You are on page 1of 4
Republic of the Philippines Province of Bulacan Municipality of Marilao OFFICE OF THE SECRETARY TO THE SANGGUNIANG BAYAN EXCERPTS FROM THE MINUTES OF THE REGULAR SESSION OF THE SANGGUNIANG BAYAN OF MARILAO, FROVINCE OF BULACAN, HELD AT THE SESSION HALL OF THE MUNICIPAL BUILDING ON SEPTEMBER 16, 2013 PRESENT: Fon, Andre Favian D. Santos ~ Municipal Vice Mayor Presiding Officer ‘COUNCILORS: Hon. Wilfredo D, Diaz Majority Floor Leader Hon. Jun Bob J. Dela Gruz ‘Mincrity Floor Leader Hon. Divina E. Reyes Hon, Allane T. Sayo Hon. Irma.G. Celones Hon. Arnold T, Papa Hon. Marlon O- Villamar Hon. Mark Joseph L. Guillermo: Hon. Rogelio C. Pascual (Ex-Oificio, Liga) Hon. Eunice A. Martin (Ex-Officio, SK) RESOLUTION NO. 2013 — 96 Introduced by Councilor Wilfredo D. Diaz and unanimously seconded by all Members of the Sangguniang Bayan present . RESOLUTION APPROVING THE THIRD UPDATED 2013 ANNUAL INVESTMENT PROGRAM (AIP) EMBODYING THE VARIOUS DEVELOPMENT PROGRAMS, PROJECTS AND ACTIVITIES OF THE MUNICIPALITY OF MARILAO, PROVINCE OF BULACAN FOR CALENDAR YEAR 2013 IN THE AMOUNT OF FORTY SIX MILLION FOUR HUNDRED TWENTY FIVE THOUSAND PESOS (P46,425,000.00), AND FURTHER AUTHORIZING THE MUNICIPAL MAYOR, FOR AND IN BEHALF OF THE MUNICIPAL GOVERNMENT OF MARILAO, TO SIGN AND EXECUTE CONTRACTS AND AGREEMENTS WITH THE WINNING BIDDERS OF PROJECTS COVERED THEREIN, SUBJECT TO EXISTING AUDITING LAWS, RULES AND REGULATIONS. WHEREAS, the Municipal Development Council, in its Resolution No. 2013-04 issued on September 10, 2013, adopted and approved the Updated 2013 Annual Investment Program (AIP) due to the need to incorporate additional projects that are deemed necessary and justifiable, consisting of the following programs/projects/activities and their corresponding eosts: | | Project Details Cost Acquisition of service vehicles for use of the Office of the V Mayor (1 nd Sangguniang Bayan Members (4 units ‘Acquisition of Rescue’ Multi Purpose Vehicle for Rescue and Disaster Response Operations Complete with needed operational accessories like but not limited to Siren, Blinkers, Two (2) way 1,00,000.00 Radios (UHF-Car Mounted with needed antenna) Mounted Utility | Spot tight 4,000,000.00 7 = EXCERPTS-—-—__——_________2___ REGULAR SESSION RESOLUTION NO, 2013 ~ 96 SEPTEMBER LS, 2013, [Acquisition of ambulance for medical emergency use complete | J with needed aveossories like but not limited to sirens, blinkers, 1,200,000,00 | oxygen tanks, UHF two (2) way radios car mounted with antenna. | Phased Installation of Protective Grilles on.the windows and other | acess points of the Municipal Government Building (hoth ground oonsne0:t | and second floor) to include stainless steel hand rails for use of “ane | BWD and protective railings on pool side along Atrium, [Acquisition of Servi use of the Office of the Mayor 7, 000,000.00 | | Acquisition of Two (2) units bulldozer for use at eur final gerbage |» o90,909,00 | disposal facility ‘Acquisition of 2013 Brand New Municipal Employees Service Bus,(similar to Mitsubishi Fuso Rosa) 29 seater or more, diesel | 3,900,000.00 engine _ ‘Coramunication Center Tower at Lama de Gato Police and Fire | mauonte Station complete with repeater and antenna installation in ‘Acquisition of Brand New Van Type Utility Vehicle, Water | Cooled Diesel Engine, approx. 10 passenger capacity. (Hi Ace or 1,800,000.00 Similar) Fs ‘AICS-Aid fo individuals in er $50,000,00 ‘Vehicles of the Municipal Soren | Road and Drainage Canal upgrading with cross drainage ai Barrio Fiesta, Nagbalon (L=75m, W-3m) elevation to eonform at 750,000.00 Salubungan Chapel road elevation | | ae = ] | Cook Si Protection along Ka Zaro, Loma de Gato (=50m, | sdidhows! [Re tosa TE (= = ee Road Seas at Tibagan, Sta Rosa 0 (=120m, W=5m, pion be Creekside Rip-rapping and Road Widening at Sta Rosa I {eet00m, Ww ra | 400,000.00 [Repair and Improvement of Drainage Canal at Fausta Village “Abangan Sur (L=150m) I 250,000.00" Repair and Improvement of Drainage Canal at Tabing-llog | (L=l00m) 130,000.00 Conerete Step along; Tabinge-Hlog river bank with Railings and rope pee | guide across Marilao River to Saog (L=30m) Creek side Protection at Ibayo INC (L=80m! = 2 Drainage Canal at Villa Consuelo Subd, Abangan Sur (L=S0m) Road Asphalt at Lambakin (L=100m, WeSm) 250,000.00 | Drainage Canal at Ihayo, Maaasahan and Matalino St_(L—120m) 280,000.00 Repair and Improvement of Water Souree System at New Municipal Building (Additional Fund) 200,000.00 | Roof for stage at Northville 4 School (A=80 sq.m) 150,000.00 | Asphalt Patching of Various Roads at Different Barangays with an approximate covered 15 Drainage Canal at Ecology Center, Sta Rosa Il (L=60m) a. of 1000 sq. meters | $30,000.00 | ir) ae J EXCERPTS—-—. RESOLUTION NO. 213-96 Repair and Declogaing of Drainage Canal along MNR, Tabing- Thk-0.2m elevation to conform with Salubungan Bisita road Tog, Abungan Sur and Abangan Nore OER Drainage Canal at Abangan Sur, Alejandra Subd (L=160m) 309,080.00, Construction of Proposed RC Drainage Pipe Canal along See pnb | Lambakin Road (L=90Lm) o of Drainage Canal and Pathwalk at Pama St, Abangan "300,000.00 | Norte (L=200L.m) | Upgrading of Drainage Canal at Prenza Une Village, Prenza 1 [using RC Pipe and CHB (L=60mm) ea Road Upgrading with Drainage Canal improvement at the | approach of Fausta Village, Abangan Sur (Canal L=idLm 1,800,000.00 | Road=789sq_m) aaa eacai $$$ | Road Upgrading with Drainage Canal Improvement at Alejandra Ce Oba AL | Subdivision, Abangan Sur (A=680 sq.m.) _ a | Proposed Upgrading of Drainage Canal, Manhole and Concrete "750,000.00 Pavement at Convention Center, Poblacion II (A=600sq nm) s Proposed Uprading of Drainage Canal with Cover at Bayan- | iaxeband | Bayanan, Laog, Prenza II (L=70Lm Depth-0.6m ave) Purchase of Diesel/Gasoline Powered Portable Water Pump (6 oa be Units) _ ’ | Proposed Road Upgrading and Construction of Drainage Canal at fson ano 0H esia ni Cristo, Thayo (Canal L=180Lm; Road A=4685q.m ) SOO ‘oad Upgrading and Construction of Drainage Canal and Cross | Drainage along T. Bernardino St, Nagbalon (Canal L=180Lm, We0.70m, Depth-1.00m ave, Road L=90m, W=5.2m. Ave, 1,500,000,00 elevation) ‘Improvement of waier supply sysiem ai New Municipal Building, | Patubie — Hie waler supply syslem at Pambayang Dalubhasaan ng 150,000.00 Fabrication of Bamboo Raft T 50,000.00 | Road Upgrading and Construction of Drainage Canal at Poblacion I (Drainage Canal: L=150Lm W=0.70m Depth=1.00m ave, Road | 1,500,000.00 | | Upgrading: L=90m W=5.2m Thk=0.20m. ave.) [Construction of Barangay Arc at MacArthur Highway Zesto Crossing, Tabing-llog side ° 190,000,00 Rehabilitation of Prenza Day 1,300,000.00 Construction of Cantecn at Pambayang Dalubhasaan ng Marilao | (PDMf) at Abangan None es = ORONO Installation of roof covering of PDM Atrium 2,000,000.00 [Construction of Covered Court at PDM 3,000,000.00 Upgrading of Service Entrance ai Lambakin Elementary School 73,000.00 Upgrading of Service Entrance at Prenza Elementary School 760,000.00 | Rehabilitation/rewiring of Marilao Public Market, Pobl = 189,000.00 Upgrading ef Service Entrance’Additional Electrical Works at Marilao Dialysis Center, Sta. Rosa Il Sy “Upgrading of Service Enirance at A.FGiB.M, Trade School, Lias 700,000.00 (Total 46,435, 000,00 fe EXCERPIS————————__—___—4—__— SEPTEMBER 16, 2013. REGULAR SESSION RESOLUTION NO. 2013 ~ 96 NOW, THEREFORE, BE IT RESOLVED, AS IT IS HEREBY RESOLVED, to approve the Third Updated 2013 Annual Investment Program (AIP), embodying the various development programs, projects and activities of the Municipality of Marilao, Province of Bulacan for Calendar Year 2013, in the amount of Forty Six Million Four Hundred Twenty Five Thousand Pesos (P46,425,000.00): RESOLVED FURTHER, to authorize the Municipal Development Council to realign the various development projects embodied in the Thied Updated 2013 Annual Investment Program (AIP) as the needs may arise or as it may deem fit due to change of pricrities and/or development thrusts; RESOLVED FURTHER, to authorize the Municipal Mayor, for and in behalf of the Municipal Government of Marilao, Bulacan, to execute and sign contracts and agreements with, the winning bidders of the projects covered by the Third Updated 2013 Annual Investment Program (ATP), subject to existing auditing laws, rules and procedures, RESOLVED FINALLY, that all concerned offices be furnished copies of this Resolution for their information. ENACTED, September 16, 2013 ANDRE EAVIAN D. SANTOS Municipal Vice Mayor Presiding Officer APPROVED: SUANITO H. SANTIAGO Municipal Mayor, CERTIFICATION This is to certify that this resolution which was approved on second reading on September 16, 2013, was finally passed by the Sangguniang Bayan 0}

You might also like