Name of Project TACLOBAN AIRPORT DEVELOPMENT PROJECT
Location Brgy. San Jose, Tacloban City
Duration ‘One Hundred Eighty (180) C.D. (Inclusive of 27
Unworkable Days)
Source of Fund : 2014GAA Locally Funded Projects
SCOPE OF WORK
‘The project covers the following scope of work which shall be done in accordance with the
approved plans, specifications and provisions of contract, to wit;
A
L
im.
ARCHITECTIRAL WORKS
FLOOR TILING WORKS. This includes the supply of labor, materials and tools
necessary to complete the laying of floor tiles (600mm x 600mm homogenous granite
tiles) for arrival, pre-departure area, executive lounge and check-in lobby and all other
related items needed for the completion of this item, (Please refer to plans).
Project Coverage:
Executive Lounge Area: 125,00 sq.m.
Arrival Area 435.00 sq.m
Check-In Area £402.00 sq.m
Pre-Departure Area £636.00 sq.m
TILING WORKS FOR TOILET. This includes the supply of labor, materials and tools
necessary to complete the laying of 600mm x 600mm Non Skid ceramic floor tiles at
Executive Lounge, Pre-Departure Male Toilet and Public Toilet and 600mm x 600mm
homogenous granite wall tiles. This item also include the replacement at Executive
Lounge Area of the following:
3cunits water closet
3.umits lavatory
3uunits faucet
2-units urinal
3.units provision of granite tiles
10-un its soap dispencer
10-units toilet signages
Installation of Phenolie board with complete accessories
Replacement of 2-unit doors at toilet executive lounge area
10, Soil & Water pipe lines
11. Mirrors:
and all other related items needed for the completion of this item. (Please refer to plans).
Sean eeE
Project Coverage:
Toilet Floor Area 58,05 sqm.
Toilet Wall. Arca 2 188.84 sq.m.
CHIPPING AND DISPOSAL OF EXISTING CONCRETE and TILES. This
includes supply of labor, equipment and tools necessary for the removal of existing
deteriorated floor tiles and cleaning of excess tile grout. Chipping and disposal of the
bIv.
existing concrete to level the existing surface prior to the concrete topping and laying of
tiles needed for the completion of the project.
Project Coverage:
Total Area: ‘1,791.00 sqm
CLEANING AND DRAINING OF EXISTING SEPTIC VAULT. This includes the
supply of labor, equipment and tools necessary to complete the cleaning of six (06) units
of existing septic vault including declogging of existing soil and water pipes needed for
the completion of the project.
‘TEMPORARY FACILITIES.
The contractor shall supply the following provisions within ten (10) calendar days upon
receipt of the Notice to Proceed (NTP),
A. DOTC STAFF HOUSE.
This includes the maintenance of the DOTC staff house including the provision of office
supplies, office tables and supply of potable water.
B. SERVICE VERILCE.
This covers the provision of service vehicles at least 2005 model in good running
condition and updated registration om a rental basis including driver and twelve (12) liters
of fuel pet day for the exclusive use of the DOTC-PMO in supervising the project for the
period of one hundred fifty (150) calendar days. Maintenance and fuel cost for the service
vehicle shall be included under this item.
‘The contractor shall be responsible for all laboratory, materials testing’s necessary in the project
implementation. Expenses for the said testing shall be incorporated in the contractor's overhead
cost and shall not be considered as pay item.
6