You are on page 1of 1

Date Description Chainge Location

Layout of pipe Culvert (479 +950)


PCC 477+745,
6/3/2018 Head wall Shuttering (478+742) 477+745, BHS
Pipe installation(477 + 745
6/4/2018 Excavation of Head wall (479+ 950) 477+745, LHS
PCC of head wall 479 +950
6/5/2018 Pipe Closed by Casting (479 + 950)
Head wall Concrete of first lift 479 +950
6/6/2018
6/7/2018 PCC of Raft ( 481+410)
6/8/2018 Concrete of Top slab 480 +500
6/9/2018
6/10/2018
6/11/2018
6/12/2018
6/13/2018
6/14/2018