No.

Uraian Unit Harga/Unit Mobilisasi/Lansiran


1 Pasir Pasang m3 1,180,000.00 1,364,000.00
2 Pasir Beton/Cor m3
1,557,000.00 1,774,000.00
3 Pasir Urug m3 1,024,000.00 1,290,000.00
4 Tanah Urug m3
756,700.00 773,400.00
5 batu pecah m3 1,600,000.00 1,700,000.00
6 Semen Portland Zak 62,000.00 61,000.00
7 Batu Kali / Batu Batu Belah m3 1,230,000.00 1,364,000.00
8 Kayu Klas II m3 6,650,000.00 6,650,000.00
6,770,000.00 6,770,000.00
9 Paku Biasa Kg 86,000.00 81,000.00
Paku Jembatan 84,000.00 83,000.00
10 Besi Beton Kg
11 Kawat Beton Kg
12 Kayu Klas III m3
13 Batu Bata Buah
14 Besi Penggantung Ø 14 mm m'
15 Warfel Mur Set 325,000.00 327,000.00
16 Buldog Grip Buah 55,000.00 55,000.00
Buldog Grip 70,000.00 70,000.00
Buldog Grip 115,000.00 113,000.00
besi beton polos 76,000.00 70,000.00

17 Besi Strip/Klem Buah


18 Besi Kabel/Sling Utama Ø 1" m' 437,000.00 435,000.00
Besi Kabel/Sling Utama Ø 3/4" 270,000.00 269,000.00
Besi Kabel/Sling Utama Ø 5/8" 235,000.00 235,000.00
19 Besi Kabel/Sling Ø 3/5" m' 235,000.00
20 Besi Strip/Klem Penggantung Bawah 3 mm Buah
21 Besi Strip/Klem Penggantung Atas 3 mm Buah
22 Besi Strip/Klem Tiang sandaran 3 mm
23 Baut Mur Ø 15, (3/8'-6') Buah 23,000.00 22,000.00
Baut Mur Ø 17.5, (3/8'-7') 26,000.00 25,000.00
Baut Mur Ø 20, (3/8'-8') 29,000.00 30,000.00
24 Kawat Harmonika m2 213,000.00 201,000.00
Pipa PVC 11/2' btg 244,000.00 273,000.00
25 Pekerja Org / Hari OH 163,000.00 163,000.00
26 Tukang Org / Hari OH 189,000.00 189,000.00
27 Kepala Tukang Org / Hari OH 220,500.00 220,500.00
28 Mandor OH 247,000.00 247,000.00

0.80
2.26
Harga Total/Unit

2,850,000.00

0.6

0.75
17125.9842519685 0.625
10590.5511811024
9251.968503937
39
14
28
12

2250 40 72000
2250 60 305100
377100

305100 1.225 373,747.50


0.162 364.5 2.36 860.22
0.0936 210.6 1.6 336.96
0.0432 97.2 1.74 169.13
0.0216 48.6 1.51 73.39
375,187.19
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitad
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

A PEKERJAAN PENDAHULUAN
1 1 m' Pengukuran dan Pemasangan Bowplank
0.012 M3 Kayu 5/7
0.020 Kg Paku biasa 2"-5"
0.007 M3 Kayu papan 3/20
0.100 Oh Tukang kayu
0.100 Oh Pekerja
0.010 Oh Kepala tukang
0.005 Oh Mandor

2 1 m 2 Direksi keet/Gudang material


1.700 Btg Dolken kayu Ø 8-10/400cm
0.210 M3 Kayu
0.300 Kg Paku biasa
0.500 Kg Semen Portland
0.030 M3 Pasir beton
0.050 M3 Koral beton
1.500 Lbr Seng gelombang bljs 30
2.000 Oh Tukang kayu
2.000 Oh Pekerja
0.200 Oh Kepala tukang
0.050 Oh Mandor

B. PEKERJAAN TANAH DAN GALIAN


1 1 m 3 Galian Tanah
0.4 Oh Pekerja
0.04 Oh Mandor

2 1 m 3 Urugan tanah kembali


0.25 Oh Pekerja
0.083 Oh Mandor
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitad
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

3 1 m 3 Urugan tanah (import soil)


1.2 M3 Tanah Urug
0.25 Oh Pekerja
0.083 Oh Mandor

C PEKERJAAN BESI
1 1 m' Pekerjaan Kawat Seling Ø 1'
1 M Kabel Baja/Seling 1'
0.079 Oh Pekerja
0.079 Oh Tukang
0.008 Oh Kepala Tukang
0.005 Oh Mandor

2 1 m' Pekerjaan Kawat Seling Ø 5/8"


1 M Kabel Baja/Seling 1'
0.079 Oh Pekerja
0.079 Oh Tukang
0.008 Oh Kepala Tukang
0.005 Oh Mandor
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitad
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

3 1 m' Pekerjaan Kabel Penggantung Ø 1/2" / Seling angin


1 M Kabel Baja/Seling 3/4'
0.048 Oh Pekerja
0.048 Oh Tukang
0.005 Oh Kepala Tukang
0.003 Oh Mandor

4 1 Buah Pekerjaan Klem Penggantung 3/4''


1 Bh Klem Penggantung 1'
0.011 Oh Pekerja
0.011 Oh Tukang
0.001 Oh Kepala Tukang
0.000 Oh Mandor

5 1 Buah Pekerjaan Klem Penggantung 5/8'


1 Bh Klem Penggantung 1'
0.006 Oh Pekerja
0.006 Oh Tukang
0.001 Oh Kepala Tukang
0.000 Oh Mandor

6 1 Buah Pekerjaan Pasang Wartel Mur


1 Bh Warfel Mur
0.025 Oh Pekerja
0.025 Oh Tukang
0.002 Oh Kepala Tukang
0.001 Oh Mandor

7 1 Kg Pengerjaan Besi Polos


1 kg Besi Polos
0.007 Oh Pekerja
0.007 Oh Tukang
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitad
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

0.0007 Oh Kepala Tukang


0.0003 Oh Mandor

8 1 Kg Pengerjaan Besi Ulir


1 kg Besi Polos
0.007 Oh Pekerja
0.007 Oh Tukang
0.0007 Oh Kepala Tukang
0.0003 Oh Mandor

9 1 m 3 Pengerjaan Kawat Harmonika


1 m Kawat Harmonika
0.02 kg Paku
0.1 Oh Pekerja
0.1 Oh Tukang
0.01 Oh Kepala Tukang
0.0005 Oh Mandor
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitad
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

D. PEKERJAAN BETON DAN PASANGAN


1 1 m 3 Pasangan batu kali 1:3
1.200 M3 Batu kali
202.0 Kg Semen portland
0.485 M3 Pasir pasang
1.500 Oh Pekerja
0.750 Oh Tukang batu
0.075 Oh Kepala Tukang
0.0750 Oh Mandor

2 1 m 3 Beton Cyclop 60% + besi 100 kg


0.480 M3 Batu kali
194.000 Kg Semen portland
0.468 M3 Kerikil
105.000 Kg Besi beton polos
0.024 M3 Pasir pasang
3.400 Oh Pekerja
0.850 Oh Tukang batu
0.085 Oh Kepala Tukang
0.170 Oh Mandor

3 1 m 3 Pondasi beton bertulang (150 kg besi+bekesting)


0.32 M3 Kayu kelas III
3.2 Kg Paku 5 cm – 12 cm
1.6 Ltr Minyak bekisting
150 Kg Besi beton polos
2.25 Kg Kawat beton
336 Kg Semen portland
0.54 M3 Pasir Beton
0.81 M3 Kerikil Beton
0.12 M3 Kayu kelas II balok
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitad
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

2.8 Lbr Plywood 9 mm


32 Btg Dolken kayu galam
5.3 OH Pekerja
2.625 OH Tukang
0.265 OH Kepala Tukang
0.265 OH Mandor
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitad
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

E. PEKERJAAN KAYU
1 1 m 3 Pas. Tiang Kayu Lokal Kelas I
1.1 Kayu Lokal Kelas I
5.6 Kg Paku
4 OH Pekerja
12 OH Tukang
1.2 OH Kepala Tukang
0.2 OH Mandor

2 1 m 3 Pas. Gelagar Kayu Lokal Kelas I


1.1 Kayu Lokal Kelas I
5.6 Kg Paku
4 OH Pekerja
12 OH Tukang
1.2 OH Kepala Tukang
0.2 OH Mandor

3 1 m 3 Pas. Lantai Kayu Lokal Kelas I


1.1 Kayu Lokal Kelas I
5.6 Kg Paku
4 OH Pekerja
12 OH Tukang
1.2 OH Kepala Tukang
0.2 OH Mandor
ANALISA HARGA SATUAN PEKERJAAN

rencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

163,503.25
6,397,000.00 76,764.00
104,500.00 2,090.00
6,572,750.00 46,009.25
189,000.00 18,900.00
163,000.00 16,300.00
220,500.00 2,205.00
247,000.00 1,235.00

2,949,043.94
27,908.20 47,443.94
6,650,000.00 1,396,500.00
104,500.00 31,350.00
77,600.00 38,800.00
1,180,000.00 35,400.00
5,042,000.00 252,100.00
258,000.00 387,000.00
189,000.00 378,000.00
163,000.00 326,000.00
220,500.00 44,100.00
247,000.00 12,350.00

75,080.00
163,000.00 65,200.00
247,000.00 9,880.00

61,251.00
163,000.00 40,750.00
247,000.00 20,501.00
ANALISA HARGA SATUAN PEKERJAAN

rencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

969,291.00
756,700.00 908,040.00
163,000.00 40,750.00
247,000.00 20,501.00

540,495.73
509,775.00 509,775.00
163,000.00 12,877.00
189,000.00 14,931.00
220,500.00 1,741.95
247,000.00 1,170.78

298,110.73
267,390.00 267,390.00
163,000.00 12,877.00
189,000.00 14,931.00
220,500.00 1,741.95
247,000.00 1,170.78
ANALISA HARGA SATUAN PEKERJAAN

rencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

253,345.76
234,680.00 234,680.00
163,000.00 7,824.00
189,000.00 9,072.00
220,500.00 1,058.40
247,000.00 711.36

149,788.68
145,750.00 145,750.00
163,000.00 1,711.50
189,000.00 1,984.50
220,500.00 231.53
247,000.00 111.15

89,829.54
87,527.50 87,527.50
163,000.00 975.56
189,000.00 1,131.17
220,500.00 131.97
247,000.00 63.36

406,173.58
396,750.00 396,750.00
163,000.00 3,993.50
189,000.00 4,630.50
220,500.00 540.23
247,000.00 259.35

99,192.45
96,500.00 96,500.00
163,000.00 1,141.00
189,000.00 1,323.00
ANALISA HARGA SATUAN PEKERJAAN

rencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

220,500.00 154.35
247,000.00 74.10

110,192.45
107,500.00 107,500.00
163,000.00 1,141.00
189,000.00 1,323.00
220,500.00 154.35
247,000.00 74.10

300,383.50
260,765.00 260,765.00
104,500.00 2,090.00
163,000.00 16,300.00
189,000.00 18,900.00
220,500.00 2,205.00
247,000.00 123.50
ANALISA HARGA SATUAN PEKERJAAN

rencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

22,962,057.50
5,092,000.00 6,110,400.00
77,600.00 15,675,200.00
1,557,000.00 755,145.00
163,000.00 244,500.00
189,000.00 141,750.00
220,500.00 16,537.50
247,000.00 18,525.00

30,971,210.50
5,092,000.00 2,444,160.00
77,600.00 15,054,400.00
5,400,000.00 2,527,200.00
96,500.00 10,132,500.00
1,557,000.00 37,368.00
163,000.00 554,200.00
189,000.00 160,650.00
220,500.00 18,742.50
247,000.00 41,990.00

53,749,579.90
6,485,000.00 2,075,200.00
104,500.00 334,400.00
73,000.00 116,800.00
96,500.00 14,475,000.00
114,500.00 257,625.00
77,600.00 26,073,600.00
1,557,000.00 840,780.00
5,400,000.00 4,374,000.00
6,650,000.00 798,000.00
ANALISA HARGA SATUAN PEKERJAAN

rencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

724,000.00 2,027,200.00
27,908.20 893,062.40
163,000.00 863,900.00
189,000.00 496,125.00
220,500.00 58,432.50
247,000.00 65,455.00
ANALISA HARGA SATUAN PEKERJAAN

rencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

11,134,200.00
6,650,000.00 7,315,000.00
104,500.00 585,200.00
163,000.00 652,000.00
189,000.00 2,268,000.00
220,500.00 264,600.00
247,000.00 49,400.00

11,134,200.00
6,650,000.00 7,315,000.00
104,500.00 585,200.00
163,000.00 652,000.00
189,000.00 2,268,000.00
220,500.00 264,600.00
247,000.00 49,400.00

11,134,200.00
6,650,000.00 7,315,000.00
104,500.00 585,200.00
163,000.00 652,000.00
189,000.00 2,268,000.00
220,500.00 264,600.00
247,000.00 49,400.00
RENCANA ANGGARAN BIAYA
KEGIATAN : Pembangunan Jembatan
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

No. Uraian Satuan Volume


(a) (b) (c) (d)
A Pekerjaan Pendahuluan
1 Pembersihan Lokasi/Pembukaan Lahan Ls 1
2 Pengukuran dan Pemasangan Bowplank M' 120
3 Pekerjaan Direksi keet/Gudang material M2 12
B Pekerjaan Tanah
1 Pek. Galian Tanah M3 66.816
2 Pek. Urugan Tanah Kembali M3 21.2448
C Pekerjaan Struktur dan Pasangan
1 Pek. Pondasi Telapak Menara M3 14.92
2 Pek. Pondasi Telapak Block Angker M3 4.18
3 Pek. Pondasi Telapak Block Angin M 3
2.02

D Pekerjaan Kabel dan Besi Penggantung serta Asesoris


1 Pek. Kabel Utama Ø 1" M' 325.50
2 Pek. Kabel Bawah Ø 1" M' 440.00
3 Pek. Kabel Skoor Angin Ø 5/8" M' 118.14
4 Pek. Kabel Penunjang Ø 1" M' 200.00
5 Pek. Kabel Pengaman Ø 1/2" M' 250.00
6 Pek. Kabel Penambat Ø 5/8" M' 22.40
7 Pek. Hanger/Besi penggantung Ø 1/2' M' 360
8 Pek. Kabel Melintang bawah Ø 1/2" M' 42
9 Pas. Klem Hanger atas Bh 82
10 Pas. Klem Hanger tengah Bh 82
10 Pas. Klem Hanger bawah Bh 164
11 Pas. Warter Mur Bh 20
12 Pas. Kawat harmonika M2 245
13 Pas. Pipa PVC 1" M3 6
E Pekerjaan Kayu
1 Tiang Menara M3 2.1
2 Gelagar Menara M3 0.072
3 Ring Balok M3 0.204
4 Balok Gelagar Melintang 5/10 M3 0.24
5 Balok Gelagar Memanjang 5/10 M3 1.8
6 Lantai Papan 3/30 M3 4.5
7 Balok penjepit Sandaran 5/10 M3 1.2
8 Pek. Baut dan Mur Bh 40
F Pekerjaan Akhir
Pembersihan Lokasi Ls 1
REKAPITULASI ANGGARAN BIAYA
KEGIATAN : Pembangunan Jembatan
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017

No. Uraian
(a) (b)
A Pekerjaan Pendahuluan
B Pekerjaan Tanah
C Pekerjaan Struktur dan Pasangan
D Pekerjaan Kabel dan Besi Penggantung serta Asesoris
E Pekerjaan Kayu
F Pekerjaan Akhir
TOTAL
PPN
TOTAL + PPN
PEMBULATAN
Terbilang : Satu Milyard Delapan Ratus Juta Rupiah
RENCANA ANGGARAN BIAYA

n Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

Harga Satuan Harga Total


(e) (f)
65,008,917.28
10,000,000.00 10,000,000.00
163,503.25 19,620,390.00
2,949,043.94 35,388,527.28
6,317,810.52
75,080.00 5,016,545.28
61,251.00 1,301,265.24
653,709,340.02
30,971,210.50 461,935,604.61
30,971,210.50 129,335,775.05
30,971,210.50 62,437,960.37

795,114,085.66
509,775.00 165,931,762.50
509,775.00 224,301,000.00
267,390.00 31,588,675.16
509,775.00 101,955,000.00
234,680.00 58,670,000.00
267,390.00 5,989,536.00
234,680.00 84,484,800.00
234,680.00 9,856,560.00
89,829.54 7,366,022.67
87,527.50 7,177,255.00
89,829.54 14,732,045.34
406,173.58 8,123,471.50
300,383.50 73,593,957.50
224,000.00 1,344,000.00
114,728,367.20
11,134,200.00 23,381,820.00
11,134,200.00 801,662.40
11,134,200.00 2,271,376.80
11,134,200.00 2,672,208.00
11,134,200.00 20,041,560.00
11,134,200.00 50,103,900.00
11,134,200.00 13,361,040.00
52,370.00 2,094,800.00
1,600,000.00
1,600,000.00 1,600,000.00
REKAPITULASI ANGGARAN BIAYA

n Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)

Harga Total
(c)
65,008,917.28
6,317,810.52
653,709,340.02
795,114,085.66
114,728,367.20
1,600,000.00
1,636,478,520.69
163,647,852.07
1,800,126,372.76
1,800,000,000.00

Sugapa, 18 Mei 2017


Konsultan Perencana
CV. BIRU CIPTA KONSULTAN

S O P Y A N, ST
Kepala Cabang
BILL OF QUANTITY (BoQ)
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2015

No. Uraian Satuan Volume Harga Satuan


(a) (b) (c) (d) (e)
A Pekerjaan Pendahuluan
1 Pembersihan Lokasi/Pembukaan Lahan Ls 1.00
2 Pengukuran dan Pemasangan Bowplank M' 120.00
3 Pekerjaan Direksi keet/Gudang material M2 12.00
B Pekerjaan Tanah
1 Pek. Galian Tanah M3 66.82
2 Pek. Urugan Tanah Kembali M3
21.24
C Pekerjaan Struktur dan Pasangan
1 Pek. Pondasi Telapak Menara M3 14.92
2 Pek. Pondasi Telapak Block Angker M3
4.18
3 Pek. Pondasi Telapak Block Angin M3 2.02

D Pekerjaan Kabel dan Besi Penggantung serta Asesoris


1 Pek. Kabel Utama Ø 3/4" M' 325.50
2 Pek. Kabel Bawah Ø 3/4" M' 440.00
3 Pek. Kabel Skoor Angin Ø 5/8" M' 118.14
4 Pek. Kabel Penunjang Ø 3/4" M' 200.00
5 Pek. Hanger/Besi penggantung Ø 5/8' Bh 360.00
6 Pek. Kabel Melintang Atas Ø 5/8" M' 42.00
7 Pas. Klem Hanger atas Bh 82.00
8 Pas. Klem Hanger tengah Bh Err:509
9 Pas. Klem Hanger bawah Bh 164.00
10 Pas. Warter Mur Bh 20.00
11 Pas. Kawat harmonika M2 245.00
12 Pas. Kawat harmonika M3
6.00
E Pekerjaan Kayu
1 Tiang Menara M3 2.10
2 Gelagar Menara M3 0.07
3 Ring Balok M3
0.20
4 Balok Gelagar Melintang 2x6/12 M3 0.24
5 Balok Gelagar Memanjang 6/12 M3 1.80
6 Lantai Papan 3/30 M3
4.50
7 Balok Sandaran 5/7 M3 1.20
8 Pek. Baut dan Mur Bh 40.00
9 Pek. Tangga Kayu M3 Err:509
F Pekerjaan Akhir
Pembersihan Lokasi Ls 1.00
REKAPITULASI ANGGARAN BIAYA
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2015

No. Uraian Harga Total


(a) (b) (c)
A Pekerjaan Pendahuluan
B Pekerjaan Tanah
C Pekerjaan Struktur dan Pasangan
D Pekerjaan Kabel dan Besi Penggantung serta Asesoris Err:509
E Pekerjaan Kayu Err:509
F Pekerjaan Akhir
TOTAL Err:509
PPN Err:509
TOTAL + PPN Err:509
PEMBULATAN Err:509
Terbilang :
LL OF QUANTITY (BoQ)

Harga Total
(f)
-
-
-
-
-
-
-
-
-
-
-

Err:509
-
-
-
-
-
-
-
Err:509
-
-
-
-
Err:509
-
-
-
-
-
-
-
-
Err:509
-
-
PITULASI ANGGARAN BIAYA

Harga Total
(c)
-
-
-
Err:509
Err:509
-
Err:509
Err:509
Err:509
Err:509
ANALISA HARGA DASAR SATUAN BAHAN

Kode : An.1
Jenis : Angkutan Bahan (Sling Ø 24 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ M' A 3.55
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi/Kg (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' A 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / M' F 1.00
Profit : 0% (tidak dimasukkan) G 1.00
Jumlah Harga Satuan (HF+HG) H 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)

Kode : An.2
Jenis : Angkutan Bahan (Sling Ø 16mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ M' A 1.58
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi/Kg (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' A 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / M' F 1.00
Profit : 0% (tidak dimasukkan) G 1.00
Jumlah Harga Satuan (HF+HG) H 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN

Kode : An.3
Jenis : Angkutan Bahan (Sling Ø 12.5 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ M' A 0.96
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' A 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / M' F 1.00
Profit : 0% (tidak dimasukkan) G 1.00
Jumlah Harga Satuan (HF+HG) H 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)

Kode : An.4
Jenis : Angkutan Bahan (kuku macan 24 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 1.50
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN

Kode : An.5
Jenis : Angkutan Bahan (kuku macan 18 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 0.86
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Bahan / Buah G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)

Kode : An.6
Jenis : Angkutan Bahan (Warfel Mur/Jarum Pengaku Kabel)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 3.50
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar / bh G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN

Kode : An.7
Jenis : Angkutan Bahan (Semen)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ sak A 50.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa (HA) 1.00
2 Biaya Mobilisasi ke Lokasi E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar/ kg (F/koef.A) G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)

Kode : An.8
Jenis : Angkutan Bahan (Besi Beton Polos)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ kg (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Besi / kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN

Kode : An.9
Jenis : Angkutan Bahan (Besi Beton Ulir)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ kg (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Besi / kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)

Kode : An.10
Jenis : Angkutan Bahan (Kawat harmonika 1 m)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipao/ M' (HA) A 2.33
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar / M' G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN

Kode : An.11
Jenis : Angkutan Bahan (Baut+mur Ø 20 x 400 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 1.14
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / bh G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)

Kode : An.12
Jenis : Angkutan Bahan (Paku Campuran)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar / kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN

Kode : An.13
Jenis : Angkutan Bahan (Kawat Ikat)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan

No. URAIAN KODE KOEF.

I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Kawat Ikat/ Kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00

catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)

Sugapa, 18 Mei 2017


Disetujui Konsultan Perencana
Pengguna Anggaran CV. BIRU CIPTA KONSULTAN
ANALISA HARGA DASAR SATUAN BAHAN

BENJAMIN G. LEKATOMPESSY, SP S O P Y A N, ST
NIP. 19680714 200212 1 006 Kepala Cabang
NALISA HARGA DASAR SATUAN BAHAN

HARGA
SATUAN SATUAN
(Rp.)

Kg 437,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

M 437,000.00
M 72,775.00
M 509,775.00

M 509,775.00
M 0.00
M 509,775.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)

Kg 235,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

M 235,000.00
M 32,390.00
M 267,390.00

M 267,390.00
M 0.00
M 267,390.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN

HARGA
SATUAN SATUAN
(Rp.)

Kg 215,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

M 215,000.00
M 19,680.00
M 234,680.00

M 234,680.00
M 0.00
M 234,680.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)

Kg 115,000.00

Kg 500.00

Kg 20,000.00
Bh 20,500.00

Bh 115,000.00
Bh 30,750.00
Bh 145,750.00

Bh 145,750.00
Bh 0.00
Bh 145,750.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN

HARGA
SATUAN SATUAN
(Rp.)

Kg 70,000.00

Kg 500.00

Kg 20,000.00
Bh 20,500.00

Bh 70,000.00
Bh 17,527.50
Bh 87,527.50

Bh 87,527.50
Bh 0.00
Bh 87,527.50

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)

Kg 325,000.00

Kg 500.00

Kg 20,000.00
Bh 20,500.00

Bh 325,000.00
Bh 71,750.00
Bh 396,750.00

Bh 396,750.00
Bh 0.00
Bh 396,750.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN

HARGA
SATUAN SATUAN
(Rp.)

kg 2,850,000.00

sak 30,000.00

sak 1,000,000.00
Kg 1,030,000.00

sak 2,850,000.00
sak 1,030,000.00
sak 3,880,000.00

Kg 77,600.00
Kg 0.00
Kg 77,600.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)

Kg 76,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

Kg 76,000.00
Kg 20,500.00
Kg 96,500.00

Kg 96,500.00
Kg 0.00
Kg 96,500.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN

HARGA
SATUAN SATUAN
(Rp.)

Kg 87,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

Kg 87,000.00
Kg 20,500.00
Kg 107,500.00

Kg 107,500.00
Kg 0.00
Kg 107,500.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)

Kg 213,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

M 213,000.00
M 47,765.00
M 260,765.00

M 260,765.00
M 0.00
M 260,765.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN

HARGA
SATUAN SATUAN
(Rp.)

Kg 29,000.00

Kg 500.00

Kg 20,000.00
Bh 20,500.00

Bh 29,000.00
Bh 23,370.00
Bh 52,370.00

Bh 52,370.00
Bh 0.00
Bh 52,370.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)

Kg 84,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

Kg 84,000.00
Kg 20,500.00
Kg 104,500.00

Kg 104,500.00
Kg 0.00
Kg 104,500.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN

HARGA
SATUAN SATUAN
(Rp.)

Kg 94,000.00

Kg 500.00

Kg 20,000.00
Kg 20,500.00

Kg 94,000.00
Kg 20,500.00
Kg 114,500.00

Kg 114,500.00
Kg 0.00
Kg 114,500.00

ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa

Sugapa, 18 Mei 2017


Konsultan Perencana
CV. BIRU CIPTA KONSULTAN
NALISA HARGA DASAR SATUAN BAHAN

S O P Y A N, ST
Kepala Cabang
STANDAR HARGA SATUAN BAHAN BANGUNAN/ KONSTRUKSI DAN UPAH KERJA

DISTRIK HITADIPA 2017


NO URAIAN JENIS SATUAN

1 2 3

I UPAH KERJA
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
5 Operator Terampil OH
6 Operator Kurang Terampil OH
7 Pembantu Operator OH
8 Sopir OH
9 Supir Personil OH
10 Pembantu Supir OH
11 Buruh Terampil OH
12 Buruh Kurang Terampil OH
13 Buruh Tak Terampil OH
14 Mekanik OH
15 Pembantu Mekanik OH

II BAHAN BATU
1 Batu kali M3
2 Kerikil / koral beton M3
3 Batu belah 15/20 M3
4 Batu pecah 5/7 (Manual) M3
5 Batu pecah 3/5 (Manual) M3
6 Batu pecah 2/3 (Manual) M3
7 Batu pecah 1/2 (Manual) M3
8 Batu pecah 5/7 (Stone Cruiser) M3
9 Batu pecah 3/5 (Stone Cruiser) M3
10 Batu pecah 2/3 (Stone Cruiser) M3
11 Batu pecah 1/2 (Stone Cruiser) M3
12 Abu Batu/Flying Ash (Aspal) M3
13 Batako Press, uk. 8x13x27 Bh
13 Bata Ringan, uk. 7,5x20x60 Bh
14 Batu Alam Bh
15 Paving Blok Bh

III BAHAN PASIR DAN TANAH


1 Pasir pasang / Pasir beton M3
2 Pasir pasang / Pasir beton pilihan (tersaring) M3
NO URAIAN JENIS SATUAN

1 2 3
3 Pasir urug / Sirtu M3
4 Tanah urug M3
5 Urugan biasa M3
6 Urugan pilihan M3

IV BAHAN KAYU
1 Balok kayu lokal kelas I M3
2 Balok kayu cina M3
3 Balok kayu putih M3
4 Papan kayu lokal kelas I M3
5 Papan kayu cina M3
6 Papan kayu putih M3
7 Papan kayu lokal kelas I di-skoning M3
8 Papan kayu cina di-skoning M3
9 Papan kayu putih di-skoning M3
10 Papan lambersharing kayu besi (dr Nabire) M3
11 Papan kayu besi kls I (dr Nabire) Bh
12 Dolken kayu (kayu buahJeobo/Wanobo) Ø 8-10 cm pjg 4 m Bh
13 Kayu Log Jeobo / Wanobo Ø 12 cm pjg 7 m Bh
14 List kayu profil M'
15 Kayu Bakar M3
V BAHAN KAYU LAPIS
1 Tripleks 3 mm Lbr
2 Tripleks 5 mm Lbr
3 Multi pleks 9 mm Lbr
4 Teakwood 122 x 244 cm tebal 3 mm Lbr
NO URAIAN JENIS SATUAN

1 2 3
5 Formika 122 x 244 cm Lbr
6 Calsiboard 4 mm Lbr
7 Calsiboard 9 mm Lbr

VI BAHAN ATAP
A. Atap Seng :
1 Seng gelombang BjLs 30 Lbr
2 Seng gelombang BjLs 20 Lbr
3 Seng plat BjLs 30 lebar 45 cm M'
4 Seng plat BjLs 30 lebar 40 cm M'
5 Seng plat BjLs 30 lebar 30 cm M'
6 Seng plat BjLs 20 lebar 45 cm M'
7 Seng plat BjLs 20 lebar 40 cm M'
8 Seng plat BjLs 20 lebar 30 cm M'
9 Seng plat BjLs 30 pelapis pintu KM Lbr
10 Seng plat BjLs 20 pelapis pintu KM Lbr

B. Metal Roof :
1 Atap Multi roof BjLs 0,2 Lbr
2 Atap Multi roof BjLs 0,25 Lbr
3 Atap Multi roof BjLs 0,3 Lbr
4 Nok Multi roof BjLs 0,2 Lbr
5 Nok Multi roof BjLs 0,25 Lbr
6 Nok Multi roof BjLs 0,3 Lbr
7 Atap Sakura roof BjLs 0,25 Lbr
8 Nok Sakura roof BjLs 0,25 Lbr

C. Atap Fiber /Fibre Roof :


1 Roof Light Fibreglass Lbr

VII BAHAN KACA & LOVERS


1 Kaca bening 3 mm M2
2 Kaca rayband 3 mm M2
3 Kaca bening 5 mm M2
4 Kaca rayband 5 mm M2
5 Kaca lovers 6 klip polos + teralis Set
6 Kaca lovers 6 klip rayband + teralis Set
7 Kaca lovers 7 klip polos + teralis Set
8 Kaca lovers 7 klip rayband + teralis Set
9 Kaca lovers 8 klip polos + teralis Set
10 Kaca lovers 8 klip rayband + teralis Set
11 Kaca cermin 122 x 51 cm M2

VIII BAHAN PENGUNCI/ PENGANTUNG


1 Kunci 2 slaag kuda terbang kecil Bh
2 Kunci 2 slaag kuda terbang besar Bh
NO URAIAN JENIS SATUAN

1 2 3
3 Kunci 2 slaag yale kecil Bh
4 Kunci 2 slaag yale besar Bh
5 Kunci 2 slaag merk ATS kecil Bh
6 Kunci 2 slaag merk ATS besar Bh
7 Kunci 2 slaag merk sobar kecil Bh
8 Kunci 2 slaag merk sobar besar Bh
9 Kunci Antik 2 slaag Bh
10 Kunci tanam silinder 2 slaag Bh
11 Engsel H pintu ( 110 x 55 ) Bh
12 Engsel H jendela ( 80 x 50 ) Bh
13 Engsel ring nilon pintu ( 3 x 4 ) Bh
14 Engsel ring nilon jendela ( 3 x 2,5 ) Bh
15 Kait angin biasa Bh
16 Kait angin merk sobar Bh
17 Grendel jendela kecil Bh
18 Grendel jendela besar Bh
19 Grendel jendela + penarik Bh
20 Grendel pintu kecil Bh
21 Grendel pintu besar Bh
22 Kunci gembok kecil ( 2" ) 5 cm Bh
23 Kunci gembok sedang ( 4") 10 cm Bh
24 Kunci gembok besar ( 6" ) 14 cm Bh
25 Tarikan jendela Bh
26 Tarikan pintu/handle Bh
27 Pintu aluminium Bh
28 Door closer Bh
29 Door stop Bh
30 Door holder Bh
NO URAIAN JENIS SATUAN

1 2 3

IX BAHAN PAKU & BAUT


1 Paku 5 - 10 cm Kg
2 Paku campur Kg
3 Paku seng Kg
4 Paku tripleks Kg
5 Paku 3 cm Kg
6 Paku 4 cm Kg
7 Paku sekrup Kg
8 Paku jembatan Kg
9 Paku beton < 12,5 cm Kg
10 Baut + mur Ø 15 = 3/8" - 6" Bh
11 Baut + mur Ø 17,5 = 3/8" - 7" Bh
12 Baut + mur Ø 20 = 3/8" - 8" Bh

X BAHAN BESI, BAJA & KAWAT


1 Besi polos Ø 8 mm (4.72 kg/btg) Btg
2 Besi polos Ø 10 mm (7.44 kg/btg) Btg
3 Besi polos Ø 12 mm (10.64 kg/btg) Btg
4 Besi polos Ø 16 mm (18.96 kg/btg) Btg
5 Besi polos Ø 25 mm (46.30 kg/btg) Btg
6 Besi beton ulir Ø 8 mm Btg
7 Besi beton ulir Ø 10 mm Btg
8 Besi beton ulir Ø 13 mm Btg
9 Besi beton ulir Ø 16 mm Btg
10 Besi beton ulir Ø 25 mm Btg
11 Besi beton ulir Ø 36 mm Btg
12 Besi beton polos Kg
13 Besi beton ulir Kg
14 Besi siku 30.30.3 p = 6 m' Btg
15 Besi siku 40.40.4 p = 6 m' Btg
16 Besi siku 40.40.5 p = 6 m' Btg
17 Besi siku 50.50.5 p = 6 m' Btg
18 Besi siku 60.60.6 p = 6 m' Btg
19 Besi Strip 2 x 3 Btg
20 Besi galvanis (aramco) Ø 1 m, t = 3 mm Kg
21 Besi galvanis (aramco) Ø 2,25 m, t = 6 mm Kg
22 Besi Virkan Bh
23 Plat Stainles steel 4 mm Lbr
24 Besi Hollow 4 x 4 cm, t= 1,75 mm Btg
25 Besi Hollow 2 x 4 cm, t= 1,75 mm Btg
26 Plat Baja 2 mm Lbr
27 Plat Baja 3 mm Lbr
28 Plat Baja 4 mm Lbr
29 Roda Baja Bh
30 Engsel Baja Bh
NO URAIAN JENIS SATUAN

1 2 3
31 Kawat bronjong 3 mm (Besi jaring ) Kg
32 Kawat ikat Kg
33 Kawat duri M'
34 Kawat RAM putih M'
35 Kawat RAM hijau M'
36 Kawat harmonika 1 m M'
37 Kawat harmonika 1,5 m M'
38 Kawat harmonika 2 m M'
39 Kawat nyamuk plastik M'
40 Kawat nyamuk aluminium M'
41 Kawat ayakan M'
42 Kawat las / Elektroda Dos
43 Kabel Sling Baja dia 12 M'
44 Kabel Sling Baja dia 16 M'
45 Kabel Sling Baja dia 18 M'
46 Kabel Sling Baja dia 24 M'
47 Kuku Macan/Buldog Grip 16 Bh
48 Kuku Macan/Buldog Grip 18 Bh
49 Kuku Macan//Buldog Grip 24 Bh
50 Warfel Mur/Jarum Pengaku Kabel Bh
51 Hanger dia 16 Bh
52 Hanger dia 18 Bh
53 Hanger dia 24 Bh

XI BAHAN LANTAI, DINDING & SANITAIR


1 Keramik putih polos 20 x 20 cm Dos
2 Keramik motif 20 x 20 cm (13Kg) Dos
3 Keramik putih polos 30 x 30 cm (14Kg) Dos
NO URAIAN JENIS SATUAN

1 2 3
4 Keramik dasar polos bercorak 30 x 30 cm (14Kg) Dos
5 Keramik motif 30 x 30 cm (14Kg) Dos
6 Keramik putih polos 40 x 40 cm (16Kg) Dos
7 Keramik dasar polos bercorak 40 x 40 cm (16Kg) Dos
8 Keramik motif 40 x 40 cm (16Kg) Dos
9 Keramik putih polos 20 x 25 cm (14Kg) Dos
10 Keramik motif 20 x 25 cm (14Kg) Dos
11 Granito Tile 60x60 cm Essensa polish (30Kg) Dos
12 Marmer 100x100 cm M2
13 Karpet, t = 2 cm M2
14 Kuku keramik Bh
15 Plint keramik 10 x 40 Bh
16 Plint Marmer 10x100 Bh
17 Kloset duduk porselen Bh
18 Kloset duduk lengkap Bh
19 Kloset jongkok porselen leher bundar Bh
20 Kloset jongkok porselen leher angsa Bh
21 Kloset jongkok TOTO Bh
22 Urinoir KIA Bh
23 Wastafel Bh
24 Krant merek AER Bh
25 Krant air PVC 3/4" Bh
26 Krant air PVC 1/2" Bh
27 Stop Krant air PVC 3/4" Bh
28 Stop Krant air PVC 1/2" Bh
29 Pompa air sanyo kecil Bh
30 Pompa air sanyo besar Bh
31 Pompa air DAB besar Bh
32 Profil Tank Fiber glass 250 liter Bh
33 Profil Tank Fiber glass 650 liter Bh
34 Profil Tank Fiber glass 1100 liter Bh
35 Dop Bak plastik Bh
36 Dop Bak stainles Bh
37 Bak cuci piring stainless steel 2 mata Bh
38 Bak cuci piring stainless steel 1 mata Bh
39 Water drain + assesoris Bh
40 Bak air fiber glass 30 L Bh
41 Floor drain stainless steel Bh

XII BAHAN PIPA


1 Pipa PVC Ø 1/2" ( Panjang 4 m ) Btg
2 Pipa PVC Ø 3/4" ( Panjang 4 m ) Btg
3 Pipa PVC Ø 1" ( Panjang 4 m ) Btg
4 Pipa PVC Ø 1.5" ( Panjang 4 m ) Btg
5 Pipa PVC Ø 2" ( Panjang 4 m ) Btg
6 Pipa PVC Ø 3" ( Panjang 4 m ) Btg
NO URAIAN JENIS SATUAN

1 2 3
7 Pipa PVC Ø 4" ( Panjang 4 m ) Btg
8 Samb L (Knee) Pipa PVC Ø 1/2" Bh
9 Samb L (Knee) Pipa PVC Ø 3/4" Bh
10 Samb L (Knee) Pipa PVC Ø 1" Bh
11 Samb L (Knee) Pipa PVC Ø 1.5" Bh
12 Samb L (Knee) Pipa PVC Ø 2" Bh
13 Samb L (Knee) Pipa PVC Ø 3" Bh
14 Samb L (Knee) Pipa PVC Ø 4" Bh
15 Sok Pipa PVC Ø 1/2" Bh
16 Sok Pipa PVC Ø 3/4" Bh
17 Sok Pipa PVC Ø 1" Bh
18 Sok Pipa PVC Ø 1.5" Bh
19 Sok Pipa PVC Ø 2" Bh
20 Sok Pipa PVC Ø 3" Bh
21 Sok Pipa PVC Ø 4" Bh
22 Samb T Sokket Pipa PVC Ø 1/2" Bh
23 Samb T Sokket Pipa PVC Ø 3/4" Bh
24 Samb T Sokket Pipa PVC Ø 1" Bh
25 Samb T Sokket Pipa PVC Ø 1.5" Bh
26 Samb T Sokket Pipa PVC Ø 2" Bh
27 Samb T Sokket Pipa PVC Ø 3" Bh
28 Samb T Sokket Pipa PVC Ø 4" Bh
29 Over sock Pipa PVC 1" to 3/4' Bh
30 Over sock Pipa PVC 1" to 1/2' Bh
31 Over sock Pipa PVC 3/4" to 1/2' Bh
32 Pipa GIV Ø 1/2" Tbl ( Panjang 6 m ) M'
33 Pipa GIV Ø 3/4" Tbl ( Panjang 6 m ) Btg
34 Pipa GIV Ø 1" Tbl ( Panjang 6 m ) Btg
NO URAIAN JENIS SATUAN

1 2 3
35 Pipa GIV Ø 1.5" Tbl ( Panjang 6 m ) Btg
36 Pipa GIV Ø 2" Tbl ( Panjang 6 m ) Btg
37 Pipa GIV Ø 3" Tbl ( Panjang 6 m ) Btg
38 Pipa GIV Ø 4" Tbl ( Panjang 6 m ) Btg
39 Pipa Stainles steel Ø 3/4" Tbl ( Panjang 6 m ) Btg
40 Pipa Stainles steel Ø 1.5" Tbl ( Panjang 6 m ) Btg
41 Pipa Stainles steel Ø2" Tbl ( Panjang 6 m ) Btg
42 Samb L (Knee) Pipa GIV Ø 1/2" Bh
43 Samb L (Knee) Pipa GIV Ø 3/4" Bh
44 Samb L (Knee) Pipa GIV Ø 1" Bh
45 Samb L (Knee) Pipa GIV Ø 1.5" Bh
46 Samb L (Knee) Pipa GIV Ø 2" Bh
47 Samb L (Knee) Pipa GIV Ø 3" Bh
48 Samb L (Knee) Pipa GIV Ø 4" Bh
49 Sok Pipa GIV Ø 1/2" Bh
50 Sok Pipa GIV Ø 3/4" Bh
51 Sok Pipa GIV Ø 1" Bh
52 Sok Pipa GIV Ø 1.5" Bh
53 Sok Pipa GIV Ø 2" Bh
54 Sok Pipa GIV Ø 3" Bh
55 Sok Pipa GIV Ø 4" Bh
56 Samb T Sokket Pipa GIV Ø 1/2" Bh
57 Samb T Sokket Pipa GIV Ø 3/4" Bh
58 Samb T Sokket Pipa GIV Ø 1" Bh
59 Samb T Sokket Pipa GIV Ø 1.5" Bh
60 Samb T Sokket Pipa GIV Ø 2" Bh
61 Samb T Sokket Pipa GIV Ø 3" Bh
62 Samb T Sokket Pipa GIV Ø 4" Bh
63 Stop Krant Pipa GIV Ø 1/2" Bh
64 Stop Krant Pipa GIV Ø 3/4" Bh
65 Stop Krant Pipa GIV Ø 1" Bh
66 Stop Krant Pipa GIV Ø 1.5" Bh
67 Stop Krant Pipa GIV Ø 2" Bh
68 Stop Krant Pipa GIV Ø 3" Bh
69 Over sock Pipa GIV Ø 1/2" Bh
70 Over sock Pipa GIV Ø 3/4" Bh
71 Over sock Pipa GIV Ø 1" Bh
72 Over sock Pipa GIV Ø 1.5" Bh
73 Over sock Pipa GIV Ø 2" Bh
74 Over sock Pipa GIV Ø 3" Bh
75 Pipa Listrik 5/8" Btg
76 Pipa Talang PVC 1/2 lingkaran 8" Btg
77 Talang karet lebar 60 cm M'
78 Ijuk Kg
79 Tali Ijuk Kg
NO URAIAN JENIS SATUAN

1 2 3
XIII BAHAN SEMEN DAN PEREKAT LAINNYA
1 Semen PC 50 Kg Zak
2 Semen PC 1 Kg Kg
3 Semen warna Kg
4 Perekat bata ringan MU-380, 40 kg Kg
5 Perekat bata ringan PM-100, 40 kg Kg

XIV BAHAN CAT/ FINISHING


1 Cat tembok 20 Kg (ember) Ember
2 Cat Minyak 1 Kg Kg
3 Cat besi Kg
4 Cat atap hardek 5 ltr Klg
5 Plamur tembok Kg
6 Plamur kayu Kg
7 Dempul besi Kg
8 Dempul kayu Kg
9 Residu Kg
10 Meni besi Kg
11 Meni kayu Kg
12 Politur/teak oil Ltr
13 Minyak cat Ltr
14 Minyak Bekisting Ltr
15 Thiner Ltr
16 Amplas kayu Lbr
17 Amplas besi Lbr
18 Lem kayu Klg
19 Lem Klg
20 Rapidrant Gal
NO URAIAN JENIS SATUAN

1 2 3

XV BAHAN BAKAR & ASPAL


1 Bensin / Premium Ltr
2 Solar Ltr
3 Pelumas Ltr
4 Aspal Kg
5 Minyak Tanah Ltr
HARGA SATUAN BAHAN BANGUNAN/ KONSTRUKSI DAN UPAH KERJA

DISTRIK HITADIPA 2017


HARGA

163,000
189,000
220,500
247,000
220,500
178,500
163,000
210,000
168,000
152,500
163,000
157,500
152,500
210,000
168,000

Rp 5,092,000
Rp 5,042,000
Rp 5,242,000
Rp 5,250,000
Rp 5,300,000
Rp 5,400,000
Rp 5,450,000
Rp 5,950,000
Rp 6,000,000
Rp 6,100,000
Rp 6,250,000
Rp 3,200,000
Rp 51,400
Rp 401,700
Rp 82,040
Rp 54,900

Rp 1,180,000
Rp 1,557,000
HARGA

4
Rp 1,024,000
Rp 656,700
Rp 756,700
Rp 856,700

Rp 6,650,000
Rp 6,485,000
Rp 6,397,000
Rp 6,770,000
Rp 6,572,750
Rp 6,397,000
Rp 7,010,000
Rp 6,836,000
Rp 6,685,500
Rp 35,850,000
Rp 35,350,000
Rp 355,000
Rp 550,000
Rp 139,125
Rp 2,000,000

Rp 248,000
Rp 457,000
Rp 724,000
Rp 502,000
HARGA

4
Rp 365,000
Rp 1,299,000
Rp 2,865,000

Rp 258,000
Rp 200,000
Rp 112,000
Rp 101,000
Rp 79,000
Rp 85,000
Rp 74,000
Rp 58,000
Rp 328,000
Rp 235,000

Rp 185,000
Rp 196,000
Rp 218,000
Rp 171,000
Rp 180,000
Rp 198,000
Rp 191,000
Rp 179,000

Rp 159,000

Rp 586,000
Rp 597,000
Rp 932,000
Rp 948,000
Rp 631,000
Rp 637,000
Rp 713,000
Rp 714,000
Rp 782,000
Rp 795,000
Rp 740,000

Rp 106,000
Rp 137,000
HARGA

4
Rp 140,000
Rp 214,000
Rp 173,000
Rp 230,000
Rp 184,000
Rp 264,000
Rp 285,000
Rp 242,000
Rp 26,000
Rp 19,000
Rp 26,000
Rp 21,000
Rp 18,000
Rp 39,000
Rp 14,000
Rp 19,000
Rp 28,000
Rp 24,000
Rp 35,000
Rp 31,000
Rp 116,000
Rp 171,000
Rp 28,000
Rp 373,000
Rp 2,214,000
Rp 478,000
Rp 115,000
Rp 146,000
HARGA

Rp 85,000
Rp 84,000
Rp 93,000
Rp 88,000
Rp 84,000
Rp 84,000
Rp 82,000
Rp 86,000
Rp 116,000
Rp 23,000
Rp 26,000
Rp 29,000

Rp 360,000
Rp 539,000
Rp 745,000
Rp 1,341,000
Rp 3,214,000
Rp 456,000
Rp 697,000
Rp 1,169,000
Rp 1,778,000
Rp 4,358,000
Rp 8,997,000
Rp 76,000
Rp 87,000
Rp 359,000
Rp 505,000
Rp 572,000
Rp 678,000
Rp 913,000
Rp 192,000
Rp 122,000
Rp 141,000
Rp 39,000
Rp 8,486,000
Rp 672,000
Rp 350,000
Rp 2,406,000
Rp 3,377,000
Rp 4,348,000
Rp 167,000
Rp 117,000
HARGA

4
Rp 93,000
Rp 94,000
Rp 12,000
Rp 67,000
Rp 62,000
Rp 213,000
Rp 288,000
Rp 424,000
Rp 39,000
Rp 48,000
Rp 56,000
Rp 472,000
Rp 215,000
Rp 235,000
Rp 270,000
Rp 437,000
Rp 55,000
Rp 70,000
Rp 115,000
Rp 325,000
Rp 222,000
Rp 229,000
Rp 249,000

Rp 821,000
Rp 841,000
Rp 883,000
HARGA

4
Rp 883,000
Rp 889,000
Rp 1,009,000
Rp 1,009,000
Rp 1,019,000
Rp 883,000
Rp 888,000
Rp 2,681,000
Rp 7,313,000
Rp 277,000
Rp 5,000
Rp 53,000
Rp 1,047,000
Rp 2,485,000
Rp 3,139,000
Rp 492,000
Rp 516,000
Rp 820,000
Rp 2,509,000
Rp 1,621,000
Rp 145,000
Rp 92,000
Rp 85,000
Rp 25,000
Rp 18,000
Rp 997,000
Rp 1,665,000
Rp 2,205,000
Rp 2,836,000
Rp 4,845,000
Rp 7,516,000
Rp 25,000
Rp 30,000
Rp 1,268,000
Rp 659,000
Rp 105,000
Rp 1,110,000
Rp 137,000

Rp 90,000
Rp 127,000
Rp 160,000
Rp 244,000
Rp 405,000
Rp 647,000
HARGA

4
Rp 915,000
Rp 6,000
Rp 6,000
Rp 10,000
Rp 15,000
Rp 21,000
Rp 53,000
Rp 97,000
Rp 7,000
Rp 10,000
Rp 14,000
Rp 21,000
Rp 27,000
Rp 50,000
Rp 84,000
Rp 6,000
Rp 7,000
Rp 13,000
Rp 19,000
Rp 32,000
Rp 61,000
Rp 108,000
Rp 19,000
Rp 15,000
Rp 13,000
Rp 315,000
Rp 419,000
Rp 535,000
HARGA

4
Rp 725,000
Rp 971,000
Rp 1,499,000
Rp 2,321,000
Rp 1,029,000
Rp 775,000
Rp 385,000
Rp 23,000
Rp 33,000
Rp 43,000
Rp 64,000
Rp 90,000
Rp 130,000
Rp 182,000
Rp 24,000
Rp 32,000
Rp 43,000
Rp 68,000
Rp 90,000
Rp 125,000
Rp 171,000
Rp 20,000
Rp 28,000
Rp 43,000
Rp 64,000
Rp 86,000
Rp 142,000
Rp 182,000
Rp 61,000
Rp 79,000
Rp 93,000
Rp 140,000
Rp 295,000
Rp 549,000
Rp 20,000
Rp 28,000
Rp 44,000
Rp 65,000
Rp 86,000
Rp 121,000
Rp 45,000
Rp 582,000
Rp 76,000
Rp 72,000
Rp 47,000
HARGA

Rp 2,850,000
Rp 62,000
Rp 73,000
Rp 77,125
Rp 75,200

Rp 1,160,000
Rp 122,000
Rp 122,000
Rp 433,000
Rp 123,000
Rp 123,000
Rp 121,000
Rp 88,000
Rp 82,000
Rp 88,000
Rp 88,000
Rp 132,000
Rp 110,000
Rp 73,000
Rp 93,000
Rp 7,100
Rp 7,200
Rp 87,000
Rp 98,000
Rp 1,284,000
HARGA

Rp 70,000
Rp 69,500
Rp 81,500
Rp 72,000
Rp 69,000
C.1 Pondasi Menara C.1 Pondasi Menara

Tapak : 2 x 2.6 x 0.4 = 2.08 Tapak : 1.8 x 1


Kolom : 0.8 x 2 x 2.1 = 3.36 Kolom : 0.5 x 0.5
5.44
Volume tiang kayu 0.9 x 0.25 x 2.1 = 0.4725 Volume tiang kayu 0.2 x 0.2
2 x 4.9675
Volume : = 9.935 Volume :
14.915

C.2 Pondasi Block Angker


Pembesian
Tapak : 1.8 x 1 x 0.3 = 0.54 a. Beugel 6 x 1.3 x
Kolom : 0.6 x 0.4 x 2.1 = 0.504 b. Telapak 4 x 2.5 +
1.044 c. Kolom 4 x 2.1 x
Volume tiang kayu 0 x 0 x 0 = 0 d. Angker 4 x 3 x
4 x 1.044
Volume : = 4.176

C.3 Pondasi Block Angin


Pembesian
Tapak : 1.2 x 1.2 x 0.25 = 0.36 a. Beugel 6 x 0.9 x
Kolom : 0.3 x 0.3 x 1.6 = 0.144 b. Telapak 4 x 2.2 +
0.504 c. Kolom 4 x 2.1 x
Volume tiang kayu 0 x 0 x 0 = 0 d. Angker 2 x 3 x
4 x 0.504
Volume : = 2.016
Pondasi Menara

x 0.4 = 0.72
x 2.1 = 0.525
1.245
x 0 = 0
4 x 1.245
= 4.98

0.3946 = 3.0778
5 x 2.5 x 0.8878 = 19.976
0.8878 = 7.4576
1.5783 = 18.94
49.451
47.367

0.3946 = 2.1308
5 x 2.2 x 0.6165 = 12.207
0.8878 = 7.4576
1.5783 = 9.47
31.266
62.035
STANDAR HARGA SATUAN BAHAN BANGUNAN/ KONSTRUKSI DAN UPAH KERJA
DISTRIK HITADIPA 2016
NO URAIAN JENIS SATUAN

1 2 3

I UPAH KERJA
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
5 Operator Terampil OH
6 Operator Kurang Terampil OH
7 Pembantu Operator OH
8 Sopir OH
9 Supir Personil OH
10 Pembantu Supir OH
11 Buruh Terampil OH
12 Buruh Kurang Terampil OH
13 Buruh Tak Terampil OH
14 Mekanik OH
15 Pembantu Mekanik OH

II BAHAN BATU
1 Batu kali M3
2 Kerikil / koral beton M3
3 Batu belah 15/20 M3
4 Batu pecah 5/7 (Manual) M3
5 Batu pecah 3/5 (Manual) M3
6 Batu pecah 2/3 (Manual) M3
7 Batu pecah 1/2 (Manual) M3
8 Batu pecah 5/7 (Stone Cruiser) M3
9 Batu pecah 3/5 (Stone Cruiser) M3
10 Batu pecah 2/3 (Stone Cruiser) M3
11 Batu pecah 1/2 (Stone Cruiser) M3
12 Abu Batu/Flying Ash (Aspal) M3
13 Batako Press, uk. 8x13x27 Bh
13 Bata Ringan, uk. 7,5x20x60 Bh
14 Batu Alam Bh
15 Paving Blok Bh

III BAHAN PASIR DAN TANAH


1 Pasir pasang / Pasir beton M3
2 Pasir pasang / Pasir beton pilihan (tersaring) M3
3 Pasir urug / Sirtu M3
4 Tanah urug M3
5 Urugan biasa M3
6 Urugan pilihan M3

IV BAHAN KAYU
1 Balok kayu lokal kelas I M3
2 Balok kayu cina M3
3 Balok kayu putih M3
4 Papan kayu lokal kelas I M3
5 Papan kayu cina M3
6 Papan kayu putih M3
7 Papan kayu lokal kelas I di-skoning M3
8 Papan kayu cina di-skoning M3
9 Papan kayu putih di-skoning M3
10 Papan lambersharing kayu besi (dr Nabire) M3
11 Papan kayu besi kls I (dr Nabire) Bh
12 Dolken kayu (kayu buahJeobo/Wanobo) Ø 8-10 cm pjg 4 m Bh
13 Kayu Log Jeobo / Wanobo Ø 12 cm pjg 7 m Bh
14 List kayu profil M'

V BAHAN KAYU LAPIS


1 Tripleks 3 mm Lbr
2 Tripleks 5 mm Lbr
3 Multi pleks 9 mm Lbr
4 Teakwood 122 x 244 cm tebal 3 mm Lbr
5 Formika 122 x 244 cm Lbr
6 Calsiboard 4 mm Lbr
7 Calsiboard 9 mm Lbr

VI BAHAN ATAP
A. Atap Seng :
1 Seng gelombang BjLs 30 Lbr
2 Seng gelombang BjLs 20 Lbr
3 Seng plat BjLs 30 lebar 45 cm M'
4 Seng plat BjLs 30 lebar 40 cm M'
5 Seng plat BjLs 30 lebar 30 cm M'
6 Seng plat BjLs 20 lebar 45 cm M'
7 Seng plat BjLs 20 lebar 40 cm M'
8 Seng plat BjLs 20 lebar 30 cm M'
9 Seng plat BjLs 30 pelapis pintu KM Lbr
10 Seng plat BjLs 20 pelapis pintu KM Lbr

B. Metal Roof :
1 Atap Multi roof BjLs 0,2 Lbr
2 Atap Multi roof BjLs 0,25 Lbr
3 Atap Multi roof BjLs 0,3 Lbr
4 Nok Multi roof BjLs 0,2 Lbr
5 Nok Multi roof BjLs 0,25 Lbr
6 Nok Multi roof BjLs 0,3 Lbr
7 Atap Sakura roof BjLs 0,25 Lbr
8 Nok Sakura roof BjLs 0,25 Lbr

C. Atap Fiber /Fibre Roof :


1 Roof Light Fibreglass Lbr

VII BAHAN KACA & LOVERS


1 Kaca bening 3 mm M2
2 Kaca rayband 3 mm M2
3 Kaca bening 5 mm M2
4 Kaca rayband 5 mm M2
5 Kaca lovers 6 klip polos + teralis Set
6 Kaca lovers 6 klip rayband + teralis Set
7 Kaca lovers 7 klip polos + teralis Set
8 Kaca lovers 7 klip rayband + teralis Set
9 Kaca lovers 8 klip polos + teralis Set
10 Kaca lovers 8 klip rayband + teralis Set
11 Kaca cermin 122 x 51 cm M2

VIII BAHAN PENGUNCI/ PENGANTUNG


1 Kunci 2 slaag kuda terbang kecil Bh
2 Kunci 2 slaag kuda terbang besar Bh
3 Kunci 2 slaag yale kecil Bh
4 Kunci 2 slaag yale besar Bh
5 Kunci 2 slaag merk ATS kecil Bh
6 Kunci 2 slaag merk ATS besar Bh
7 Kunci 2 slaag merk sobar kecil Bh
8 Kunci 2 slaag merk sobar besar Bh
9 Kunci Antik 2 slaag Bh
10 Kunci tanam silinder 2 slaag Bh
11 Engsel H pintu ( 110 x 55 ) Bh
12 Engsel H jendela ( 80 x 50 ) Bh
13 Engsel ring nilon pintu ( 3 x 4 ) Bh
14 Engsel ring nilon jendela ( 3 x 2,5 ) Bh
15 Kait angin biasa Bh
16 Kait angin merk sobar Bh
17 Grendel jendela kecil Bh
18 Grendel jendela besar Bh
19 Grendel jendela + penarik Bh
20 Grendel pintu kecil Bh
21 Grendel pintu besar Bh
22 Kunci gembok kecil ( 2" ) 5 cm Bh
23 Kunci gembok sedang ( 4") 10 cm Bh
24 Kunci gembok besar ( 6" ) 14 cm Bh
25 Tarikan jendela Bh
26 Tarikan pintu/handle Bh
27 Pintu aluminium Bh
28 Door closer Bh
29 Door stop Bh
30 Door holder Bh

IX BAHAN PAKU & BAUT


1 Paku 5 - 10 cm Kg
2 Paku campur Kg
3 Paku seng Kg
4 Paku tripleks Kg
5 Paku 3 cm Kg
6 Paku 4 cm Kg
7 Paku sekrup Kg
8 Paku jembatan Kg
9 Paku beton < 12,5 cm Kg
10 Baut + mur Ø 15 = 3/8" - 6" Bh
11 Baut + mur Ø 17,5 = 3/8" - 7" Bh
12 Baut + mur Ø 20 = 3/8" - 8" Bh

X BAHAN BESI, BAJA & KAWAT


1 Besi polos Ø 8 mm (4.72 kg/btg) Btg
2 Besi polos Ø 10 mm (7.44 kg/btg) Btg
3 Besi polos Ø 12 mm (10.64 kg/btg) Btg
4 Besi polos Ø 16 mm (18.96 kg/btg) Btg
5 Besi polos Ø 25 mm (46.30 kg/btg) Btg
6 Besi beton ulir Ø 8 mm Btg
7 Besi beton ulir Ø 10 mm Btg
8 Besi beton ulir Ø 13 mm Btg
9 Besi beton ulir Ø 16 mm Btg
10 Besi beton ulir Ø 25 mm Btg
11 Besi beton ulir Ø 36 mm Btg
12 Besi beton polos Kg
13 Besi beton ulir Kg
14 Besi siku 30.30.3 p = 6 m' Btg
15 Besi siku 40.40.4 p = 6 m' Btg
16 Besi siku 40.40.5 p = 6 m' Btg
17 Besi siku 50.50.5 p = 6 m' Btg
18 Besi siku 60.60.6 p = 6 m' Btg
19 Besi Strip 2 x 3 Btg
20 Besi galvanis (aramco) Ø 1 m, t = 3 mm Kg
21 Besi galvanis (aramco) Ø 2,25 m, t = 6 mm Kg
22 Besi Virkan Bh
23 Plat Stainles steel 4 mm Lbr
24 Besi Hollow 4 x 4 cm, t= 1,75 mm Btg
25 Besi Hollow 2 x 4 cm, t= 1,75 mm Btg
26 Besi profil WF Kg
27 Besi galvanis / rangka jembatan Kg
26 Plat Baja 2 mm Lbr
27 Plat Baja 3 mm Lbr
28 Plat Baja 4 mm Lbr
29 Roda Baja Bh
30 Engsel Baja Bh
31 Kawat bronjong 3 mm (Besi jaring ) Kg
32 Kawat ikat Kg
33 Kawat duri M'
34 Kawat RAM putih M'
35 Kawat RAM hijau M'
36 Kawat harmonika 1 m M'
37 Kawat harmonika 1,5 m M'
38 Kawat harmonika 2 m M'
39 Kawat nyamuk plastik M'
40 Kawat nyamuk aluminium M'
41 Kawat ayakan M'
42 Kawat las / Elektroda Dos
43 Kabel Sling Baja dia 16 M'
44 Kabel Sling Baja dia 18 M'
45 Kabel Sling Baja dia 24 M'
46 Kuku Macan/Buldog Grip 16 Bh
47 Kuku Macan/Buldog Grip 18 Bh
48 Kuku Macan//Buldog Grip 24 Bh
49 Warfel Mur/Jarum Pengaku Kabel Bh
50 Hanger dia 16 Bh
51 Hanger dia 18 Bh
52 Hanger dia 24 Bh

XI BAHAN LANTAI, DINDING & SANITAIR


1 Keramik putih polos 20 x 20 cm Dos
2 Keramik motif 20 x 20 cm (13Kg) Dos
3 Keramik putih polos 30 x 30 cm (14Kg) Dos
4 Keramik dasar polos bercorak 30 x 30 cm (14Kg) Dos
5 Keramik motif 30 x 30 cm (14Kg) Dos
6 Keramik putih polos 40 x 40 cm (16Kg) Dos
7 Keramik dasar polos bercorak 40 x 40 cm (16Kg) Dos
8 Keramik motif 40 x 40 cm (16Kg) Dos
9 Keramik putih polos 20 x 25 cm (14Kg) Dos
10 Keramik motif 20 x 25 cm (14Kg) Dos
11 Granito Tile 60x60 cm Essensa polish (30Kg) Dos
12 Marmer 100x100 cm M2
13 Karpet, t = 2 cm M2
14 Kuku keramik Bh
15 Plint keramik 10 x 40 Bh
16 Plint Marmer 10x100 Bh
17 Kloset duduk porselen Bh
18 Kloset duduk lengkap Bh
19 Kloset jongkok porselen leher bundar Bh
20 Kloset jongkok porselen leher angsa Bh
21 Kloset jongkok TOTO Bh
22 Urinoir KIA Bh
23 Wastafel Bh
24 Krant merek AER Bh
25 Krant air PVC 3/4" Bh
26 Krant air PVC 1/2" Bh
27 Stop Krant air PVC 3/4" Bh
28 Stop Krant air PVC 1/2" Bh
29 Pompa air sanyo kecil Bh
30 Pompa air sanyo besar Bh
31 Pompa air DAB besar Bh
32 Profil Tank Fiber glass 250 liter Bh
33 Profil Tank Fiber glass 650 liter Bh
34 Profil Tank Fiber glass 1100 liter Bh
35 Dop Bak plastik Bh
36 Dop Bak stainles Bh
37 Bak cuci piring stainless steel 2 mata Bh
38 Bak cuci piring stainless steel 1 mata Bh
39 Water drain + assesoris Bh
40 Bak air fiber glass 30 L Bh
41 Floor drain stainless steel Bh

XII BAHAN PIPA


1 Pipa PVC Ø 1/2" ( Panjang 4 m ) Btg
2 Pipa PVC Ø 3/4" ( Panjang 4 m ) Btg
3 Pipa PVC Ø 1" ( Panjang 4 m ) Btg
4 Pipa PVC Ø 1.5" ( Panjang 4 m ) Btg
5 Pipa PVC Ø 2" ( Panjang 4 m ) Btg
6 Pipa PVC Ø 3" ( Panjang 4 m ) Btg
7 Pipa PVC Ø 4" ( Panjang 4 m ) Btg
8 Samb L (Knee) Pipa PVC Ø 1/2" Bh
9 Samb L (Knee) Pipa PVC Ø 3/4" Bh
10 Samb L (Knee) Pipa PVC Ø 1" Bh
11 Samb L (Knee) Pipa PVC Ø 1.5" Bh
12 Samb L (Knee) Pipa PVC Ø 2" Bh
13 Samb L (Knee) Pipa PVC Ø 3" Bh
14 Samb L (Knee) Pipa PVC Ø 4" Bh
15 Sok Pipa PVC Ø 1/2" Bh
16 Sok Pipa PVC Ø 3/4" Bh
17 Sok Pipa PVC Ø 1" Bh
18 Sok Pipa PVC Ø 1.5" Bh
19 Sok Pipa PVC Ø 2" Bh
20 Sok Pipa PVC Ø 3" Bh
21 Sok Pipa PVC Ø 4" Bh
22 Samb T Sokket Pipa PVC Ø 1/2" Bh
23 Samb T Sokket Pipa PVC Ø 3/4" Bh
24 Samb T Sokket Pipa PVC Ø 1" Bh
25 Samb T Sokket Pipa PVC Ø 1.5" Bh
26 Samb T Sokket Pipa PVC Ø 2" Bh
27 Samb T Sokket Pipa PVC Ø 3" Bh
28 Samb T Sokket Pipa PVC Ø 4" Bh
29 Over sock Pipa PVC 1" to 3/4' Bh
30 Over sock Pipa PVC 1" to 1/2' Bh
31 Over sock Pipa PVC 3/4" to 1/2' Bh
32 Pipa GIV Ø 1/2" Tbl ( Panjang 6 m ) M'
33 Pipa GIV Ø 3/4" Tbl ( Panjang 6 m ) Btg
34 Pipa GIV Ø 1" Tbl ( Panjang 6 m ) Btg
35 Pipa GIV Ø 1.5" Tbl ( Panjang 6 m ) Btg
36 Pipa GIV Ø 2" Tbl ( Panjang 6 m ) Btg
37 Pipa GIV Ø 3" Tbl ( Panjang 6 m ) Btg
38 Pipa GIV Ø 4" Tbl ( Panjang 6 m ) Btg
39 Pipa Stainles steel Ø 3/4" Tbl ( Panjang 6 m ) Btg
40 Pipa Stainles steel Ø 1.5" Tbl ( Panjang 6 m ) Btg
41 Pipa Stainles steel Ø2" Tbl ( Panjang 6 m ) Btg
42 Samb L (Knee) Pipa GIV Ø 1/2" Bh
43 Samb L (Knee) Pipa GIV Ø 3/4" Bh
44 Samb L (Knee) Pipa GIV Ø 1" Bh
45 Samb L (Knee) Pipa GIV Ø 1.5" Bh
46 Samb L (Knee) Pipa GIV Ø 2" Bh
47 Samb L (Knee) Pipa GIV Ø 3" Bh
48 Samb L (Knee) Pipa GIV Ø 4" Bh
49 Sok Pipa GIV Ø 1/2" Bh
50 Sok Pipa GIV Ø 3/4" Bh
51 Sok Pipa GIV Ø 1" Bh
52 Sok Pipa GIV Ø 1.5" Bh
53 Sok Pipa GIV Ø 2" Bh
54 Sok Pipa GIV Ø 3" Bh
55 Sok Pipa GIV Ø 4" Bh
56 Samb T Sokket Pipa GIV Ø 1/2" Bh
57 Samb T Sokket Pipa GIV Ø 3/4" Bh
58 Samb T Sokket Pipa GIV Ø 1" Bh
59 Samb T Sokket Pipa GIV Ø 1.5" Bh
60 Samb T Sokket Pipa GIV Ø 2" Bh
61 Samb T Sokket Pipa GIV Ø 3" Bh
62 Samb T Sokket Pipa GIV Ø 4" Bh
63 Stop Krant Pipa GIV Ø 1/2" Bh
64 Stop Krant Pipa GIV Ø 3/4" Bh
65 Stop Krant Pipa GIV Ø 1" Bh
66 Stop Krant Pipa GIV Ø 1.5" Bh
67 Stop Krant Pipa GIV Ø 2" Bh
68 Stop Krant Pipa GIV Ø 3" Bh
69 Over sock Pipa GIV Ø 1/2" Bh
70 Over sock Pipa GIV Ø 3/4" Bh
71 Over sock Pipa GIV Ø 1" Bh
72 Over sock Pipa GIV Ø 1.5" Bh
73 Over sock Pipa GIV Ø 2" Bh
74 Over sock Pipa GIV Ø 3" Bh
75 Pipa Listrik 5/8" Btg
76 Pipa Talang PVC 1/2 lingkaran 8" Btg
77 Talang karet lebar 60 cm M'
78 Ijuk Kg
79 Tali Ijuk Kg

XIII BAHAN SEMEN DAN PEREKAT LAINNYA


1 Semen PC 50 Kg Zak
2 Semen PC 1 Kg Kg
3 Semen warna Kg
4 Perekat bata ringan MU-380, 40 kg Kg
5 Perekat bata ringan PM-100, 40 kg Kg

XIV BAHAN CAT/ FINISHING


1 Cat tembok 20 Kg (ember) Ember
2 Cat Minyak 1 Kg Kg
3 Cat besi Kg
4 Cat atap hardek 5 ltr Klg
5 Plamur tembok Kg
6 Plamur kayu Kg
7 Dempul besi Kg
8 Dempul kayu Kg
9 Residu Kg
10 Meni besi Kg
11 Meni kayu Kg
12 Politur/teak oil Ltr
13 Minyak cat Ltr
14 Minyak Bekisting Ltr
15 Thiner Ltr
16 Amplas kayu Lbr
17 Amplas besi Lbr
18 Lem kayu Klg
19 Lem Klg
20 Rapidrant Gal

XV BAHAN BAKAR & ASPAL


1 Bensin / Premium Ltr
2 Solar Ltr
3 Pelumas Ltr
4 Aspal Kg
5 Minyak Tanah Ltr

CATATAN :
1. Penggunaan Bahan disesuaikan dengan situasi dan kondisi dearah / lokasi pekerjaan.
UKSI DAN UPAH KERJA

HARGA

163,000
189,000
220,500
247,000
220,500
178,500
163,000
210,000
168,000
152,500
163,000
157,500
152,500
210,000
168,000

Rp 5,092,000
Rp 5,042,000
Rp 5,242,000
Rp 5,250,000
Rp 5,300,000
Rp 5,400,000
Rp 5,450,000
Rp 5,950,000
Rp 6,000,000
Rp 6,100,000
Rp 6,250,000
Rp 3,200,000
Rp 51,400
Rp 401,700
Rp 82,040
Rp 54,900
Rp 1,180,000
Rp 1,557,000
Rp 1,024,000
Rp 656,700
Rp 756,700
Rp 856,700

Rp 6,650,000
Rp 6,485,000
Rp 6,397,000
Rp 6,770,000
Rp 6,572,750
Rp 6,397,000
Rp 7,010,000
Rp 6,836,000
Rp 6,685,500
Rp 37,850,000
Rp 37,850,000
Rp 355,000
Rp 550,000
Rp 139,125

Rp 248,000
Rp 457,000
Rp 724,000
Rp 502,000
Rp 365,000
Rp 1,299,000
Rp 2,865,000

Rp 258,000
Rp 200,000
Rp 112,000
Rp 101,000
Rp 79,000
Rp 85,000
Rp 74,000
Rp 58,000
Rp 328,000
Rp 235,000

Rp 185,000
Rp 196,000
Rp 218,000
Rp 171,000
Rp 180,000
Rp 198,000
Rp 191,000
Rp 179,000

Rp 159,000

Rp 586,000
Rp 597,000
Rp 932,000
Rp 948,000
Rp 631,000
Rp 637,000
Rp 713,000
Rp 714,000
Rp 782,000
Rp 795,000
Rp 740,000

Rp 106,000
Rp 137,000
Rp 140,000
Rp 214,000
Rp 173,000
Rp 230,000
Rp 184,000
Rp 264,000
Rp 285,000
Rp 242,000
Rp 26,000
Rp 19,000
Rp 26,000
Rp 21,000
Rp 18,000
Rp 39,000
Rp 14,000
Rp 19,000
Rp 28,000
Rp 24,000
Rp 35,000
Rp 31,000
Rp 116,000
Rp 171,000
Rp 28,000
Rp 373,000
Rp 2,214,000
Rp 478,000
Rp 115,000
Rp 146,000

Rp 85,000
Rp 84,000
Rp 93,000
Rp 88,000
Rp 84,000
Rp 84,000
Rp 82,000
Rp 86,000
Rp 116,000
Rp 23,000
Rp 26,000
Rp 29,000

Rp 360,000
Rp 539,000
Rp 745,000
Rp 1,341,000
Rp 3,214,000
Rp 456,000
Rp 697,000
Rp 1,169,000
Rp 1,778,000
Rp 4,358,000
Rp 8,997,000
Rp 76,000
Rp 87,000
Rp 359,000
Rp 505,000
Rp 572,000
Rp 678,000
Rp 913,000
Rp 192,000
Rp 122,000
Rp 141,000
Rp 39,000
Rp 8,486,000
Rp 672,000
Rp 350,000
Rp -
Rp -
Rp 2,406,000
Rp 3,377,000
Rp 4,348,000
Rp 167,000
Rp 117,000
Rp 93,000
Rp 94,000
Rp 12,000
Rp 67,000
Rp 62,000
Rp 213,000
Rp 288,000
Rp 424,000
Rp 39,000
Rp 48,000
Rp 56,000
Rp 472,000
Rp 235,000
Rp 270,000
Rp 437,000
Rp 55,000
Rp 70,000
Rp 115,000
Rp 325,000
Rp 222,000
Rp 229,000
Rp 249,000

Rp 821,000
Rp 841,000
Rp 883,000
Rp 883,000
Rp 889,000
Rp 1,009,000
Rp 1,009,000
Rp 1,019,000
Rp 883,000
Rp 888,000
Rp 2,681,000
Rp 7,313,000
Rp 277,000
Rp 5,000
Rp 53,000
Rp 1,047,000
Rp 2,485,000
Rp 3,139,000
Rp 492,000
Rp 516,000
Rp 820,000
Rp 2,509,000
Rp 1,621,000
Rp 145,000
Rp 92,000
Rp 85,000
Rp 25,000
Rp 18,000
Rp 997,000
Rp 1,665,000
Rp 2,205,000
Rp 2,836,000
Rp 4,845,000
Rp 7,840,800
Rp 25,000
Rp 30,000
Rp 1,268,000
Rp 659,000
Rp 105,000
Rp 1,110,000
Rp 137,000

Rp 90,000
Rp 127,000
Rp 160,000
Rp 244,000
Rp 405,000
Rp 647,000
Rp 915,000
Rp 6,000
Rp 6,000
Rp 10,000
Rp 15,000
Rp 21,000
Rp 53,000
Rp 97,000
Rp 7,000
Rp 10,000
Rp 14,000
Rp 21,000
Rp 27,000
Rp 50,000
Rp 84,000
Rp 6,000
Rp 7,000
Rp 13,000
Rp 19,000
Rp 32,000
Rp 61,000
Rp 108,000
Rp 19,000
Rp 15,000
Rp 13,000
Rp 315,000
Rp 419,000
Rp 535,000
Rp 725,000
Rp 971,000
Rp 1,499,000
Rp 2,321,000
Rp 1,029,000
Rp 775,000
Rp 385,000
Rp 23,000
Rp 33,000
Rp 43,000
Rp 64,000
Rp 90,000
Rp 130,000
Rp 182,000
Rp 24,000
Rp 32,000
Rp 43,000
Rp 68,000
Rp 90,000
Rp 125,000
Rp 171,000
Rp 20,000
Rp 28,000
Rp 43,000
Rp 64,000
Rp 86,000
Rp 142,000
Rp 182,000
Rp 61,000
Rp 79,000
Rp 93,000
Rp 140,000
Rp 295,000
Rp 549,000
Rp 20,000
Rp 28,000
Rp 44,000
Rp 65,000
Rp 86,000
Rp 121,000
Rp 45,000
Rp 582,000
Rp 76,000
Rp 72,000
Rp 47,000

Rp 2,850,000
Rp 62,000
Rp 73,000
Rp 77,125
Rp 75,200

Rp 1,160,000
Rp 122,000
Rp 122,000
Rp 433,000
Rp 123,000
Rp 123,000
Rp 121,000
Rp 88,000
Rp 82,000
Rp 88,000
Rp 88,000
Rp 132,000
Rp 110,000
Rp 73,000
Rp 93,000
Rp 7,100
Rp 7,200
Rp 87,000
Rp 98,000
Rp 1,284,000

Rp 70,000
Rp 69,500
Rp 81,500
Rp 72,000
Rp 69,000

i dearah / lokasi pekerjaan.