Discussed points:

 Clarifying of new bridge concept (elevations at EPS and Oil Rocks, height of
the bridges, turning area and truck road dimension)
 New pier slop and air gap (environmental loads impact on designed pier)
 Tie-in to EPS and Oil Rocks (especially to Oil Rocks: like a cantilever)
 Pipeline slop and starting point connections
 Additional turning area between Oil Rocks and EPS platform (not required_
because these kind of structures are considered to design for after each
300m-350m length of the pier)
 Escape road for pier (TOTAL agreed and confirmed that for this concept
escape road is not required on the top of pier: the road inside the bridges is
enough) to be agreed with (FHN-MINISTRY OF EMERGENCY SITUATIONS)
 Cable supports and root (the number of cables might be decreased by
SOCAR-KBR)
 Security access
 Lighting System (should be kept the same as the previous design)
 Master point are (clarified)