177 - LKP T6 FQ
177 - LKP T6 FQ
No. /LKP/KO
01 02 03
A PENGADAAN
I TOWER & MATERIAL PELENGKAP LAINNYA
a. Tower
1 Tower Type AA6
a. Tower AA6 + 3 set
b. Tower AA6 + 6 set
c. Tower AA6 + 9 set
d. Tower AA6 + 12 set
e. Tower AA6 + 15 set
2 Tower Type BB6
a. Tower BB6 + 15 set
3 Tower Type CC6
a. Tower CC6 + 12 set
b. Tower CC6 + 15 set
4 Tower Type DrD6
a. Tower DrD6 + 12 set
Sub Total - I.a (Pengadaan Tower)
b. Stub Tower
1 Type AA6
Stub angle SF set
Stub angle borepile set
2 Type BB6
Stub angle borepile set
3 Type CC6
Stub angle SF set
Stub angle borepile set
4 Type DrD6
Stub angle borepile set
Sub Total - I.b (Pengadaan Stub Tower)
c. Material Pelengkap Tower
1 Anti climbing device set
2 Danger plate set
3 Number and phase plate set
Sub Total - I.c (Material Pelengkap Tower)
01 02 03
d Material E/M
1 KONDUKTOR & KAWAT TANAH :
a. ACSR 435/55 mm² m
b. GSW 55 mm² m
c. OPGW 60 mm² m
2 FITTING & ACCESSORIES KONDUKTOR PHASA DAN KAWAT TANAH
a. Suspension set untuk GSW 55 mm², lengkap dengan armour rods Set
b.Suspension set untuk OPGW 60 mm², lengkap dengan armour rods Set
c. Tension set for GSW 55 mm² Set
d. Tension set for OPGW 60 mm² Set
e. Stockbridge type Vibration Damper for ACSR 435/55 mm² Bh
f. Stockbridge type Vibration Damper untuk GSW 55 mm² Bh
g. Stockbridge type Vibration Damper untuk OPGW 60 mm² Bh
h. Compression midspan joint untuk ACSR 435/55 mm² Bh
i. Compression midspan joint untuk GSW 55 mm² Bh
j. Junction Box untuk OPGW 60 mm², lengkap dengan mounting clamp Bh
k. Repair sleeve untuk ACSR 435/55 mm² Bh
l. Spacer Jumper Bh
m. Spacer Liner Bh
f. Jumper insulator set lengkap clamp, untuk 2xACSR 435/55 mm² Set
4 DISK INSULATOR
Disk Insulator fog 160 kN Bh
Disk Insulator normal 120 kN Bh
Sub Total - I.c (Pengadaan Material E/M)
TOTAL A (PENGADAAN)
B PEMASANGAN
01 02 03
II Tower
1 Tower Type AA6
a. Tower AA6 + 3 set
b. Tower AA6 + 6 set
c. Tower AA6 + 9 set
d. Tower AA6 + 12 set
e. Tower AA6 + 15 set
2 Tower Type BB6
a. Tower BB6 + 15 set
3 Tower Type CC6
a. Tower CC6 + 12 set
b. Tower CC6 + 15 set
4 Tower Type DrD6
a. Tower DrD6 + 12 set
Sub Total - I.b (Pemasangan Tower)
01 02 03
2 INSULATOR SET
a Single suspension set lengkap clamp, arching Horn, armour rods dan disk insulator (12 Set
disk), untuk 2xACSR 435/55 mm²
b Double suspension set lengkap clamp, arching horn, armour rods dan disk insulator (12 Set
disk), untuk 2xACSR 435/55 mm²
c Single tension set lengkap clamp, arching horn, armour rods dan disk insulator (12 disk), Set
untuk 2xACSR 435/55 mm²
d Double tension set lengkap clamp, arching horn, armour rods dan disk insulator (12 disk), Set
untuk 2xACSR 435/55 mm²
e Single tension inverted set lengkap clamp, arching horn dan disk insulator (12 disk), untuk Set
2xACSR 435/55 mm²
f Jumper insulator set lengkap clamp dan disk insulator (12 disk), untuk 2xACSR 435/55 Set
mm²
3 PENARIKAN KAWAT
a. ACSR 435/55 mm² m
b. GSW 55 mm² m
c. OPGW 60 mm² m
d. Pekerjaan sagging konduktor Twr
a Suspension set untuk GSW 55 mm², lengkap dengan armour rods Set
b Suspension set untuk OPGW 60 mm², lengkap dengan armour rods Set
c Tension set for GSW 55 mm² Set
d Tension set for OPGW 60 mm² Set
e Stockbridge type Vibration Damper for ACSR 435/55 mm² Bh
f Stockbridge type Vibration Damper untuk GSW 55 mm² Bh
g Stockbridge type Vibration Damper untuk OPGW 60 mm² Bh
h Compression midspan joint untuk ACSR 435/55 mm² Bh
i Compression midspan joint untuk GSW 55 mm² Bh
j Junction Box untuk OPGW 60 mm², lengkap dengan mounting clamp Bh
k Repair sleeve untuk ACSR 435/55 mm² Bh
l Spacer Jumper Bh
m Spacer Liner Bh
01 02 03
5 KOMISIONING TEST Ls
6 PERALATAN K3 Ls
I Pekerjaan Persiapan
II Pekerjaan Pondasi
Nomor Tower Type Tower
1 Tower 1 (aktual) DDR+12 Tower
2 Tower 1A (aktual) BB+12 Tower
3 Tower 2 (aktual) AA+12 Tower
4 Tower 3 (aktual) AA+12 Tower
5 Tower 4 (aktual) AA+12 Tower
6 Tower 5 (aktual) AA+15 Tower
7 Tower 6 (aktual) AA+15 Tower
8 Tower 7 (aktual) AA+12 Tower
9 Tower 8 (aktual) BB+12 Tower
10 Tower 9 (aktual) AA+15 Tower
11 Tower 10 (aktual) AA+06 Tower
12 Tower 11 (aktual) AA+03 Tower
13 Tower 12 (aktual) AA+06 Tower
14 Tower 13 (aktual) AA+06 Tower
15 Tower 14 (aktual) AA+03 Tower
16 Tower 15 (aktual) AA+09 Tower
17 Tower 16 (aktual) AA+12 Tower
18 Tower 17 (aktual) CC+12 Tower
19 Tower 18 (aktual) AA+06 Tower
20 Tower 19 (aktual) AA+09 Tower
21 Tower 20 (aktual) AA+15 Tower
22 Tower 21 (aktual) AA+15 Tower
23 Tower 22 (aktual) AA+15 Tower
24 Tower 23 (aktual) AA+09 Tower
01 02 03
25 Tower 24 (aktual) AA+09 Tower
26 Tower 25 (aktual) AA+09 Tower
27 Tower 26 (aktual) AA+15 Tower
28 Tower 27 (aktual) AA+15 Tower
29 Tower 28 (aktual) CC+15 Tower
30 Tower 29 (aktual) AA+12 Tower
31 Tower 30 (aktual) AA+15 Tower
Sub Total - b. (Pekerjaan Pondasi)
TOTAL - (PEKERJAAN PONDASI)
D TRANSPORTASI MATERIAL
1 KONDUKTOR & KAWAT TANAH :
ACSR 435/55 mm² Kg
GSW 55 mm² Kg
OPGW 60 mm² Kg
01 02 03
4 DISK INSULATOR
Disk Insulator fog 160 kN Kg
Disk Insulator normal 160 kN Kg
Demikian Laporan Kemajuan Pekerjaan ini dibuat dengan sesungguhnya untuk dapat dipergunakan sebagaimana
PIHAK KEDUA
PROJECT MANAGER
MAHZURI
N 1)
HARGA JUMLAH
% BOBOT TERHADAP VOLUME
VOLUME SATUAN HARGA
TERCAPAI
(Rp) (Rp) KONTRAK BAGIAN
04 05 06 07
na mestinya.
P
PT
UNIT PELA
JARI
DIR
1.2967 6.5071
12.4840 62.6473
19.9274 100.0000
0.7925 100.0000
100.0000
PIHAK PERTAMA
PT PLN (PERSERO)
UNIT PELAKSANAAN KONSTRUKSI
JARINGAN SUMATERA 2
DIREKSI PEKERJAAN
MANAJER
RACHMAT BASUKI
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp)
1 2 3 4
C PEKERJAAN PONDASI
1 TP 01
I Pekerjaan Tanah
a Galian tanah m3 58.28 117,473.62
b Urugan kembali m3 22.80 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 256.00 414,973.76
b Beton K 175 m3 68.72 1,598,533.82
c Besi beton BJTP kg 1,597.51 17,528.72
d Besi beton BJTD kg 6,656.20 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 31.36 1,654,668.95
d Besi beton BJTP kg 38.64 17,528.72
e Besi beton BJTD kg 2,587.28 17,528.72
f Cetakan m2 51.20 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 01
2 TP 01A
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.92 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 192.00 414,973.76
b Beton K 175 m3 50.64 1,598,533.82
c Besi beton BJTP kg 1,121.23 17,528.72
d Besi beton BJTD kg 5,158.00 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
1 2 3 4
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 160.00 414,973.76
b Beton K 175 m3 41.60 1,598,533.82
c Besi beton BJTP kg 922.78 17,528.72
d Besi beton BJTD kg 4,305.56 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 02
1 2 3 4
4 TR-03
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.92 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 192.00 414,973.76
b Beton K 175 m3 50.64 1,598,533.82
c Besi beton BJTP kg 1,121.23 17,528.72
d Besi beton BJTD kg 5,158.00 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 03
5 TR-04
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.92 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 192.00 414,973.76
b Beton K 175 m3 50.64 1,598,533.82
c Besi beton BJTP kg 1,121.23 17,528.72
d Besi beton BJTD kg 5,158.00 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
c Lansir Material Pondasi ke Lokasi Tower kg 72,385.72 3,044.43
d Penyetelan stub (besi kaki) tower kg 157.20 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 04
6 TR-05
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.91 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 160.00 414,973.76
b Beton K 175 m3 41.60 1,598,533.82
c Besi beton BJTP kg 922.78 17,528.72
d Besi beton BJTD kg 4,305.56 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 05
1 2 3 4
7 TR-06
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.92 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 224.00 414,973.76
b Beton K 175 m3 59.68 1,598,533.82
c Besi beton BJTP kg 1,319.68 17,528.72
d Besi beton BJTD kg 6,015.12 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 06
8 TR-07
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.92 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 224.00 414,973.76
b Beton K 175 m3 59.68 1,598,533.82
c Besi beton BJTP kg 1,319.68 17,528.72
d Besi beton BJTD kg 6,015.12 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
b Tes kubus beton (15 x 15 x15) cm set 4.00 355,691.79
c Lansir Material Pondasi ke Lokasi Tower kg 216,673.29 3,044.43
d Penyetelan stub (besi kaki) tower kg 157.20 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 07
9 TR-08
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.92 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 192.00 414,973.76
b Beton K 175 m3 50.64 1,598,533.82
c Besi beton BJTP kg 1,121.23 17,528.72
d Besi beton BJTD kg 5,158.00 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 08
1 2 3 4
10 TR-09
I Pekerjaan Tanah
a Galian tanah m3 40.20 117,473.62
b Urugan kembali m3 11.06 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 224.00 414,973.76
b Beton K 175 m3 59.68 1,598,533.82
c Besi beton BJTP kg 1,319.68 17,528.72
d Besi beton BJTD kg 5,993.76 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 24.60 1,654,668.95
d Besi beton BJTP kg 40.68 17,528.72
e Besi beton BJTD kg 2,201.52 17,528.72
f Cetakan m2 38.48 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 09
11 TR-10
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.91 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 256.00 414,973.76
b Beton K 175 m3 68.72 1,598,533.82
c Besi beton BJTP kg 1,518.13 17,528.72
d Besi beton BJTD kg 6,866.80 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
c Lansir Material Pondasi ke Lokasi Tower kg 239,148.49 3,044.43
d Penyetelan stub (besi kaki) tower kg 157.20 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 10
12 TR-11
I Pekerjaan Tanah
a Galian tanah m3 248.20 117,473.62
b Urugan kembali m3 195.25 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.48 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.24 1,226,891.53
c Beton K 225 m3 40.72 1,654,668.95
d Besi beton BJTP kg 60.60 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 11
1 2 3 4
13 TR-12
I Pekerjaan Tanah
a Galian tanah m3 248.20 117,473.62
b Urugan kembali m3 195.25 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.48 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.24 1,226,891.53
c Beton K 225 m3 40.72 1,654,668.95
d Besi beton BJTP kg 60.60 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER12
14 TR-13
I Pekerjaan Tanah
a Galian tanah v 248.20 117,473.62
b Urugan kembali m3 195.25 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.48 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.24 1,226,891.53
c Beton K 225 m3 40.72 1,654,668.95
d Besi beton BJTP kg 60.60 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
c Lansir Material Pondasi ke Lokasi Tower kg 124,068.51 3,044.43
d Penyetelan stub (besi kaki) tower kg 283.04 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 13
15 TR-14
I Pekerjaan Tanah
a Galian tanah m3 199.68 117,473.62
b Urugan kembali m3 165.61 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 5.20 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 2.60 1,226,891.53
c Beton K 225 m3 26.76 1,654,668.95
d Besi beton BJTP kg 77.68 17,528.72
e Besi beton BJTD kg 2,492.49 17,528.72
f Cetakan m2 53.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 14
1 2 3 4
16 TR-15
I Pekerjaan Tanah
a Galian tanah m3 248.20 117,473.62
b Urugan kembali m3 195.25 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.48 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.24 1,226,891.53
c Beton K 225 m3 40.72 1,654,668.95
d Besi beton BJTP kg 60.60 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 15
17 TR-16
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.92 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 192.00 414,973.76
b Beton K 175 m3 50.64 1,598,533.82
c Besi beton BJTP kg 1,121.23 17,528.72
d Besi beton BJTD kg 5,158.00 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
c Lansir Material Pondasi ke Lokasi Tower kg 193,650.82 3,044.43
d Penyetelan stub (besi kaki) tower kg 157.20 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 16
18 TR-17
I Pekerjaan Tanah
a Galian tanah m3 200.75 117,473.62
b Urugan kembali m3 166.20 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 5.18 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 2.59 1,226,891.53
c Beton K 225 m3 26.78 1,654,668.95
d Besi beton BJTP kg 77.67 17,528.72
e Besi beton BJTD kg 2,492.46 17,528.72
f Cetakan m2 53.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 17
1 2 3 4
19 TR-18
I Pekerjaan Tanah
a Galian tanah m3 41.67 117,473.62
b Urugan kembali m3 10.68 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 256.00 414,973.76
b Beton K 175 m3 68.28 1,598,533.82
c Besi beton BJTP kg 1,810.81 17,528.72
d Besi beton BJTD kg 6,824.09 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 26.57 1,654,668.95
d Besi beton BJTP kg 44.15 17,528.72
e Besi beton BJTD kg 2,430.03 17,528.72
f Cetakan m2 41.44 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 18
20 TR-19
I Pekerjaan Tanah
a Galian tanah m3 248.19 117,473.62
b Urugan kembali m3 197.40 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.46 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.23 1,226,891.53
c Beton K 225 m3 40.74 1,654,668.95
d Besi beton BJTP kg 60.61 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
c Lansir Material Pondasi ke Lokasi Tower kg 124,074.29 3,044.43
d Penyetelan stub (besi kaki) tower kg 353.23 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 19
21 TR-20
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.91 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 160.00 414,973.76
b Beton K 175 m3 41.60 1,598,533.82
c Besi beton BJTP kg 922.78 17,528.72
d Besi beton BJTD kg 4,303.60 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 20
1 2 3 4
22 TR-21
I Pekerjaan Tanah
a Galian tanah m3 199.68 117,473.62
b Urugan kembali m3 165.61 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 5.20 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 2.60 1,226,891.53
c Beton K 225 m3 26.76 1,654,668.95
d Besi beton BJTP kg 77.68 17,528.72
e Besi beton BJTD kg 2,492.49 17,528.72
f Cetakan m2 53.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 21
23 TR-22
I Pekerjaan Tanah
a Galian tanah m3 248.20 117,473.62
b Urugan kembali m3 195.25 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.48 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.24 1,226,891.53
c Beton K 225 m3 40.72 1,654,668.95
d Besi beton BJTP kg 60.60 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
c Lansir Material Pondasi ke Lokasi Tower kg 124,068.51 3,044.43
d Penyetelan stub (besi kaki) tower kg 283.04 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 22
24 TR-23
I Pekerjaan Tanah
a Galian tanah m3 248.20 117,473.62
b Urugan kembali m3 195.25 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.48 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.24 1,226,891.53
c Beton K 225 m3 40.72 1,654,668.95
d Besi beton BJTP kg 60.60 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
25 TR-24
I Pekerjaan Tanah
a Galian tanah m3 38.20 117,473.62
b Urugan kembali m3 10.91 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 128.00 414,973.76
b Beton K 175 m3 32.56 1,598,533.82
c Besi beton BJTP kg 724.34 17,528.72
d Besi beton BJTD kg 3,449.20 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 96.00 414,973.76
b Beton K 175 m3 23.52 1,598,533.82
c Besi beton BJTP kg 525.89 17,528.72
d Besi beton BJTD kg 2,594.80 17,528.72
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 3.60 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 1.80 1,226,891.53
c Beton K 225 m3 22.60 1,654,668.95
d Besi beton BJTP kg 37.28 17,528.72
e Besi beton BJTD kg 1,939.80 17,528.72
f Cetakan m2 35.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
c Lansir Material Pondasi ke Lokasi Tower kg 125,404.28 3,044.43
d Penyetelan stub (besi kaki) tower kg 157.20 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 25
27 TR-26
I Pekerjaan Tanah
a Galian tanah m3 200.75 117,473.62
b Urugan kembali m3 166.20 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 5.18 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 2.59 1,226,891.53
c Beton K 225 m3 26.78 1,654,668.95
d Besi beton BJTP kg 77.67 17,528.72
e Besi beton BJTD kg 2,492.46 17,528.72
f Cetakan m2 53.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 26
1 2 3 4
28 TR-27
I Pekerjaan Tanah
a Galian tanah m3 376.62 117,473.62
b Urugan kembali m3 301.03 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 10.00 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 5.00 1,226,891.53
c Beton K 225 m3 61.57 1,654,668.95
d Besi beton BJTP kg 119.64 17,528.72
e Besi beton BJTD kg 6,702.34 17,528.72
f Cetakan m2 81.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 27
29 TR-28
I Pekerjaan Tanah
a Galian tanah m3 200.75 117,473.62
b Urugan kembali m3 166.20 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 5.18 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 2.59 1,226,891.53
c Beton K 225 m3 26.78 1,654,668.95
d Besi beton BJTP kg 77.67 17,528.72
e Besi beton BJTD kg 2,492.46 17,528.72
f Cetakan m2 53.52 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
1 2 3 4
d Penyetelan stub (besi kaki) tower kg 355.17 5,218.52
e Pemasangan grounding dan perlengkapannya set 1.00 1,568,917.89
f Pengujian grounding dan perlengkapannya set 1.00 1,185,639.31
TOTAL TOWER 28
30 TR-29
I Pekerjaan Tanah
a Galian tanah m3 179.97 117,473.62
b Urugan kembali m3 148.77 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 4.62 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 2.31 1,226,891.53
c Beton K 225 m3 24.26 1,654,668.95
d Besi beton BJTP kg 77.67 17,528.72
e Besi beton BJTD kg 2,287.60 17,528.72
f Cetakan m2 52.08 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 29
1 2 3 4
31 30
I Pekerjaan Tanah
a Galian tanah m3 248.19 117,473.62
b Urugan kembali m3 197.40 87,333.78
II Pekerjaan Beton
II.1 Pekerjaan Bore Pile
a Pengeboran m' 0.00 0.00
b Beton K 175 m3 0.00 0.00
c Besi beton BJTP kg 0.00 0.00
d Besi beton BJTD kg 0.00 0.00
II.2 Pekerjaan Pile Cap / Pad Chimney
a Urugan pasir, t = 10 cm m3 8.46 202,266.84
b Beton 1 : 3 : 5, leveling ( t = 5 cm ) m3 4.23 1,226,891.53
c Beton K 225 m3 40.74 1,654,668.95
d Besi beton BJTP kg 60.61 17,528.72
e Besi beton BJTD kg 3,847.56 17,528.72
f Cetakan m2 54.32 335,219.81
g Pre-cast block ukuran 20 x 20 x 10 (cm) bh 4.00 88,922.95
TOTAL TOWER 30
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
(Rp) (%) S/D BULAN LALU BULAN INI S/D BULAN INI
VOL. BOBOT VOL. BOBOT VOL. TERCAPAI BOBOT
5 6 7 8 9 10 11 12
01 02 03
A PENGADAAN
I TOWER & MATERIAL PELENGKAP LAINNYA
a. Tower
1 Tower Type AA6
a. Tower AA6 + 0 set
b. Tower AA6 + 3 set
c. Tower AA6 + 6 set
d. Tower AA6 + 9 set
e. Tower AA6 + 12 set
f. Tower AA6 + 15 set
g. Tower AA6 + 18 set
01 02 03
4 Tower Type DRD6
a. Tower DrD6 + 0 set
b. Tower DRD6 + 3 set
c. Tower DRD6 + 6 set
d. Tower DRD6 + 9 set
e. Tower DRD6 + 12 set
f. Tower DRD6 + 15 set
Sub Total - I.a (Pengadaan Tower)
b. Stub Tower
1 Type AA6
Stub angle SF set
Stub angle borepile set
2 Type BB6
Stub angle SF set
Stub angle borepile set
3 Type CC6
Stub angle SF set
Stub angle borepile set
4 Type DRD6
Stub angle SF set
Stub angle borepile set
Sub Total - I.b (Pengadaan Stub Tower)
c. Material Pelengkap Tower
1 Anti climbing device set
2 Danger plate set
3 Number and phase plate set
Sub Total - I.c (Material Pelengkap Tower)
d Material E/M
1 KONDUKTOR & KAWAT TANAH :
a. ACSR 435/55 mm² m
b. GSW 55 mm² m
c. OPGW 60 mm² m
2 FITTING & ACCESSORIES KONDUKTOR PHASA DAN KAWAT TANAH
a. Suspension set untuk GSW 55 mm², lengkap dengan armour rods Set
b.Suspension set untuk OPGW 60 mm², lengkap dengan armour rods Set
c. Tension set for GSW 55 mm² Set
d. Tension set for OPGW 60 mm² Set
e. Stockbridge type Vibration Damper for ACSR 435/55 mm² Bh
f. Stockbridge type Vibration Damper untuk GSW 55 mm² Bh
g. Stockbridge type Vibration Damper untuk OPGW 60 mm² Bh
h. Compression midspan joint untuk ACSR 435/55 mm² Bh
i. Compression midspan joint untuk GSW 55 mm² Bh
j. Junction Box untuk OPGW 60 mm², lengkap dengan mounting clamp Bh
k. Repair sleeve untuk ACSR 435/55 mm² Bh
NO. URAIAN PEKERJAAN SATUAN
01 02 03
l. Spacer Jumper Bh
m. Spacer Liner Bh
3 Hardware and Fitting
a.Single suspension set lengkap clamp, arching Horn, armour rods , untuk 2xACSR Set
435/55 mm²
b. Double suspension set lengkap clamp, arching horn, armour rods , untuk 2xACSR Set
435/55 mm²
c. Single tension set lengkap clamp, arching horn, armour rods , untuk 2xACSR 435/55 Set
mm²
d. Double tension set lengkap clamp, arching horn, armour rods , untuk 2xACSR 435/55 Set
mm²
e. Single tension inverted set lengkap clamp, arching horn , untuk 2xACSR435/55 mm² Set
f. Jumper insulator set lengkap clamp, untuk 2xACSR 435/55 mm² Set
4 DISK INSULATOR
Disk Insulator fog 120 kN Bh
Disk Insulator fog 160 kN Bh
Disk Insulator normal 120 kN Bh
Disk Insulator normal 160 kN Bh
Sub Total - I.c (Pengadaan Material E/M)
TOTAL A (PENGADAAN)
B PEMASANGAN
II Tower
1 Tower Type AA6
b. Tower AA6 + 3 set
c. Tower AA6 + 6 set
d. Tower AA6 + 9 set
e. Tower AA6 + 12 set
f. Tower AA6 + 15 set
g. Tower AA6 + 18 set
2 Tower Type BB6
b. Tower BB6 + 3 set
c. Tower BB6 + 6 set
d. Tower BB6 + 9 set
e. Tower BB6 + 12 set
f. Tower BB6 + 15 set
3 Tower CC6 + 0
NO. URAIAN PEKERJAAN SATUAN
01 02 03
b. Tower CC6 + 3 set
c. Tower CC6 + 6 set
d. Tower CC6 + 9 set
e. Tower CC6 + 12 set
f. Tower CC6 + 15 set
4 Tower Type DRD6
b. Tower DRD6 + 3 set
c. Tower DRD6 + 6 set
d. Tower DRD6 + 9 set
e. Tower DRD6 + 12 set
f. Tower DRD6 + 15 set
Sub Total - I.b (Pemasangan Tower)
01 02 03
2 INSULATOR SET
a Single suspension set lengkap clamp, arching Horn, armour rods dan disk insulator (12 Set
disk), untuk 2xACSR 435/55 mm²
b Double suspension set lengkap clamp, arching horn, armour rods dan disk insulator (12 Set
disk), untuk 2xACSR 435/55 mm²
c Single tension set lengkap clamp, arching horn, armour rods dan disk insulator (12 disk), Set
untuk 2xACSR 435/55 mm²
d Double tension set lengkap clamp, arching horn, armour rods dan disk insulator (12 disk), Set
untuk 2xACSR 435/55 mm²
e Single tension inverted set lengkap clamp, arching horn dan disk insulator (12 disk), untuk Set
2xACSR 435/55 mm²
f Jumper insulator set lengkap clamp dan disk insulator (12 disk), untuk 2xACSR 435/55 Set
mm²
3 PENARIKAN KAWAT
a. ACSR 435/55 mm² m
b. GSW 55 mm² m
c. OPGW 60 mm² m
d. Pekerjaan sagging konduktor Twr
a Suspension set untuk GSW 55 mm², lengkap dengan armour rods Set
b Suspension set untuk OPGW 60 mm², lengkap dengan armour rods Set
c Tension set for GSW 55 mm² Set
d Tension set for OPGW 60 mm² Set
e Stockbridge type Vibration Damper for ACSR 435/55 mm² Bh
f Stockbridge type Vibration Damper untuk GSW 55 mm² Bh
g Stockbridge type Vibration Damper untuk OPGW 60 mm² Bh
h Compression midspan joint untuk ACSR 435/55 mm² Bh
i Compression midspan joint untuk GSW 55 mm² Bh
j Junction Box untuk OPGW 60 mm², lengkap dengan mounting clamp Bh
k Repair sleeve untuk ACSR 435/55 mm² Bh
l Space Jumper Bh
m Space Liner Bh
NO. URAIAN PEKERJAAN SATUAN
01 02 03
5 KOMISIONING TEST Ls
6 PERALATAN K3 Ls
I Pekerjaan Persiapan
II Pekerjaan Pondasi
Nomor Tower Type Tower
1 Tower 1 (aktual) DDR+12 Tower
2 Tower 1A (aktual) BB+12 Tower
3 Tower 2 (aktual) AA+12 Tower
4 Tower 3 (aktual) AA+12 Tower
5 Tower 4 (aktual) AA+12 Tower
6 Tower 5 (aktual) AA+15 Tower
7 Tower 6 (aktual) AA+15 Tower
8 Tower 7 (aktual) AA+12 Tower
9 Tower 8 (aktual) BB+12 Tower
10 Tower 9 (aktual) AA+15 Tower
11 Tower 10 (aktual) AA+06 Tower
12 Tower 11 (aktual) AA+03 Tower
13 Tower 12 (aktual) AA+06 Tower
14 Tower 13 (aktual) AA+06 Tower
15 Tower 14 (aktual) AA+03 Tower
16 Tower 15 (aktual) AA+09 Tower
17 Tower 16 (aktual) AA+12 Tower
18 Tower 17 (aktual) CC+12 Tower
19 Tower 18 (aktual) AA+06 Tower
20 Tower 19 (aktual) AA+09 Tower
21 Tower 20 (aktual) AA+15 Tower
22 Tower 21 (aktual) AA+15 Tower
23 Tower 22 (aktual) AA+15 Tower
24 Tower 23 (aktual) AA+09 Tower
NO. URAIAN PEKERJAAN SATUAN
01 02 03
25 Tower 24 (aktual) AA+09 Tower
26 Tower 25 (aktual) AA+09 Tower
27 Tower 26 (aktual) AA+15 Tower
28 Tower 27 (aktual) AA+15 Tower
29 Tower 28 (aktual) CC+15 Tower
30 Tower 29 (aktual) AA+12 Tower
31 Tower 30 (aktual) AA+15 Tower
Sub Total - b. (Pekerjaan Pondasi)
TOTAL - (PEKERJAAN PONDASI)
NO. URAIAN PEKERJAAN SATUAN
01 02 03
5 Pekerjaan Grounding
Counterpoise cable 4 x 15m panjang, galian sedalam 450 mm termasuk compression m
joints
Tambahan sambungan diagonal tersambung ke counterpoise cable, galian sedalam 450 m'
mm termasuk compression joints
Tambahan untuk item 3.a dan 3.b untuk galian batu sedalam 450 mm m'
Tambahan untuk item 3.a dan 3.b untuk pemasangan pada kedalaman 750 mm m'
NO. URAIAN PEKERJAAN SATUAN
01 02 03
D TRANSPORTASI MATERIAL
1 KONDUKTOR & KAWAT TANAH :
ACSR 435/55 mm² Kg
GSW 55 mm² Kg
OPGW 60 mm² Kg
4 DISK INSULATOR
Disk Insulator fog 120 kN Kg
NO. URAIAN PEKERJAAN SATUAN
01 02 03
Disk Insulator fog 160 kN Kg
Disk Insulator normal 120 kN Kg
Disk Insulator normal 160 kN Kg
Demikian Laporan Kemajuan Pekerjaan ini dibuat dengan sesungguhnya untuk dapat dipergunakan sebagaimana
PIHAK KEDUA
PROJECT MANAGER
MAHZURI
ARA MATERIAL ON SITE
A-MOS/RE/16.37.13/XII/2016
% BOBOT TE
Berat Tower % BOBOT TERHADAP VOLUME %
VOLUME TERHAD
(kg) TERCAPAI PENYELESAIAN
KONTRAK BAGIAN KONTRAK
04 05 06 07 08 09
0.00 8,650
1.00 9,740 0.3627 1.0836 1.00 100.0000 0.3627
2.00 10,460 0.7839 2.3422 2.00 100.0000 0.7839
3.00 11,390 1.2692 3.7921 3.00 100.0000 1.2692
11.00 12,480 5.1170 15.2884 11.00 100.0000 5.1170
9.00 13,250 4.4107 13.1782 9.00 100.0000 4.4107
0.00
0.00 11,020
0.00 12,480
0.00 13,510
0.00 15,630
3.00 17,760 2.0463 6.1138 0.00 0.0000 0.0000
0.00 19,270
0.00 13,180
0.00 14,840
0.00 16,390
1.00 18,630 0.6943 2.0746 0.00 0.0000 0.0000
1.00 20,580 0.7649 2.2852 1.00 100.0000 0.7649
1.00 22,530 0.8378 2.5032 1.00 100.0000 0.8378
0.00 18,770
0.00 20,030
0.00 21,290
0.00 24,680
0.00 27,010
0.00 29,330
% BOBOT TE
Berat Tower % BOBOT TERHADAP VOLUME %
VOLUME TERHAD
(kg) TERCAPAI PENYELESAIAN
KONTRAK BAGIAN KONTRAK
04 05 06 07 08 09
0.00 20,270
0.00 21,450
0.00 22,710
0.00 24,680
0.00 27,010
0.00 29,330
16.2868 48.6614 13.5461
0.00
26.00 0.2041 0.6098 26.00 100.0000 0.2041
0.00
3.00 0.0353 0.1055 1.00 33.3333 0.0118
0.00
3.00 0.0471 0.1407 3.00 100.0000 0.0471
0.00
0.00
0.2865 0.8561 0.2630
0.00
0.00
1,848.00 1.9195 5.7350 0.00 0.0000 0.0000
0.00
16.7847 50.1490 128,919.00 1,938.7209 14.6599
33.4696 100.0000 128,919.00 1,938.7209 28.4690
0.00
0.00
0.00
3.00 0.6255 3.2328 0.00 0.0000 0.0000
0.00
% BOBOT TE
Berat Tower % BOBOT TERHADAP VOLUME %
VOLUME TERHAD
(kg) TERCAPAI PENYELESAIAN
KONTRAK BAGIAN KONTRAK
04 05 06 07 08 09
0.00
0.00
1.00 0.2187 1.1304 0.00 0.0000 0.0000
1.00 0.2416 1.2487 0.00 0.0000 0.0000
1.00 0.2645 1.3670 0.00 0.0000 0.0000
0.00
0.00
0.00
0.00
0.00
5.1230 26.4780 0.4448
0.00
% BOBOT TE
Berat Tower % BOBOT TERHADAP VOLUME %
VOLUME TERHAD
(kg) TERCAPAI PENYELESAIAN
KONTRAK BAGIAN KONTRAK
04 05 06 07 08 09
0.00
11,088.00 0.0526 6.8398 0.00 0.0000 0.0000
0.00
ana mestinya.
PIHAK PERTAMA
PT PLN (PERSERO)
UNIT PELAKSANAAN KONSTRUKSI
JARINGAN SUMATERA 2
DIREKSI PEKERJAAN
MANAJER
RACHMAT BASUKI
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
1.0836
2.3422
3.7921
15.2884
13.1782
0.0000
0.0000
2.2852
2.5032
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
40.4730
0.6098
0.0352
0.1407
0.7858
0.0000
0.0000
0.0000
0.0000
35.4440
1.2227
1.7966
0.1273
0.1273
0.0419
0.0419
0.7136
0.0924
0.1098
0.0908
0.0151
0.1572
0.0017
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
1.9686
0.5833
0.7132
0.3962
0.1387
0.0183
0.0000
43.8006
85.0593
0.3060
0.3060
0.0000
0.0000
0.6911
0.0000
1.6079
0.0000
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
0.0000
0.0000
0.0000
2.2990
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
0.0000
0.0000
0.0000
2.6050
0.7097
0.7615
0.6966
0.0245
0.1393
2.3317
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
6.6477
0.0000
2.2596
0.0000
0.0000
0.0000
0.0000
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.2417
11.1491
11.1491
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
0.0000
0.0000
11.1491
81.7276
3.3709
3.5394
0.1283
0.1283
0.0296
0.0296
1.4620
0.2467
0.2467
0.0925
0.0154
0.0000
0.0204
0.0000
0.2221
0.0000
0.1388
0.0833
0.0241
% BOBOT TERCAPAI
TERHADAP
BAGIAN
10
0.0000
91.5057