EXCAVACIÓN VIGAS

EJES LONGITUD ANCHO ALTURA TOTAL SON GRAN TOTAL EJES


3 A-D 9.50 0.60 0.63 3.59 2.00 7.18
9 D-E 3.70 0.60 0.63 1.40 1.00 1.40
J 1-4 0.65 0.60 0.63 0.25 4.00 0.98
J 4-5 2.03 0.60 0.63 0.77 4.00 3.07
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 0.00
0.60 0.63 0.00 12.63
CANTIDAD DE OBRA DE CONCRETO
EJES LONGITUD ANCHO ALTURA SON TOTAL LONGITUD ANCHO ALTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SON TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00