltrami trans- cavation. Flue gas is directed into electro-
portowany jest do kopalni, gdzie po zmie- static precipitators of high efficiency, where
szaniu z nadk³adem, deponowany jest particulates are almost hundred percent

w wyrobisku. Zanieczyszczone spaliny s¹ removed. Flue gases discharged by units


kierowane do wysokosprawnych elektro- 5, 6, 8, 10, 11 & 12 and cleaned in precipita-
filtrów, gdzie nastêpuje ich prawie stupro- tors are brought into flue gas desulphuri-
centowe odpylenie. Spaliny z bloków nr 5, sation installations (FGD), where chiefly
6, 8, 10, 11 i 12 po przejœciu przez elektro- sulphur dioxide (SO2) is removed. Average
filtry, podawane s¹ do instalacji odsiarcza- desulphurisation efficiency is over 93%.
nia spalin (IOS), gdzie nastêpuje usuwa- High grade gypsum being a by-product of
nie dwutlenku siarki (SO2). SprawnoϾ IOS flue gas desulphurisation process is used
wynosi œrednio ponad 93 %. Produktem to make building materials.
procesu odsiarczania spalin jest wysokiej Until recently the electrical power was
jakoœci gips, który jest wykorzystywany do fed from the power station into the domes-
produkcji materia³ów budowlanych. tic system through 220 and 400 kV switch-
Do niedawna moc elektryczna wyprowa- ing stations. In February 2001, after 14
dzona by³a z elektrowni do systemu krajo- months from start of a project, the 110 kV
wego poprzez rozdzielnie 220 i 400 kV. W lu- switching station was put to operation,
tym 2001 roku, po trwaj¹cym 14 miesiêcy which allows supply of electricity to a lo-
procesie inwestycyjnym, nast¹pi³o przekaza- cal grid without extraneous transformation
nie do eksploatacji rozdzielni 110 kV. Umo¿- losses at higher voltage transformers.
liwia to dostarczanie energii elektrycznej bez- The Station’s power units, operate with-
poœrednio do systemu sieci lokalnych bez in the National Power System. The Nation-
dodatkowych strat transformacji, w trakcie al Dispatching Centre sends, under the
przesy³u przez kolejne transformatory automatic adjustment of the system’s pow-
w uk³adach najwy¿szych napiêæ. er and frequency, a power setpoint signal
Bloki energetyczne Elektrowni „Be³cha- for each power unit - in the range of 290-
10 tów” pracuj¹ w Krajowym Systemie Ener-
getycznym. Krajowa Dyspozycja Mocy
370 MW. The group adjustment for eco-
nomical distribution of load installed at the
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Ukad technologiczny Elektrowni „Be³chatów” S.A.


Technology scheme of Power Station „Be³chatów”

11
(KDM) przesy³a, w ra- Power Station performs
mach regulacji czêstotli- a secondary distribu-
woœci i mocy systemu, tion of power, which is
sygna³ mocy zadanej preset for the entire sta-
dla ka¿dego z bloków - tion, by distributing
w przedziale 290-370 power between indi-
MW. Zainstalowany vidual units according
w Elektrowni „Be³cha- to economical criteria.
tów” S.A. regulator gru- The power units’
powy ERO (ekonomicz- components are con-
ny rozdzia³ obci¹¿enia) trolled from the units’
dokonuje wtórnego control rooms (one
rozdzia³u mocy, zadanej room for each two
dla ca³ej elektrowni, rozdzielaj¹c moc na units). The control room of the Power Sta-
poszczególne bloki wed³ug kryterium eko- tion Supervisor is a control centre for op-
nomicznego rozdzia³u obci¹¿eñ. eration of the entire power station.
Sterowanie wszystkimi urz¹dzeniami
bloków energetycznych odbywa siê z na-
stawni blokowych (jedna dla dwóch blo-
ków). Centrum sterowania ruchem elek-
trowni stanowi nastawnia Dy¿urnego In-
¿yniera Ruchu Elektrowni.

12
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Bilans 1 kWh
Balance of 1 kWh

13
W ZGODZIE Z NATUR¥
CZYSTA MOC XXI WIEKU

IN HARMONY WITH NATURE


PURE ENERGY OF THE XXI CENTURY

Ostatnie lata XX wieku to czas The last decade of the XX century


szczególnej wra¿liwoœci was a time of particular
spo³eczeñstw na potrzeby ochrony environmental sensitivity for
œrodowiska naturalnego. Równie¿ growing number of nations. The
zak³ady przemys³owe przy³¹czy³y siê industrial plants also have joined
do intensywnych dzia³añ na rzecz the intense actions aimed at
zminimalizowania negatywnego minimising the harm done to the
wp³ywu na œrodowisko naturalne. environment. The Power Station
Elektrownia „Be³chatów” S.A. jest „Be³chatów” S.A. is one of Polish
jednym z najbardziej zaanga¿o- companies most engaged in this
wanych w ten proces polskich process.
przedsiêbiorstw.

14
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

ZIELONA ENERGIA
ŒWIAT ROŒLINNY OKOLIC BE£CHATOWA

GREEN ENERGY
FLORA IN THE COUNTRYSIDE
OF BE£CHATÓW

Be³chatów i jego najbli¿sze okolice le¿¹ The town of Be³chatów and its sur-
na pograniczu Wysoczyzny Be³chatowskiej roundings are located at the border of the
i Kotliny Szczercowskiej. S¹ to dwie jed- Be³chatów Upland and the Szczerców Dale
nostki geograficzne ró¿ni¹ce siê od siebie - two geographical units that differ in re-
rzeŸb¹ terenu i budow¹ geologiczn¹. Tere- lief and geological structure. The area of
ny obecnego Be³chatowa i pobliskich oko- Be³chatów and its neighbourhood had
lic przed wielu tysi¹cami lat pokrywa³y been covered with woods many thousand
lasy, czego dobitnym przyk³adem s¹ years ago, which is proved by abundant
ogromne z³o¿a wêgla brunatnego. W ist- brown coal deposits. Woods in the coun-
niej¹cych obecnie lasach wystêpuje zró¿- tryside have a diversified and rich flora
nicowana i bogata szata roœlinna. Mo¿na where one can discover rare and protect-
spotkaæ tu rzadkie i chronione gatunki ro- ed plants. Everybody concerned with en-
œlin, a co cieszy wszystkich, s¹ to gatunki vironmental protection is happy to find out
wskazuj¹ce na niski poziom stê¿enia zanie- that the species of existing plants, e.g. cup-
czyszczeñ np. chrobotek, p³ucnica islandz- moss, Iceland moss, sundew round-leaved,
ka, rosiczka okr¹g³olistna, czworolist po- true-love, helleborine, orchid broad-
spolity, kruszczyk b³otny, storczyk szero- leaved, clavariaceous edible fungus, marsh
kolistny, szmaciak ga³êziasty, bagno zwy- tea, club-moss, cotton grass narrow-leaved
czajne, wid³aczek, we³nianka w¹skolistna and many other, indicate low levels of en-
i wiele innych. vironmental pollution.

Prowadzone od wielu lat prace badaw- Environmental research conducted for


cze wokó³ elektrowni, wykonywane przez many years around the station by inde-
niezale¿ne instytucje naukowe, (niektóre pendent scientific institutions, (some of
rozpoczête jeszcze przed uruchomieniem them had been begun before the station
elektrowni) wykazuj¹ jednoznacznie, i¿ started operation) indicated definitely, that
wp³yw Elektrowni „Be³chatów” na takie environmental impact of the „Be³chatów”
elementy œrodowiska jak ha³as, zagro¿enie Power Station such as noise, radiation, in-
radiologiczne, wody powierzchniowe fluence on surface and ground water and
i podziemne, stan roœlinnoœci jest niewiel- condition of flora is slight and unnoticea- 15
ki i praktycznie niezauwa¿alny. ble in fact.
OCHRONA POWIETRZA ATMOSFERYCZNEGO
PROTECTION OF THE ATMOSPHERE

OGRANICZENIE EMISJI PY£ÓW


REDUCTION OF PARTICULATES
EMISSION

Ze wzglêdu na Because protection of


wagê zagadnienia, ja- atmospheric air is an im-
kim jest ochrona po- portant issue and re-
wietrza atmosferyczne- garding mandatory le-
go oraz z uwagi na obo- gal regulations in Poland
wi¹zuj¹ce w Polsce as well as decisions is-
przepisy prawne i de- sued by local authorities,
cyzje wydawane przez the „Be³chatów” Power
lokalne w³adze admini- Station has developed
stracyjne, w Elektrow- pollutants monitoring
ni „Be³chatów” zosta³y systems, which com-
rozbudowane systemy prise continuous meas-
monitoringu zanie- urements of emissions
czyszczeñ sk³adaj¹ce through all power units
siê z ci¹g³ych pomia- and measurements of
rów emisji ze wszystkich bloków energe- pollutants imissions in surrounding of
tycznych oraz pomiary imisji zanieczysz- Be³chatów.
czeñ w okolicach Be³chatowa. Each boiler at the „Be³chatów” Power
Ka¿dy z kot³ów Elektrowni „Be³cha- Station has been equipped with a double
tów” wyposa¿ony jest w podwójny trzy- three-zone electrostatic precipitator. Aver-
strefowy elektrofiltr. Œrednia skutecznoœæ age particulate removal efficiency reaches
odpylania spalin wynosi 99,6%. Py³ wy- 99,6%. Fly-ash captured in chambers of the
chwycony w komorach elektrofiltra do- precipitators is transported into the ash
prowadzany jest do zbiorników popio³o- tanks and from them into the tank pumps.
wych, a z nich do pomp zbiornikowych. From the pumps, the ash is forced by com-
Z pomp, za pomoc¹ sprê¿onego powietrza, pressed air through steel pipelines into re-
popió³ przesy³any jest stalowymi ruroci¹- tention tanks. Accumulated ash may be dis-
gami do zbiorników retencyjnych. Nagro- posed of in three ways:
madzony w nich popió³ mo¿e byæ odpro- • basically; to dampers (granulators),
wadzany nastêpuj¹cymi sposobami : from where after moistening with wa-
• podstawowo do nawil¿aczy (granula- ter it is directed onto a train of belt con-
torów), sk¹d po zwil¿eniu wod¹ odpro- veyors, and after being mixed with mine
wadzany jest na ci¹g przenoœników ta- strippings it is disposed of into the ex-
œmowych i po wymieszaniu z nadk³a- cavation of the Be³chatów Brown Coal
dem deponowany jest w wyrobisku Mine (this is around 70% of total fur-
KWB „Be³chatów” (stanowi to oko³o nace wastes),
70% ca³oœci odpadów paleniskowych), • in case of emergency; into a hydraulic
• awaryjnie do uk³adu hydroodpopiela- disposal system at the „Lubieñ” settling
nia na skladowisko „Lubieñ”. pond.

16
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

OGRANICZENIE EMISJI DWUTLENKU SIARKI


REDUCTION OF SULPHUR DIOXIDE
EMISSION

Projekt techniczny budowy elektrowni The design of the power station that
opracowywany w latach 70-tych nie przewi- had been worked out in the 1970s did
dywa³ specjalnych technicznych rozwi¹zañ not anticipate any technical solutions
maj¹cych na celu ograniczenie emisji tlenków aimed at limiting sulphur oxides emis-
siarki poniewa¿ w owym czasie technologie sions, because at that time the flue gas
odsiarczania spalin by³y ma³o znane i stoso- desulphurisation technologies were
wane jedynie w formie eksperymentalnej. hardly known and were only in the test-
W latach 1988 - 1990 w Elektrowni „Be³cha- ing phase. From 1988 to 1990, the
tów” przeprowadzono rozeznanie w zakre- „Be³chatów ” Power Station investigated
sie zaawansowania prac badawczych nad developments in Polish desulphurisa-
polskimi metodami odsiarczania spalin jak tion technologies as well as those ap-
równie¿ zebrano informacje na temat tech- plied worldwide. From 1994 to 1996, the

nologii odsiarczania stosowanych na œwie- Dutch company HTS constructed at


cie. W latach 1994-1996 holenderska firma units 8,10, 11 and 12 first four flue gas
HTS wybudowa³a pierwsze cztery instalacje desulphurisation (FGD) installations
odsiarczania spalin pracuj¹ce w technologii that used the wet limestone-gypsum
mokrej wapienno-gipsowej na blokach nr 8, desulphurisation process. From 1999 to
10, 11 i 12, a w latach 1999-2000 zosta³y wy- 2000, two further FGDs (also wet lime-
budowane i uruchomione nastêpne dwie in- stone-gypsum) were constructed and
stalacje odsiarczania spalin (równie¿ w tech- put into operation at units 5 and 6 by
nologii mokrej) na blokach 5 i 6 przez polsk¹ the Polish company Rafako. Presently
firmê Rafako. W chwili obecnej w Elektrow- the „Be³chatów ” Power Station operates
ni „Be³chatów” pracuje 6 instalacji odsiarcza- 6 FGDs at units 5, 6, 8, 10, 11 and 12.
nia spalin na blokach nr 5, 6, 8, 10, 11 i 12. 17
Schemat Instalacji Odsiarczania Spalin
Plan of Flue Gas Desulphurisation

18
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Instalacje te charakte- The efficiency of des-


ryzuj¹ siê bardzo wysok¹ ulphurisation is very
skutecznoœci¹ odsiarcza- high for those installa-
nia (œrednia za rok 2000 tions (in year 2000 aver-
dla 6 instalacji wynios³a age efficiency for the 6
92,97 %) i prawie 100% installations was 92,97%)
dyspozycyjnoœci¹. W 2000 and their availability is
roku zosta³o zredukowa- nearly 100%. In 2000, SO2
ne ponad 208 tys. ton SO2. emission was reduced by
W zwi¹zku z pogarszaj¹- more than 208 thousand
c¹ siê jakoœci¹ wêgla do- tons. Due to the deterio-
starczanego przez Kopal- rating quality of the coal
niê Wêgla Brunatnego „Be³chatów” podjê- supplied by the Be³chatów Brown Coal
to decyzjê o budowie nastêpnych dwóch in- Mine (high sulphur contents), it was de-
stalacji. Przetarg na budowê tych instalacji cided to construct further two FGD instal-
zosta³ rozstrzygniêty w marcu 2000 roku. lations. In March 2000, a tender for con-
Wygra³a ponownie firma Rafako, która do struction of those installations was award-
2003 roku wybuduje instalacje odsiarczania ed again to Rafako company. Through 2003,
spalin na blokach nr 7 i 9, równie¿ w tech- Rafako will construct FGD installations at
nologii mokrej wapienno-gipsowej. units 7 & 9, using also the wet limestone-
Zakoñczenie kolejnego etapu wyposa- gypsum technology. The completion of the
¿ania bloków energetycznych w te instala- subsequent phase in FGDs construction
cje pozwoli na ograniczenie emisji SO2 will allow an additional SO2 reduction by
o kolejnych 70 tys. ton. 70 thousand tons per year

19
OGRANICZANIE EMISJI TLENKÓW AZOTU
REDUCTION OF NITROGEN
OXIDES EMISSION

Równie wa¿ne jak ograniczanie emisji Of equal importance to the reduction


dwutlenku siarki jest ograniczanie emisji of sulphur-dioxide emission is the cutting
tlenków azotu (NOx). Jest to grupa zwi¹z- of nitrogen oxides (NOx) emissions. These
ków bêd¹cych produktem spalania, któr¹ compounds are products of combustion,
jest niezwykle trudno wyeliminowaæ ze which are extremely difficult to remove
spalin za kot³em. W 1992 roku w celu ogra- from post-combustion flue gas. In 1992 pri-
niczenia emisji zwi¹zków azotu wprowa- mary methods of NOx emission control, by
dzono w Elektrowni „Be³chatów” metody way of combustion process optimisation,
pierwotne ograniczania emisji NOx pole- were introduced in the „Be³chatów” Power
gaj¹ce na optymalizacji procesu spalania. Station. Excess of air in the boiler was opti-
Zoptymalizowano nadmiar powietrza mised from 4,5% down to 2,8%. A refur-
w kotle z 4,5 % do 2,8 %. Zmodernizowa- bishment was also performed on the auto-
no tak¿e uk³ady automatycznej regulacji matic regulation systems and actuators of
i elementy wykonaw- process trains that are
cze urz¹dzeñ ci¹gów responsible for optimi-
technologicznych odpo- sation of boilers opera-
wiedzialnych za realiza- tional parameters. As
cjê zoptymalizowanych a result of those actions,
parametrów pracy ko- a reduction of NO x
t³ów. W wyniku wspo- emission by around 40%
mnianych dzia³añ osi¹- was achieved, that
gniêto redukcjê NO x means; down from 77
o ok. 40%, z 77 tys. ton/ thousand tons in 1991 to
rok w 1991 r. do ok. 40 about 40 thousand tons
tys. ton/rok w 1992 roku in 1992. This reduction
i mniej wiêcej taki po- level is still being main-
ziom utrzymywany jest tained today.
do dnia dzisiejszego.

20
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

GIPS Z IOS
ODPAD CZY PRODUKT

FGD GYPSUM
WASTE OR BY-PRODUCT?

Produktem ubocz- Gypsum is a by-


nym funkcjonowania product of the wet lime-
instalacji odsiarczania stone-gypsum flue gas
spalin metod¹ mokr¹ desulphurisation proc-
jest gips. Gips z IOS ess. The FGD gypsum
w Elektrowni „Be³cha- produced by the Pow-
tów” S.A. charaktery- er Station „Be³chatów”
zuje siê bardzo dobry- S.A. is characterised by
mi parametrami fizyko- extremely good physi-
chemicznymi, które zo- cal and chemical pa-
sta³y potwierdzone nie rameters, which have
tylko pomiarami gwarancyjnymi i ci¹g³¹ been confirmed not only by guarantee
kontrol¹ laboratoryjn¹, lecz równie¿ przez measurements and continuous laborato-
jego g³ównego odbiorcê - potentata w bran- ry control but also by the main custom-
¿y przetwórstwa gipsowego - firmê KNAUF. er - a leader in gypsum processing indus-
Zarz¹d Elektrowni „Be³chatów” S.A. zda- try - the KNAUF company. Management
j¹c sobie sprawê, i¿ gips syntetyczny jest of the Power Station „Be³chatów” S.A., re-
nowym produktem na polskim ryn- alising that the synthetic gypsum is a new
ku, podejmowa³ i nadal podej- product in the Polish market, has been tak-
muje dzia³ania maj¹ce na ing actions to ensure its full commercial uti-
lisation. A growing number of companies
in Poland are starting to manufacture gyp-
sum building elements based on the FGD
synthetic gypsum. The German com-
pany KNAUF, which manufactures
gypsum plasterboards in their
factory located next to the
power station, is the first

21
celu zapewnienie jego pe³nego wykorzy- and the biggest consumer of gypsum from
stania. Coraz wiêcej firm rozpoczyna w Pol- the Power Station „Be³chatów” S.A. Oth-
sce produkcjê gipsu budowlanego i ró¿ne- er companies utilising the FGD gypsum
go rodzaju prefabrykatów budowlanych from the station include Arel Gips - man-
w³aœnie w oparciu o gips syntetyczny z in- ufacturer of gypsum building elements,
stalacji odsiarczania spalin. Pierwszym gypsum binders and plasters and Polish
i najwiêkszym odbiorc¹ gipsu z Elektrow- cement plants. It is certainly a success,
ni „Be³chatów” S.A. jest niemiecka firma that since August 1998 the total FGD gyp-
KNAUF, która w swojej fabryce zlokalizo- sum produced by the Power Station
wanej w pobli¿u elektrowni produkuje p³y- „Be³chatów” S.A. has been commercially
ty kartonowo - gipsowe. Inne przedsiêbior- utilised and there is no need to store re-
stwa, które wykorzystuj¹ gips z IOS w Elek- maining amounts.
trowni „Be³chatów” S.A. to m.in. Arel Gips
Annual production of gypsum by six
- producent gipsu budowlanego, spoiw i tyn-
Flue Gas Desulphurisation installations
ków gipsowych oraz polskie cementownie.
amounts to over 600 thousand tons.
Niew¹tpliwym sukcesem jest to, i¿ od sierp-
nia 1998 roku ca³oœæ gipsu wyprodukowa-
nego w Elektrowni „Be³chatów” S.A. jest wy-
korzystywana gospodarczo i nie ma ko-
niecznoœci sk³adowania nadwy¿ek.
Roczna produkcja gipsu z szeœciu In-
stalacji Odsiarczania Spalin to ponad
600 tys. ton.

22
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

DALSZE DZIA£ANIA FURTHER


NA RZECZ OCHRONY ENVIRONMENTAL ACTIVITIES
ŒRODOWISKA W ELEKTROWNI AT THE POWER STATION
„BE£CHATÓW” S.A. „BE£CHATÓW” S.A.

Do najwa¿niejszych zagadnieñ w za- The most important environmental is-


kresie ochrony œrodowiska, które wyma- sues requiring further intense activities
gaj¹ dalszych intensywnych dzia³añ ze on part of the Power Station „Be³chatów”
strony Elektrowni „Be³chatów” S.A. na- S.A. are the following:
le¿¹:
• further reduction of sulphur dioxide
• dalsze ograniczenie emisji dwutlen- emission by means of constructing
ku siarki poprzez budowê kolejnych subsequent Flue Gas Desulphurisa-
Instalacji Odsiarczania Spalin (bloki tion installations (at units 7 and 9),
7 i 9),
further reduction of
• dalsze ograniczenie nitrogen oxides emis-
emisji tlenków azo- sion by means of en-
tu poprzez udosko- hancing the primary
nalenie wprowa- methods of NOx emis-
dzonych metod sion control and work-
pierwotnych oraz ing out the boilers
opracowanie planu modernisation plan
modernizacji ko - with application of
t³ów z zastosowa- low-emission burners
niem palników ni- under the Power Sta-
skoemisyjnych tion's units refurbish-
w ramach planu ment schedule after
modernizacji blo- year 2007,
ków energetycz-
• introduction of a
nych w Elektrowni
new technology for
„Be³chatów” S.A. po
furnace wastes storage
roku 2007,
in the opencast of the
• wprowadzenie no- Be³chatów Brown Coal
wej technologii Mine,
sk³adowania odpa-
• optimal modernisa-
dów paleniskowych
tion of electrostatic pre-
w wyrobisku KWB
cipitators during the
„Be³chatów” S.A.,
period 2007-2011, so that they meet
• przeprowadzenie optymalnej moder- demands during following years of
nizacji elektrofiltrów w latach 2007- operation,
2011, tak aby sprosta³y one wymaga-
• adjustment of environmental man-
niom w nastêpnych latach eksploata-
agement to the requirements of the
cji,
standard ISO 14000 and obtaining
• przystosowanie zarz¹dzania œrodowi- a relevant certificate,
skiem do wymogów wynikaj¹cych
• commercial utilisation of maximal
z norm serii ISO 14000 oraz uzyska-
amounts of gypsum produced by the
nie przedmiotowego certyfikatu,
eight FGDs.
• gospodarcze wykorzystanie maksy-
malnych iloœci produkowanego gip-
su z oœmiu IOS.

23
DZIA£ALNOŒÆ INWESTYCYJNA
KTO NIE IDZIE NAPRZÓD ...

DEVELOPMENT PROJECTS
GOING AHEAD

Elektrownia „Be³chatów” S.A. to The Power Station „Be³chatów” S.A.


przedsiêbiorstwo o bardzo du¿ej is a very complex technical & engi-
z³o¿onoœci techniczno-technolo- neering organisation of a very
gicznej i wysokiej kapita³och³onnoœci capital consuming production.
produkcji. Dlatego, w celu Therefore, in order to maintain its
utrzymania zdolnoœci produkcyjnych production capabilities and assure
oraz zapewnienia odpowiedniego proper technical condition, the
stanu i poziomu techniki, Power Station implements
realizowany jest w Elektrowni a modernisation and development
„Be³chatów” S.A. program rozwoju programme.
i modernizacji.

24
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Program ten obejmuje: The programme includes:


• Inwestycje proekologiczne: • Environmental protection projects:
• budowa kolejnych instalacji odsiar- • construction of subsequent flue gas
czania spalin, desulphurisation installations,
• budowa docelowego sk³adowiska • construction of ultimate furnace
odpadów paleniskowych w obrêbie wastes storage in the excavation of
zwa³owiska wewnêtrznego, zlokali- the open-cast mine,
zowanego na wyrobisku powêglo- • complete commercial utilisation of
wym, FGD gypsum,
• gospodarcze wykorzystanie, w stop- • Efficiency improvement projects:
niu maksymalnym, gipsu powstaj¹-
• modernisation of turbine-generator
cego w procesie odsiarczania spalin,
sets (retrofit),
• Inwestycje efektywnoœciowe:
• modernisation of the power units
• modernizacja turbozespo³ów (retro- cooling systems,
fit),
• Moder nisation and replacement
• modernizacja uk³adów ch³odz¹cych tasks;
bloków,
• Construction of new power generation
• Prace modernizacyjno-odtworzeniowe; facilities - Be³chatów II Power Plant.
• Budowa nowych Ÿróde³ energii - Elek-
trowni Be³chatów II.

Flue Gas Desulphurisation


Kontynuacja Programu Programme Continued
Odsiarczania Spalin
After reaching its full capacity, the
Po osi¹gniêciu pe³nej mocy Elektrownia „Be³chatów” Power Station, leading elec-
„Be³chatów”, bêd¹c najwiêkszym w kra- trical power producer in the country, simul-
ju producentem energii elektrycznej, sta- taneously became the largest source of sul-
³a siê jednoczeœnie jednym z najwiêk- phur dioxide emission. In order to with-
szych Ÿróde³ emisji draw the station from its
dwutlenku siarki. Po to, leading position in such
aby tê niechlubn¹ staty- a disgraceful statistic,
stykê zmieniæ, w roku a decision was made in
1990 podjêto decyzjê 1990 to start the construc-
o rozpoczêciu budowy tion of the first Polish
pierwszej w Polsce insta- Flue Gas Desulphurisa-
lacji. Wybrano szeroko tion (FGD) system. The
znan¹ w œwiecie techno- world-recognised wet
logiê mokr¹ wapienno- limestone-gypsum des-
gipsow¹. ulphurisation process
Po sukcesywnym was chosen.
przekazywaniu do eks- After a successive
ploatacji kolejnych IOS commissioning of subse-
(wrzesieñ 1994 - blok 10, quent FGDs (September
lipiec 1995 - blok 8, maj 1994 - unit 10, July 1995 -
1996 - blok 11) wraz unit 8, May 1996 - unit 11)
z uruchomieniem we in September 1996, when
wrzeœniu 1996 instalacji a final acceptance of the
na bloku 12, zakoñczony FGD at unit 12 took place,
zosta³ pierwszy etap the first stage of provid-
wyposa¿ania Elektrow- ing the „Be³chatów ”
ni „Be³chatów ” w te, Power Station with es-
bardzo istotne dla ograniczania emisji SO2 sential SO2 reduction measures was closed.
instalacje. Pozwala³o to ju¿ wówczas na At that time already it allowed reduction
redukcjê emisji SO2 o ponad 1/3 w stosun- of SO2 emission by 1/3 compared to previ-
ku do lat ubieg³ych. ous years. 25
Zrealizowane w latach 1997-2000, dwie Two FGD installations, constructed by
nowe instalacje na blokach 5 i 6, dostarczone the Polish company RAFAKO at units 5&6
przez polsk¹ firmê RAFAKO Racibórz, razem from 1997 to 2000, together with those com-
z wczeœniej uruchamianymi, daj¹ w efekcie missioned before, achieve SO2 reduction of
redukcjê emisji SO2 o 50% w stosunku do lat 50% as compared to years before the FGD
sprzed rozpoczêcia programu odsiarczania programme at the „Be³chatów” Power Sta-
spalin w Elektrowni „Be³chatów”. tion had been started
Koszty realizacji programu odsiarczania The total investment costs of PLN 715
spalin w Elektrowni „Be³chatów” w la- mln in prices current during realisation of
tach 1991-2000 zamykaj¹ siê kwot¹ pra- each project, spent from 1991 to 2000, were
wie 715 mln PLN, wyra¿on¹ w cenach needed to implement the FGD programme
bie¿¹cych z okresu realizacji poszczegól- at the „Be³chatów” Power Station.
nych inwestycji. Expected deteriorating quality of the
Prognozowane pogarszanie siê jakoœci fuel and aspiration to adjust technology of
dostarczanego paliwa, oraz d¹¿enie do the Power Station „Be³chatów” S.A. to more
przygotowania technologicznego Elektrow- stringent domestic environmental require-
ni „Be³chatów” S.A. do zaostrzaj¹cych siê ments, as well as European Union regula-
wymagañ krajowych w zakresie ochrony tions, were main reasons for decisions to
œrodowiska, a tak¿e regulacji obowi¹zuj¹- construct further FGD installations at units
cych w Unii Europejskiej, to g³ówne powo- 7 & 9.
dy, dla których podjête zosta³y decyzje o bu-
dowie kolejnych IOS, na blokach 7 i 9.
Furnace
wastes storage
Sk³adowiska odpadów
The amount of furnace wastes de-
paleniskowych pends on quantity and quality of coal that
Iloœæ powstaj¹cych w elektrowni odpa- is fired. The Power Station „Be³chatów”
dów paleniskowych uzale¿niona jest bez- S.A. burns around 34,4 - 35,8 mln tons of
poœrednio od iloœci i jakoœci spalanego pa- brown coal annually. In consequence,
liwa. W Elektrowni „Be³chatów” S.A. spa- yearly production of furnace wastes is
la siê rocznie 34,4 - 35,8 mln ton wêgla bru- around 3 mln tons.
natnego. Tym samym roczna produkcja Presently the Power Station „Be³chatów”
odpadów paleniskowych wynosi oko³o S.A. has various systems for transportation
26 3 milionów ton. and storage of furnace wastes:
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

W chwili obecnej w Elektrowni „Be³cha- • hydraulic ash and slag disposal system
tów” S.A. istniej¹ ró¿ne systemy transpor- to the „Lubieñ - settling pond” storage
tu i sk³adowania odpadów paleniskowych: (around 30% of total furnace wastes),
• system hydraulicznego transportu ¿u¿- • pneumatic system of ash disposal into
la i popio³u na sk³adowisko „Bagno - storage tanks in the power station and
Lubieñ”(ok. 30 % ca³oœci odpadów pa- humid ash transportation via belt con-
leniskowych), veyors into the excavation of the
• system pneumatycznego odpopielania Be³chatów Brown Coal Mine (around
do zbiorników magazynowych w Elek- 70% of total furnace wastes) by mixing
trowni oraz transportu nawil¿onego ash with overlay in proportion of 1:10.
popio³u podajnikami taœmowymi do The project of final furnace wastes stor-
odkrywki Kopalni Wêgla Brunatnego age, using a new hydraulic method, with-
„Be³chatów” (ok. 70 % ca³oœci odpadów in the internal stockpile of the Be³chatów
paleniskowych) poprzez mieszanie po- Brown Coal Mine is continued. It is worth
pio³u z nadk³adem w proporcji 1:10. to mention that both the project and stor-
Kontynuowane s¹ prace inwestycyjne age technology comply with EU require-
docelowego sk³adowiska odpadów paleni- ments determined by relevant Directives
skowych w nowej technologii hydraulicz- concerning ground wastes storage.
nej, zlokalizowanego w obrêbie zwa³owi- Planned for year 2003, putting into use
ska wewnêtrznego KWB Be³chatów. War- a final storage of furnace wastes will allow
tym podkreœlenia jest fakt, ¿e zarówno pro- a smooth, gradual moving from present
jekt jak i technologia sk³adowania, spe³nia- storage places (Lubieñ settling pond and
j¹ ju¿ wymagania unijne, zawarte w odpo- stockpiling a mixture of ash and overlay)
wiednich Dyrektywach dotycz¹cych ziem- to more ecological ones, which are under
nych sk³adowisk odpadów. construction in the open-cast
Planowane na rok excavation.
2003 uruchomienie eks-
ploatacji docelowego
sk³adowiska odpadów
paleniskowych, pozwo-
li na p³ynne, stopniowe
przechodzenie z obec-
nych sk³adowisk (Bagno
Lubieñ i zwa³owanie mie-
szaniny popio³u z nadk³a-
dem) na nowe, bardziej
ekologiczne, bêd¹ce aktual-
nie w przygotowaniu, na te-
renie wyrobiska powêglo-
wego.
Dzia³ania podejmowane
na rzecz ochrony œrodowiska
zaskutkowa³y trwa³¹ popra-
w¹ jego stanu w porównaniu
do pocz¹tku lat 90-tych. Po
wnikliwych analizach aktual-
nej sytuacji w tym zakresie, prowadzo-
nych przez Inspekcjê Ochrony Œrodowi-
ska, G³ówny Inspektor Ochrony Œrodowi- Environmental protection actions im-
ska, w grudniu 2000 roku skreœli³ Elektrow- proved its condition as compared with ear-
niê „Be³chatów” z tzw. „Listy 80”. Jest to ly 90-ties. In December 2000, after careful
niew¹tpliwie du¿y sukces prowadzonej examination of actual condition conduct-
przez Zarz¹d polityki ekologicznej przed- ed by the Environmental Supervision
siêbiorstwa. Office, the Chief Environmental Inspector
removed the „Be³chatów” Power Station
from the „List of the 80” Polish plants most
burdensome to the environment. It is cer-
tainly a big success of the environmental 27
policy conducted by the Management.
Prace modernizacyjno Modernisation
- odtworzeniowe and rehabilitation work
Od czasu uruchomienia pierwszych It has been 20 years since the first pow-
bloków energetycznych Elektrowni „Be³- er units in the „Be³chatów” Power Station
chatów” minê³o 20 lat. Pierwsze trzy bloki were put to operation. The first three units
przepracowa³y ponad 120 tys. godzin. Ko- have been working over 120 thousand
lejnych siedem bloków przekroczy³o 100 hours. Another seven units exceeded 100
tys. godzin pracy ka¿dy. W zwi¹zku z tym thousand operating hours. For that reason
Elektrownia „Be³chatów” S.A. od 1997 roku the Power Station „Be³chatów” S.A. has
prowadzi prace modernizacyjno-odtwo- been carrying on modernisation and reha-
rzeniowe. Najwa¿niejsze z nich to.: bilitation work since 1997.
• modernizacja czêœci niskoprê¿nej, wy- The most important include:
sokoprê¿nej i œrednioprê¿nej turbiny • modernisation of the low pressure, high
18K360, pressure and medium pressure part of
• modernizacja sterowania urz¹dzeñ na- the turbine 18K360,
wêglania, • modernisation of coal handling control
• modernizacja wizualizacji i archiwiza- appliances,
cji danych na blokach energetycznych,
• modernisation of monitoring and data
• modernizacja stanowiska oleju uszczel- storage at power units,
niaj¹cego i stanowiska gazowego gene-
• modernisation of sealing oil stand and
ratora,
gas stand of generators,
• modernizacja komór zaworowych tur-
biny, • modernisation of turbine valve chests,
• modernizacja uk³adu ci¹g³ego monito- • modernisation of the turbine-generator
rowania i diagnostyki turbozespo³u and turbo-pump continuous monitor-
i turbopompy, ing and diagnosis system,
• modernizacja urz¹dzeñ wewnêtrznych • modernisation of cooling towers inter-
ch³odni kominowych, nal fixtures,
• modernizacja wtrysków pary pierwot- • modernisation of live and reheated
nej i wtórnej na kot³ach, steam injections at boilers,
• modernizacja wêz³a mazutowego - za- • modernisation of heavy oil feeding
budowa palników niskociœnieniowych point - enclosing low pressure burners
na kot³ach, at the boilers,
• modernizacja komór wylotowych prze- • modernisation of live steam reheater P3
grzewacza pary pierwotnej P3 na ko- outlet chambers at the boilers,
t³ach, • modernisation of automatic samplers.
• modernizacja uk³adu próbopobiera- Modernisation and rehabilitation work
ków. is aimed at enhancing the technical and eco-
Prace modernizacyjno-odtworzeniowe nomic indices of power generation (i.e. unit
maj¹ na celu poprawê wskaŸników tech- fuel energy consumption per unit of gener-
niczno-ekonomicznych wy- ated electricity), pow-
twarzania energii elektrycz- er plant availability
nej (tj. jednostkowego zu¿y- and maintaining its
cia ciep³a na jednostkê wy- production capabili-
produkowanej energii), dys- ties.
pozycyjnoœci i utrzymanie
zdolnoœci produkcyjnych.

28
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Poprawa bezpieczeñstwa Improvement of safety and


i ochrona œrodowiska pracy protection of work environment
W ramach realizacji programu popra- Within the programme of work safe-
wy bezpieczeñstwa i ochrony œrodowiska ty improvement and protection of work
pracy w Elektrowni „Be³chatów” S.A. pro- environment at the Power Station
wadzone s¹ prace maj¹ce na celu wycisze- „Be³chatów” S.A., reduction of unwanted
nie urz¹dzeñ. noise is carried out.
Zmodernizowane s¹ t³umiki ha³asu Air fans noise absorbers at power units
wentylatorów podmuchu (powietrza) na have been modernised, noise-absorbing
blokach energetycznych, budowane s¹ t³u- casings have been made at flue gas fans
miki na silnikach wentylatorów ci¹gu (spa-
motors. Construction of noise absorbing
lin). Dokoñczono zabudowê os³on dŸwiê-
casings at condensate pumps was finished,
koch³onnych na pompach kondensatu,
casings of cooling water pumps and cas-
wykonywane s¹ obudowy pomp wody
ings of feed water turbo-pumps have been
ch³odz¹cej oraz os³ony turbopomp.
made.
W 2000 roku Elektrownia „Be³chatów”
S.A. zabudowa³a prototypow¹ os³onê tur- In 2000, the Power Station „Be³chatów”
bozespo³u w wyniku czego osi¹gniêto ob- S.A. made a prototype casing of the tur-
ni¿enie poziomu ha³asu poni¿ej 85 dB (A). bine-generator set which reduced noise
Oprócz wyciszania urz¹dzeñ Elektrow- level beneath 85 dB(A).
nia „Be³chatów” S.A. prowadzi prace ma- Besides noise control, the Power Station
j¹ce na celu obni¿enie zapylenia w takich „Be³chatów” S.A. implements measures
obiektach jak zasobnik szczelinowy aimed at reducing dust emissions at the
i pierwsza sortownia wêgla. coal bunker and first coal sorting plant.

Kompleksowy Program Complex Program


Rekonstrukcji Technicznej of Technical Reconstruction
i Modernizacji and Modernisation
W Elektrowni „Be³chatów” S.A. przyjê- The Complex Program of Technical Re-
to plan realizacji Kompleksowego Progra- construction and Modernisation for years
mu Rekonstrukcji Technicznej i Moderni- 2007 - 2011 has been adopted by the Power
zacji na lata 2007-2011. Station „Be³chatów” S.A.
Programowi temu podlegaæ bêdzie 10 The program covers a modernisation of
bloków energetycznych, w cyklu 2 bloki
rocznie (od bloku nr 3 do bloku nr 12).
10 power units, 2 units every year (from
unit 3 to unit 12). 29
Dziêki planowanym dzia³aniom mo- Thanks to modernisation activities, elec-
dernizacyjnym, wzroœnie sprawnoœæ wy- trical power generation efficiency will in-
twarzania energii elektrycznej. Efektem crease. This will result in a smaller fuel con-
tego bêdzie dalsze obni¿enie zu¿ycia pali- sumption per unit of the generated elec-
wa na jednostkê wyprodukowanej energii, tricity, and therefore in reduction of flue
a tym samym zmniejszenie emisji szkodli- gas and particulate emissions to the atmos-
wych gazów i py³ów do atmosfery. phere.
Bloki nr 1 i 2 przejd¹ poszerzone remon- Units 1 and 2 will undergo extended
ty kapitalne w celu dalszej bezpiecznej eks- capital overhauls so that they work safely
ploatacji do osi¹gniêcia oko³o 220 tys. go- until they reach 220 thousand hours of
dzin. operation time.

Budowa nowych mocy Construction


energetycznych of new power capacities
Wysoka efektywnoϾ ekonomiczna The high commercial efficiency of pow-
wytwarzania energii elektrycznej, istniej¹- er generation, existing deposits of brown
ce zasoby wêgla brunatnego w Be³chatow- coal, growth of electric power consumption
skim Zag³êbiu Górniczo-Energetycznym anticipated in "Power Policy Assumptions",
oraz przewidywany w „Za³o¿eniach poli- and the resulting need to build new pow-
tyki energetycznej” wzrost zu¿ycia energii er capacities, have all been an incentive to
elektrycznej i w konsekwencji potrzeba develop the idea of locating new power
budowy nowych Ÿróde³ mocy, stanowi³y capacities in the Be³chatów area
podstawê opracowania koncepcji lokaliza- Taking this into account, during the
cji tych Ÿróde³ w Okrêgu Be³chatowskim. meeting at the Ministry of Industry &
Wobec powy¿szego na spotkaniu w Mi- Trade, held on 9 January 1996, the Minister
nisterstwie Przemys³u i Handlu w dniu of Industry & Trade, to whom the project's
9.01.1996 r., po przedstawieniu stanu za- development plans, business and legal as-
awansowania prac przygotowawczych do sumptions, together with the project's im-
rozpoczêcia budowy, za³o¿eñ ekonomicz- plementation schedule were presented, is-
nych i koncepcji organizacyjno-prawnych sued permission to start the „Be³chatów II
30 przedsiêwziêcia oraz przewidywanego Power Plant” project.
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

harmonogramu dzia³añ dla realizacji pla- The submitted project - construction of


nowanej inwestycji, Minister Przemys³u a new power unit with a capacity of 833
i Handlu podj¹³ decyzjê zezwalaj¹c¹ na MW - is fully feasible concerning the exe-
rozpoczêcie procesu inwestycyjnego „Elek- cution potential of contractors and exist-
trownia Be³chatów II”. ing back-up facilities. This is the first such
Przedstawiony projekt przedsiêwziêcia commercial project employing its own
inwestycyjnego - budowa nowego bloku funds and bank loans without the use of
energetycznego o mocy 833 MW jest w pe³- resources from the government budget,
ni wykonalny od strony mo¿liwoœci reali- whilst complying with the criteria of busi-
zacyjnych firm wykonawczych i istniej¹- ness effectiveness and price competitive-
cego zaplecza. Jest to pierwszy komercyj- ness
ny projekt inwestycyjny oparty na œrod- In order to carry out this project a com-
kach w³asnych i kredytach bankowych bez pany - the Be³chatów II Power Plant Ltd
zaanga¿owania œrodków bud¿etowych, was established, being 100 percent owned
spe³niaj¹cy równoczeœnie kryterium efek- by the Power Station „Be³chatów” S.A.
tywnoœci ekonomicznej i konkurencyjno-
œci cenowej.
Do realizacji przedsiêwziêcia inwesty-
cyjnego zwi¹zanego z budow¹ nowej elek-
trowni powo³ano spó³kê z o.o. Elektrownia
Be³chatów II, której stuprocentowym w³a-
œcicielem jest Elektrownia „Be³chatów” S.A.

Elektrownia Be³chatów II
The Be³chatów II Power Plant

31
SWOIM PRACOWNIKOM
DZIA£ALNOŒÆ NA RZECZ PRACOWNIKÓW

THE STATION FOR ITS STAFF


ACTIVITIES FOR EMPLOYEE’S WELFARE

Elektrownia „Be³chatów” S.A. zapew- The Power Station „Be³chatów” S.A.


nia swoim pracownikom mo¿liwoœæ pod- provides its employees with opportunities
noszenia kwalifikacji. Rokrocznie du¿a to enhance their qualifications. Every year
czêœæ pracowników zak³adu bierze udzia³ most of its personnel take part in various
w ró¿norodnych szkoleniach prowadzo- training programmes held in its own train-
nych we w³asnej bazie szkoleniowej oraz ing centre or organised by other institu-
organizowanych na zlecenie przez inne tions. The facilities of the Training Depart-
instytucje. W trzech salach doskonale wy- ment, including three halls well furnished
posa¿onych w pomocniczy sprzêt audio- with modern audio-visual equipment, are
wizualny najnowszej generacji, Dzia³ used for training courses that cover the fol-
Szkolenia prowadzi szkolenia z zakresu: lowing subjects: work safety, organisation
BHP, organizacji i zarz¹dzania, ekonomi- and management, business, accounting
ki, ksiêgowoœci i finansów, obs³ugi, remon- and finance, operation, maintenance, diag-
tów i diagnostyki urz¹dzeñ technicznych, nosis of installations and welding, and
spawalnictwa i obs³ugi sprzêtu kompute- computer skills.
rowego. The Power Station „Be³chatów” S.A. ac-
Elektrownia „Be³chatów” S.A. czynnie tively supports the organisations and fel-
32 wspiera dzia³alnoœæ organizacji i stowarzy- lowships, which gather employees of the
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

szeñ zrzeszaj¹cych pracowników przedsiê-


biorstwa. Aktywn¹ dzia³alnoœæ statutow¹
prowadz¹ tu:
• Towarzystwo Sportu i Rekreacji company. The following associations are
„Jupiter ”, active:
• Stowarzyszenie Ksiêgowych w Polsce, • „Jupiter ” Sport and Recreation
Fellowship,
• Stowarzyszenie Elektryków Polskich,
• Polish Association of Accountants,
• Stowarzyszenie In¿ynierów i Techni-
ków Mechaników Polskich, • Association of Polish Electrical
Engineers,
• Klub Honorowych Dawców Krwi,
• Association of Polish Mechanical
• Klub Motorowy „ Energetyk”,
Engineers and Technicians,
• Jacht Klub „Elektron”,
• Honorary Blood Donors Club,
• Klub Emerytów, Rencistów i Inwali-
• „Energetyk” Automobile Club,
dów „Energetyk”,
• „Elektron” Yacht Club,
• Polski Zwi¹zek In¿ynierów i Techni-
ków Budownictwa, • „Energetyk” Club of Retired
Employees, Pensioners and Invalids,
• Energetyczny Klub Sportowy SKRA,
w ramach którego funkcjonuje • Polish Association of Civil
I Ligowy Zespó³ Siatkarski oraz odno- and Structural Engineers,
sz¹ca du¿e sukcesy dzieciêca sekcja • Energetic Sport Club SKRA, including
p³ywacka. a I-st League Volleyball Team and
a successful youth swimming team.
33
ZAK£ADY I SPÓ£KI
ELEKTROWNI „BE£CHATÓW” S.A.
KRÓTKA CHARAKTERYSTYKA

DIVISIONS AND SUBSIDIARIES OF


THE POWER STATION „BE£CHATÓW” S.A.
SHORT DESCRIPTION

ZAK£AD POWER GENERATION


WYTWARZANIA DIVISION
ENERGII
The Power Gener-
Zak³ad Wytwarzania ation Division (ZWE)
Energii (ZWE) od- is responsible for con-
powiedzialny jest trol of operation and
za nadzór eksploata- running power gener-
cyjny i prowadzenie ation machinery in-
ruchu urz¹dzeñ elek- cluding chemical con-
trowni wraz z kontrol¹ trol of processes.
chemiczn¹ procesów tech- It is a basic objective
nologicznych. of the Division to oper-
Zasadniczym celem Zak³adu ate the station in a way, which
jest taka eksploatacja elektrowni, reasonably satisfies the demand for
która umo¿liwi racjonaln¹ realiza- electricity and heat. To attain the objective,
cjê zamówieñ na produkcjê energii elek- it is extremely essential to secure a proper
trycznej i cieplnej. W procesie tym niezwy- efficiency of power generation, low costs
kle istotne jest zapewnienie odpowiedniej and assure maintaining the production ca-
sprawnoœci wytwarzania, niskich kosztów pabilities of the station at a high technical
oraz zagwarantowanie utrzymania zdol- level.
noœci produkcyjnych elektrowni na wyso-
kim poziomie technicznym.

MAINTENANCE
DIVISION
ZAK£AD
REMONTOWY The Station’s Mainte-
ELEKTROWNI nance Division (ZRE)
performs a majority
Zak³ad Remon- of maintenance work
towy Elektrowni for the „Be³chatów ”
(ZRE) realizuje wiêk- Power Station and
szoϾ prac remonto - having free labour
wych dla potrzeb Elek- force capacities, during pe-
trowni „Be³chatów ” S.A. riods between over-
oraz w ramach wolnych mocy hauls, the division
renders a wide range of
34 w okresach miêdzy kampaniami
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

remontowymi, œwiadczy us³ugi obejmuj¹- services for other customers within the
ce szeroki zakres prac wykonywanych dla power-generating sector.
innych klientów z sektora elektroenerge- The ZRE division with its present per-
tycznego. sonnel and engineering potential is one of
ZRE z obecnym potencja³em kadrowym the largest maintenance plants operating
i technicznym jest jednym z najwiêkszych in the Polish power industry. Many years
zak³adów remontowych dzia³aj¹cych of professional experience have contribut-
w polskiej energetyce. D³ugoletnie do- ed to a high specialisation in all types of
œwiadczenie spowodowa³o wysokie wyspe- power generating equipment overhauls,
cjalizowanie we wszelkiego rodzaju pracach shop repairs, production and regeneration
remontowych urz¹dzeñ energetycznych, of spare parts.
naprawach warsztatowych oraz produkcji
i regeneracji czêœci zamiennych.

AUTOMATIC CONTROL
DIVISION
ZAK£AD AUTOMATYKI
ELEKTROWNI
The Station’s Automatic
Control Division (ZAE) deals
Zak³ad Automatyki with the modernisa-
Elektrowni (ZAE) zajmuje tions of all classes of
siê wszelkiego rodza- automatic control
ju modernizacjami z and tele-technical
zakresu bran¿y auto- systems. Compre-
matycznej i teletech- hensively qualified
nicznej. Wszechstronnie staff assures complete
wykwalifikowana kadra performance of all
zapewnia kompleksowe wy- projects in this range
konanie inwestycji z tej bran¿y - from assembly to
pocz¹wszy od prac monta¿owych start-up and optimisation.
a¿ do uruchomienia i optymalizacji.

PROCUREMENT AND
ZAK£AD ZAOPATRZENIA TRANSPORTATION DIVISION
I TRANSPORTU
The Procurement and Trans-
Zak³ad Zaopatrzenia portation Division (ZZT) is an
i Transportu (ZZT) jest auxiliary unit in relation to other
jednostk¹ us³ugow¹ divisions and organisational
w stosunku do pozosta- sections of the Power
³ych zak³adów i ko- Station „Be³chatów”
mórek organizacyj- S.A. It renders com-
nych Elektrowni plex services in the
„Be³chatów ” S.A. range of transporta-
Œwiadczy komplekso- tion, procurement, ma-
wo us³ugi w zakresie terials management and
us³ug transportowych, go- storage.
spodarki materia³owej i za-
opatrzenia oraz magazynowa-
nia materia³ów.

35
MegaMed sp. z o.o. MegaMed Ltd. (Health
Service Division)
O zdrowie pracowni-
ków Elektrowni „Be³cha- Health of the Power
tów” S.A. dba personel Station „Be³chatów”
Niepublicznego Za- S.A.’s staff is looked
k³adu Opieki Zdro- after by personnel of
wotnej, który do po- the Non-public Health
cz¹tku 2000 roku Polyclinic, which until
funkcjonowa³ jako je- the beginning of 2000
den z Zak³adów Elek- was operating as a division
trowni „Be³chatów” S.A. of the Power Station
(ZLZ). Od dnia 1.03.2000 r. „Be³chatów” S.A. Since
Zak³ad ten przekszta³cony zo- 1 March 2000, the Division
sta³ w spó³kê z ograniczon¹ odpo- has been transformed into a limit-
wiedzialnoœci¹ MegaMed, zale¿n¹ ed liability company „MegaMed” depend-
od Elektrowni „Be³chatów” S.A. Zak³ad ent from the Power Station „Be³chatów” S.A.
prowadzi badania profilaktyczne oraz ofe- The company carries out preventive exam-
ruje us³ugi w ramach podstawowej i spe- inations and offers services in the range of
cjalistycznej opieki zdrowotnej. Przychod- basic and specialised health care. The poly-
nia dysponuje bardzo dobrze wyposa¿ony- clinic has well-equipped diagnostic rooms,
mi gabinetami diagnostycznymi, laborato- laboratories for medical analyses, an X-ray
riami analitycznymi, pracowni¹ rentgeno- diagnostic workroom, dentist surgeries and
diagnostyki, gabinetami stomatologicznymi a rehabilitation outpatient clinic.
i poradni¹ rehabilitacyjn¹.

BE£CHATÓW II POWER
ELEKTROWNIA PLANT Ltd.
BE£CHATÓW II sp. z o.o.
The limited liability company
Spó³ka z ograniczon¹ od- Be³chatów II Power Plant had
powiedzialnoœci¹ Elek- been set up by at that time state-
trownia Be³chatów II zosta- owned Be³chatów
³a za³o¿ona przez Przedsiê- Power Station. The
biorstwo Pañstwowe company was regis-
Elektrownia Be³cha- tered on 20 Septem-
tów. Rejestracja Spó³- ber 1996. Basically, the
ki mia³a miejsce 20 company was estab-
wrzeœnia 1996 r. Zasadni- lished to develop the
czy cel powo³ania Spó³ki to 833MW power project,
przygotowanie inwestycji then construct, and
oraz budowa i eksploatacja operate the plant fired
elektrowni o mocy ok. 833 MW, with brown coal as a ba-
wykorzystuj¹cej wêgiel brunatny sic fuel.
jako paliwo podstawowe.
Additional business of the Be³chatów II
Elektrownia Be³chatów II podejmuje Power Plant Ltd. includes wide range of
ponadto szereg przedsiêwziêæ z zakresu: operations such as:
• obrotu energi¹ elektryczn¹, • electricity trading
• dzia³alnoœci w zakresie architektury i in- • activities in the area of architecture, en-
¿ynierii i pokrewne doradztwo tech- gineering and ancillary technical advi-
niczne, sory services
• badañ i analiz technicznych, • technical research and analyses,
• doradztwa w zakresie dzia³alnoœci • advisory activities in the area of elec-
36 zwi¹zanej z wytwarzaniem i obrotem
energi¹ elektryczn¹ i ciepln¹.
tricity and heat generation and trading.
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

ELBEST sp. z o.o.


ELBEST Ltd.
W dniu 12.04.2001 r. w Elektrowni „Be³-
chatów” S.A. zosta³ podpisany akt notarial- On 12 April 2001, a deed record-
ny zawi¹zania spó³ki z ograniczon¹ od- ed by a notary establishing the
powiedzialnoœci¹ ELBEST, ELBEST limited liability compa-
która rozpoczê³a swoj¹ dzia- ny was signed at the Power Sta-
³alnoœæ gospodarcz¹ tion „Be³chatów ” S.A. The
z dniem 1.05.2001 r. „ELBEST” Ltd. started busi-
Spó³kê utworzono na ness on 1 May 2001.
bazie maj¹tku i pra- The company was
cowników Oddzia- set up based on assets
³u ZST - Restauracje, and human resources
Hotele, Turystyka oraz of the Division Social
czêœci Zak³adu Us³ug Services - Restaurants,
Wewnêtrznych Elek- Hotels, Tourism, using
trowni „Be³chatów” S.A. partly resources of the
Przedmiot dzia³alnoœci spó³- Division of Internal
ki pokrywa siê z dotychczaso- Services. The company's
wym zakresem dzia³ania wy- scope of business coincides with
dzielonych w ten sposób obsza- their scope before spin-off and includes
rów i obejmuje przede wszystkim: first of all:
• prowadzenie dzia³alnoœci hotelarskiej, • providing hotel services,
• prowadzenie dzia³alnoœci gastrono- • providing gastronomical services,
micznej,
• organising cultural and recreation pas-
• organizowanie dzia³alnoœci kulturalnej time,
i rekreacyjnej,
• cleaning of offices and production
• us³ugi w zakresie sprz¹tania pomiesz- rooms, maintenance of green fields,
czeñ biurowych i produkcyjnych oraz roads, squares and pavements.
konserwacji i utrzymania terenów zie-
lonych, dróg, placów, chodników.

37
Elektrownia „Be³chatów” S.A. w oczach dzieci
Power Station „Be³chatów” S.A. in the eyes of the children
Piotr
Niewieczerza³

Aleksandra Iwona
Graczyk Brzozowska

Grzegorz Adrianna
Niewieczerza³ Bodasiñska

38
E l e k t r o w n i a „ B e ³ c h a t ó w ” S . A .

Miko³aj
Michalczyk

Angelika
Szlakowicz

Aleksandra
S³owiñska

Agnieszka
Szymanek

Sylwia
Blady

Pawe³
Kociniak

Sylwia 39
Walenczak
Elektrownia „Be³chatów” S.A. w Rogowcu
97–406 Be³chatów 5
tel. +48 (44) 632 51 32, 632 65 73
fax +48 (44) 735 22 11
http://www.elb.pl
e–mail: Elektrownia_Belchatow@elb.pl

T³umaczenie: Tomasz Lizak


Zdjêcia: Marek Zadumiñski
Projekt i druk: Reflex Studio - Jacek Wira¿ka
tel. (44) 733 03 00