April 2012
1. Introduction...............................................................................................: 3
2. Existing Land Use Plan of Port Area.....................................................: 4
2.1. Existing Land Use Plan of Willingdon Island.......................................: 4
2.1.1. Land Lease Details....................................................................................: 7
2.1.2. Height Restrictions due to Flying Funnel restrictions.........................: 9
2.1.3. Coastal Regulation Zone Restrictions....................................................: 11
2.2. Existing Land Usage of Other Areas Outside Willingdon Island.....: 12
2.2.1. At Vallarpadam..........................................................................................: 12
2.2.2. At Puthuvypeen.........................................................................................: 12
2.2.3. At Bolghatty................................................................................................: 13
2.2.4. At Ernakulam.............................................................................................: 13
2.2.5. At Palluruthy..............................................................................................: 13
2.2.6. At Fort Cochin............................................................................................: 13
3. Proposed Land Use Plan...........................................................................: 13
3.1 Proposed Land Usage Plan of WIllingdon Island.................................: 14
3.1.1. Proposed Port Side Land Usage..............................................................: 15
3.1.2. South End Land Use Plan.........................................................................: 18
3.2. Proposed Land Usage Plan of Other Areas outside Willingdon Island.: 21
3.2.1. At Vallarpadam..........................................................................................: 21
3.2.2. At Puthuvypeen.........................................................................................: 21
3.2.3 At Bolghatty...............................................................................................: 22
3.2.4 At Ernakulam.............................................................................................: 22
3.2.5 At Palluruthy..............................................................................................: 22
3.2.6 At Fort Cochin............................................................................................: 22
3.2.7. Future Development..................................................................................: 22
Figure 12 Location of the Proposed Logistics Park and port User’s Complex. : 16
The total proposed backup area, as per the revised master plan, required for
the future Port operations at Willingdon Island is approximately 80.12
hectares. The existing land area being used for core operations of Willingdon
Island is approximately 56.62 hectares.
Additionally, CoPT has approximately 37.13 hectares of land housing port
residences and used for non-operational purposes and vacant land of 5.77
hectares. Thus the total land area, that has not been leased out, available with
the port is approximately 99.52 hectares.
Hence, CoPT will be able to create infrastructure for proposed scale of
operations by realigning the existing land being used for core operations as
well as non-operational purposes based on the new land use plan. The
existing lease tenure of land with third parties has been taken into account so
that there is minimum disruption to existing tenancy and the proposed
development may be carried out in a phased manner.
The above diagram provides a layout plan detailing the land area based on
lease expiry. The colour coded layout of the land area of Willingdon Island
gives an idea of the land available to the port in the coming years. The areas
marked in red belong to the port and have not been leased out. The other
areas are colour-coded as per the legend based on their lease expiry dates.
Lease
Land Area ( Hectares) Percentage
Expiry
2006-2010 0.64 1.19%
2011-2015 24.26 45.48%
2016-2020 11.41 21.39%
2021-2025 8.80 16.49%
2026-2030 0.96 1.80%
2031-2035 4.51 8.46%
2036-2040 1.55 2.91%
2041-2080 1.21 2.28%
Total 53.34 100.00%
Approximately 46.67% of the total area under the port trust’s jurisdiction in
the northern end is likely to be free of any lease or tenements beyond FY15,
provided Cochin Port Trust does not extend the lease contracts with the
existing lessees. Beyond 2020, about 68.06% of the area on the northern end of
Willingdon Island will be available for development as per the existing lease
agreements. Remaining lessees can be suitably relocated to other parts of the
island or may be allowed to continue their tenancy as per the port’s
developmental plans.
The entire area on the south end reclaimed land is available for development.
Land parcel measuring 4.046 hectares has been allotted to the Indian
Maritime University for setting up a campus. An area admeasuring 1.62
hectares has been allotted to the Indian Navy.
Sl. Plot
Proposed Usage Area Height Restrictions due to Flying Funnel
No. ID
1 A15 Commercial Area 1.82 Ha Partially Applicable (G+6/7)
Applicable, only small portion can be built
2 A16 Commercial Area 5.5 Ha with (G+0) Structures
3 A17 FTWZ 41.27 Ha Mostly applicable ( G+1/2/3/4/5/6/7/8/9)
4 A18 Business District 7.88 Ha Partially Applicable (G+3/4/5/6/7/8/9)
5 A19 Hospitality Node &
Business District 22.38 Ha Applicable (G+5/6/7/8)
6 Maritime
University 4.05 Ha Partially Applicable (G+4/5)
*Not Applicable implies that the area does not fall under any of the flying funnels
The height restriction for built-up development in land parcels that do not fall
under the flying funnel restrictions has been assumed to be 17.3 m,
considering the height achieved by infrastructure at Vallarpadam ICTT and
restrictions imposed by Indian Navy, which occupies considerable portion of
the island.
2.2.1 At Vallarpadam
Cochin Port Trust is developing a Special Economic Zone at Vallarpadam in a
land area of 115 Ha, out of the 163.637 ha. available. This will be the first port-
based Special Economic Zones in the country. M/s Dubai Port World (DPW)
is the Co-developer of the Vallarpadam SEZ
i) International Container Transshipment Terminal (ICTT)
A land area of 115 Ha. has been earmarked for the ICTT and land is allotting
in phases. The ICTT project envisages development of facilities for handling
mother container ships of 8000+ TEU capacities. This is a State of the Art
Terminal with 1800m berth in the final stage with supporting handling
equipment to have an annual throughput of 3 million TEUs. The project is
executed on BOT basis by M/s. India Gateway Terminal Pvt. Ltd (IGT), a
subsidiary of M/s Dubai Port World (DPW). The anticipated investment of
the BOT Operator is Rs. 2118 Crores.
The License Agreement contemplates the development of the terminal in
phases. Phase-I of ICTT consisting of construction of 600m berth and
development of stacking area and other allied facilities has been partly
commissioned on 11th February 2011.
Phase I B and Phase II for Extension of berth by 300m & 900m respectively
and providing related facilities will be taken up for Implementation by BOT
operator, based on traffic build up.
ii) Other Areas
At Vallarpadam 2.58 ha. and 7.59ha. of land area have been leased to
M/s.Distipark Ltd. And M/s.M.I.V Logistics Ltd respectively for developing
Container Freight stations.
2.2.2 At Puthuvypeen
Cochin Port Trust is developing a Special Economic Zone at Puthuvypeen in
a land area of 285.8413 Ha.. M/s. BPCL-KR, Petronet LNG Ltd. and IOCL are
the Co-developers of the Puthuvypeen SEZ. The SPM project of M/s.BPCL
KR has already commissioned.
i) LNG Re-gasification Terminal
A land area of 33.4 ha. has been allotted to M/s.Petronet LNG Ltd. for setting
up of re-gasification plant of LNG Re-gasification Terminal. The LNG
terminal will consist of a jetty for LNG vessels up to a length of 280 m and
draft of 12.5m.
2.2.3 At Bolghatty
At Bolghatty 0.81 Ha. has been leased to Kerala Tourism Development
Corporation for their Marina, 0.50 Ha. to IWAI for their Inland waterway
terminal and 10.59 Ha. to M/s.Lulu Convention Centre for setting up of
hospitality complex. Apart from this, the water area lying adjacent to the
Vallarpadam NH connectivity can be developed later.
2.2.4 At Ernakulam
i) Land near GIDA area and Chathiyath
3.51 Ha. of land near GIDA area and 0.22 Ha. of land at Chathiyath are lying
vacant.
ii) Ernakulum Tanker Berths
At Ernakulam tanker berths an area of 1.13 Ha. is already occupied for South
and North tanker berths.
iii) At Thevara
At Thevara 0.587 Ha. area is available to be leased out for development.
2.2.5 At Palluruthy
At Palluruthy 3.86 Ha. area is available to be leased out for development.
2.2.6 At Fort Cochin
At Fort Cochin 0.16 Ha. has been leased to Kerala State Police for their
Coastal Police Station, 0.053 Ha. to Acquatic club and 0.267 ha. to M/s.Suvira
Energy.
Figure 12 Location of the proposed Logistics Park and Port User’s Complex
The canal abutting this portion of the land is currently being used by the
Indian Navy for conducting drills and training exercises. Options to make use
of the canal for providing water connectivity between the proposed FTWZ
and the container terminal or the Inland Waterways may be evaluated. The
area statement for the proposed business district is as follows:
Land Area
Total
Parcel Proposal Suggested Functional Configuration under
Area
No CRZ
Business
Five star hotel, convention centre, commercial complexes,
District and 22.38 7.36
A19 budgeted hotel, an open shopping area with a concept of
Hospitality Ha Ha
“Kochin Haat” and public spaces in the CRZ belt
Node
Free Trade General Warehousing, Sea Food, Cashew, Tea, Shipping
41.27
A17 Warehousing Ancillary, Empty Container Yard, Open Storage, Rain Water None
Ha
Zone (FTWZ) Harvesting and Roads and Green Areas.
Business 7.88
A18 Commercial Complex, office building, and public space.
District Ha
5.5
A16 Commercial Offices None
Ha
1.82 1.36
A15 Commercial Shopping complex
Ha Ha
78.85 8.72
Total
Ha Ha
Cochin being a preferred tourist destination and considering the unique and
exclusive nature of the location; star hotel facilities, convention centers are
proposed (A19 area) which can attract many domestic and international
tourists. The clustering of tourism functions such as five star hotels,
convention centre, commercial areas, offices, public spaces including
children’s play areas, Chinese fishing net, open food plazas and activities
such as “Kochi Haat” are proposed in the south end reclamation area(A19
area).
Considering the shift in shopping habits of Keralites towards organized
retailing and their requirement for associated entertainment, the commercial
projects are proposed (A15 area). Further, the planned reallocation of office
3.2.1 At Vallarpadam
i) International Container Transshipment Terminal (ICTT)
The License Agreement for ICTT with M/s Dubai Port World (DPW)
contemplates the development of the terminal in phases. Phase-I of ICTT
consisting of construction of 600m berth and development of stacking area
and other allied facilities has been partly commissioned on 11th February
2011.
Phase I B and Phase II for Extension of berth by 300m & 900m respectively
and providing related facilities will be taken up for Implementation by BOT
operator, based on traffic build up.
ii) Other Areas
The remaining area is earmarked for setting up of MT depots, Container
freight stations and value services, Distribution parks closely related to
container logistic activities etc..
3.2.2 At Puthuvypeen
i) LNG Re-gasification Terminal
The LNG terminal along with re-gasification plant is expected to be
commissioned by the end of 2012. On commissioning of the terminal a lot of
processing units using the byproducts generated on LNG regasification are
expected to come up in the vicinity of LNG regasification terminal.
ii) LPG Import Terminal
M/s Indian Oil Corporation Ltd (IOCL) is setting up 0.6 MTPA capacity LPG
import terminal at Cochin Port to feed the markets of Kerala and South West
Tamil Nadu on the 15 Ha. of land leased at Puthuvypeen SEZ for providing
facilities for pressurised storage of LPG and the ships with LPG will be
berthed at the Multi-User Liquid Terminal proposed to be set up at
Puthuvypeen SEZ under Cochin Port.
iii) Multi – User Liquid Terminal
The Multi – User Liquid Terminal is proposed to be set up at Puthuvypeen,
near the entrance to Cochin Harbour. Services proposed to be provided at the
3.2.3 At Bolghatty
At Bolghatty most of the area has been already leased out. Apart from this,
the water area lying adjacent to the Vallarpadam NH connectivity can be
reclaimed later. After developing, this area can be utilized for way side
parking, setting up of gas stations and other wayside amenities.
3.2.4 At Ernakulam
i) Land near GIDA area and Chathiyath
3.73 ha of land area available is proposed for the commercial development
considering the potential of this area in the heart of city and also the similar
developments taking place in the vicinity.
ii) Ernakulum Tanker Berths
No land area is available at Ernakulam tanker berths for leasing.
iii) At Thevara
At Thevara 0.587 Ha. land area available is proposed to be leased out for
commercial / non-port related development.
3.2.5 At Palluruthy
At Palluruthy 3.86 Ha. area is available to be leased out, which is also
proposed for non port related development.
3.2.6 At Fort Cochin
Out of the 2.06 Ha. land at Fort Cochin 0.48 ha. area has already laesed to
various parties and balance area is proposed for commercial/ non port based
development.
Area
Development Commencement
Area Requirement Status
Period of Operation
(Hectare)
Dry Bulk Stock Yard - A1 14 Backup area of 14 ha available for immediate development 2013-2015 2015
Storage Area - Fertilizer - A3 2.3 Backup area of 2.4 ha available for immediate development 2013-2015 2015
Storage Area for Ro-Ro - A2 6 Storage Area available for immediate development 2013-2014 2014
Tank Farm - A4 3 Area available immediately 2013-2014 2014
Storage Area for Cement - A5 (i) 1.3 Backup area of 1.3 ha available for immediate development 2013-2014 2014
Storage Area for Cement - A5 (ii) 1.4 Backup area of 1.4 ha available for immediate development 2013-2015 2015
Storage Area for Cement - A5 (iii) 1.6 Backup area of 1.6 ha available for immediate development 2013-2014 2014
Storage Area for General Cargo -
5.1
A6(i) Backup area of 5.1 ha available for immediate development 2013-2015 2015
Storage Area for General Cargo -
1.3
A6(ii) Backup area of 1.3 ha available for immediate development 2013-2014 2014
Backup Area - Cruise Terminal - A7 1.3 Backup area of 1.3 ha available for immediate development 2013-2014 2014
Container Freight Station - A8 3.5 Backup area of 3.5 ha available for immediate development 2013-2014 2014
Rain Water Harvesting - A9 1 Backup area of 1 ha available for immediate development 2013-2014 2014
Logistics Park - A10 Around 20 ha of land will be available after 2015 and remaining 24.8 Phase 1 - 2016-2017 Phase 1 – 2017
44.8
ha after 2020 Phase 2 - 2020-2021 Phase 2 - 2021
Port Users Complex - A11 Around 1 ha of land available for immediate development, 1.5 ha Phase 1 - 2013-2014 Phase 1 – 2014
3.7 available after 2015 and remaining 1.2 ha available after 2040 Phase 2 - 2016-2017 Phase 2 – 2017
Phase 3 - 2041 -2042 Phase 3 - 2042
Dry Dock/ Ship Repair - A13 18 Backup area of 18 ha available for immediate development 2013-2015 2015
Commercial Area - A15 1.8 Area for development available only after 2015 2016-2017 2017
Commercial Area - A16 5.5 Area for development available only after 2020 2021-2022 2022
FTWZ - A17 41.27 Area for development available only after 2015 2016-2017 2017
Business District -A18 7.88 Area for development available only after 2015 2016-2017 2017
Hospitality Node and Business
22.38
Area - A19 Area for development available only after 2015 2016-2017 2017