1.2 STATEMENT OF THE PROBLEM 1.3 OBJECTIVES OF THE STUDY 1.4 SIGNIFICANCE OF THE STUDY 1.5 SCOPE AND LIMITATIONS 1.6 CONCEPTUAL FRAMEWORK 1.7 DEFINITION OF TERMS
3.1 SURVEY AND SITE INVESTIGATION 3.1.1 INTERVIEW 3.1.2 SITE VISIT 3.2 TOPOGRAPHIC AND LAND USE INFORMATION 3.2.1 DELINEATION OF THE CATCHMENT AREA 3.2.2 SOIL CLASSIFICATION 3.3 HYDROLOGICAL DATA 3.3.1 COLLECTION OF RAINFALL DATA 1 THEISSEN POLYGON METHOD 3.3.2 RAINFALL INTENSITY DURATION FREQUENCY 3.3.3 RUNOFF ANALYSIS (ACTUAL DISCHARGE) 3.4 SELECTION OF BMP 3.4.1 PHYSICAL SITE CHARACTERISTICS 1.1 SOIL 1.2 WATERSHED SIZE 1.3 GROUNDWATER 1.4 BASEFLOW 1.5 WATERSHED 3.4.2 SPACE CONSTRAINTS 3.4.3 TARGETTED POLLUTANTS AND BMP PROCESSES 3.5 DESIGN OF BMP 3.5.1 MAINTENANCE AND SUSTAINABILITY 3.5.2 ECONOMIC ANALYSIS 3.5.3 COST-EFFECTIVENESS