METRADO DE EXPLANACIONES

"ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DE LA CARRETERA TRAMO MANTACOCHA - MATAUCRUZ - DISTRITO DE UMARI - PROVINCIA DE PACHITEA - DEPARTAMENTO DE HUANUCO"
PROYECTO Hoja Nº 1
RESPONSABLE MUNICIPALIDAD DE UMARI Plano Nº SECCIONES
FECHA 7/30/2017 Hecho por OLGER

VOLUMENES CLASIFICACION DEL CORTE CLASIFICACION DE RELLENO ELIMINACION


DISTANCIA
KM KM CORTE RELLENO M.S. R.S. R.F. PROPIO TRANSPORTADO MAT. EXCEDENTE
m (m3) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
TRAMO MANTACOCHA - MATAUCRUZ
Prog: 0+00 - 1+00
0+000 1+000 1000.00 8,659.100 2,628.100 6,927.280 1,298.865 432.955 2,628.100 0.000 6,031.000
Prog: 1+00 - 2+00
1+000 2+000 1000.00 7,791.150 1,894.050 6,232.920 1,168.673 389.558 1,894.050 0.000 5,897.100
Prog: 2+00 - 3+00
2+000 3+000 1000.00 5,752.100 2,277.750 4,601.680 862.815 287.605 2,277.750 0.000 3,474.350
Prog: 3+00 - 3+863.55
3+000 3+864 863.55 7,099.267 1,620.579 5,679.413 1,064.890 354.963 1,620.579 0.000 5,478.688
******************************************************************************************************
TOTAL FINAL 3,863.55 29,301.617 8,420.479 23,441.293 4,395.243 1,465.081 8,420.479 0.000 20,881.138

Ver desagregado METRADO DE EXPLANACIONES


METRADO DE EXPLANACIONES
"ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DE LA CARRETERA TRAMO
OBRA MANTACOCHA - MATAUCRUZ - DISTRITO DE UMARI - PROVINCIA DE PACHITEA - Hoja Nº 1
DEPARTAMENTO DE HUANUCO"
RESPONSABLE MUNICIPALIDAD DE UMARI Plano Nº SECCIONES

FECHA 7/30/2017 Hecho por OLGER

Area de Area de Volumen de Vol. de Corte Vol. De Vol. De Volumen de


Estaca Distancia
Corte Relleno Corte MS. Corte RS Corte RF Relleno
TRAMO MANTACOCHA - MATAUCRUZ
Prog: 0+00 - 1+00
0+000 4.830 0.000
0+020 4.330 0.380 20.000 91.600 73.280 13.740 4.580 3.800
0+040 0.920 1.620 20.000 52.500 42.000 7.875 2.625 20.000
0+060 3.880 2.050 20.000 48.000 38.400 7.200 2.400 36.700
0+080 7.010 0.510 20.000 108.900 87.120 16.335 5.445 25.600
0+100 11.510 0.220 20.000 185.200 148.160 27.780 9.260 7.300
0+120 9.660 1.690 20.000 211.700 169.360 31.755 10.585 19.100
0+140 10.080 2.170 20.000 197.400 157.920 29.610 9.870 38.600
0+150 14.050 0.000 10.000 120.650 96.520 18.098 6.033 10.850
0+160 5.370 2.470 10.000 97.100 77.680 14.565 4.855 12.350
0+180 1.730 4.370 20.000 71.000 56.800 10.650 3.550 68.400
0+200 6.540 2.020 20.000 82.700 66.160 12.405 4.135 63.900
0+220 8.210 2.840 20.000 147.500 118.000 22.125 7.375 48.600
0+230 5.570 2.790 10.000 68.900 55.120 10.335 3.445 28.150
0+240 5.670 2.220 10.000 56.200 44.960 8.430 2.810 25.050
0+260 4.750 2.500 20.000 104.200 83.360 15.630 5.210 47.200
0+280 7.330 1.720 20.000 120.800 96.640 18.120 6.040 42.200
0+300 13.930 3.460 20.000 212.600 170.080 31.890 10.630 51.800
0+320 41.330 0.060 20.000 552.600 442.080 82.890 27.630 35.200
0+330 65.510 0.000 10.000 534.200 427.360 80.130 26.710 0.300
0+340 54.250 0.000 10.000 598.800 479.040 89.820 29.940 0.000
0+350 28.770 0.010 10.000 415.100 332.080 62.265 20.755 0.050
0+360 13.090 0.000 10.000 209.300 167.440 31.395 10.465 0.050
0+370 3.630 2.790 10.000 83.600 66.880 12.540 4.180 13.950
0+380 0.000 15.020 10.000 18.150 14.520 2.723 0.908 89.050
0+400 0.000 18.070 20.000 0.000 0.000 0.000 0.000 330.900
0+420 5.400 3.070 20.000 54.000 43.200 8.100 2.700 211.400
0+440 0.630 7.070 20.000 60.300 48.240 9.045 3.015 101.400
0+460 3.280 4.090 20.000 39.100 31.280 5.865 1.955 111.600
0+480 7.020 1.690 20.000 103.000 82.400 15.450 5.150 57.800
0+500 3.970 3.650 20.000 109.900 87.920 16.485 5.495 53.400
0+520 8.210 0.520 20.000 121.800 97.440 18.270 6.090 41.700
0+540 9.860 0.170 20.000 180.700 144.560 27.105 9.035 6.900
0+560 10.490 0.000 20.000 203.500 162.800 30.525 10.175 1.700
0+580 22.880 0.000 20.000 333.700 266.960 50.055 16.685 0.000
0+600 0.890 3.310 20.000 237.700 190.160 35.655 11.885 33.100
0+620 1.100 0.550 20.000 19.900 15.920 2.985 0.995 38.600
0+640 0.600 4.450 20.000 17.000 13.600 2.550 0.850 50.000
0+650 1.140 3.140 10.000 8.700 6.960 1.305 0.435 37.950
0+660 4.840 0.090 10.000 29.900 23.920 4.485 1.495 16.150
0+670 10.080 0.000 10.000 74.600 59.680 11.190 3.730 0.450
0+680 6.930 0.000 10.000 85.050 68.040 12.758 4.253 0.000
0+700 5.400 0.310 20.000 123.300 98.640 18.495 6.165 3.100
0+710 5.360 1.730 10.000 53.800 43.040 8.070 2.690 10.200
0+720 6.760 1.520 10.000 60.600 48.480 9.090 3.030 16.250
0+740 5.520 5.240 20.000 122.800 98.240 18.420 6.140 67.600
0+760 4.280 0.370 20.000 98.000 78.400 14.700 4.900 56.100
0+770 6.410 0.000 10.000 53.450 42.760 8.018 2.673 1.850
0+780 10.770 0.000 10.000 85.900 68.720 12.885 4.295 0.000
0+800 21.900 0.000 20.000 326.700 261.360 49.005 16.335 0.000
0+820 35.040 0.000 20.000 569.400 455.520 85.410 28.470 0.000
0+840 19.020 0.000 20.000 540.600 432.480 81.090 27.030 0.000
0+850 0.000 0.850 10.000 95.100 76.080 14.265 4.755 4.250
0+860 0.000 12.780 10.000 0.000 0.000 0.000 0.000 68.150
0+870 0.000 13.760 10.000 0.000 0.000 0.000 0.000 132.700
0+880 0.000 6.950 10.000 0.000 0.000 0.000 0.000 103.550
0+890 0.000 6.950 10.000 0.000 0.000 0.000 0.000 69.500
0+900 0.000 4.520 10.000 0.000 0.000 0.000 0.000 57.350
METRADO DE EXPLANACIONES
"ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DE LA CARRETERA TRAMO
OBRA MANTACOCHA - MATAUCRUZ - DISTRITO DE UMARI - PROVINCIA DE PACHITEA - Hoja Nº 1
DEPARTAMENTO DE HUANUCO"
RESPONSABLE MUNICIPALIDAD DE UMARI Plano Nº SECCIONES

FECHA 7/30/2017 Hecho por OLGER

Area de Area de Volumen de Vol. de Corte Vol. De Vol. De Volumen de


Estaca Distancia
Corte Relleno Corte MS. Corte RS Corte RF Relleno
0+920 0.990 4.220 20.000 9.900 7.920 1.485 0.495 87.400
0+940 2.390 5.650 20.000 33.800 27.040 5.070 1.690 98.700
0+960 5.990 0.030 20.000 83.800 67.040 12.570 4.190 56.800
0+970 8.060 0.000 10.000 70.250 56.200 10.538 3.513 0.150
0+980 7.010 0.310 10.000 75.350 60.280 11.303 3.768 1.550
0+990 5.520 1.010 10.000 62.650 50.120 9.398 3.133 6.600
1+000 19.710 0.000 10.000 126.150 100.920 18.923 6.308 5.050
----------------------------------------------------------------------------------------------------------------------------------------------
Area de Vol. De Vol. de Corte Vol. De Vol. De Vol. De
Sub-Total: Corte Corte Total MS. Corte RS Corte RF Relleno
599.400 8,659.100 6,927.280 1,298.865 432.955 2,628.100
----------------------------------------------------------------------------------------------------------------------------------------------
Prog: 1+00 - 2+00
1+000 19.710 0.000
1+010 13.170 0.000 10.000 164.400 131.520 24.660 8.220 0.000
1+020 16.490 0.000 10.000 148.300 118.640 22.245 7.415 0.000
1+030 31.360 0.000 10.000 239.250 191.400 35.888 11.963 0.000
1+040 27.130 0.000 10.000 292.450 233.960 43.868 14.623 0.000
1+050 0.000 2.030 10.000 135.650 108.520 20.348 6.783 10.150
1+060 0.000 14.490 10.000 0.000 0.000 0.000 0.000 82.600
1+080 0.970 4.430 20.000 9.700 7.760 1.455 0.485 189.200
1+090 16.410 0.000 10.000 86.900 69.520 13.035 4.345 22.150
1+100 10.310 7.240 10.000 133.600 106.880 20.040 6.680 36.200
1+120 10.080 0.000 20.000 203.900 163.120 30.585 10.195 72.400
1+130 18.040 0.000 10.000 140.600 112.480 21.090 7.030 0.000
1+140 12.080 0.000 10.000 150.600 120.480 22.590 7.530 0.000
1+160 6.660 2.240 20.000 187.400 149.920 28.110 9.370 22.400
1+180 5.520 0.040 20.000 121.800 97.440 18.270 6.090 22.800
1+190 2.670 0.000 10.000 40.950 32.760 6.143 2.048 0.200
1+200 2.940 0.020 10.000 28.050 22.440 4.208 1.403 0.100
1+220 6.190 0.030 20.000 91.300 73.040 13.695 4.565 0.500
1+240 2.660 0.010 20.000 88.500 70.800 13.275 4.425 0.400
1+260 8.410 0.000 20.000 110.700 88.560 16.605 5.535 0.100
1+280 14.920 0.160 20.000 233.300 186.640 34.995 11.665 1.600
1+310 6.550 1.920 30.000 322.050 257.640 48.308 16.103 31.200
1+320 6.160 3.980 10.000 63.550 50.840 9.533 3.178 29.500
1+330 6.330 2.480 10.000 62.450 49.960 9.368 3.123 32.300
1+340 7.710 1.720 10.000 70.200 56.160 10.530 3.510 21.000
1+370 5.250 2.770 30.000 194.400 155.520 29.160 9.720 67.350
1+390 4.020 1.400 10.000 46.350 37.080 6.953 2.318 20.850
1+400 3.740 0.780 10.000 38.800 31.040 5.820 1.940 10.900
1+410 3.810 1.480 10.000 37.750 30.200 5.663 1.888 11.300
1+420 4.550 1.580 10.000 41.800 33.440 6.270 2.090 15.300
1+430 5.060 1.030 10.000 48.050 38.440 7.208 2.403 13.050
1+440 9.220 0.010 10.000 71.400 57.120 10.710 3.570 5.200
1+450 12.770 0.200 10.000 109.950 87.960 16.493 5.498 1.050
1+460 3.070 2.380 10.000 79.200 63.360 11.880 3.960 12.900
1+470 4.290 1.730 10.000 36.800 29.440 5.520 1.840 20.550
1+480 3.630 2.090 10.000 39.600 31.680 5.940 1.980 19.100
1+490 4.890 0.980 10.000 42.600 34.080 6.390 2.130 15.350
1+500 4.770 1.580 10.000 48.300 38.640 7.245 2.415 12.800
1+520 4.280 3.140 20.000 90.500 72.400 13.575 4.525 47.200
1+550 8.430 1.310 30.000 190.650 152.520 28.598 9.533 66.750
1+560 9.830 0.300 10.000 91.300 73.040 13.695 4.565 8.050
1+580 8.840 5.960 20.000 186.700 149.360 28.005 9.335 62.600
1+600 8.060 0.410 20.000 169.000 135.200 25.350 8.450 63.700
1+620 8.090 0.020 20.000 161.500 129.200 24.225 8.075 4.300
1+630 15.600 0.000 10.000 118.450 94.760 17.768 5.923 0.100
1+640 17.080 0.480 10.000 163.400 130.720 24.510 8.170 2.400
1+650 6.520 0.340 10.000 118.000 94.400 17.700 5.900 4.100
METRADO DE EXPLANACIONES
"ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DE LA CARRETERA TRAMO
OBRA MANTACOCHA - MATAUCRUZ - DISTRITO DE UMARI - PROVINCIA DE PACHITEA - Hoja Nº 1
DEPARTAMENTO DE HUANUCO"
RESPONSABLE MUNICIPALIDAD DE UMARI Plano Nº SECCIONES

FECHA 7/30/2017 Hecho por OLGER

Area de Area de Volumen de Vol. de Corte Vol. De Vol. De Volumen de


Estaca Distancia
Corte Relleno Corte MS. Corte RS Corte RF Relleno
1+660 10.860 0.510 10.000 86.900 69.520 13.035 4.345 4.250
1+680 8.760 0.090 20.000 196.200 156.960 29.430 9.810 6.000
1+700 11.860 0.070 20.000 206.200 164.960 30.930 10.310 1.600
1+710 12.160 0.000 10.000 120.100 96.080 18.015 6.005 0.350
1+720 1.400 1.610 10.000 67.800 54.240 10.170 3.390 8.050
1+730 1.100 5.950 10.000 12.500 10.000 1.875 0.625 37.800
1+740 3.960 5.970 10.000 25.300 20.240 3.795 1.265 59.600
1+760 3.050 3.370 20.000 70.100 56.080 10.515 3.505 93.400
1+780 3.420 4.000 20.000 64.700 51.760 9.705 3.235 73.700
1+800 8.170 5.720 20.000 115.900 92.720 17.385 5.795 97.200
1+820 1.220 5.440 20.000 93.900 75.120 14.085 4.695 111.600
1+840 7.660 1.460 20.000 88.800 71.040 13.320 4.440 69.000
1+860 4.430 0.010 20.000 120.900 96.720 18.135 6.045 14.700
1+880 4.280 0.200 20.000 87.100 69.680 13.065 4.355 2.100
1+910 9.620 1.090 30.000 208.500 166.800 31.275 10.425 19.350
1+920 10.120 3.880 10.000 98.700 78.960 14.805 4.935 24.850
1+940 10.990 2.130 20.000 211.100 168.880 31.665 10.555 60.100
1+970 8.590 2.150 20.000 195.800 156.640 29.370 9.790 42.800
1+990 9.920 2.310 30.000 277.650 222.120 41.648 13.883 66.900
2+010 9.370 1.790 20.000 192.900 154.320 28.935 9.645 41.000
----------------------------------------------------------------------------------------------------------------------------------------------
Area de Vol. De Vol. de Corte Vol. De Vol. De Vol. De
Sub-Total: Corte Corte Total MS. Corte RS Corte RF Relleno
549.210 7,791.150 6,232.920 1,168.673 389.558 1,894.050
----------------------------------------------------------------------------------------------------------------------------------------------
Prog: 2+00 - 3+00
2+000 9.37 1.79
2+020 9.51 2.00 20.000 188.800 151.040 28.320 9.440 37.900
2+040 7.99 5.08 20.000 175.000 140.000 26.250 8.750 70.800
2+060 8.94 2.13 20.000 169.300 135.440 25.395 8.465 72.100
2+070 8.82 3.14 10.000 88.800 71.040 13.320 4.440 26.350
2+080 8.09 2.13 10.000 84.550 67.640 12.683 4.228 26.350
2+090 7.61 2.41 10.000 78.500 62.800 11.775 3.925 22.700
2+100 6.98 1.89 10.000 72.950 58.360 10.943 3.648 21.500
2+130 6.94 1.98 10.000 69.600 55.680 10.440 3.480 19.350
2+140 6.68 2.16 10.000 68.100 54.480 10.215 3.405 20.700
2+150 6.17 1.95 10.000 64.250 51.400 9.638 3.213 20.550
2+160 8.14 5.95 10.000 71.550 57.240 10.733 3.578 39.500
2+170 11.83 0.14 10.000 99.850 79.880 14.978 4.993 30.450
2+180 8.89 2.59 10.000 103.600 82.880 15.540 5.180 13.650
2+190 4.55 4.63 10.000 67.200 53.760 10.080 3.360 36.100
2+200 8.37 2.39 10.000 64.600 51.680 9.690 3.230 35.100
2+210 8.19 1.49 10.000 82.800 66.240 12.420 4.140 19.400
2+220 5.52 2.96 10.000 68.550 54.840 10.283 3.428 22.250
2+230 3.52 5.79 10.000 45.200 36.160 6.780 2.260 43.750
2+240 4.73 4.73 10.000 41.250 33.000 6.188 2.063 52.600
2+260 3.66 2.55 20.000 83.900 67.120 12.585 4.195 72.800
2+270 3.17 3.84 10.000 34.150 27.320 5.123 1.708 31.950
2+280 3.97 2.38 10.000 35.700 28.560 5.355 1.785 31.100
2+290 4.96 2.15 10.000 44.650 35.720 6.698 2.233 22.650
2+300 5.74 2.25 10.000 53.500 42.800 8.025 2.675 22.000
2+310 8.21 0.51 10.000 69.750 55.800 10.463 3.488 13.800
2+320 6.62 2.34 10.000 74.150 59.320 11.123 3.708 14.250
2+330 8.02 1.86 10.000 73.200 58.560 10.980 3.660 21.000
2+340 5.80 1.53 10.000 69.100 55.280 10.365 3.455 16.950
2+350 3.32 2.97 10.000 45.600 36.480 6.840 2.280 22.500
2+360 2.50 3.09 10.000 29.100 23.280 4.365 1.455 30.300
2+370 2.92 3.77 10.000 27.100 21.680 4.065 1.355 34.300
2+380 2.14 3.24 10.000 25.300 20.240 3.795 1.265 35.050
2+390 2.48 2.37 10.000 23.100 18.480 3.465 1.155 28.050
METRADO DE EXPLANACIONES
"ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DE LA CARRETERA TRAMO
OBRA MANTACOCHA - MATAUCRUZ - DISTRITO DE UMARI - PROVINCIA DE PACHITEA - Hoja Nº 1
DEPARTAMENTO DE HUANUCO"
RESPONSABLE MUNICIPALIDAD DE UMARI Plano Nº SECCIONES

FECHA 7/30/2017 Hecho por OLGER

Area de Area de Volumen de Vol. de Corte Vol. De Vol. De Volumen de


Estaca Distancia
Corte Relleno Corte MS. Corte RS Corte RF Relleno
2+400 1.56 3.40 10.000 20.200 16.160 3.030 1.010 28.850
2+410 1.10 3.34 10.000 13.300 10.640 1.995 0.665 33.700
2+420 0.00 8.83 10.000 5.500 4.400 0.825 0.275 60.850
2+440 3.28 2.20 20.000 32.800 26.240 4.920 1.640 110.300
2+450 1.99 3.18 10.000 26.350 21.080 3.953 1.318 26.900
2+460 4.26 2.00 10.000 31.250 25.000 4.688 1.563 25.900
2+470 7.06 0.99 10.000 56.600 45.280 8.490 2.830 14.950
2+480 7.08 1.49 10.000 70.700 56.560 10.605 3.535 12.400
2+500 5.80 2.88 20.000 128.800 103.040 19.320 6.440 43.700
2+510 4.68 0.58 10.000 52.400 41.920 7.860 2.620 17.300
2+520 5.29 0.26 10.000 49.850 39.880 7.478 2.493 4.200
2+530 5.56 0.02 10.000 54.250 43.400 8.138 2.713 1.400
2+540 5.34 0.17 10.000 54.500 43.600 8.175 2.725 0.950
2+550 3.39 0.79 10.000 43.650 34.920 6.548 2.183 4.800
2+560 5.64 0.48 10.000 45.150 36.120 6.773 2.258 6.350
2+570 5.48 1.19 10.000 55.600 44.480 8.340 2.780 8.350
2+580 6.27 1.09 10.000 58.750 47.000 8.813 2.938 11.400
2+600 9.07 0.25 10.000 76.700 61.360 11.505 3.835 6.700
2+610 9.77 0.27 10.000 94.200 75.360 14.130 4.710 2.600
2+620 7.47 0.00 10.000 86.200 68.960 12.930 4.310 1.350
2+650 8.61 0.31 30.000 241.200 192.960 36.180 12.060 4.650
2+660 9.62 0.52 10.000 91.150 72.920 13.673 4.558 4.150
2+680 9.47 0.53 20.000 190.900 152.720 28.635 9.545 10.500
2+700 7.29 0.09 20.000 167.600 134.080 25.140 8.380 6.200
2+710 12.35 0.11 10.000 98.200 78.560 14.730 4.910 1.000
2+720 4.73 3.39 10.000 85.400 68.320 12.810 4.270 17.500
2+740 7.06 2.98 20.000 117.900 94.320 17.685 5.895 63.700
2+770 4.94 1.76 30.000 180.000 144.000 27.000 9.000 71.100
2+780 4.15 2.56 10.000 69.600 55.680 10.440 3.480 14.150
2+800 5.48 2.78 20.000 96.300 77.040 14.445 4.815 53.400
2+830 7.39 1.26 30.000 193.050 154.440 28.958 9.653 60.600
2+850 4.67 2.32 20.000 120.600 96.480 18.090 6.030 35.800
2+870 4.94 2.22 20.000 96.100 76.880 14.415 4.805 45.400
2+890 4.84 2.48 20.000 97.800 78.240 14.670 4.890 47.000
2+910 3.85 9.69 20.000 86.900 69.520 13.035 4.345 121.700
2+930 6.06 1.69 20.000 99.100 79.280 14.865 4.955 113.800
2+940 5.10 2.18 10.000 55.800 44.640 8.370 2.790 19.350
2+960 1.93 4.56 20.000 70.300 56.240 10.545 3.515 67.400
2+980 4.37 1.00 20.000 63.000 50.400 9.450 3.150 55.600
3+000 3.80 0.40 20.000 81.700 65.360 12.255 4.085 14.000
----------------------------------------------------------------------------------------------------------------------------------------------
Area de Vol. De Vol. de Corte Vol. De Vol. De Vol. De
Sub-Total: Corte Corte Total MS. Corte RS Corte RF Relleno
435.090 5,752.100 4,601.680 862.815 287.605 2,277.750
----------------------------------------------------------------------------------------------------------------------------------------------
Prog: 3+00 - 3+863.55
3+000 3.800 0.400
3+010 3.670 0.180 10.000 37.350 29.880 5.603 1.868 2.900
3+020 3.430 1.430 10.000 35.500 28.400 5.325 1.775 8.050
3+040 6.120 0.650 20.000 95.500 76.400 14.325 4.775 20.800
3+060 5.280 0.480 20.000 114.000 91.200 17.100 5.700 11.300
3+070 5.340 0.550 10.000 53.100 42.480 7.965 2.655 5.150
3+080 5.010 1.330 10.000 51.750 41.400 7.763 2.588 9.400
3+100 1.930 3.070 20.000 69.400 55.520 10.410 3.470 44.000
3+110 0.000 6.690 10.000 9.650 7.720 1.448 0.483 48.800
3+120 1.260 2.790 10.000 6.300 5.040 0.945 0.315 47.400
3+140 5.330 0.380 20.000 65.900 52.720 9.885 3.295 31.700
3+150 9.340 0.380 10.000 73.350 58.680 11.003 3.668 3.800
3+160 13.400 0.280 10.000 113.700 90.960 17.055 5.685 3.300
3+170 13.420 0.520 10.000 134.100 107.280 20.115 6.705 4.000
METRADO DE EXPLANACIONES
"ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DE LA CARRETERA TRAMO
OBRA MANTACOCHA - MATAUCRUZ - DISTRITO DE UMARI - PROVINCIA DE PACHITEA - Hoja Nº 1
DEPARTAMENTO DE HUANUCO"
RESPONSABLE MUNICIPALIDAD DE UMARI Plano Nº SECCIONES

FECHA 7/30/2017 Hecho por OLGER

Area de Area de Volumen de Vol. de Corte Vol. De Vol. De Volumen de


Estaca Distancia
Corte Relleno Corte MS. Corte RS Corte RF Relleno
3+180 6.710 6.200 10.000 100.650 80.520 15.098 5.033 33.600
3+200 6.590 3.990 20.000 133.000 106.400 19.950 6.650 101.900
3+220 9.650 2.190 20.000 162.400 129.920 24.360 8.120 61.800
3+230 7.780 3.690 10.000 87.150 69.720 13.073 4.358 29.400
3+240 8.410 2.490 10.000 80.950 64.760 12.143 4.048 30.900
3+250 6.540 2.700 10.000 74.750 59.800 11.213 3.738 25.950
3+260 4.760 3.310 10.000 56.500 45.200 8.475 2.825 30.050
3+280 5.630 2.350 20.000 103.900 83.120 15.585 5.195 56.600
3+300 9.610 0.100 20.000 152.400 121.920 22.860 7.620 24.500
3+320 5.200 2.110 20.000 148.100 118.480 22.215 7.405 22.100
3+340 5.040 2.570 20.000 102.400 81.920 15.360 5.120 46.800
3+350 7.330 1.270 10.000 61.850 49.480 9.278 3.093 19.200
3+360 4.790 4.190 10.000 60.600 48.480 9.090 3.030 27.300
3+380 13.770 0.970 20.000 185.600 148.480 27.840 9.280 51.600
3+400 13.980 0.820 20.000 277.500 222.000 41.625 13.875 17.900
3+410 16.190 0.000 10.000 150.850 120.680 22.628 7.543 4.100
3+420 21.230 0.000 10.000 187.100 149.680 28.065 9.355 0.000
3+430 20.860 0.000 10.000 210.450 168.360 31.568 10.523 0.000
3+440 16.480 0.180 10.000 186.700 149.360 28.005 9.335 0.900
3+450 7.240 1.790 10.000 118.600 94.880 17.790 5.930 9.850
3+460 7.930 1.470 10.000 75.850 60.680 11.378 3.793 16.300
3+470 6.380 2.160 10.000 71.550 57.240 10.733 3.578 18.150
3+480 3.510 3.920 10.000 49.450 39.560 7.418 2.473 30.400
3+500 5.830 2.580 20.000 93.400 74.720 14.010 4.670 65.000
3+510 11.060 1.320 10.000 84.450 67.560 12.668 4.223 19.500
3+520 12.320 0.940 10.000 116.900 93.520 17.535 5.845 11.300
3+540 6.850 2.740 20.000 191.700 153.360 28.755 9.585 36.800
3+550 1.450 7.410 10.000 41.500 33.200 6.225 2.075 50.750
3+560 5.360 2.990 10.000 34.050 27.240 5.108 1.703 52.000
3+580 3.850 2.750 20.000 92.100 73.680 13.815 4.605 57.400
3+600 2.840 2.910 20.000 66.900 53.520 10.035 3.345 56.600
3+610 5.930 0.670 10.000 43.850 35.080 6.578 2.193 17.900
3+620 7.430 1.270 10.000 66.800 53.440 10.020 3.340 9.700
3+630 11.650 0.160 10.000 95.400 76.320 14.310 4.770 7.150
3+640 9.910 1.650 10.000 107.800 86.240 16.170 5.390 9.050
3+660 11.200 0.730 20.000 211.100 168.880 31.665 10.555 23.800
3+680 14.130 5.810 20.000 253.300 202.640 37.995 12.665 65.400
3+700 8.720 2.050 20.000 228.500 182.800 34.275 11.425 78.600
3+720 11.660 1.350 20.000 203.800 163.040 30.570 10.190 34.000
3+740 13.270 1.350 20.000 249.300 199.440 37.395 12.465 27.000
3+760 13.230 1.250 20.000 265.000 212.000 39.750 13.250 26.000
3+780 9.870 0.700 20.000 231.000 184.800 34.650 11.550 19.500
3+800 10.780 0.330 20.000 206.500 165.200 30.975 10.325 10.300
3+820 11.490 0.160 20.000 222.700 178.160 33.405 11.135 4.900
3+840 11.430 0.260 20.000 229.200 183.360 34.380 11.460 4.200
3+850 0.760 2.380 10.000 60.950 48.760 9.143 3.048 13.200
3+860 0.000 1.270 10.000 3.800 3.040 0.570 0.190 18.250
3+863.55 0.770 0.070 3.550 1.367 1.093 0.205 0.068 2.379
----------------------------------------------------------------------------------------------------------------------------------------------
Area de Vol. De Vol. de Corte Vol. De Vol. De Vol. De
Sub-Total: Corte Corte Total MS. Corte RS Corte RF Relleno
494.730 7,099.267 5,679.413 1,064.890 354.963 1,620.579
----------------------------------------------------------------------------------------------------------------------------------------------
RESUMEN TOTAL
******************************************************************************************************
******************************************************************************************************
Area de Vol. De Vol. de Vol. De Vol. De Vol. De
Sub-Total: Corte Corte Total Corte MS. Corte RS Corte RF Relleno
TRAMO MANTACOCHA - MATAU
Prog: 0+00 - 1+00 599.400 8659.100 6927.280 1298.865 432.955 2628.100
METRADO DE EXPLANACIONES
"ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DE LA CARRETERA TRAMO
OBRA MANTACOCHA - MATAUCRUZ - DISTRITO DE UMARI - PROVINCIA DE PACHITEA - Hoja Nº 1
DEPARTAMENTO DE HUANUCO"
RESPONSABLE MUNICIPALIDAD DE UMARI Plano Nº SECCIONES

FECHA 7/30/2017 Hecho por OLGER

Area de Area de Volumen de Vol. de Corte Vol. De Vol. De Volumen de


Estaca Distancia
Corte Relleno Corte MS. Corte RS Corte RF Relleno
Prog: 1+00 - 2+00 549.210 7791.150 6232.920 1168.673 389.558 1894.050
Prog: 2+00 - 3+00 435.090 5752.100 4601.680 862.815 287.605 2277.750
Prog: 3+00 - 3+863.55 494.730 7099.267 5679.413 1064.890 354.963 1620.579
******************************************************************************************************
******************************************************************************************************

You might also like