Discussed points:
Clarifying of new bridge concept (elevations at EPS and Oil Rocks, height of
the bridges, turning area and truck road dimension)
New pier slop and air gap (environmental loads impact on designed pier)
Tie-in to EPS and Oil Rocks (especially to Oil Rocks: like a cantilever)
Pipeline slop and starting point connections
Additional turning area between Oil Rocks and EPS platform (not required_
because these kind of structures are considered to design for after each
300m-350m length of the pier)
Escape road for pier (TOTAL agreed and confirmed that for this concept
escape road is not required on the top of pier: the road inside the bridges is
enough) to be agreed with (FHN-MINISTRY OF EMERGENCY SITUATIONS)
Cable supports and root (the number of cables might be decreased by
SOCAR-KBR)
Security access
Lighting System (should be kept the same as the previous design)
Master point are (clarified)