A PEKERJAAN PENDAHULUAN
1 1 m' Pengukuran dan Pemasangan Bowplank
0.012 M3 Kayu 5/7
0.020 Kg Paku biasa 2"-5"
0.007 M3 Kayu papan 3/20
0.100 Oh Tukang kayu
0.100 Oh Pekerja
0.010 Oh Kepala tukang
0.005 Oh Mandor
C PEKERJAAN BESI
1 1 m' Pekerjaan Kawat Seling Ø 1'
1 M Kabel Baja/Seling 1'
0.079 Oh Pekerja
0.079 Oh Tukang
0.008 Oh Kepala Tukang
0.005 Oh Mandor
E. PEKERJAAN KAYU
1 1 m 3 Pas. Tiang Kayu Lokal Kelas I
1.1 Kayu Lokal Kelas I
5.6 Kg Paku
4 OH Pekerja
12 OH Tukang
1.2 OH Kepala Tukang
0.2 OH Mandor
163,503.25
6,397,000.00 76,764.00
104,500.00 2,090.00
6,572,750.00 46,009.25
189,000.00 18,900.00
163,000.00 16,300.00
220,500.00 2,205.00
247,000.00 1,235.00
2,949,043.94
27,908.20 47,443.94
6,650,000.00 1,396,500.00
104,500.00 31,350.00
77,600.00 38,800.00
1,180,000.00 35,400.00
5,042,000.00 252,100.00
258,000.00 387,000.00
189,000.00 378,000.00
163,000.00 326,000.00
220,500.00 44,100.00
247,000.00 12,350.00
75,080.00
163,000.00 65,200.00
247,000.00 9,880.00
61,251.00
163,000.00 40,750.00
247,000.00 20,501.00
ANALISA HARGA SATUAN PEKERJAAN
969,291.00
756,700.00 908,040.00
163,000.00 40,750.00
247,000.00 20,501.00
540,495.73
509,775.00 509,775.00
163,000.00 12,877.00
189,000.00 14,931.00
220,500.00 1,741.95
247,000.00 1,170.78
298,110.73
267,390.00 267,390.00
163,000.00 12,877.00
189,000.00 14,931.00
220,500.00 1,741.95
247,000.00 1,170.78
ANALISA HARGA SATUAN PEKERJAAN
253,345.76
234,680.00 234,680.00
163,000.00 7,824.00
189,000.00 9,072.00
220,500.00 1,058.40
247,000.00 711.36
149,788.68
145,750.00 145,750.00
163,000.00 1,711.50
189,000.00 1,984.50
220,500.00 231.53
247,000.00 111.15
89,829.54
87,527.50 87,527.50
163,000.00 975.56
189,000.00 1,131.17
220,500.00 131.97
247,000.00 63.36
406,173.58
396,750.00 396,750.00
163,000.00 3,993.50
189,000.00 4,630.50
220,500.00 540.23
247,000.00 259.35
99,192.45
96,500.00 96,500.00
163,000.00 1,141.00
189,000.00 1,323.00
ANALISA HARGA SATUAN PEKERJAAN
220,500.00 154.35
247,000.00 74.10
110,192.45
107,500.00 107,500.00
163,000.00 1,141.00
189,000.00 1,323.00
220,500.00 154.35
247,000.00 74.10
300,383.50
260,765.00 260,765.00
104,500.00 2,090.00
163,000.00 16,300.00
189,000.00 18,900.00
220,500.00 2,205.00
247,000.00 123.50
ANALISA HARGA SATUAN PEKERJAAN
22,962,057.50
5,092,000.00 6,110,400.00
77,600.00 15,675,200.00
1,557,000.00 755,145.00
163,000.00 244,500.00
189,000.00 141,750.00
220,500.00 16,537.50
247,000.00 18,525.00
30,971,210.50
5,092,000.00 2,444,160.00
77,600.00 15,054,400.00
5,400,000.00 2,527,200.00
96,500.00 10,132,500.00
1,557,000.00 37,368.00
163,000.00 554,200.00
189,000.00 160,650.00
220,500.00 18,742.50
247,000.00 41,990.00
53,749,579.90
6,485,000.00 2,075,200.00
104,500.00 334,400.00
73,000.00 116,800.00
96,500.00 14,475,000.00
114,500.00 257,625.00
77,600.00 26,073,600.00
1,557,000.00 840,780.00
5,400,000.00 4,374,000.00
6,650,000.00 798,000.00
ANALISA HARGA SATUAN PEKERJAAN
724,000.00 2,027,200.00
27,908.20 893,062.40
163,000.00 863,900.00
189,000.00 496,125.00
220,500.00 58,432.50
247,000.00 65,455.00
ANALISA HARGA SATUAN PEKERJAAN
11,134,200.00
6,650,000.00 7,315,000.00
104,500.00 585,200.00
163,000.00 652,000.00
189,000.00 2,268,000.00
220,500.00 264,600.00
247,000.00 49,400.00
11,134,200.00
6,650,000.00 7,315,000.00
104,500.00 585,200.00
163,000.00 652,000.00
189,000.00 2,268,000.00
220,500.00 264,600.00
247,000.00 49,400.00
11,134,200.00
6,650,000.00 7,315,000.00
104,500.00 585,200.00
163,000.00 652,000.00
189,000.00 2,268,000.00
220,500.00 264,600.00
247,000.00 49,400.00
RENCANA ANGGARAN BIAYA
KEGIATAN : Pembangunan Jembatan
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2017
No. Uraian
(a) (b)
A Pekerjaan Pendahuluan
B Pekerjaan Tanah
C Pekerjaan Struktur dan Pasangan
D Pekerjaan Kabel dan Besi Penggantung serta Asesoris
E Pekerjaan Kayu
F Pekerjaan Akhir
TOTAL
PPN
TOTAL + PPN
PEMBULATAN
Terbilang : Satu Milyard Delapan Ratus Juta Rupiah
RENCANA ANGGARAN BIAYA
795,114,085.66
509,775.00 165,931,762.50
509,775.00 224,301,000.00
267,390.00 31,588,675.16
509,775.00 101,955,000.00
234,680.00 58,670,000.00
267,390.00 5,989,536.00
234,680.00 84,484,800.00
234,680.00 9,856,560.00
89,829.54 7,366,022.67
87,527.50 7,177,255.00
89,829.54 14,732,045.34
406,173.58 8,123,471.50
300,383.50 73,593,957.50
224,000.00 1,344,000.00
114,728,367.20
11,134,200.00 23,381,820.00
11,134,200.00 801,662.40
11,134,200.00 2,271,376.80
11,134,200.00 2,672,208.00
11,134,200.00 20,041,560.00
11,134,200.00 50,103,900.00
11,134,200.00 13,361,040.00
52,370.00 2,094,800.00
1,600,000.00
1,600,000.00 1,600,000.00
REKAPITULASI ANGGARAN BIAYA
Harga Total
(c)
65,008,917.28
6,317,810.52
653,709,340.02
795,114,085.66
114,728,367.20
1,600,000.00
1,636,478,520.69
163,647,852.07
1,800,126,372.76
1,800,000,000.00
S O P Y A N, ST
Kepala Cabang
BILL OF QUANTITY (BoQ)
KEGIATAN : Pembangunan Jembatan Gantung
PEKERJAAN : Perencanaan Teknis Pembangunan Jembatan Gantung Kali Dogabu 3 (Balamai-Hitadipa)
LOKASI : Hitadipa-Kab. Intan Jaya
TAHUN ANGGARAN : 2015
Harga Total
(f)
-
-
-
-
-
-
-
-
-
-
-
Err:509
-
-
-
-
-
-
-
Err:509
-
-
-
-
Err:509
-
-
-
-
-
-
-
-
Err:509
-
-
PITULASI ANGGARAN BIAYA
Harga Total
(c)
-
-
-
Err:509
Err:509
-
Err:509
Err:509
Err:509
Err:509
ANALISA HARGA DASAR SATUAN BAHAN
Kode : An.1
Jenis : Angkutan Bahan (Sling Ø 24 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ M' A 3.55
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi/Kg (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' A 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / M' F 1.00
Profit : 0% (tidak dimasukkan) G 1.00
Jumlah Harga Satuan (HF+HG) H 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
Kode : An.2
Jenis : Angkutan Bahan (Sling Ø 16mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ M' A 1.58
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi/Kg (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' A 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / M' F 1.00
Profit : 0% (tidak dimasukkan) G 1.00
Jumlah Harga Satuan (HF+HG) H 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN
Kode : An.3
Jenis : Angkutan Bahan (Sling Ø 12.5 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ M' A 0.96
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' A 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / M' F 1.00
Profit : 0% (tidak dimasukkan) G 1.00
Jumlah Harga Satuan (HF+HG) H 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
Kode : An.4
Jenis : Angkutan Bahan (kuku macan 24 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 1.50
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN
Kode : An.5
Jenis : Angkutan Bahan (kuku macan 18 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 0.86
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Bahan / Buah G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
Kode : An.6
Jenis : Angkutan Bahan (Warfel Mur/Jarum Pengaku Kabel)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 3.50
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar / bh G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN
Kode : An.7
Jenis : Angkutan Bahan (Semen)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ sak A 50.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa (HA) 1.00
2 Biaya Mobilisasi ke Lokasi E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar/ kg (F/koef.A) G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
Kode : An.8
Jenis : Angkutan Bahan (Besi Beton Polos)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ kg (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Besi / kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN
Kode : An.9
Jenis : Angkutan Bahan (Besi Beton Ulir)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ kg (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Besi / kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
Kode : An.10
Jenis : Angkutan Bahan (Kawat harmonika 1 m)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN
I. Harga Dasar
1 Harga satuan bahan di Hitadipao/ M' (HA) A 2.33
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar / M' G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN
Kode : An.11
Jenis : Angkutan Bahan (Baut+mur Ø 20 x 400 mm)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ bh A 1.14
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sling / bh G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
Kode : An.12
Jenis : Angkutan Bahan (Paku Campuran)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
ANALISA HARGA DASAR SATUAN BAHAN
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ M' (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar / kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
ANALISA HARGA DASAR SATUAN BAHAN
Kode : An.13
Jenis : Angkutan Bahan (Kawat Ikat)
Lokasi : Hitadipa
Tujuan : Hitadipa - Lokasi Pekerjaan
I. Harga Dasar
1 Harga satuan bahan di Hitadipa/ kg A 1.00
II. MOBILISASI
1 Bahan diangkut menggunakan Truk kap. 3 ton
Hitadipa - Balamai (1.500.000/ret) B 1.00
2 Lansir (Tenaga Manusia Rp. 1.000.000,-/50 Kg)
ke lokasi pekerjaan C 1.00
Harga Mobilisasi (HB+HC) D 1.00
III. PERHITUNGAN
1 Harga satuan bahan di Hitadipa/ bh (HA) 1.00
2 Biaya Mobilisasi ke Lokasi (Koef.A x HD) E 1.00
Harga Satuan Dasar (HD+HE) F 1.00
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Kawat Ikat/ Kg G 1.00
Profit : 0% (tidak dimasukkan) H 1.00
Jumlah Harga Satuan (HG+HH) I 1.00
catatan :
1 Profit tidak dimasukkan karena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
2 Harga lansiran didasarkan harga lansiran semen 50 kg/sak (Rp. 1.000.000,-)
BENJAMIN G. LEKATOMPESSY, SP S O P Y A N, ST
NIP. 19680714 200212 1 006 Kepala Cabang
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 437,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
M 437,000.00
M 72,775.00
M 509,775.00
M 509,775.00
M 0.00
M 509,775.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 235,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
M 235,000.00
M 32,390.00
M 267,390.00
M 267,390.00
M 0.00
M 267,390.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 215,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
M 215,000.00
M 19,680.00
M 234,680.00
M 234,680.00
M 0.00
M 234,680.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 115,000.00
Kg 500.00
Kg 20,000.00
Bh 20,500.00
Bh 115,000.00
Bh 30,750.00
Bh 145,750.00
Bh 145,750.00
Bh 0.00
Bh 145,750.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 70,000.00
Kg 500.00
Kg 20,000.00
Bh 20,500.00
Bh 70,000.00
Bh 17,527.50
Bh 87,527.50
Bh 87,527.50
Bh 0.00
Bh 87,527.50
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 325,000.00
Kg 500.00
Kg 20,000.00
Bh 20,500.00
Bh 325,000.00
Bh 71,750.00
Bh 396,750.00
Bh 396,750.00
Bh 0.00
Bh 396,750.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
kg 2,850,000.00
sak 30,000.00
sak 1,000,000.00
Kg 1,030,000.00
sak 2,850,000.00
sak 1,030,000.00
sak 3,880,000.00
Kg 77,600.00
Kg 0.00
Kg 77,600.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 76,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
Kg 76,000.00
Kg 20,500.00
Kg 96,500.00
Kg 96,500.00
Kg 0.00
Kg 96,500.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 87,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
Kg 87,000.00
Kg 20,500.00
Kg 107,500.00
Kg 107,500.00
Kg 0.00
Kg 107,500.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 213,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
M 213,000.00
M 47,765.00
M 260,765.00
M 260,765.00
M 0.00
M 260,765.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 29,000.00
Kg 500.00
Kg 20,000.00
Bh 20,500.00
Bh 29,000.00
Bh 23,370.00
Bh 52,370.00
Bh 52,370.00
Bh 0.00
Bh 52,370.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 84,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
Kg 84,000.00
Kg 20,500.00
Kg 104,500.00
Kg 104,500.00
Kg 0.00
Kg 104,500.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
NALISA HARGA DASAR SATUAN BAHAN
HARGA
SATUAN SATUAN
(Rp.)
Kg 94,000.00
Kg 500.00
Kg 20,000.00
Kg 20,500.00
Kg 94,000.00
Kg 20,500.00
Kg 114,500.00
Kg 114,500.00
Kg 0.00
Kg 114,500.00
ena harga dasar bahan menggunakan harga satuan bahan Distrik Hitadipa
S O P Y A N, ST
Kepala Cabang
STANDAR HARGA SATUAN BAHAN BANGUNAN/ KONSTRUKSI DAN UPAH KERJA
1 2 3
I UPAH KERJA
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
5 Operator Terampil OH
6 Operator Kurang Terampil OH
7 Pembantu Operator OH
8 Sopir OH
9 Supir Personil OH
10 Pembantu Supir OH
11 Buruh Terampil OH
12 Buruh Kurang Terampil OH
13 Buruh Tak Terampil OH
14 Mekanik OH
15 Pembantu Mekanik OH
II BAHAN BATU
1 Batu kali M3
2 Kerikil / koral beton M3
3 Batu belah 15/20 M3
4 Batu pecah 5/7 (Manual) M3
5 Batu pecah 3/5 (Manual) M3
6 Batu pecah 2/3 (Manual) M3
7 Batu pecah 1/2 (Manual) M3
8 Batu pecah 5/7 (Stone Cruiser) M3
9 Batu pecah 3/5 (Stone Cruiser) M3
10 Batu pecah 2/3 (Stone Cruiser) M3
11 Batu pecah 1/2 (Stone Cruiser) M3
12 Abu Batu/Flying Ash (Aspal) M3
13 Batako Press, uk. 8x13x27 Bh
13 Bata Ringan, uk. 7,5x20x60 Bh
14 Batu Alam Bh
15 Paving Blok Bh
1 2 3
3 Pasir urug / Sirtu M3
4 Tanah urug M3
5 Urugan biasa M3
6 Urugan pilihan M3
IV BAHAN KAYU
1 Balok kayu lokal kelas I M3
2 Balok kayu cina M3
3 Balok kayu putih M3
4 Papan kayu lokal kelas I M3
5 Papan kayu cina M3
6 Papan kayu putih M3
7 Papan kayu lokal kelas I di-skoning M3
8 Papan kayu cina di-skoning M3
9 Papan kayu putih di-skoning M3
10 Papan lambersharing kayu besi (dr Nabire) M3
11 Papan kayu besi kls I (dr Nabire) Bh
12 Dolken kayu (kayu buahJeobo/Wanobo) Ø 8-10 cm pjg 4 m Bh
13 Kayu Log Jeobo / Wanobo Ø 12 cm pjg 7 m Bh
14 List kayu profil M'
15 Kayu Bakar M3
V BAHAN KAYU LAPIS
1 Tripleks 3 mm Lbr
2 Tripleks 5 mm Lbr
3 Multi pleks 9 mm Lbr
4 Teakwood 122 x 244 cm tebal 3 mm Lbr
NO URAIAN JENIS SATUAN
1 2 3
5 Formika 122 x 244 cm Lbr
6 Calsiboard 4 mm Lbr
7 Calsiboard 9 mm Lbr
VI BAHAN ATAP
A. Atap Seng :
1 Seng gelombang BjLs 30 Lbr
2 Seng gelombang BjLs 20 Lbr
3 Seng plat BjLs 30 lebar 45 cm M'
4 Seng plat BjLs 30 lebar 40 cm M'
5 Seng plat BjLs 30 lebar 30 cm M'
6 Seng plat BjLs 20 lebar 45 cm M'
7 Seng plat BjLs 20 lebar 40 cm M'
8 Seng plat BjLs 20 lebar 30 cm M'
9 Seng plat BjLs 30 pelapis pintu KM Lbr
10 Seng plat BjLs 20 pelapis pintu KM Lbr
B. Metal Roof :
1 Atap Multi roof BjLs 0,2 Lbr
2 Atap Multi roof BjLs 0,25 Lbr
3 Atap Multi roof BjLs 0,3 Lbr
4 Nok Multi roof BjLs 0,2 Lbr
5 Nok Multi roof BjLs 0,25 Lbr
6 Nok Multi roof BjLs 0,3 Lbr
7 Atap Sakura roof BjLs 0,25 Lbr
8 Nok Sakura roof BjLs 0,25 Lbr
1 2 3
3 Kunci 2 slaag yale kecil Bh
4 Kunci 2 slaag yale besar Bh
5 Kunci 2 slaag merk ATS kecil Bh
6 Kunci 2 slaag merk ATS besar Bh
7 Kunci 2 slaag merk sobar kecil Bh
8 Kunci 2 slaag merk sobar besar Bh
9 Kunci Antik 2 slaag Bh
10 Kunci tanam silinder 2 slaag Bh
11 Engsel H pintu ( 110 x 55 ) Bh
12 Engsel H jendela ( 80 x 50 ) Bh
13 Engsel ring nilon pintu ( 3 x 4 ) Bh
14 Engsel ring nilon jendela ( 3 x 2,5 ) Bh
15 Kait angin biasa Bh
16 Kait angin merk sobar Bh
17 Grendel jendela kecil Bh
18 Grendel jendela besar Bh
19 Grendel jendela + penarik Bh
20 Grendel pintu kecil Bh
21 Grendel pintu besar Bh
22 Kunci gembok kecil ( 2" ) 5 cm Bh
23 Kunci gembok sedang ( 4") 10 cm Bh
24 Kunci gembok besar ( 6" ) 14 cm Bh
25 Tarikan jendela Bh
26 Tarikan pintu/handle Bh
27 Pintu aluminium Bh
28 Door closer Bh
29 Door stop Bh
30 Door holder Bh
NO URAIAN JENIS SATUAN
1 2 3
1 2 3
31 Kawat bronjong 3 mm (Besi jaring ) Kg
32 Kawat ikat Kg
33 Kawat duri M'
34 Kawat RAM putih M'
35 Kawat RAM hijau M'
36 Kawat harmonika 1 m M'
37 Kawat harmonika 1,5 m M'
38 Kawat harmonika 2 m M'
39 Kawat nyamuk plastik M'
40 Kawat nyamuk aluminium M'
41 Kawat ayakan M'
42 Kawat las / Elektroda Dos
43 Kabel Sling Baja dia 12 M'
44 Kabel Sling Baja dia 16 M'
45 Kabel Sling Baja dia 18 M'
46 Kabel Sling Baja dia 24 M'
47 Kuku Macan/Buldog Grip 16 Bh
48 Kuku Macan/Buldog Grip 18 Bh
49 Kuku Macan//Buldog Grip 24 Bh
50 Warfel Mur/Jarum Pengaku Kabel Bh
51 Hanger dia 16 Bh
52 Hanger dia 18 Bh
53 Hanger dia 24 Bh
1 2 3
4 Keramik dasar polos bercorak 30 x 30 cm (14Kg) Dos
5 Keramik motif 30 x 30 cm (14Kg) Dos
6 Keramik putih polos 40 x 40 cm (16Kg) Dos
7 Keramik dasar polos bercorak 40 x 40 cm (16Kg) Dos
8 Keramik motif 40 x 40 cm (16Kg) Dos
9 Keramik putih polos 20 x 25 cm (14Kg) Dos
10 Keramik motif 20 x 25 cm (14Kg) Dos
11 Granito Tile 60x60 cm Essensa polish (30Kg) Dos
12 Marmer 100x100 cm M2
13 Karpet, t = 2 cm M2
14 Kuku keramik Bh
15 Plint keramik 10 x 40 Bh
16 Plint Marmer 10x100 Bh
17 Kloset duduk porselen Bh
18 Kloset duduk lengkap Bh
19 Kloset jongkok porselen leher bundar Bh
20 Kloset jongkok porselen leher angsa Bh
21 Kloset jongkok TOTO Bh
22 Urinoir KIA Bh
23 Wastafel Bh
24 Krant merek AER Bh
25 Krant air PVC 3/4" Bh
26 Krant air PVC 1/2" Bh
27 Stop Krant air PVC 3/4" Bh
28 Stop Krant air PVC 1/2" Bh
29 Pompa air sanyo kecil Bh
30 Pompa air sanyo besar Bh
31 Pompa air DAB besar Bh
32 Profil Tank Fiber glass 250 liter Bh
33 Profil Tank Fiber glass 650 liter Bh
34 Profil Tank Fiber glass 1100 liter Bh
35 Dop Bak plastik Bh
36 Dop Bak stainles Bh
37 Bak cuci piring stainless steel 2 mata Bh
38 Bak cuci piring stainless steel 1 mata Bh
39 Water drain + assesoris Bh
40 Bak air fiber glass 30 L Bh
41 Floor drain stainless steel Bh
1 2 3
7 Pipa PVC Ø 4" ( Panjang 4 m ) Btg
8 Samb L (Knee) Pipa PVC Ø 1/2" Bh
9 Samb L (Knee) Pipa PVC Ø 3/4" Bh
10 Samb L (Knee) Pipa PVC Ø 1" Bh
11 Samb L (Knee) Pipa PVC Ø 1.5" Bh
12 Samb L (Knee) Pipa PVC Ø 2" Bh
13 Samb L (Knee) Pipa PVC Ø 3" Bh
14 Samb L (Knee) Pipa PVC Ø 4" Bh
15 Sok Pipa PVC Ø 1/2" Bh
16 Sok Pipa PVC Ø 3/4" Bh
17 Sok Pipa PVC Ø 1" Bh
18 Sok Pipa PVC Ø 1.5" Bh
19 Sok Pipa PVC Ø 2" Bh
20 Sok Pipa PVC Ø 3" Bh
21 Sok Pipa PVC Ø 4" Bh
22 Samb T Sokket Pipa PVC Ø 1/2" Bh
23 Samb T Sokket Pipa PVC Ø 3/4" Bh
24 Samb T Sokket Pipa PVC Ø 1" Bh
25 Samb T Sokket Pipa PVC Ø 1.5" Bh
26 Samb T Sokket Pipa PVC Ø 2" Bh
27 Samb T Sokket Pipa PVC Ø 3" Bh
28 Samb T Sokket Pipa PVC Ø 4" Bh
29 Over sock Pipa PVC 1" to 3/4' Bh
30 Over sock Pipa PVC 1" to 1/2' Bh
31 Over sock Pipa PVC 3/4" to 1/2' Bh
32 Pipa GIV Ø 1/2" Tbl ( Panjang 6 m ) M'
33 Pipa GIV Ø 3/4" Tbl ( Panjang 6 m ) Btg
34 Pipa GIV Ø 1" Tbl ( Panjang 6 m ) Btg
NO URAIAN JENIS SATUAN
1 2 3
35 Pipa GIV Ø 1.5" Tbl ( Panjang 6 m ) Btg
36 Pipa GIV Ø 2" Tbl ( Panjang 6 m ) Btg
37 Pipa GIV Ø 3" Tbl ( Panjang 6 m ) Btg
38 Pipa GIV Ø 4" Tbl ( Panjang 6 m ) Btg
39 Pipa Stainles steel Ø 3/4" Tbl ( Panjang 6 m ) Btg
40 Pipa Stainles steel Ø 1.5" Tbl ( Panjang 6 m ) Btg
41 Pipa Stainles steel Ø2" Tbl ( Panjang 6 m ) Btg
42 Samb L (Knee) Pipa GIV Ø 1/2" Bh
43 Samb L (Knee) Pipa GIV Ø 3/4" Bh
44 Samb L (Knee) Pipa GIV Ø 1" Bh
45 Samb L (Knee) Pipa GIV Ø 1.5" Bh
46 Samb L (Knee) Pipa GIV Ø 2" Bh
47 Samb L (Knee) Pipa GIV Ø 3" Bh
48 Samb L (Knee) Pipa GIV Ø 4" Bh
49 Sok Pipa GIV Ø 1/2" Bh
50 Sok Pipa GIV Ø 3/4" Bh
51 Sok Pipa GIV Ø 1" Bh
52 Sok Pipa GIV Ø 1.5" Bh
53 Sok Pipa GIV Ø 2" Bh
54 Sok Pipa GIV Ø 3" Bh
55 Sok Pipa GIV Ø 4" Bh
56 Samb T Sokket Pipa GIV Ø 1/2" Bh
57 Samb T Sokket Pipa GIV Ø 3/4" Bh
58 Samb T Sokket Pipa GIV Ø 1" Bh
59 Samb T Sokket Pipa GIV Ø 1.5" Bh
60 Samb T Sokket Pipa GIV Ø 2" Bh
61 Samb T Sokket Pipa GIV Ø 3" Bh
62 Samb T Sokket Pipa GIV Ø 4" Bh
63 Stop Krant Pipa GIV Ø 1/2" Bh
64 Stop Krant Pipa GIV Ø 3/4" Bh
65 Stop Krant Pipa GIV Ø 1" Bh
66 Stop Krant Pipa GIV Ø 1.5" Bh
67 Stop Krant Pipa GIV Ø 2" Bh
68 Stop Krant Pipa GIV Ø 3" Bh
69 Over sock Pipa GIV Ø 1/2" Bh
70 Over sock Pipa GIV Ø 3/4" Bh
71 Over sock Pipa GIV Ø 1" Bh
72 Over sock Pipa GIV Ø 1.5" Bh
73 Over sock Pipa GIV Ø 2" Bh
74 Over sock Pipa GIV Ø 3" Bh
75 Pipa Listrik 5/8" Btg
76 Pipa Talang PVC 1/2 lingkaran 8" Btg
77 Talang karet lebar 60 cm M'
78 Ijuk Kg
79 Tali Ijuk Kg
NO URAIAN JENIS SATUAN
1 2 3
XIII BAHAN SEMEN DAN PEREKAT LAINNYA
1 Semen PC 50 Kg Zak
2 Semen PC 1 Kg Kg
3 Semen warna Kg
4 Perekat bata ringan MU-380, 40 kg Kg
5 Perekat bata ringan PM-100, 40 kg Kg
1 2 3
163,000
189,000
220,500
247,000
220,500
178,500
163,000
210,000
168,000
152,500
163,000
157,500
152,500
210,000
168,000
Rp 5,092,000
Rp 5,042,000
Rp 5,242,000
Rp 5,250,000
Rp 5,300,000
Rp 5,400,000
Rp 5,450,000
Rp 5,950,000
Rp 6,000,000
Rp 6,100,000
Rp 6,250,000
Rp 3,200,000
Rp 51,400
Rp 401,700
Rp 82,040
Rp 54,900
Rp 1,180,000
Rp 1,557,000
HARGA
4
Rp 1,024,000
Rp 656,700
Rp 756,700
Rp 856,700
Rp 6,650,000
Rp 6,485,000
Rp 6,397,000
Rp 6,770,000
Rp 6,572,750
Rp 6,397,000
Rp 7,010,000
Rp 6,836,000
Rp 6,685,500
Rp 35,850,000
Rp 35,350,000
Rp 355,000
Rp 550,000
Rp 139,125
Rp 2,000,000
Rp 248,000
Rp 457,000
Rp 724,000
Rp 502,000
HARGA
4
Rp 365,000
Rp 1,299,000
Rp 2,865,000
Rp 258,000
Rp 200,000
Rp 112,000
Rp 101,000
Rp 79,000
Rp 85,000
Rp 74,000
Rp 58,000
Rp 328,000
Rp 235,000
Rp 185,000
Rp 196,000
Rp 218,000
Rp 171,000
Rp 180,000
Rp 198,000
Rp 191,000
Rp 179,000
Rp 159,000
Rp 586,000
Rp 597,000
Rp 932,000
Rp 948,000
Rp 631,000
Rp 637,000
Rp 713,000
Rp 714,000
Rp 782,000
Rp 795,000
Rp 740,000
Rp 106,000
Rp 137,000
HARGA
4
Rp 140,000
Rp 214,000
Rp 173,000
Rp 230,000
Rp 184,000
Rp 264,000
Rp 285,000
Rp 242,000
Rp 26,000
Rp 19,000
Rp 26,000
Rp 21,000
Rp 18,000
Rp 39,000
Rp 14,000
Rp 19,000
Rp 28,000
Rp 24,000
Rp 35,000
Rp 31,000
Rp 116,000
Rp 171,000
Rp 28,000
Rp 373,000
Rp 2,214,000
Rp 478,000
Rp 115,000
Rp 146,000
HARGA
Rp 85,000
Rp 84,000
Rp 93,000
Rp 88,000
Rp 84,000
Rp 84,000
Rp 82,000
Rp 86,000
Rp 116,000
Rp 23,000
Rp 26,000
Rp 29,000
Rp 360,000
Rp 539,000
Rp 745,000
Rp 1,341,000
Rp 3,214,000
Rp 456,000
Rp 697,000
Rp 1,169,000
Rp 1,778,000
Rp 4,358,000
Rp 8,997,000
Rp 76,000
Rp 87,000
Rp 359,000
Rp 505,000
Rp 572,000
Rp 678,000
Rp 913,000
Rp 192,000
Rp 122,000
Rp 141,000
Rp 39,000
Rp 8,486,000
Rp 672,000
Rp 350,000
Rp 2,406,000
Rp 3,377,000
Rp 4,348,000
Rp 167,000
Rp 117,000
HARGA
4
Rp 93,000
Rp 94,000
Rp 12,000
Rp 67,000
Rp 62,000
Rp 213,000
Rp 288,000
Rp 424,000
Rp 39,000
Rp 48,000
Rp 56,000
Rp 472,000
Rp 215,000
Rp 235,000
Rp 270,000
Rp 437,000
Rp 55,000
Rp 70,000
Rp 115,000
Rp 325,000
Rp 222,000
Rp 229,000
Rp 249,000
Rp 821,000
Rp 841,000
Rp 883,000
HARGA
4
Rp 883,000
Rp 889,000
Rp 1,009,000
Rp 1,009,000
Rp 1,019,000
Rp 883,000
Rp 888,000
Rp 2,681,000
Rp 7,313,000
Rp 277,000
Rp 5,000
Rp 53,000
Rp 1,047,000
Rp 2,485,000
Rp 3,139,000
Rp 492,000
Rp 516,000
Rp 820,000
Rp 2,509,000
Rp 1,621,000
Rp 145,000
Rp 92,000
Rp 85,000
Rp 25,000
Rp 18,000
Rp 997,000
Rp 1,665,000
Rp 2,205,000
Rp 2,836,000
Rp 4,845,000
Rp 7,516,000
Rp 25,000
Rp 30,000
Rp 1,268,000
Rp 659,000
Rp 105,000
Rp 1,110,000
Rp 137,000
Rp 90,000
Rp 127,000
Rp 160,000
Rp 244,000
Rp 405,000
Rp 647,000
HARGA
4
Rp 915,000
Rp 6,000
Rp 6,000
Rp 10,000
Rp 15,000
Rp 21,000
Rp 53,000
Rp 97,000
Rp 7,000
Rp 10,000
Rp 14,000
Rp 21,000
Rp 27,000
Rp 50,000
Rp 84,000
Rp 6,000
Rp 7,000
Rp 13,000
Rp 19,000
Rp 32,000
Rp 61,000
Rp 108,000
Rp 19,000
Rp 15,000
Rp 13,000
Rp 315,000
Rp 419,000
Rp 535,000
HARGA
4
Rp 725,000
Rp 971,000
Rp 1,499,000
Rp 2,321,000
Rp 1,029,000
Rp 775,000
Rp 385,000
Rp 23,000
Rp 33,000
Rp 43,000
Rp 64,000
Rp 90,000
Rp 130,000
Rp 182,000
Rp 24,000
Rp 32,000
Rp 43,000
Rp 68,000
Rp 90,000
Rp 125,000
Rp 171,000
Rp 20,000
Rp 28,000
Rp 43,000
Rp 64,000
Rp 86,000
Rp 142,000
Rp 182,000
Rp 61,000
Rp 79,000
Rp 93,000
Rp 140,000
Rp 295,000
Rp 549,000
Rp 20,000
Rp 28,000
Rp 44,000
Rp 65,000
Rp 86,000
Rp 121,000
Rp 45,000
Rp 582,000
Rp 76,000
Rp 72,000
Rp 47,000
HARGA
Rp 2,850,000
Rp 62,000
Rp 73,000
Rp 77,125
Rp 75,200
Rp 1,160,000
Rp 122,000
Rp 122,000
Rp 433,000
Rp 123,000
Rp 123,000
Rp 121,000
Rp 88,000
Rp 82,000
Rp 88,000
Rp 88,000
Rp 132,000
Rp 110,000
Rp 73,000
Rp 93,000
Rp 7,100
Rp 7,200
Rp 87,000
Rp 98,000
Rp 1,284,000
HARGA
Rp 70,000
Rp 69,500
Rp 81,500
Rp 72,000
Rp 69,000
C.1 Pondasi Menara C.1 Pondasi Menara
x 0.4 = 0.72
x 2.1 = 0.525
1.245
x 0 = 0
4 x 1.245
= 4.98
0.3946 = 3.0778
5 x 2.5 x 0.8878 = 19.976
0.8878 = 7.4576
1.5783 = 18.94
49.451
47.367
0.3946 = 2.1308
5 x 2.2 x 0.6165 = 12.207
0.8878 = 7.4576
1.5783 = 9.47
31.266
62.035
STANDAR HARGA SATUAN BAHAN BANGUNAN/ KONSTRUKSI DAN UPAH KERJA
DISTRIK HITADIPA 2016
NO URAIAN JENIS SATUAN
1 2 3
I UPAH KERJA
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
5 Operator Terampil OH
6 Operator Kurang Terampil OH
7 Pembantu Operator OH
8 Sopir OH
9 Supir Personil OH
10 Pembantu Supir OH
11 Buruh Terampil OH
12 Buruh Kurang Terampil OH
13 Buruh Tak Terampil OH
14 Mekanik OH
15 Pembantu Mekanik OH
II BAHAN BATU
1 Batu kali M3
2 Kerikil / koral beton M3
3 Batu belah 15/20 M3
4 Batu pecah 5/7 (Manual) M3
5 Batu pecah 3/5 (Manual) M3
6 Batu pecah 2/3 (Manual) M3
7 Batu pecah 1/2 (Manual) M3
8 Batu pecah 5/7 (Stone Cruiser) M3
9 Batu pecah 3/5 (Stone Cruiser) M3
10 Batu pecah 2/3 (Stone Cruiser) M3
11 Batu pecah 1/2 (Stone Cruiser) M3
12 Abu Batu/Flying Ash (Aspal) M3
13 Batako Press, uk. 8x13x27 Bh
13 Bata Ringan, uk. 7,5x20x60 Bh
14 Batu Alam Bh
15 Paving Blok Bh
IV BAHAN KAYU
1 Balok kayu lokal kelas I M3
2 Balok kayu cina M3
3 Balok kayu putih M3
4 Papan kayu lokal kelas I M3
5 Papan kayu cina M3
6 Papan kayu putih M3
7 Papan kayu lokal kelas I di-skoning M3
8 Papan kayu cina di-skoning M3
9 Papan kayu putih di-skoning M3
10 Papan lambersharing kayu besi (dr Nabire) M3
11 Papan kayu besi kls I (dr Nabire) Bh
12 Dolken kayu (kayu buahJeobo/Wanobo) Ø 8-10 cm pjg 4 m Bh
13 Kayu Log Jeobo / Wanobo Ø 12 cm pjg 7 m Bh
14 List kayu profil M'
VI BAHAN ATAP
A. Atap Seng :
1 Seng gelombang BjLs 30 Lbr
2 Seng gelombang BjLs 20 Lbr
3 Seng plat BjLs 30 lebar 45 cm M'
4 Seng plat BjLs 30 lebar 40 cm M'
5 Seng plat BjLs 30 lebar 30 cm M'
6 Seng plat BjLs 20 lebar 45 cm M'
7 Seng plat BjLs 20 lebar 40 cm M'
8 Seng plat BjLs 20 lebar 30 cm M'
9 Seng plat BjLs 30 pelapis pintu KM Lbr
10 Seng plat BjLs 20 pelapis pintu KM Lbr
B. Metal Roof :
1 Atap Multi roof BjLs 0,2 Lbr
2 Atap Multi roof BjLs 0,25 Lbr
3 Atap Multi roof BjLs 0,3 Lbr
4 Nok Multi roof BjLs 0,2 Lbr
5 Nok Multi roof BjLs 0,25 Lbr
6 Nok Multi roof BjLs 0,3 Lbr
7 Atap Sakura roof BjLs 0,25 Lbr
8 Nok Sakura roof BjLs 0,25 Lbr
CATATAN :
1. Penggunaan Bahan disesuaikan dengan situasi dan kondisi dearah / lokasi pekerjaan.
UKSI DAN UPAH KERJA
HARGA
163,000
189,000
220,500
247,000
220,500
178,500
163,000
210,000
168,000
152,500
163,000
157,500
152,500
210,000
168,000
Rp 5,092,000
Rp 5,042,000
Rp 5,242,000
Rp 5,250,000
Rp 5,300,000
Rp 5,400,000
Rp 5,450,000
Rp 5,950,000
Rp 6,000,000
Rp 6,100,000
Rp 6,250,000
Rp 3,200,000
Rp 51,400
Rp 401,700
Rp 82,040
Rp 54,900
Rp 1,180,000
Rp 1,557,000
Rp 1,024,000
Rp 656,700
Rp 756,700
Rp 856,700
Rp 6,650,000
Rp 6,485,000
Rp 6,397,000
Rp 6,770,000
Rp 6,572,750
Rp 6,397,000
Rp 7,010,000
Rp 6,836,000
Rp 6,685,500
Rp 37,850,000
Rp 37,850,000
Rp 355,000
Rp 550,000
Rp 139,125
Rp 248,000
Rp 457,000
Rp 724,000
Rp 502,000
Rp 365,000
Rp 1,299,000
Rp 2,865,000
Rp 258,000
Rp 200,000
Rp 112,000
Rp 101,000
Rp 79,000
Rp 85,000
Rp 74,000
Rp 58,000
Rp 328,000
Rp 235,000
Rp 185,000
Rp 196,000
Rp 218,000
Rp 171,000
Rp 180,000
Rp 198,000
Rp 191,000
Rp 179,000
Rp 159,000
Rp 586,000
Rp 597,000
Rp 932,000
Rp 948,000
Rp 631,000
Rp 637,000
Rp 713,000
Rp 714,000
Rp 782,000
Rp 795,000
Rp 740,000
Rp 106,000
Rp 137,000
Rp 140,000
Rp 214,000
Rp 173,000
Rp 230,000
Rp 184,000
Rp 264,000
Rp 285,000
Rp 242,000
Rp 26,000
Rp 19,000
Rp 26,000
Rp 21,000
Rp 18,000
Rp 39,000
Rp 14,000
Rp 19,000
Rp 28,000
Rp 24,000
Rp 35,000
Rp 31,000
Rp 116,000
Rp 171,000
Rp 28,000
Rp 373,000
Rp 2,214,000
Rp 478,000
Rp 115,000
Rp 146,000
Rp 85,000
Rp 84,000
Rp 93,000
Rp 88,000
Rp 84,000
Rp 84,000
Rp 82,000
Rp 86,000
Rp 116,000
Rp 23,000
Rp 26,000
Rp 29,000
Rp 360,000
Rp 539,000
Rp 745,000
Rp 1,341,000
Rp 3,214,000
Rp 456,000
Rp 697,000
Rp 1,169,000
Rp 1,778,000
Rp 4,358,000
Rp 8,997,000
Rp 76,000
Rp 87,000
Rp 359,000
Rp 505,000
Rp 572,000
Rp 678,000
Rp 913,000
Rp 192,000
Rp 122,000
Rp 141,000
Rp 39,000
Rp 8,486,000
Rp 672,000
Rp 350,000
Rp -
Rp -
Rp 2,406,000
Rp 3,377,000
Rp 4,348,000
Rp 167,000
Rp 117,000
Rp 93,000
Rp 94,000
Rp 12,000
Rp 67,000
Rp 62,000
Rp 213,000
Rp 288,000
Rp 424,000
Rp 39,000
Rp 48,000
Rp 56,000
Rp 472,000
Rp 235,000
Rp 270,000
Rp 437,000
Rp 55,000
Rp 70,000
Rp 115,000
Rp 325,000
Rp 222,000
Rp 229,000
Rp 249,000
Rp 821,000
Rp 841,000
Rp 883,000
Rp 883,000
Rp 889,000
Rp 1,009,000
Rp 1,009,000
Rp 1,019,000
Rp 883,000
Rp 888,000
Rp 2,681,000
Rp 7,313,000
Rp 277,000
Rp 5,000
Rp 53,000
Rp 1,047,000
Rp 2,485,000
Rp 3,139,000
Rp 492,000
Rp 516,000
Rp 820,000
Rp 2,509,000
Rp 1,621,000
Rp 145,000
Rp 92,000
Rp 85,000
Rp 25,000
Rp 18,000
Rp 997,000
Rp 1,665,000
Rp 2,205,000
Rp 2,836,000
Rp 4,845,000
Rp 7,840,800
Rp 25,000
Rp 30,000
Rp 1,268,000
Rp 659,000
Rp 105,000
Rp 1,110,000
Rp 137,000
Rp 90,000
Rp 127,000
Rp 160,000
Rp 244,000
Rp 405,000
Rp 647,000
Rp 915,000
Rp 6,000
Rp 6,000
Rp 10,000
Rp 15,000
Rp 21,000
Rp 53,000
Rp 97,000
Rp 7,000
Rp 10,000
Rp 14,000
Rp 21,000
Rp 27,000
Rp 50,000
Rp 84,000
Rp 6,000
Rp 7,000
Rp 13,000
Rp 19,000
Rp 32,000
Rp 61,000
Rp 108,000
Rp 19,000
Rp 15,000
Rp 13,000
Rp 315,000
Rp 419,000
Rp 535,000
Rp 725,000
Rp 971,000
Rp 1,499,000
Rp 2,321,000
Rp 1,029,000
Rp 775,000
Rp 385,000
Rp 23,000
Rp 33,000
Rp 43,000
Rp 64,000
Rp 90,000
Rp 130,000
Rp 182,000
Rp 24,000
Rp 32,000
Rp 43,000
Rp 68,000
Rp 90,000
Rp 125,000
Rp 171,000
Rp 20,000
Rp 28,000
Rp 43,000
Rp 64,000
Rp 86,000
Rp 142,000
Rp 182,000
Rp 61,000
Rp 79,000
Rp 93,000
Rp 140,000
Rp 295,000
Rp 549,000
Rp 20,000
Rp 28,000
Rp 44,000
Rp 65,000
Rp 86,000
Rp 121,000
Rp 45,000
Rp 582,000
Rp 76,000
Rp 72,000
Rp 47,000
Rp 2,850,000
Rp 62,000
Rp 73,000
Rp 77,125
Rp 75,200
Rp 1,160,000
Rp 122,000
Rp 122,000
Rp 433,000
Rp 123,000
Rp 123,000
Rp 121,000
Rp 88,000
Rp 82,000
Rp 88,000
Rp 88,000
Rp 132,000
Rp 110,000
Rp 73,000
Rp 93,000
Rp 7,100
Rp 7,200
Rp 87,000
Rp 98,000
Rp 1,284,000
Rp 70,000
Rp 69,500
Rp 81,500
Rp 72,000
Rp 69,000