1 PRELIMINARIES ‐
2.1 Excavation M3 6 1 2.7 2.7 2.3 100.602 100.602 15.50 1,559.33
2.2 Back Filling M3 6 1 2.7 2.7 1.9 83.106 83.106 14.40 1,196.73
3 Water Proofing M2 12,310.50
4 Concrete M3 56,731.99
Corete Works Which Include Concreting,Shuttering &
Rteinforcement
4.1 Sub‐Structure
4.2 Super‐Structure
4.2.1 Top Slab (100mm Screed only) M3 1 1 80 0.1 8 8 660.00 5,280.00
6 Blockwork 21,297.60
7 FINISHING 70,002.08
Flooring
1 Epoxy paint ‐ At parking area M2 1 1 60 60 60 59.80 3,588.00
2 Tiles (at Mezzanine Floors) M2 1 1 60 60 60 135.70 8,142.00
Skirting
1 Tile Skirting at Mezzzanine M 1 1 36 36 36 48.00 1,728.00
Wall Finish
1 Anti carbonation Paint‐ at Parking raea M2 1 1 36 2.5 90 90 98.00 8,820.00
2 Emulsion Paint at Mezzanine Floor M2 1 1 36 3.5 126 126 92.00 11,592.00
3 External Paint M2 1 1 36.8 6.5 239.2 239.2 104.90 25,092.08
False Ceiling
1 Mezzanine Floor M2 1 1 80 80 80 138.00 11,040.00
Total 227,390.41