You are on page 1of 6
Name of Project SIQUIDOR AIRPORT DEVELOPMENT PROJECT Location Bray. Cang-Alnang, Pasihagon, Siqujor Duration ‘Two Hundred Forty (240) Calendar Days Inclusive of #8 unworkable days Source of Fund cr 2016 ‘SCOPE OF WORK ‘The project covers the Siquijr Arport Development Project with the following scope of works which shall be done in accordance with the approved plans, specifications and provisions of contrac, to wit; SPL-1_ GENERAL REQUIREMENTS. This item covers the expenses fr building permit, insurances, water & electric connections including temporary connections, the provisions of worker barracks and other related works necessary during the implementation and completion phase ofthe project AL New Passenger Terminal Building L nL m1. Ww SITEWORKS. This item covers the supply of labor, materials and equipment necessary to accomplish the falloning = Excavation for the construction of Footings, footing te-beams, columns, cistern tank, catch basin and septic tank. = Backiling of excavated materials; = Filing of gravel base as indicated In the approved plans; = Setting of batter boards for laying out purposes. = Demolition of all the existing buildings as indicated in the approved plans. CONCRETE WORKS. This item covers the supply of labor, materials and equipment necessary to accomplish the allowing: = Concreting of column footings and column posts, slabs on fil, beams, footing tie~ beams, cistern tank, catch basin, and septic tank with a compressive strength of Fc = 3000 psi; and = ‘Fabrication and installation of reinforced steel bas, formworks. (Pls. refer to plans). MASONRY WORKS. This item covers the supply of labor, materials and equipment necessary to accomplish the laying of 6” thk. exterior and 4” thi. interior CHB wals as required and indicated inthe approved plans. This item also includes the formation and installation of reinforced steel bars and plastering of CHB walls withthe thickness of %" For bath sides, (Ps. refer to plans). STEEL WORKS. = Trusses. This item covers the supply of labor, materials and equipment necessary for the fabrication and installation of Pipe 6 (SCH 40), Pipe 6 (SCH 80), and Pipe 4 (SCH 40) including al other related works needed to complete this item. (Please refer to plans). = Purlins. This tem covers the supply of labor, materials and equipment necessary for the fabrication and installation of LC 150mm x 65mm x 20mm x 2mm Purine with Sagrods and Cross-Bracing and 2 1" x2 14" x '4" Andle bars including all other related works needed to-complete this item. (Please refer to plans). ~ Steel Beam. This item covers the supply of labor, materials and equipment necessary for the Fabrication and installation of W 6 X 12 Stee! Beam including all other related works needed to complete this item, (Please refer to plans) ~ Baseplate. This item covers the supply of labor, materials and equipment necessary for the Fabrication and installation of 250mm x 300mm x 16mm Baseplate w) 4- 025mm x 400mm long A325 Bolts and 200mm x 200mm x 16mm Baseplate w) 4- 225mm x 300mm long A325 Bolts including all other related works needed to complete this item. (Please refer to plans). = Signage. This item covers the supply of labor, materials and equipment necessary forthe fabrication and installation of Tubular Steel with sizes 2" x 2" x ta” and 1.5" x 1.5" x 14" including all other related works needed to complete this item. (Please refer to plans). Be vi vu. vu. 1K ARCHITECTURAL WORKS. ~ Floor Finishes. This includes the supply of labor, materials and tools necessary for the installation of 600mm x 600mm Synthetic Granite, 600mm x 600mm Non-Slip Synthetic Granite and 600mm x 600mm Unpolished Homogeneous Tiles including all other related works needed to complete this item. (Please refer to plans). ~ Wall Finishes. This includes the supply of labor, materials and tools necessary for the installation of 600mm x 600mm Jet Black Granite Tiles, Aluminum Composite Panels and Including all other related works needed to complete this item. (Please refer to plans). = Paint. This item covers the supply of labor, materials and equipment necessary for the painting of Exterior walls and Interior walls with Smoath Cement Wal Facing Acrylic Solvent Based Paint including all other related works needed to complete this tem. (Please refer to plans) = Counter Top. This includes the supply of labor, materials and tools necessary for the installation of Synthetic Granite in the New Passenger Terminal Building, including ll other related works needed to complete this item. (Please refer to plans). - Aluminum Composite Panel Cladding. This includes the supply of labor, materials and tools necessary forthe installation of Aluminum Composite Panel Cladding including al other related works needed to complete this item. (Please refer to plans). = Signage. This covers the Fabrication and installation of Stainless Steel Letteting on Tubular Framing including all other related works needed to complete this item. (Please refer to plans.) ‘THERMAL AND MOISTURE PROTECTION WORKS. This item covers the supply of labor, materials and tools necessary forthe installation of 0,60mm thick Pre-painted Rib-Type Long Span Roofing, 0.6mm thk, Stainless Stee! Gutter, 0.60mm thk. flashing, 4mm Thk. Aluminum Composite Panel Sheets, 12mm thk, clear Polycarbonate complete w) accessories and all accessories including all other related works ‘needed for the completion of this item. (Please refer to plans). CEILING WORKS. This item covers the supply of labor, materials and tools necessary forthe instalation ‘of 6mm thk. Fibercement Cellng Board on Metal Furing, 0.6mm thk. 390mm Spandrel Metal Celing Pane! 44mm thk, Aluminum Composite Panels complete with all accessories, 2” x2" S45 Wood Naller, 100mm x ‘Somm x 2mm Tubular Steel and Olémm Structural Tendon including all other related works needed for the completion ofthis item. (Please refer to plans). DOORS, WINDOWS AND ACCESSORIES. This item covers the supply of labor, materials, and tools necessary forthe installation of doors and windows including al its accessories as indicated in the approved plans. (Please refer to plans) PLUMBING, SANITARY AND DRAINAGE WORKS. This item covers the supply of labor, materials, and tools for the laying out and installation of all sanitary fixtures and other accessories, inspection of all joint connection for possible leakage and all other related works in accordance with the approved plans and specification. (Please refer to plans.) ELECTRICAL WORKS. ~ Lighting Fixtures. This item covers the supply of labor, materials and tools necessary for the installation of 30 Recessed Downlight, 49 Recessed Downlight, 16"0 Highbay Luminaire, 3°0 Recessed Downlight with cover, 6° Recessed Downlight with cover, 600mm TS Batten Linkable Luminaire, 6" Recessed Downlight and Emergency lamps including all its accessories as indcated inthe approved plans. (Please refer to plans) ~ Wires and Conduits. Ths item covers the supply of labor, materials and tools necessary far the installation of 3.5 mm? THW, 5.5 mm? THW, 8.0 mm? THV4, 14.0 mm? THW, 30.0, mm? THW, 100 mm? THW, 250 mm? THW, 20mm @ PVC, 25mm @ PVC, 25mm @ RSC, m 32mm ORSC, 65mm @ RSC, and 90mm O RSC including all other related works necessary to complete this item. (Please refer to plans) ~ Panel Board and Circuit Breaker. This item covers the supply of labor, materials and tools necessary for the installation of the following (including all ather works related to complete this item): (© MDP: Main: 1-3S0AT, 3°, 240V 60H2; Branches: 2-7OAT 3P, 1-200AT 3° LP: Main: 1-70AT, 3°, 240V; 60H2, Branches: 12-1SAT 2 (CP: Main: 1-70AT, 3P, 240V; 60Hz, Branches: 18-20AT 2° OAT, 3, 240V; 60H2, Branches: 5-20AT 2P, 5-40AT 2P, 8-40AT 3P IAT'3P, 340, 60Hz, Branches: 1-20AT 3P ~ Generator Set and Other Accessories. This item covers the supply of labor, materials ‘and tools necessary forthe instalation of 200KVa 30 240V 60Hz Generator Set including all other related works to complete this tem. (Please refer to plans). ~ Transformers and Other Accessories. This tem covers the supply of labor, materials and tools necessary for the installation of 200KVa 30 13.2KV/240V 60H2 ‘Dry Type Distribution Transformer including all other related works to complete ths item. (Please refer to plans) = Miscellaneous Items B. Power House L nL m1. Ww v. ‘SITEWORKS. This item covers the supply of labor, materials and equipment necessary to accomplish the falloning = Excavation for the construction of foatings, footing tie-beams and columns = Backiling of excavated materials; = Filing of gravel base as indicated In the approved plans; = Setting of batter boards for laying out purposes. = Demoition of all the existing buildings as indicated in the approved plans, CONCRETE WORKS. This item covers the supply of labor, materials and equipment necessary to accomplish the allowing: = Cancteting of column Footings and column posts, slabs an fil, beams and foating te beams with a compressive strength of Fc = 3000 psi; and = Fabrication and installation of reinforced steel bars, formworks. (Pls. refer to plans). MASONRY WORKS. This item covers the supply of labor, materials and equipment necessary to accomplish the laying of 6” thk. CHB walls as required and indicated in the approved plans. Ths item also Includes the Formation and instalation of reinforced steel bars and plastering of CHB walls with the thickness of % for both sides. (Pls. refer to plans). ARCHITECTURAL WORKS. = Floor Finishes. This includes the supply of labor, materials and tools necessary for the installation of Pebble Washout Finish including ll other related works needed to complete this item, (Please refer to plans) = Paint. This item covers the supply of labor, materials and equipment necessary for the painting using Premium Acrylic Water-Based Paint, Acrylic Based Paint and Slab Soffit in Paint Finish including allather related works needed to complete this item, (Please refer to plans) = Louvers. This item covers the supply of labor, materials and equipment necessary forthe Fabrication and installation of 1" x 4" Tubular Louver (6 meter) including all other related works needed to complete this tem. (Please refer to plans). DOORS, WINDOWS AND ACCESSORIES. This item covers the supply of labor, materials, and tools necessary for the installation of doors and windows including all its accessories as indicated in the approved plans. (Please refer to plans) 80 vi ELECTRICAL WORKS. ~ Lighting Fixtures. This item covers the supply of labor, materials and tools necessary for the installation of TS Batten Luminaire including all its accessories as indicated in the ‘approved plans, (Please refer to plans) ~ Wires and Conduits. Ths item covers the supply of labor, materials and tools necessary far the installation of 3.5 mm? THW, 5.5mm? THW, 8.0 mm2THW, 20mm @ PVC and 20mm RSC including all other related works necessary to complete this item. (Please refer to plans) ~ Panel Board and Circuit Breaker. This item covers the supply of labor, materials and tools necessary for the installation of the following (Including all other works related to complete this item): ‘0 PB: Main: 20AT 2, 240V, 602 ACB © MDP: Main: SOOAT 2P, 240V, 60Fz ACB, Branches: 1-350AT 3P, 1-100AT 3°, 1- 20aT 3 = Automatic Transfer Switch, This item covers the supply of labor, materials and tools necessary for the installation ofthe 500A ATS including al other works related to complete this item = Miscellaneous Items . Vehicular Parking Area 102. 104, 200. 201. au. 405, EXCAVATION. This covers the supply of labor, materials and equipment necessary to complete the ‘excavation for the Construction of Vehicular Parking Avea as indicated in the approved plans are also Included under this item EMBANKMENT. This covers the supply of labor, materials and equipment necessary to complete the ‘embankment forthe Construction of Vehicular Parking Area as indicated in the approved plans are aso Included under ths item, AGGREGATE SUB-BASE COURSE (0.20M THK.). This item covers the supply of labor, materials and ‘equipment required to provide a wellcompacted aggregate sub-base course in accordance with the approved design grade dimensions & cross-section. (Ps. refer to plans). AGGREGATE BASE COURSE (0.20M THK.). This Item covers the supply of labor, materials and ‘equipment required to provide a well-compacted aggregate base course in accordance with the approved design grade dimensions & cross-section, (Pl. refer to plans), PORTLAND CEMENT CONCRETE PAVEMENT. This item covers the supply of labor, materials {including shipping cost) and equipment required to construct the PCCP in accordance with the approved

You might also like