You are on page 1of 1

REKAPITULASI TOTAL

RENCANA ANGGARAN BIAYA

No. Uraian Pekerjaan Jumlah Harga [Rp.]

A PEKERJAAN PENDAHULUAN Rp. 4,418,333.00


B PEKERJAAN PONDASI Rp. 11,463,026.00
C PEKERJAAN STRUKTUR Rp. 109,957,460
D PEKERJAAN DINDING Rp. 22,396,048
E PEK. KUSEN, PINTU, JENDELA Rp. 15,448,917
F PEKERJAAN INSTALASI LISTRIK Rp. 4,980,000
G PEKERJAAN SANITASI Rp. 15,684,122
H PEKERJAAN ATAP Rp. 16,045,570
I PEKERJAAN FINISHING Rp. 14,010,750

TOTAL Rp. 214,404,226.00


DIBULATKAN Rp. 214,405,000.00

Terbilang : DUA RATUS EMPAT BELAS JUTA EMPAT RATUS LIMA RIBU RUPIAH

You might also like