You are on page 1of 1

BLOCK WORK

TR
KEY PLAN:

UE
NO
RT
CH
A
C
ME
A1 A2 B1 B2 C1 C2 D1 D2 G1 G2 H1 H2
C3 C4 D3 D4
E1 E2 F1 F2
E3 E4 F3 F4
LEGEND:
K' MATCHLINE - SEE DRAWING TD-B1000-A02-10D20
MATCHLINE - SEE DRAWING TD-B1000-A02-10E20

MATCHLINE - SEE DRAWING TD-B1000-A02-10F20


STAIR 92
L00-F-CI860
1.61 m²
L
ELECTRICAL CABINET
L00-F-EL334
1.59 m²
UP
GHF3 LOST&FOUND
BAGGAGE HOLD WITH
L00-E-SH263-1

L00-F-EL334-1
PROVISION FOR L00-F-LF410-1
STAIR 23

2730
LIFT 2 LIFT 8 SCREENING
L00-F-CI828 L00-F-CI826 L00-F-CI827
4500 22280 L00-F-LF410 1580
9.39 m² 8.59 m² 8.59 m² 102.88 m²
L00-F-CI828-1

L00-E-TD236-1
GHF3 LOST&FOUND
L00-F-LF405-2

BAGGAGE HOLD WITH


PROVISION FOR
SCREENING
RETAIL36 DUTY FREE GHF5 LOST & FOUND
L00-F-LF410 OFFICE BAC AREA

2890
RETAIL
L00-E-SH263 102.88 m² L00-F-LF408 GHF2 LOST & FOUND L00-E-TD236
9890

L00-F-LF408-1
13.71 m² PANTRY BREAKROOM 16.01 m²
559.45 m²
L00-F-RR407
34.00 m²
L00-F-LF405-1 11920
1 0 1 2 4 6 8 10M
GHF5 GRAPHIC SCALE 1:100
LOST &
FOUND
STORAGE L00-F-RR407-1 REVISION:
4100 1500
L00-F-LF405
38.58 m² GHF5 LOST & FOUND
M COUNTERS
L00-F-LF406
60.62 m²
A 18/03/15 INITIAL ISSUE JM. L
1960

DATE
REV. (dd/mm/yy) DESCRIPTION OF REVISION APP.
NAME DATE (dd/mm/yyyy)
L00-F-LF406-1
DESIGNED BY: A. RIQUELME 18/03/2015
DRAWN BY: ADPI 18/03/2015
CHECKED BY: M.DRAIEF/M.DAVID 18/03/2015
LIFT 12 APPROVED BY: J.M. LE PEUVEDIC 18/03/2015
L00-F-CI366
7.62 m²
UP Bahrain International Airport
STAIR 73
AIRPORT MODERNIZATION PROGRAM
2960 L00-F-CI418
CLIENT: CLIENT REPRESENTATIVE :
3.78 m²
PROJECT MANAGER: STAKEHOLDER SIGN-OFF:
RETAIL36 DUTY FREE
RETAIL ESCALATOR 04 DESIGN CONSULTANT:
L00-E-SH263 L00-F-CI417
559.45 m² 8.33 m²
PHASE & DISCIPLINE:
TENDER DOCUMENTS
ARCHITECTURE
DRAWING TITLE:
MATCHLINE - SEE DRAWING TD-B1000-A02-10F30
PASSENGER TERMINAL BUILDING
FLOOR PLAN GROUND FLOOR
N
GRIDS 43-50 , I-O
ZONE F1
LEVEL GF - ARRIVAL LEVEL - 0.00 PROJECT NUMBER DRAWING NUMBER REV.
1 1 : 100
4351377
SCALE (A0) TD-B1000-A02-10F10 A
1 : 100

You might also like