You are on page 1of 1

CAPACITY OF PV UNIT

NO. OF TRANSFORMER INSTALLED

PV penetration level (%), time duration 24hrs

Capacity of transformers

Load ON transformer (HV side)


Time duration 24hrs

Load on transformer (LV side),time duration 24hrs

Transformer winding temperature

Temperature of transformer oil

You might also like