You are on page 1of 67

Scheduling/Leveling Report - 01-Sep-18 - PM.

exe
===============================================

Default Project..................................................BLR3UP

Projects:
BLR3UP...........................................................Depot
- (DT.RSD) and Stabling yard (SY.RST)

Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Progress
Override
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar

Advanced
--------
Calculate multiple float paths...................................No

Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................1722
# Not Started....................................................1069
# In Progress....................................................126
# Completed......................................................527
# Relationships..................................................5597
# Activities with Constraint.....................................305
Project: BLR3UP Activity: DSICNDT01GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT01GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT01GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT01GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT02GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT02GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT02GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT02GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT03GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT03GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT03GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT03GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT04GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT04GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT04GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT06GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT06GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT06GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT07GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT07GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT07GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT07GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT09GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT09GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT09GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT09GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT10GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT10GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT10GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT10GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT11GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT11GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT11GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT11GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT13GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT13GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT13GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT13GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT14GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT14GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT14GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT14GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT15GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT15GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT15GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT15GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT16GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT16GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT16GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT17GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT17GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT17GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT17GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT18GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT18GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT18GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT18GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT21GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT21GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT21GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT21GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY00GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY01GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY01GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY01GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY01GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY02GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY02GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY02GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY02GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY04GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY04GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY04GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY04GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY05GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY05GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY05GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY05GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY07GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY07GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY07GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY07GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY08GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY08GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY08GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY08GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY09GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY09GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY09GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY09GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY10GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY10GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY10GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY10GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY12GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY12GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY12GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY12GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY13GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY13GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY13GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY13GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY14GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY14GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY14GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY17GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY17GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY17GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY17GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICTDTXXMS1090 Notice To Proceed
Project: BLR3UP Activity: DSICTDTXXMS1110 84 - Submittal of
All Material Submittals - List Only
Project: BLR3UP Activity: DSICTDTXXMS1190 202 - MEP Works
for the HPA
Project: BLR3UP Activity: DSICTDTXXMS1200 189 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1220 203 - MEP T&C for
the HPA
Project: BLR3UP Activity: DSICTDTXXMS1240 181 - MEP Works
for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1260 197 - MEP Works
for the Unloading Area
Project: BLR3UP Activity: DSICTDTXXMS1300 190 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1360 178 - MEP Works
for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1370 105 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1380 198 - MEP T&C for
the Unloading Area
Project: BLR3UP Activity: DSICTDTXXMS1400 145 - MEP Works
for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1410 139 - MEP Works
for the Handover Platform
Project: BLR3UP Activity: DSICTDTXXMS1420 146 - MEP T&C for
the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1450 191 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1460 179 - MEP T&C for
the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1470 106 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1500 140 - MEP T&C for
the Handover Platform
Project: BLR3UP Activity: DSICTDTXXMS1510 204 - MEP Works
for the DPA
Project: BLR3UP Activity: DSICTDTXXMS1520 209 - MEP Works
for the GCA
Project: BLR3UP Activity: DSICTDTXXMS1530 148 - MEP Works
for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS1540 182 - MEP T&C for
the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1550 122 - MEP Works
for the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1560 123 - MEP T&C for
the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1570 147 - Inspection &
Approval (building only) for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1580 125 - MEP Works
for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS1610 180 - Inspection &
Approval (building only) for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1620 128 - MEP Works
for the unloading Area for new car
Project: BLR3UP Activity: DSICTDTXXMS1640 88 - MEP Works in
the Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS1710 141 - Inspection &
Approval (building only) for the Handover Platform
Project: BLR3UP Activity: DSICTDTXXMS1720 205 - MEP T&C for
the DPA
Project: BLR3UP Activity: DSICTDTXXMS1730 210 - MEP T&C for
the GCA
Project: BLR3UP Activity: DSICTDTXXMS1740 107 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1760 195 - MEP Works
for the LMS Area
Project: BLR3UP Activity: DSICTDTXXMS1770 99 - MEP Works for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS1780 124 - Inspection &
Approval (building only) for the Wheel, Brake Pad and Current Collector Shoe
Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1790 172 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1800 126 - MEP T&C for
the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS1820 111 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1830 183 - Inspection &
Approval (building only) for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1840 184 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1850 185 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1860 129 - MEP T&C for
the unloading area for new car
Project: BLR3UP Activity: DSICTDTXXMS1870 187 - MEP Works
for the WDA
Project: BLR3UP Activity: DSICTDTXXMS1880 199 - MEP Works
for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS1890 211 - Inspection &
Approval (building only) for the GCA
Project: BLR3UP Activity: DSICTDTXXMS1900 133 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1910 134 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1920 91 - MEP Works for
the the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS1940 94 - MEP Works for
the Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS1950 119 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1960 120 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1970 196 - MEP T&C for
the LMS Area
Project: BLR3UP Activity: DSICTDTXXMS1980 100 - MEP T&C for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS2010 157 - MEP Works
for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2020 158 - MEP T&C for
the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2030 127 - Inspection &
Approval (building only) for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2040 149 - MEP T&C for
the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2050 89 - MEP T&C for
the MEP works for Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2060 113 - MEP Works
for the WTP & PS
Project: BLR3UP Activity: DSICTDTXXMS2070 114 - MEP T&C for
the WTP & PS
Project: BLR3UP Activity: DSICTDTXXMS2080 135 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2090 186 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2110 154 - MEP Works
for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2130 206 - MEP Works
for the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2140 212 - MEP Works
for the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2150 121 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2160 136 - MEP Works
for the Departure Platform
Project: BLR3UP Activity: DSICTDTXXMS2170 137 - MEP T&C for
the Departure platform
Project: BLR3UP Activity: DSICTDTXXMS2180 159 - Inspection &
Approval (building only) for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2190 96 - MEP Works for
the Civil and TM Area
Project: BLR3UP Activity: DSICTDTXXMS2200 97 - MEP T&C for
the Civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2210 101 - Inspection &
Approval (building only) for the Admin & ECC building
Project: BLR3UP Activity: DSICTDTXXMS2220 173 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2260 108 - MEP Works
for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2270 109 - MEP T&C for
the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2280 90 - Inspection &
Approval (building only) for the stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2290 188 - MEP T&C for
the WDA
Project: BLR3UP Activity: DSICTDTXXMS2300 192 - MEP Works
for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2310 115 - Inspection &
Approval (building only) for the WTP and PS
Project: BLR3UP Activity: DSICTDTXXMS2320 92 - MEP T&C for
the MEP works for the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS2330 95 - MEP T&C for
the MEP works for Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS2340 112 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2570 200 - MEP T&C for
the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2590 207 - MEP T&C for
the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2600 213 - MEP T&C for
the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2610 138 - Inspection &
Approval (building only) for the Departure Platform
Project: BLR3UP Activity: DSICTDTXXMS2620 102 - MEP Works
for the potable water & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2630 103 - MEP T&C for
the Potable water &Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2640 116 - MEP Works
for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2680 98 - Inspection &
Approval (building only) for the civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2700 110 - Inspection &
Approval (building only) for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2710 151 - MEP Works
for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2730 117 - MEP T&C for
the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2740 189 - Inspection &
Approval (building only) for the WDA
Project: BLR3UP Activity: DSICTDTXXMS2750 201 - Inspection &
Approval (building only) for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2760 208 - Inspection &
Approval (building only) for the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2770 214 - Inspection &
Approval (building only) for the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2780 174 -Inspection &
Approval (building only) for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2790 155 - MEP T&C for
the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2800 93 - Inspection &
Approval (building only) for the Light Maintenance & Corrective Maintenance
Workshop
Project: BLR3UP Activity: DSICTDTXXMS2810 104 - Inspection &
Approval (building only) for the PW & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2820 118 - Inspection &
Approval (building only) for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2830 193 - MEP T&C for
the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2840 169 - MEP Works
for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2850 170 - MEP T&C for
the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2860 160 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2870 161 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2880 163 - MEP Works
for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2890 164 - MEP T&C for
the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2900 166 - MEP Works
for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2910 167 - MEP T&C for
the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2920 150 - Inspection &
Approval (building only) for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2930 152 - MEP T&C for
the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2940 171 - Inspection &
Approval (building only) for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2950 175 - MEP Works
for the Sewerage Treatment Plant
Project: BLR3UP Activity: DSICTDTXXMS2960 176 - MEP T&C for
the Sewerage Treatment Plant
Project: BLR3UP Activity: DSICTDTXXMS2970 162 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS3000 165 - Inspection &
Approval (building only) for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS3010 194 - Inspection &
Approval (building only) for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS3020 153 - Inspection &
Approval (building only) for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS3030 85 - MEP Works in
the Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3040 168 - Inspection &
Approval (building only) for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS3050 177 - Inspection &
Approval (building only) for the Sewerage Treatment Plant
Project: BLR3UP Activity: DSICTDTXXMS3060 86 - Prelim T&C
for the MEP works in Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3070 142 - MEP Works
for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3100 87 - Submit
Inspection & Approval to Authorities (civil defence/Elec/Water/Municipality)
Project: BLR3UP Activity: DSICTDTXXMS3130 143 - MEP T&C for
the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3140 156 - Inspection &
Approval (building only) for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS3150 Completion of
Stabling Yard Works
Project: BLR3UP Activity: DSICTDTXXMS3160 144 - Inspection &
Approval (building only) for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3190 Completion of
Depot Works
Project: BLR3UP Activity: DSICTDTXXMS3200 Letter of Intent
Project: BLR3UP Activity: DSICTDTXXMS3210 Contract Signed
Project: BLR3UP Activity: DSIENDTXXDS1000 Get - DT01 -
Design Model - Receipt of Co-ordinated MEP Design Model for Stabling Hall
Project: BLR3UP Activity: DSIENDTXXDS1010 Get - DT14 -
Design Model - Receipt of Co-ordinated MEP Design Model for ICC Building
Project: BLR3UP Activity: DSIENDTXXDS1020 Get - DT02 -
Design Model - Receipt of Co-ordinated MEP Design Model for Light Maintenance &
UFWL
Project: BLR3UP Activity: DSIENDTXXDS1030 Get - DT03 -
Design Model - Receipt of Co-ordinated MEP Design Model for Heavy Maintenance
Project: BLR3UP Activity: DSIENDTXXDS1040 Get - DT17 -
Design Model - Receipt of Co-ordinated MEP Design Model for Traction Power Supply
Project: BLR3UP Activity: DSIENDTXXDS1050 Get - DT04 -
Design Model - Receipt of Co-ordinated MEP Design Model for Civil & Trackwork
Maintenance
Project: BLR3UP Activity: DSIENDTXXDS1060 Get - DT16 -
Design Model - Receipt of Co-ordinated MEP Design Model for Wheel Diagnostic
Project: BLR3UP Activity: DSIENDTXXDS1070 Get - DT15 -
Design Model - Receipt of Co-ordinated MEP Design Model for Automatic Train Set
Wash
Project: BLR3UP Activity: DSIENDTXXDS1080 Get - DT07 -
Design Model - Receipt of Co-ordinated MEP Design Model for Storage Warehouse and
Oil Hazard Material
Project: BLR3UP Activity: DSIENDTXXDS1090 Get - DT09 -
Design Model - Receipt of Co-ordinated MEP Design Model for Potable Water, Fire
Water & Swerage
Project: BLR3UP Activity: DSIENDTXXDS1100 Get - DT10 -
Design Model - Receipt of Co-ordinated MEP Design Model for Waste Disposal
Project: BLR3UP Activity: DSIENDTXXDS1110 Get - DT11 -
Design Model - Receipt of Co-ordinated MEP Design Model for Chilled Water Plant - 1
Project: BLR3UP Activity: DSIENDTXXDS1120 Get - DT18 -
Design Model - Receipt of Co-ordinated MEP Design Model for Chilled Water Plant - 2
Project: BLR3UP Activity: DSIENDTXXDS1130 Get - DT21 -
Design Model - Receipt of Co-ordinated MEP Design Model for Chilled Water Plant for
Ras Abu Fontas
Project: BLR3UP Activity: DSIENDTXXDS1140 Get - DT13 -
Design Model - Receipt of Co-ordinated MEP Design Model for SPS & Diesel Backup
Generator
Project: BLR3UP Activity: DSIENDTXXDS1150 Get - DT06 -
Design Model - Receipt of Co-ordinated MEP Design Model for Security Building
Project: BLR3UP Activity: DSIENDTXXDS1160 Get - DT00 -
Design Model - Receipt of Co-ordinated MEP Design Model for External Works
Project: BLR3UP Activity: DSIENDTXXDS1170 Get - DT01 -
Design Report - Receipt of Co-ordinated MEP Design Report for Stabling Hall
Project: BLR3UP Activity: DSIENDTXXDS1180 Get - DT14 -
Design Report - Receipt of Co-ordinated MEP Design Report for ICC Building
Project: BLR3UP Activity: DSIENDTXXDS1190 Get - DT02 -
Design Report - Receipt of Co-ordinated MEP Design Report for Light Maintenance &
UFWL
Project: BLR3UP Activity: DSIENDTXXDS1200 Get - DT03 -
Design Report - Receipt of Co-ordinated MEP Design Report for Heavy Maintenance
Project: BLR3UP Activity: DSIENDTXXDS1210 Get - DT17 -
Design Report - Receipt of Co-ordinated MEP Design Report for Traction Power Supply
Project: BLR3UP Activity: DSIENDTXXDS1220 Get - DT04 -
Design Report - Receipt of Co-ordinated MEP Design Report for Civil & Trackwork
Maintenance
Project: BLR3UP Activity: DSIENDTXXDS1230 Get - DT16 -
Design Report - Receipt of Co-ordinated MEP Design Report for Wheel Diagnostic
Project: BLR3UP Activity: DSIENDTXXDS1240 Get - DT15 -
Design Report - Receipt of Co-ordinated MEP Design Report for Automatic Train Set
Wash
Project: BLR3UP Activity: DSIENDTXXDS1250 Get - DT07 -
Design Report - Receipt of Co-ordinated MEP Design Report for Storage Warehouse and
Oil Hazard Material
Project: BLR3UP Activity: DSIENDTXXDS1260 Get - DT09 -
Design Report - Receipt of Co-ordinated MEP Design Report for Potable Water, Fire
Water & Swerage
Project: BLR3UP Activity: DSIENDTXXDS1270 Get - DT10 -
Design Report - Receipt of Co-ordinated MEP Design Report for Waste Disposal
Project: BLR3UP Activity: DSIENDTXXDS1280 Get - DT11 -
Design Report - Receipt of Co-ordinated MEP Design Report for Chilled Water Plant -
1
Project: BLR3UP Activity: DSIENDTXXDS1290 Get - DT18 -
Design Report - Receipt of Co-ordinated MEP Design Report for Chilled Water Plant -
2
Project: BLR3UP Activity: DSIENDTXXDS1300 Get - DT21 -
Design Report - Receipt of Co-ordinated MEP Design for Chilled Water Plant for Ras
Abu Fontas
Project: BLR3UP Activity: DSIENDTXXDS1310 Get - DT13 -
Design Report - Receipt of Co-ordinated MEP Design Report for SPS & Diesel Backup
Generator
Project: BLR3UP Activity: DSIENDTXXDS1320 Get - DT06 -
Design Report - Receipt of Co-ordinated MEP Design Report for Security Building
Project: BLR3UP Activity: DSIENDTXXDS1330 Get - DT00 -
Design Report - Receipt of Co-ordinated MEP Design Report for External Works
Project: BLR3UP Activity: DSIENSYXXDS1000 Get - SY01 -
Design Report - Receipt of Co-ordinated MEP Design Report for Stabling Hall
Project: BLR3UP Activity: DSIENSYXXDS1010 Get - SY05 -
Design Report - Receipt of Co-ordinated MEP Design Report for ECC Building
Project: BLR3UP Activity: DSIENSYXXDS1020 Get - SY00 -
Design Report - Receipt of Co-ordinated MEP Design Report for External Works
Project: BLR3UP Activity: DSIENSYXXDS1030 Get - SY02,3 -
Design Report - Receipt of Co-ordinated MEP Design Report for Light Maintenance &
CMW
Project: BLR3UP Activity: DSIENSYXXDS1040 Get - SY08 -
Design Report - Receipt of Co-ordinated MEP Design Report for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXDS1050 Get - SY04 -
Design Report - Receipt of Co-ordinated MEP Design Report for Civil & Trackwork
Maintenance
Project: BLR3UP Activity: DSIENSYXXDS1060 Get - SY14 -
Design Report - Receipt of Co-ordinated MEP Design Report for Wheel, Brake Pad &
CCS Diagnostic
Project: BLR3UP Activity: DSIENSYXXDS1070 Get - SY13 -
Design Report - Receipt of Co-ordinated MEP Design Report for Automatic Train Set
Wash
Project: BLR3UP Activity: DSIENSYXXDS1080 Get - SY09 -
Design Report - Receipt of Co-ordinated MEP Design Report for Oil Supply
Project: BLR3UP Activity: DSIENSYXXDS1090 Get - SY07 -
Receipt of Co-ordinated MEP Design Report for Potable Water, Fire Water & Sewerage
Project: BLR3UP Activity: DSIENSYXXDS1100 Get - SY12 -
Design Report - Receipt of Co-ordinated MEP Design Report for Waste Disposal
Project: BLR3UP Activity: DSIENSYXXDS1110 Get - SY10 -
Design Report - Receipt of Co-ordinated MEP Design Report for Chilled Water Plant
Project: BLR3UP Activity: DSIENSYXXDS1120 Get - SY17 -
Design Report - Receipt of Co-ordinated MEP Design Report for Security Building
Project: BLR3UP Activity: DSIENSYXXDS1130 Get - SY01 -
Design Model - Receipt of Co-ordinated MEP Design Model for Stabling Hall
Project: BLR3UP Activity: DSIENSYXXDS1140 Get - SY09 -
Design Model - Receipt of Co-ordinated MEP Design Model for Oil Supply
Project: BLR3UP Activity: DSIENSYXXDS1150 Get - SY05 -
Design Model - Receipt of Co-ordinated MEP Design Model for ECC Building
Project: BLR3UP Activity: DSIENSYXXDS1160 Get - SY00 -
Design Model - Receipt of Co-ordinated MEP Design Model for External Works
Project: BLR3UP Activity: DSIENSYXXDS1170 Get - SY02,3 -
Design Model - Receipt of Co-ordinated MEP Design Model for Light Maintenance & CMW
Project: BLR3UP Activity: DSIENSYXXDS1180 Get - SY08 -
Design Model - Receipt of Co-ordinated MEP Design Model for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXDS1190 Get - SY04 -
Design Model - Receipt of Co-ordinated MEP Design Model for Civil & Trackwork
Maintenance
Project: BLR3UP Activity: DSIENSYXXDS1200 Get - SY14 -
Design Model - Receipt of Co-ordinated MEP Design Model for Wheel, Brake Pad & CCS
Diagnostic
Project: BLR3UP Activity: DSIENSYXXDS1210 Get - SY13 -
Design Model - Receipt of Co-ordinated MEP Design Model for Automatic Train Set
Wash
Project: BLR3UP Activity: DSIENSYXXDS1220 Get - SY12 -
Design Model - Receipt of Co-ordinated MEP Design Model for Waste Disposal
Project: BLR3UP Activity: DSIENSYXXDS1230 Get - SY07 -
Receipt of Co-ordinated MEP Design Model for Potable Water, Fire Water & Sewerage
Project: BLR3UP Activity: DSIENSYXXDS1240 Get - SY10 -
Design Model - Receipt of Co-ordinated MEP Design Model for Chilled Water Plant
Project: BLR3UP Activity: DSIENSYXXDS1250 Get - SY17 -
Design Model - Receipt of Co-ordinated MEP Design Model for Security Building
Project: BLR3UP Activity: DSIVRDTXXMS1000 DT01, DT07 &
External Drainage & Earthing Works (Materials Proc, Shop Drawings)
Project: BLR3UP Activity: DSIVRDTXXMS1010 DT02 Drainage &
Earthing Works (Materials Proc, Shop Drawings)

Errors:
-------
Warnings:
---------
Activities without predecessors..................................1
Project: BLR3UP Activity: DSICTDTXXMS3200 Letter of Intent
Activities without successors....................................1
Project: BLR3UP Activity: DSICTDTXXMS1000 Project Completion

Out-of-sequence activities.......................................226
Project: BLR3UP Activity: DSICNDT01AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT01AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNDT01EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT01EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNDT01EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT01FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT01GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT01PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT02AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT02AC1100 Plant Room - AHU,
CRAC, Air Compressors
Project: BLR3UP Activity: DSICNDT02AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNDT02EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT02EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNDT02EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT02GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT02TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNDT03EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT03FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT03FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT03PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT04EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNDT04PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT07AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT07AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNDT07EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT07GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT07PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT09PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT10PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT11EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNDT11PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT13AC1090 Final Fix -
Grilles and Diffusers, Louvers, Split AC
Project: BLR3UP Activity: DSICNDT13AC1110 Second Fix -
Valves, Insulation, Dampers, Fans
Project: BLR3UP Activity: DSICNDT13EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT13EL1210 Plant Room - SMDB,
DB, ATS, Generator
Project: BLR3UP Activity: DSICNDT13EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT13GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT14AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNDT14AC1110 Second Fix -
Valves, Insulation, Cladding, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNDT14EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT14EL1240 First Fix -
Earthing, Lightning
Project: BLR3UP Activity: DSICNDT14FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT14PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT15PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT16PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT17AC1110 Second Fix -
Valves, Insulation, Dampers, Fans, FCU
Project: BLR3UP Activity: DSICNDT17EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT17EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT17EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT18AC1100 Plant Room -
Chillers, CHW Pump, Expansion Tank, AHU
Project: BLR3UP Activity: DSICNDT18EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT18FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT18PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT21AC1100 Plant Room -
Chillers, CHW Pump, Expansion Tank, AHU
Project: BLR3UP Activity: DSICNDT21PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY00EL1190 First Fix - Cable
Ducts
Project: BLR3UP Activity: DSICNSY00EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSIENDTXXMS1000 Submission of
Method Statement for Installation of Submersible Pumps - Not Required
Project: BLR3UP Activity: DSIENDTXXMS1050 Submission of
Method Statement for installation of Drainage system
Project: BLR3UP Activity: DSIENDTXXMS1060 Submission of
Method Statement for Installation of Fire Suppression System
Project: BLR3UP Activity: DSIENDTXXMS1070 Submission of
Method Statement for Installation of Fire Fighting System
Project: BLR3UP Activity: DSIENDTXXMS1140 Submission of
Method Statement for Installation of Air Cooled Chillers
Project: BLR3UP Activity: DSIENDTXXMS1160 Submission of
Method Statement for Installation of Air Curtain - Not Required
Project: BLR3UP Activity: DSIENDTXXMS1190 Submission of
Method Statement for Installation of Earthing and Lightning Protection System
Project: BLR3UP Activity: DSIENDTXXMS1200 Submission of
Method Statement for Installation of DBs and outgoing circuits
Project: BLR3UP Activity: DSIENDTXXMS1210 Submission of
Method Statement for Installation of Capacitor Bank - Not Required
Project: BLR3UP Activity: DSIENDTXXMS1230 Submission of
Method Statement for Installation of Automatic Transfer Switch. - Not Required
Project: BLR3UP Activity: DSIENDTXXMS1240 Submission of
Method Statement for Installation of MDB, EMDB,SMDB,ESMDB
Project: BLR3UP Activity: DSIENDTXXMS1260 Submission of
Method Statement for Installation of MCC , VFD - Not Required
Project: BLR3UP Activity: DSIENDTXXSD1000 DT01 - MEP Shop
Drawings Submission for Stabling Hall
Project: BLR3UP Activity: DSIENDTXXSD1010 DT14 - MEP Shop
Drawings Submission for ICC Building
Project: BLR3UP Activity: DSIENDTXXSD1020 DT03 - MEP Shop
Drawings Submission for Heavy Maintenance
Project: BLR3UP Activity: DSIENDTXXSD1030 DT02 - MEP Shop
Drawings Submission for Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSIENDTXXSD1040 DT00 - MEP Shop
Drawings Submission for External Works
Project: BLR3UP Activity: DSIENDTXXSD1050 DT17 - MEP Shop
Drawings Submission for Traction Power Supply
Project: BLR3UP Activity: DSIENDTXXSD1060 DT04 - MEP Shop
Drawings Submission for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENDTXXSD1070 DT16 - MEP Shop
Drawings Submission for Wheel Diagnostic
Project: BLR3UP Activity: DSIENDTXXSD1080 DT15 - MEP Shop
Drawings Submission for Automatic Train Set Wash
Project: BLR3UP Activity: DSIENDTXXSD1090 DT07 - MEP Shop
Drawings Submission for Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSIENDTXXSD1100 DT09 - MEP Shop
Drawings Submission for Potable Water, Fire Water & Swerage
Project: BLR3UP Activity: DSIENDTXXSD1110 DT10 - MEP Shop
Drawings Submission for Waste Disposal
Project: BLR3UP Activity: DSIENDTXXSD1120 DT11 - MEP Shop
Drawings Submission for Chilled Water Plant - 1
Project: BLR3UP Activity: DSIENDTXXSD1130 DT18 - MEP Shop
Drawings Submission for Chilled Water Plant - 2
Project: BLR3UP Activity: DSIENDTXXSD1140 DT21 - MEP Shop
Drawings Submission for Chilled Water Plant for Ras Abu Fontas
Project: BLR3UP Activity: DSIENDTXXSD1150 DT13 - MEP Shop
Drawings Submission for SPS & Diesel Backup Generator
Project: BLR3UP Activity: DSIENDTXXSD1160 DT06 - MEP Shop
Drawings Submission for Security Building
Project: BLR3UP Activity: DSIENDTXXSD1170 DT16 - MEP Shop
Drawings Review & Approval for Wheel Diagnostic
Project: BLR3UP Activity: DSIENDTXXSD1180 DT15 - MEP Shop
Drawings Review & Approval for Automatic Train Set Wash
Project: BLR3UP Activity: DSIENDTXXSD1190 DT09 - MEP Shop
Drawings Review & Approval for Potable Water, Fire Water & Swerage
Project: BLR3UP Activity: DSIENDTXXSD1200 DT10 - MEP Shop
Drawings Review & Approval for Waste Disposal
Project: BLR3UP Activity: DSIENDTXXSD1210 DT06 - MEP Shop
Drawings Review & Approval for Security Building
Project: BLR3UP Activity: DSIENDTXXSD1220 DT17 - MEP Shop
Drawings Review & Approval for Traction Power Supply
Project: BLR3UP Activity: DSIENDTXXSD1230 DT11 - MEP Shop
Drawings Review & Approval for Chilled Water Plant - 1
Project: BLR3UP Activity: DSIENDTXXSD1240 DT18 - MEP Shop
Drawings Review & Approval for Chilled Water Plant - 2
Project: BLR3UP Activity: DSIENDTXXSD1250 DT21 - MEP Shop
Drawings Review & Approval for Chilled Water Plant for Ras Abu Fontas
Project: BLR3UP Activity: DSIENDTXXSD1260 DT04 - MEP Shop
Drawings Review & Approval for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENDTXXSD1270 DT07 - MEP Shop
Drawings Review & Approval for Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSIENDTXXSD1280 DT13 - MEP Shop
Drawings Review & Approval for SPS & Diesel Backup Generator
Project: BLR3UP Activity: DSIENDTXXSD1290 DT14 - MEP Shop
Drawings Review & Approval for ICC Building
Project: BLR3UP Activity: DSIENDTXXSD1300 DT02 - MEP Shop
Drawings Review & Approval for Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSIENDTXXSD1310 DT00 - MEP Shop
Drawings Review & Approval for External Works
Project: BLR3UP Activity: DSIENDTXXSD1330 DT03 - MEP Shop
Drawings Review & Approval for Heavy Maintenance
Project: BLR3UP Activity: DSIENSYXXSD1000 SY01 - MEP Shop
Drawings Submission for Stabling Hall
Project: BLR3UP Activity: DSIENSYXXSD1030 SY02 - MEP Shop
Drawings Submission for Light Maintenance & Corrective Maintenance Workshop
Project: BLR3UP Activity: DSIENSYXXSD1040 SY08 - MEP Shop
Drawings Submission for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXSD1050 SY04 - MEP Shop
Drawings Submission for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENSYXXSD1230 SY04 - MEP Shop
Drawings Review & Approval for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIPRDTXXAC1000 Split AC Unit -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1010 Ducts - Submission
of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1020 Fire Damper -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1030 CHW pipes -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1040 Pre-insulated
pipes - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1050 FCU - Submission
of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1060 Duct Access Doors
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1070 Motorized Dampers
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1080 Air Outlets -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1090 Louvers -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1100 Duct insulation -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1110 Flexible Duct
Connections - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1120 Volume Control
Dampers - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1130 Stainless Steel
Duct work - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1140 Hangers & Supports
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1150 Condensate Drain
pipes - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1160 CHW pipes
insulation - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1170 Aluminium Cladding
for Chilled water pipes & Ducts - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1180 Vibration
Isolators and Inertia Basis for HVAC Equipment - Submission of technical submittal
- Not Required
Project: BLR3UP Activity: DSIPRDTXXAC1190 Air Cooled
Chillers - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1200 AHU - Submission
of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1210 CRAC units -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1220 Chilled Water
Pumps - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1230 Fans - Submission
of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1240 Air Compressors -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1260 Sound Attenuators
- Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXAC1270 Expansion Tanks -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1280 Chilled Water
Valves - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1290 Air Curtains -
Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXAC1600 Fire Damper -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1610 Air Cooled
Chillers - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1650 Pre-insulated
pipes - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1660 FCU - Issue PO /
Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1680 Motorized Dampers
- Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1690 Air Outlets -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1770 CHW pipes
insulation - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1800 AHU - Issue PO /
Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1810 CRAC units - Issue
PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1820 Chilled Water
Pumps - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1830 Fans - Issue PO /
Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1840 Air Compressors -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1850 Air Separator -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1870 Expansion Tanks -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1880 Chilled Water
Valves - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL1000 BMS System -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1010 Structured Cabling
- Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1020 Lighting Control
System - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1030 Street Lighting -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1040 Cable Trunking -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1050 Lightning
Protection - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1060 Isolator /
Stoplock - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1070 Flexible Conduits
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1080 GI Conduits -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1090 PVC Conduits -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1100 Warning tapes -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1120 Fire stopping
materials - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1130 Diesel Generator -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1140 MDB/EMDB -
Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1150 SMDB/ESMDB -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1160 MCC - Submission
of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1170 Capacitor Bank -
Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1180 ATS - Submission
of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1190 Diesel Tanks -
Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1200 Lighting Fixtures
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1210 Emergency exit
light signs - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1220 Wiring accessories
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1230 Variable Frequency
Drives - Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1240 Earthing System -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1250 Distribution Board
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1260 Feeder Pillar -
Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXEL1270 Fire rated power
cable FP 400 - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1280 LV Cables -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1290 Single Core Cable
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1300 LV Termination -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1310 Cable Tray -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1320 Back Box & Adapt
Box - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1330 UPVC Ducts -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1340 Support System -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1710 BMS System - Issue
PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL1830 Diesel Generator -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL1850 SMDB/ESMDB - Issue
PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL1900 Lighting Fixtures
- Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL1910 Emergency exit
light signs - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL1950 Distribution Board
- Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1000 Fire Fighting
pipes - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1010 Fire Fighting
Fittings - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1020 Electric Water
Heaters - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1030 Copper Pipes -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1040 Water meters -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1050 PPR pipes -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1060 Plumbing Pumps -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1070 Solar water
heating system - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1080 Sanitary wares -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1090 Drainage
Accessories - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1100 Fire Detection &
Suppression system - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1110 Fire Pumps -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1120 Plumbing Valves -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1130 Fire Valves -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1140 U/G Drainage Pipes
External - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1150 U/G Fire Pipes
External - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1160 Water Supply Pipe
Insulation - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1170 Manhole Covers -
Submission of technical submittal - Not Required
Project: BLR3UP Activity: DSIPRDTXXPL1180 Cast Iron Pipes &
Fittings - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1190 Fire Hose Cabinets
- Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1200 Fire
Extinguisher / Blanket - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1210 Zone Control
Valves - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1220 Sprinkler Heads -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1230 Plumbing & Fire
Fighting Supports - Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1240 Breaching inlets -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1250 Fuel System -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1580 Plumbing Pumps -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1590 Solar water
heating system - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1620 Fire Detection &
Suppression system - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1630 Fire Pumps - Issue
PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1670 U/G Fire Pipes
External - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1750 Plumbing & Fire
Fighting Supports - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1770 Fuel System -
Issue PO / Establish LC
Project: BLR3UP Activity: DSITCDTXXSW1020 DT - As Built
Drawings and O&M
Project: BLR3UP Activity: DSITCDTXXSW1030 DT - Closing out
snags & Staff Training

Activities with Actual Dates > Data Date.........................2


Project: BLR3UP Activity: DSIENDTXXMS1510 Approval of Method
Statement for Installation of Capacitor Bank - Not Required
Project: BLR3UP Activity: DSIENSYXXSD1230 SY04 - MEP Shop
Drawings Review & Approval for Civil & Trackwork Maintenance

Milestone Activities with invalid relationships..................0

Finish milestone and predecessors have different calendars.......98


Project: BLR3UP Activity: DSICTDTXXMS1200 189 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1240 181 - MEP Works
for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1300 190 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1360 178 - MEP Works
for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1370 105 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1400 145 - MEP Works
for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1420 146 - MEP T&C for
the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1450 191 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1460 179 - MEP T&C for
the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1470 106 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1530 148 - MEP Works
for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS1540 182 - MEP T&C for
the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1550 122 - MEP Works
for the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1560 123 - MEP T&C for
the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1570 147 - Inspection &
Approval (building only) for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1610 180 - Inspection &
Approval (building only) for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1640 88 - MEP Works in
the Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS1740 107 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1770 99 - MEP Works for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS1780 124 - Inspection &
Approval (building only) for the Wheel, Brake Pad and Current Collector Shoe
Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1790 172 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1820 111 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1830 183 - Inspection &
Approval (building only) for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1840 184 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1850 185 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1870 187 - MEP Works
for the WDA
Project: BLR3UP Activity: DSICTDTXXMS1880 199 - MEP Works
for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS1900 133 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1910 134 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1920 91 - MEP Works for
the the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS1940 94 - MEP Works for
the Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS1950 119 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1960 120 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1980 100 - MEP T&C for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS2040 149 - MEP T&C for
the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2050 89 - MEP T&C for
the MEP works for Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2080 135 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2090 186 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2110 154 - MEP Works
for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2150 121 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2190 96 - MEP Works for
the Civil and TM Area
Project: BLR3UP Activity: DSICTDTXXMS2200 97 - MEP T&C for
the Civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2210 101 - Inspection &
Approval (building only) for the Admin & ECC building
Project: BLR3UP Activity: DSICTDTXXMS2220 173 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2260 108 - MEP Works
for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2270 109 - MEP T&C for
the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2280 90 - Inspection &
Approval (building only) for the stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2290 188 - MEP T&C for
the WDA
Project: BLR3UP Activity: DSICTDTXXMS2300 192 - MEP Works
for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2320 92 - MEP T&C for
the MEP works for the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS2330 95 - MEP T&C for
the MEP works for Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS2340 112 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2340 112 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2570 200 - MEP T&C for
the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2620 102 - MEP Works
for the potable water & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2630 103 - MEP T&C for
the Potable water &Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2640 116 - MEP Works
for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2680 98 - Inspection &
Approval (building only) for the civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2700 110 - Inspection &
Approval (building only) for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2710 151 - MEP Works
for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2730 117 - MEP T&C for
the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2740 189 - Inspection &
Approval (building only) for the WDA
Project: BLR3UP Activity: DSICTDTXXMS2750 201 - Inspection &
Approval (building only) for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2780 174 -Inspection &
Approval (building only) for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2790 155 - MEP T&C for
the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2800 93 - Inspection &
Approval (building only) for the Light Maintenance & Corrective Maintenance
Workshop
Project: BLR3UP Activity: DSICTDTXXMS2810 104 - Inspection &
Approval (building only) for the PW & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2820 118 - Inspection &
Approval (building only) for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2830 193 - MEP T&C for
the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2840 169 - MEP Works
for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2850 170 - MEP T&C for
the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2860 160 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2870 161 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2880 163 - MEP Works
for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2890 164 - MEP T&C for
the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2900 166 - MEP Works
for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2910 167 - MEP T&C for
the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2920 150 - Inspection &
Approval (building only) for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2930 152 - MEP T&C for
the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2940 171 - Inspection &
Approval (building only) for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2970 162 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS3000 165 - Inspection &
Approval (building only) for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS3010 194 - Inspection &
Approval (building only) for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS3020 153 - Inspection &
Approval (building only) for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS3030 85 - MEP Works in
the Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3040 168 - Inspection &
Approval (building only) for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS3060 86 - Prelim T&C
for the MEP works in Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3070 142 - MEP Works
for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3100 87 - Submit
Inspection & Approval to Authorities (civil defence/Elec/Water/Municipality)
Project: BLR3UP Activity: DSICTDTXXMS3130 143 - MEP T&C for
the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3140 156 - Inspection &
Approval (building only) for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS3150 Completion of
Stabling Yard Works
Project: BLR3UP Activity: DSICTDTXXMS3150 Completion of
Stabling Yard Works
Project: BLR3UP Activity: DSICTDTXXMS3150 Completion of
Stabling Yard Works
Project: BLR3UP Activity: DSICTDTXXMS3160 144 - Inspection &
Approval (building only) for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3190 Completion of
Depot Works
Project: BLR3UP Activity: DSICTDTXXMS3190 Completion of
Depot Works
Project: BLR3UP Activity: DSICTDTXXMS3190 Completion of
Depot Works

Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................1195
# Relationships with other projects..............................0
Data Date........................................................18-Feb-18
Earliest Early Start Date........................................17-Feb-18
Latest Early Finish Date.........................................06-Feb-20
Exceptions:
-----------
Critical Activities..............................................1108
Project: BLR3UP Activity: DSICNDT00AC1080 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT00AC1110 Second Fix -
Valves
Project: BLR3UP Activity: DSICNDT00EL1190 First Fix - Cable
Ducts - Descoped
Project: BLR3UP Activity: DSICNDT00EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT00EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT00EL1250 Final Fix - Street
Lighting
Project: BLR3UP Activity: DSICNDT00FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT00FF1130 Final Fix - Fire
Hydrants
Project: BLR3UP Activity: DSICNDT00GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT00GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT00GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT00PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT00PL1180 Final Fix -
Manhole Covers - Not in Scope
Project: BLR3UP Activity: DSICNDT00TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT00TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT00TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT00TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT00TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT00TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT01AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT01AC1100 Plant Room - AHU
Project: BLR3UP Activity: DSICNDT01EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT01EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT01FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNDT01GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT01GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT01GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT01GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT01GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT01GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT01GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT01PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT01PL1160 Final Fix -
Sanitary Fixtures, Water Meters
Project: BLR3UP Activity: DSICNDT01PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNDT01TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT01TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT01TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT01TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT01TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT01TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT02EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT02EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT02FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT02FF1140 Plant Room -
Valves
Project: BLR3UP Activity: DSICNDT02GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT02GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT02GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT02GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT02GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT02GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT02GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT02PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT02PL1160 Final Fix -
Sanitary Fixtures, Water Meters
Project: BLR3UP Activity: DSICNDT02PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNDT02TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT02TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT02TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT02TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT02TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT02TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT03AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNDT03AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT03AC1100 Plant Room - AHU,
Air Compressors
Project: BLR3UP Activity: DSICNDT03AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs
Project: BLR3UP Activity: DSICNDT03EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT03EL1210 Plant Room - MDB,
SMDB, DB
Project: BLR3UP Activity: DSICNDT03EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT03EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNDT03EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT03FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNDT03GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT03GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT03GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT03GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT03GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT03GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT03GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT03GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT03GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT03PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT03PL1160 Final Fix -
Sanitary Fixtures, Water Meters
Project: BLR3UP Activity: DSICNDT03PL1170 Plant Room - Sump
Pumps (Not Required)
Project: BLR3UP Activity: DSICNDT03PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNDT03TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT03TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNDT03TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT03TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT03TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT03TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT03TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT04AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNDT04AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT04AC1100 Plant Room - AHU,
Air Compressors
Project: BLR3UP Activity: DSICNDT04AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNDT04EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT04EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT04EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT04EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT04EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNDT04EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNDT04EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT04FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT04FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT04FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNDT04GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT04GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT04GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT04GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT04GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT04GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT04GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT04GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT04GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT04PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT04PL1160 Final Fix -
Sanitary Fixtures, Water Meters
Project: BLR3UP Activity: DSICNDT04PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNDT04TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT04TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNDT04TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT04TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT04TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT04TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT04TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT06AC1080 First Fix -
Ductwork
Project: BLR3UP Activity: DSICNDT06AC1090 Final Fix -
Grilles and Diffusers, Louvers, Split AC
Project: BLR3UP Activity: DSICNDT06AC1110 Second Fix -
Insulation, Dampers, FCUs
Project: BLR3UP Activity: DSICNDT06EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT06EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT06EL1210 Plant Room - DB
Project: BLR3UP Activity: DSICNDT06EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT06EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNDT06EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT06FF1130 Final Fix - Fire
Extinguishers
Project: BLR3UP Activity: DSICNDT06GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT06GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT06GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT06GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT06GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT06GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT06GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT06GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT06GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT06GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT06PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT06PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNDT06PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNDT06PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNDT06TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT06TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT06TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT06TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT06TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT06TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT07AC1100 Plant Room - AHU
Project: BLR3UP Activity: DSICNDT07EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT07EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT07EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT07FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT07FF1140 Plant Room - Fire
Suppression System, Foam System, Valves
Project: BLR3UP Activity: DSICNDT07GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT07GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT07GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT07GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT07GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT07GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT07GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT07PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT07PL1160 Final Fix -
Sanitary Fixtures, Water Meters
Project: BLR3UP Activity: DSICNDT07PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNDT07TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT07TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT07TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT07TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT07TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT07TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT09AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNDT09AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT09AC1110 Second Fix -
Valves, Insulation, Dampers, Fans
Project: BLR3UP Activity: DSICNDT09EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT09EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT09EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT09EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT09EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNDT09EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT09FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT09FF1130 Final Fix -
Sprinklers, Fire Extinguishers
Project: BLR3UP Activity: DSICNDT09FF1140 Plant Room - Fire
Pumps, Valves
Project: BLR3UP Activity: DSICNDT09GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT09GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT09GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT09GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT09GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT09GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT09GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT09GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT09GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNDT09GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT09PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT09PL1170 Plant Room -
Plumbing Pumps
Project: BLR3UP Activity: DSICNDT09PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT09TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT09TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT09TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT09TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT09TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT09TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT10AC1110 Second Fix - Fans
(Not Required)
Project: BLR3UP Activity: DSICNDT10EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT10EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT10EL1210 Plant Room - DB
Project: BLR3UP Activity: DSICNDT10EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT10EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT10FF1130 Final Fix - Fire
Extinguishers, Foam System
Project: BLR3UP Activity: DSICNDT10GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT10GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT10GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT10GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT10GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT10GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT10GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT10GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT10GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT10PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT10PL1160 Final Fix - Hose
Bibs
Project: BLR3UP Activity: DSICNDT10PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT10TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT10TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT10TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT10TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT10TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT10TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT11AC1080 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT11AC1090 Final Fix -
Louvers
Project: BLR3UP Activity: DSICNDT11AC1100 Plant Room -
Chillers, CHW Pump, Expansion Tank, AHU
Project: BLR3UP Activity: DSICNDT11AC1110 Second Fix -
Valves, Insulation, Cladding, FCU, Fans
Project: BLR3UP Activity: DSICNDT11EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT11EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT11EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT11EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT11EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT11FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT11FF1130 Final Fix - Fire
Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT11FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNDT11GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT11GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT11GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT11GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT11GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT11GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT11GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT11GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT11GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT11PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT11PL1160 Final Fix - Hose
Bibs, Water Meters
Project: BLR3UP Activity: DSICNDT11PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT11TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT11TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT11TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT11TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT11TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT11TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT13AC1100 Plant Room - AHU,
CRAC
Project: BLR3UP Activity: DSICNDT13EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT13FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT13FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNDT13GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT13GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT13GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT13GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT13GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT13GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT13GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT13PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT13PL1180 Second Fix -
Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT13TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT13TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT13TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT13TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT13TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT13TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT14AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNDT14AC1100 Plant Room - AHU,
CRAC
Project: BLR3UP Activity: DSICNDT14EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT14EL1210 Plant Room - MDB,
SMDB, DB, LCP
Project: BLR3UP Activity: DSICNDT14EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT14EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNDT14EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT14FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT14FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNDT14GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT14GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT14GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT14GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT14GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT14GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT14GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT14GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT14GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT14PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT14PL1160 Final Fix -
Sanitary Fixtures, Water Meters
Project: BLR3UP Activity: DSICNDT14PL1170 Plant Room - Solar
Water Heating
Project: BLR3UP Activity: DSICNDT14PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT14TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT14TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNDT14TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT14TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT14TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT14TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT14TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT15AC1080 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT15AC1110 Second Fix -
Valves, Insulation
Project: BLR3UP Activity: DSICNDT15EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT15EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT15EL1210 Plant Room - DB
Project: BLR3UP Activity: DSICNDT15EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT15EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT15FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT15FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT15FF1140 Second Fix -
Valves
Project: BLR3UP Activity: DSICNDT15GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT15GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT15GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT15GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT15GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT15GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT15GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT15GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT15GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT15PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT15PL1160 Final Fix - Hose
Bibs, Water Meters
Project: BLR3UP Activity: DSICNDT15PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT15TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT15TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT15TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT15TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT15TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT15TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT16EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT16EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT16EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT16FF1130 Final Fix - Fire
Extinguishers
Project: BLR3UP Activity: DSICNDT16GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT16GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT16GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT16GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT16GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT16GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT16GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT16GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT16PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT16PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT16TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT16TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT16TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT16TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT17EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT17FF1130 Final Fix - Fire
Extinguishers
Project: BLR3UP Activity: DSICNDT17GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT17GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT17GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT17GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT17GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT17GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT17PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT17TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT17TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT17TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT17TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT17TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT17TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT18AC1080 First Fix -
Pipework & Ductwork
Project: BLR3UP Activity: DSICNDT18AC1090 Final Fix -
Louvers
Project: BLR3UP Activity: DSICNDT18AC1110 Second Fix -
Valves, Insulation, Cladding, FCU, Fans
Project: BLR3UP Activity: DSICNDT18EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT18EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT18EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT18EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT18FF1130 Final Fix - Fire
Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT18FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNDT18GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT18GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT18GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT18GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT18GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT18GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT18GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT18GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT18GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT18PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT18PL1160 Final Fix -
Sanitary Fixtures, Water Meters
Project: BLR3UP Activity: DSICNDT18PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT18TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT18TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT18TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT18TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT18TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT18TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNDT21AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNDT21AC1110 Second Fix -
Valves, Insulation, Cladding, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNDT21AC1120 Final Fix -
Grilles and Diffusers
Project: BLR3UP Activity: DSICNDT21EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNDT21EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNDT21EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNDT21EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNDT21EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNDT21FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT21FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNDT21FF1140 Plant Room -
Valves
Project: BLR3UP Activity: DSICNDT21GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT21GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNDT21GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNDT21GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNDT21GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNDT21GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNDT21GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNDT21GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNDT21GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNDT21PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT21PL1160 Final Fix - Hose
Bibs, Water Meters
Project: BLR3UP Activity: DSICNDT21PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNDT21TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNDT21TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNDT21TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNDT21TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNDT21TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNDT21TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY00AC1080 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY00EL1190 First Fix - Cable
Ducts
Project: BLR3UP Activity: DSICNSY00EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY00EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY00EL1250 Final Fix - Stree
Lighting
Project: BLR3UP Activity: DSICNSY00FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY00FF1130 Final Fix - Fire
Hydrants
Project: BLR3UP Activity: DSICNSY00GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY00GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY00GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY00GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY00PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY00PL1160 Final Fix -
Manhole Covers
Project: BLR3UP Activity: DSICNSY00TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY00TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY00TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY00TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY00TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY00TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY01AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNSY01AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNSY01AC1100 Plant Room - AHU,
Air Compressors
Project: BLR3UP Activity: DSICNSY01AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNSY01EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY01EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY01EL1210 Plant Room - MDB,
SMDB, DB
Project: BLR3UP Activity: DSICNSY01EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY01EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNSY01EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY01EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY01FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY01FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNSY01FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNSY01GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY01GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY01GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY01GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY01GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY01GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY01GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY01GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY01GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY01GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY01PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY01PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY01PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNSY01PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY01TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY01TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNSY01TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY01TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY01TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY01TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY01TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY02AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNSY02AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNSY02AC1100 Plant Room - AHU,
Air Compressors
Project: BLR3UP Activity: DSICNSY02AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNSY02EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY02EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY02EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNSY02EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY02EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNSY02EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY02EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY02FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY02FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNSY02FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNSY02GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY02GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY02GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY02GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY02GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY02GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY02GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY02GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY02GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY02GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY02PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY02PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY02PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNSY02PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY02TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY02TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNSY02TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY02TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY02TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY02TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY02TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY04AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNSY04AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNSY04AC1100 Plant Room - AHU,
Air Compressors
Project: BLR3UP Activity: DSICNSY04AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNSY04EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY04EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY04EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNSY04EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY04EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNSY04EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY04EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY04FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY04FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNSY04FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNSY04GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY04GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY04GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY04GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY04GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY04GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY04GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY04GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY04GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY04GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY04PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY04PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY04PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNSY04PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY04TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY04TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNSY04TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY04TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY04TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY04TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY04TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY05AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNSY05AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNSY05AC1100 Plant Room - AHU,
CRAC
Project: BLR3UP Activity: DSICNSY05AC1110 Second Fix -
Valves, Insulation, Cladding, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNSY05EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY05EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY05EL1210 Plant Room - MDB,
SMDB, DB, LCP, Generator
Project: BLR3UP Activity: DSICNSY05EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY05EL1230 Installation of
Telephone and Data Cabling and Accessories - Not in Scope
Project: BLR3UP Activity: DSICNSY05EL1240 First Fix -
Earthing, Lightning
Project: BLR3UP Activity: DSICNSY05EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY05FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY05FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNSY05FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNSY05GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY05GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY05GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY05GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY05GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY05GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY05GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY05GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY05GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY05GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY05PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY05PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY05PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNSY05PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY05TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY05TC1300 Testing Local
Telephone and Data Systems - Not in Scope
Project: BLR3UP Activity: DSICNSY05TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY05TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY05TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY05TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY05TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY07AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNSY07AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSICNSY07AC1110 Second Fix -
Valves, Insulation, Dampers, FCUs, Fans
Project: BLR3UP Activity: DSICNSY07EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY07EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY07EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNSY07EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY07EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY07EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY07FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY07FF1130 Final Fix -
Sprinklers, Fire Extinguishers
Project: BLR3UP Activity: DSICNSY07FF1140 Plant Room - Fire
Suppression System, Fire Pumps, Valves
Project: BLR3UP Activity: DSICNSY07GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY07GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY07GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY07GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY07GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY07GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY07GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY07GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY07GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY07PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY07PL1170 Plant Room -
Plumbing Pumps
Project: BLR3UP Activity: DSICNSY07PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNSY07PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY07TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY07TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY07TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY07TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY07TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY07TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY08AC1080 First Fix -
Ductwork and Pipework
Project: BLR3UP Activity: DSICNSY08AC1090 Final Fix -
Grilles and Diffusers
Project: BLR3UP Activity: DSICNSY08AC1100 Plant Room - CRAC
Project: BLR3UP Activity: DSICNSY08AC1110 Second Fix -
Valves, Insulation, Dampers, Fans
Project: BLR3UP Activity: DSICNSY08EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY08EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY08EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNSY08EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY08EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY08EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY08FF1130 Final Fix - Fire
Extinguishers
Project: BLR3UP Activity: DSICNSY08FF1140 Plant Room - Fire
Suppression System
Project: BLR3UP Activity: DSICNSY08GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY08GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY08GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY08GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY08GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY08GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY08GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY08GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY08GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY08GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY08PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY08TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY08TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY08TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY08TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY08TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY08TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY09AC1080 First Fix -
Refrigerant Pipework
Project: BLR3UP Activity: DSICNSY09AC1090 Final Fix - Split
AC
Project: BLR3UP Activity: DSICNSY09AC1110 Second Fix - Fans
Project: BLR3UP Activity: DSICNSY09EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY09EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY09EL1210 Plant Room - DB
Project: BLR3UP Activity: DSICNSY09EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY09EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY09EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY09FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY09FF1130 Final Fix - Fire
Extinguishers, Breaching inlets
Project: BLR3UP Activity: DSICNSY09FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNSY09GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY09GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY09GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY09GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY09GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY09GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY09GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY09GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY09GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY09PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY09PL1180 Second Fix -
Valves, Insulation
Project: BLR3UP Activity: DSICNSY09PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY09TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY09TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY09TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY09TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY09TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY09TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY10AC1080 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY10AC1090 Final Fix -
Louvers
Project: BLR3UP Activity: DSICNSY10AC1100 Plant Room -
Chillers, CHW Pump, Expansion Tank
Project: BLR3UP Activity: DSICNSY10AC1110 Second Fix -
Valves, Insulation, Cladding, FCUs
Project: BLR3UP Activity: DSICNSY10EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY10EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY10EL1210 Plant Room - SMDB,
DB
Project: BLR3UP Activity: DSICNSY10EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY10EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY10EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY10FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY10FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNSY10FF1140 Plant Room - Fire
Suppression System, Valves
Project: BLR3UP Activity: DSICNSY10GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY10GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY10GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY10GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY10GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY10GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY10GN1060 Ceiling Wokrs by
Others
Project: BLR3UP Activity: DSICNSY10GN1070 Get -
Architectural Interface - MEP Final Fix
Project: BLR3UP Activity: DSICNSY10GN1080 Get - Civil
Interface - Access for MEP U/G Works
Project: BLR3UP Activity: DSICNSY10GN1090 Civil Wokrs by
Others
Project: BLR3UP Activity: DSICNSY10PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY10PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY10PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNSY10PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY10TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY10TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY10TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY10TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY10TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY10TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY12AC1110 Second Fix - Fans
Project: BLR3UP Activity: DSICNSY12EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY12EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY12EL1210 Plant Room - DB
Project: BLR3UP Activity: DSICNSY12EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY12EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY12EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY12FF1130 Final Fix - Fire
Extinguishers
Project: BLR3UP Activity: DSICNSY12GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY12GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY12GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY12GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY12GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY12GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY12GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY12GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY12GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY12PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY12PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY12PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNSY12PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY12TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY12TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY12TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY12TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY12TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY12TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY13AC1080 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY13AC1110 Second Fix -
Valves, Insulation, FCUs
Project: BLR3UP Activity: DSICNSY13EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY13EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY13EL1210 Plant Room - DB
Project: BLR3UP Activity: DSICNSY13EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY13EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY13EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY13FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY13FF1130 Final Fix -
Sprinklers, Fire Extinguishers, Fire Hosereel
Project: BLR3UP Activity: DSICNSY13FF1140 Second Fix -
Valves
Project: BLR3UP Activity: DSICNSY13GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY13GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY13GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY13GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY13GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY13GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY13GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY13GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY13GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY13PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY13PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY13PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNSY13PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY13TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY13TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY13TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY13TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY13TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY13TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY14EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY14EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY14EL1240 First Fix -
Earthing
Project: BLR3UP Activity: DSICNSY14EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY14FF1130 Final Fix - Fire
Extinguishers
Project: BLR3UP Activity: DSICNSY14GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY14GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY14GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY14GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY14GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY14GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY14GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY14GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY14PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY14PL1180 Second Fix -
Valves, Insulation, Floor Drains
Project: BLR3UP Activity: DSICNSY14PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY14TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY14TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY14TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY14TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICNSY17AC1080 First Fix -
Ductwork
Project: BLR3UP Activity: DSICNSY17AC1090 Final Fix -
Grilles and Diffusers, Louvers, Split AC
Project: BLR3UP Activity: DSICNSY17AC1110 Second Fix -
Insulation, Dampers, Fans
Project: BLR3UP Activity: DSICNSY17EL1190 First Fix -
Containment
Project: BLR3UP Activity: DSICNSY17EL1200 Second Fix -
Cabling
Project: BLR3UP Activity: DSICNSY17EL1210 Plant Room - DB
Project: BLR3UP Activity: DSICNSY17EL1220 Installation of
BMS Cabling and Accessories
Project: BLR3UP Activity: DSICNSY17EL1240 First Fix -
Earthing, Lightning
Project: BLR3UP Activity: DSICNSY17EL1250 Final Fix -
Lighting Fixtures, Switches & Sockets
Project: BLR3UP Activity: DSICNSY17FF1130 Final Fix - Fire
Extinguishers
Project: BLR3UP Activity: DSICNSY17GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNSY17GN1010 Get - Access for
MEP Works in Plant Room (doors on, watertight, floor prepped, delivery route
accessible)
Project: BLR3UP Activity: DSICNSY17GN1020 MEP Testing and
Commissioning Completion
Project: BLR3UP Activity: DSICNSY17GN1030 Give -
Architectural Interface - MEP Ceiling Clearance
Project: BLR3UP Activity: DSICNSY17GN1040 MEP Installation
Completion
Project: BLR3UP Activity: DSICNSY17GN1050 MEP Final
Inspection & Approval Completion
Project: BLR3UP Activity: DSICNSY17GN1060 Ceiling Works by
Others
Project: BLR3UP Activity: DSICNSY17GN1070 Get -
Architectural Interface - Ceilings Ready for MEP Final Fix
Project: BLR3UP Activity: DSICNSY17GN1090 Civil Works by
Others
Project: BLR3UP Activity: DSICNSY17PL1150 First Fix -
Pipework
Project: BLR3UP Activity: DSICNSY17PL1160 Final Fix -
Sanitary Fixtures
Project: BLR3UP Activity: DSICNSY17PL1180 Second Fix -
Valves, Insulation, Floor Drains, Water Heaters
Project: BLR3UP Activity: DSICNSY17PL1190 First Fix - U/G
Drainage Pipework
Project: BLR3UP Activity: DSICNSY17TC1290 Testing Local
Electrical Systems
Project: BLR3UP Activity: DSICNSY17TC1310 Testing Mechanical
Systems
Project: BLR3UP Activity: DSICNSY17TC1320 Testing Plumbing
and Drainage Systems
Project: BLR3UP Activity: DSICNSY17TC1330 Testing Fire
Systems
Project: BLR3UP Activity: DSICNSY17TC1350 Testing BMS
Systems
Project: BLR3UP Activity: DSICNSY17TC1360 Final Inspection &
Approval
Project: BLR3UP Activity: DSICTDTXXMS1000 Project Completion
Project: BLR3UP Activity: DSICTDTXXMS1190 202 - MEP Works
for the HPA
Project: BLR3UP Activity: DSICTDTXXMS1200 189 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1220 203 - MEP T&C for
the HPA
Project: BLR3UP Activity: DSICTDTXXMS1240 181 - MEP Works
for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1260 197 - MEP Works
for the Unloading Area
Project: BLR3UP Activity: DSICTDTXXMS1300 190 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1360 178 - MEP Works
for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1370 105 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1380 198 - MEP T&C for
the Unloading Area
Project: BLR3UP Activity: DSICTDTXXMS1400 145 - MEP Works
for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1410 139 - MEP Works
for the Handover Platform
Project: BLR3UP Activity: DSICTDTXXMS1420 146 - MEP T&C for
the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1450 191 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1460 179 - MEP T&C for
the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1470 106 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1500 140 - MEP T&C for
the Handover Platform
Project: BLR3UP Activity: DSICTDTXXMS1510 204 - MEP Works
for the DPA
Project: BLR3UP Activity: DSICTDTXXMS1520 209 - MEP Works
for the GCA
Project: BLR3UP Activity: DSICTDTXXMS1530 148 - MEP Works
for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS1540 182 - MEP T&C for
the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1550 122 - MEP Works
for the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1560 123 - MEP T&C for
the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1570 147 - Inspection &
Approval (building only) for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1580 125 - MEP Works
for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS1610 180 - Inspection &
Approval (building only) for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1620 128 - MEP Works
for the unloading Area for new car
Project: BLR3UP Activity: DSICTDTXXMS1640 88 - MEP Works in
the Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS1710 141 - Inspection &
Approval (building only) for the Handover Platform
Project: BLR3UP Activity: DSICTDTXXMS1720 205 - MEP T&C for
the DPA
Project: BLR3UP Activity: DSICTDTXXMS1730 210 - MEP T&C for
the GCA
Project: BLR3UP Activity: DSICTDTXXMS1740 107 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1760 195 - MEP Works
for the LMS Area
Project: BLR3UP Activity: DSICTDTXXMS1770 99 - MEP Works for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS1780 124 - Inspection &
Approval (building only) for the Wheel, Brake Pad and Current Collector Shoe
Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1790 172 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1800 126 - MEP T&C for
the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS1820 111 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1830 183 - Inspection &
Approval (building only) for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1840 184 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1850 185 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1860 129 - MEP T&C for
the unloading area for new car
Project: BLR3UP Activity: DSICTDTXXMS1870 187 - MEP Works
for the WDA
Project: BLR3UP Activity: DSICTDTXXMS1880 199 - MEP Works
for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS1890 211 - Inspection &
Approval (building only) for the GCA
Project: BLR3UP Activity: DSICTDTXXMS1900 133 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1910 134 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1920 91 - MEP Works for
the the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS1940 94 - MEP Works for
the Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS1950 119 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1960 120 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1970 196 - MEP T&C for
the LMS Area
Project: BLR3UP Activity: DSICTDTXXMS1980 100 - MEP T&C for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS2010 157 - MEP Works
for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2020 158 - MEP T&C for
the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2030 127 - Inspection &
Approval (building only) for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2040 149 - MEP T&C for
the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2050 89 - MEP T&C for
the MEP works for Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2060 113 - MEP Works
for the WTP & PS
Project: BLR3UP Activity: DSICTDTXXMS2070 114 - MEP T&C for
the WTP & PS
Project: BLR3UP Activity: DSICTDTXXMS2080 135 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2090 186 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2110 154 - MEP Works
for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2130 206 - MEP Works
for the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2140 212 - MEP Works
for the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2150 121 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2160 136 - MEP Works
for the Departure Platform
Project: BLR3UP Activity: DSICTDTXXMS2170 137 - MEP T&C for
the Departure platform
Project: BLR3UP Activity: DSICTDTXXMS2180 159 - Inspection &
Approval (building only) for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2190 96 - MEP Works for
the Civil and TM Area
Project: BLR3UP Activity: DSICTDTXXMS2200 97 - MEP T&C for
the Civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2210 101 - Inspection &
Approval (building only) for the Admin & ECC building
Project: BLR3UP Activity: DSICTDTXXMS2220 173 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2260 108 - MEP Works
for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2270 109 - MEP T&C for
the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2280 90 - Inspection &
Approval (building only) for the stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2290 188 - MEP T&C for
the WDA
Project: BLR3UP Activity: DSICTDTXXMS2300 192 - MEP Works
for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2310 115 - Inspection &
Approval (building only) for the WTP and PS
Project: BLR3UP Activity: DSICTDTXXMS2320 92 - MEP T&C for
the MEP works for the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS2330 95 - MEP T&C for
the MEP works for Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS2340 112 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2570 200 - MEP T&C for
the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2590 207 - MEP T&C for
the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2600 213 - MEP T&C for
the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2610 138 - Inspection &
Approval (building only) for the Departure Platform
Project: BLR3UP Activity: DSICTDTXXMS2620 102 - MEP Works
for the potable water & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2630 103 - MEP T&C for
the Potable water &Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2640 116 - MEP Works
for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2680 98 - Inspection &
Approval (building only) for the civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2700 110 - Inspection &
Approval (building only) for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2710 151 - MEP Works
for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2730 117 - MEP T&C for
the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2740 189 - Inspection &
Approval (building only) for the WDA
Project: BLR3UP Activity: DSICTDTXXMS2750 201 - Inspection &
Approval (building only) for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2760 208 - Inspection &
Approval (building only) for the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2770 214 - Inspection &
Approval (building only) for the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2780 174 -Inspection &
Approval (building only) for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2790 155 - MEP T&C for
the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2800 93 - Inspection &
Approval (building only) for the Light Maintenance & Corrective Maintenance
Workshop
Project: BLR3UP Activity: DSICTDTXXMS2810 104 - Inspection &
Approval (building only) for the PW & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2820 118 - Inspection &
Approval (building only) for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2830 193 - MEP T&C for
the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2840 169 - MEP Works
for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2850 170 - MEP T&C for
the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2860 160 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2870 161 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2880 163 - MEP Works
for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2890 164 - MEP T&C for
the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2900 166 - MEP Works
for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2910 167 - MEP T&C for
the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2920 150 - Inspection &
Approval (building only) for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2930 152 - MEP T&C for
the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2940 171 - Inspection &
Approval (building only) for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2950 175 - MEP Works
for the Sewerage Treatment Plant
Project: BLR3UP Activity: DSICTDTXXMS2960 176 - MEP T&C for
the Sewerage Treatment Plant
Project: BLR3UP Activity: DSICTDTXXMS2970 162 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS3000 165 - Inspection &
Approval (building only) for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS3010 194 - Inspection &
Approval (building only) for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS3020 153 - Inspection &
Approval (building only) for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS3030 85 - MEP Works in
the Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3040 168 - Inspection &
Approval (building only) for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS3050 177 - Inspection &
Approval (building only) for the Sewerage Treatment Plant
Project: BLR3UP Activity: DSICTDTXXMS3060 86 - Prelim T&C
for the MEP works in Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3070 142 - MEP Works
for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3100 87 - Submit
Inspection & Approval to Authorities (civil defence/Elec/Water/Municipality)
Project: BLR3UP Activity: DSICTDTXXMS3130 143 - MEP T&C for
the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3140 156 - Inspection &
Approval (building only) for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS3150 Completion of
Stabling Yard Works
Project: BLR3UP Activity: DSICTDTXXMS3160 144 - Inspection &
Approval (building only) for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3190 Completion of
Depot Works
Project: BLR3UP Activity: DSIENDTXXDS1090 Get - DT09 -
Design Model - Receipt of Co-ordinated MEP Design Model for Potable Water, Fire
Water & Swerage
Project: BLR3UP Activity: DSIENDTXXDS1260 Get - DT09 -
Design Report - Receipt of Co-ordinated MEP Design Report for Potable Water, Fire
Water & Swerage
Project: BLR3UP Activity: DSIENDTXXDS2100 DT09 - MEP Design
review for Potable Water, Fire Water & Swerage
Project: BLR3UP Activity: DSIENDTXXMS1010 Submission of
Method Statement for Installation of Plumbing Pumps (Circulation Pumps).
Project: BLR3UP Activity: DSIENDTXXMS1020 Submission of
Method Statement for Installation of Solar Water Heating System.
Project: BLR3UP Activity: DSIENDTXXMS1030 Submission of
Method Statement for Installation of Plumbing System
Project: BLR3UP Activity: DSIENDTXXMS1040 Submission of
Method Statement for Installation of Booster Pump/Transfer Pump
Project: BLR3UP Activity: DSIENDTXXMS1090 Submission of
Method Statement for Installation of CHW Pumps (Primary & Secondary)
Project: BLR3UP Activity: DSIENDTXXMS1120 Submission of
Method Statement for Installation of Split System Air conditioners.
Project: BLR3UP Activity: DSIENDTXXMS1150 Submission of
Method Statement for Installation of Expansion Tanks
Project: BLR3UP Activity: DSIENDTXXMS1180 Submission of
Method Statement for MEP Installation works on Fuel System
Project: BLR3UP Activity: DSIENDTXXMS1250 Submission of
Method Statement for Installation of Lighting Control System.
Project: BLR3UP Activity: DSIENDTXXMS1270 Submission of
Method Statement for Installation of Emergency Lighting & Exit Signage
Project: BLR3UP Activity: DSIENDTXXMS1280 Submission of
Method Statement for Installation of Structural Cabling System
Project: BLR3UP Activity: DSIENDTXXMS1290 Submission of
Method Statement for Installation of Building Management System.
Project: BLR3UP Activity: DSIENDTXXMS1310 Approval of Method
Statement for Installation of Plumbing Pumps (Circulation Pumps).
Project: BLR3UP Activity: DSIENDTXXMS1320 Approval of Method
Statement for Installation of Solar Water Heating System.
Project: BLR3UP Activity: DSIENDTXXMS1330 Approval of Method
Statement for Installation of Plumbing System
Project: BLR3UP Activity: DSIENDTXXMS1340 Approval of Method
Statement for Installation of Booster Pump/Transfer Pump
Project: BLR3UP Activity: DSIENDTXXMS1350 Approval of Method
Statement for installation of Drainage system
Project: BLR3UP Activity: DSIENDTXXMS1360 Approval of Method
Statement for Installation of Fire Suppression System
Project: BLR3UP Activity: DSIENDTXXMS1370 Approval of Method
Statement for Installation of Fire Fighting System
Project: BLR3UP Activity: DSIENDTXXMS1380 Approval of Method
Statement for Installation of Fans
Project: BLR3UP Activity: DSIENDTXXMS1390 Approval of Method
Statement for Installation of CHW Pumps (Primary & Secondary)
Project: BLR3UP Activity: DSIENDTXXMS1400 Approval of Method
Statement for Installation of Air Handling Units.
Project: BLR3UP Activity: DSIENDTXXMS1410 Approval of Method
Statement for Installation of Fan Coil Unit.
Project: BLR3UP Activity: DSIENDTXXMS1420 Approval of Method
Statement for Installation of Split System Air conditioners.
Project: BLR3UP Activity: DSIENDTXXMS1440 Approval of Method
Statement for Installation of Air Cooled Chillers
Project: BLR3UP Activity: DSIENDTXXMS1450 Approval of Method
Statement for Installation of Expansion Tanks
Project: BLR3UP Activity: DSIENDTXXMS1480 Approval of Method
Statement for MEP Installation works on Fuel System
Project: BLR3UP Activity: DSIENDTXXMS1500 Approval of Method
Statement for Installation of DBs and outgoing circuits
Project: BLR3UP Activity: DSIENDTXXMS1520 Approval of Method
Statement for Installation of Diesel Engine Generator.
Project: BLR3UP Activity: DSIENDTXXMS1540 Approval of Method
Statement for Installation of MDB, EMDB,SMDB,ESMDB
Project: BLR3UP Activity: DSIENDTXXMS1550 Approval of Method
Statement for Installation of Lighting Control System.
Project: BLR3UP Activity: DSIENDTXXMS1570 Approval of Method
Statement for Installation of Emergency Lighting & Exit Signage
Project: BLR3UP Activity: DSIENDTXXMS1580 Approval of Method
Statement for Installation of Structural Cabling System
Project: BLR3UP Activity: DSIENDTXXMS1590 Approval of Method
Statement for Installation of Building Management System.
Project: BLR3UP Activity: DSIENDTXXSD1170 DT16 - MEP Shop
Drawings Review & Approval for Wheel Diagnostic
Project: BLR3UP Activity: DSIENDTXXSD1180 DT15 - MEP Shop
Drawings Review & Approval for Automatic Train Set Wash
Project: BLR3UP Activity: DSIENDTXXSD1190 DT09 - MEP Shop
Drawings Review & Approval for Potable Water, Fire Water & Swerage
Project: BLR3UP Activity: DSIENDTXXSD1200 DT10 - MEP Shop
Drawings Review & Approval for Waste Disposal
Project: BLR3UP Activity: DSIENDTXXSD1210 DT06 - MEP Shop
Drawings Review & Approval for Security Building
Project: BLR3UP Activity: DSIENDTXXSD1220 DT17 - MEP Shop
Drawings Review & Approval for Traction Power Supply
Project: BLR3UP Activity: DSIENDTXXSD1230 DT11 - MEP Shop
Drawings Review & Approval for Chilled Water Plant - 1
Project: BLR3UP Activity: DSIENDTXXSD1240 DT18 - MEP Shop
Drawings Review & Approval for Chilled Water Plant - 2
Project: BLR3UP Activity: DSIENDTXXSD1250 DT21 - MEP Shop
Drawings Review & Approval for Chilled Water Plant for Ras Abu Fontas
Project: BLR3UP Activity: DSIENDTXXSD1260 DT04 - MEP Shop
Drawings Review & Approval for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENDTXXSD1270 DT07 - MEP Shop
Drawings Review & Approval for Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSIENDTXXSD1280 DT13 - MEP Shop
Drawings Review & Approval for SPS & Diesel Backup Generator
Project: BLR3UP Activity: DSIENDTXXSD1290 DT14 - MEP Shop
Drawings Review & Approval for ICC Building
Project: BLR3UP Activity: DSIENDTXXSD1300 DT02 - MEP Shop
Drawings Review & Approval for Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSIENDTXXSD1330 DT03 - MEP Shop
Drawings Review & Approval for Heavy Maintenance
Project: BLR3UP Activity: DSIENSYXXDS1040 Get - SY08 -
Design Report - Receipt of Co-ordinated MEP Design Report for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXDS1050 Get - SY04 -
Design Report - Receipt of Co-ordinated MEP Design Report for Civil & Trackwork
Maintenance
Project: BLR3UP Activity: DSIENSYXXDS1080 Get - SY09 -
Design Report - Receipt of Co-ordinated MEP Design Report for Oil Supply
Project: BLR3UP Activity: DSIENSYXXDS1120 Get - SY17 -
Design Report - Receipt of Co-ordinated MEP Design Report for Security Building
Project: BLR3UP Activity: DSIENSYXXDS1140 Get - SY09 -
Design Model - Receipt of Co-ordinated MEP Design Model for Oil Supply
Project: BLR3UP Activity: DSIENSYXXDS1180 Get - SY08 -
Design Model - Receipt of Co-ordinated MEP Design Model for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXDS1190 Get - SY04 -
Design Model - Receipt of Co-ordinated MEP Design Model for Civil & Trackwork
Maintenance
Project: BLR3UP Activity: DSIENSYXXDS1250 Get - SY17 -
Design Model - Receipt of Co-ordinated MEP Design Model for Security Building
Project: BLR3UP Activity: DSIENSYXXDS2010 SY05 - MEP Design
review for ECC Building
Project: BLR3UP Activity: DSIENSYXXDS2040 SY08 - MEP Design
review for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXDS2050 SY04 - MEP Design
review for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENSYXXDS2080 SY09 - MEP Design
review for Oil Supply
Project: BLR3UP Activity: DSIENSYXXDS2120 SY17 - MEP Design
review for Security Building
Project: BLR3UP Activity: DSIENSYXXDS2140 Get - SY05 -
Receipt of Approved Design and Model for the ECC Building
Project: BLR3UP Activity: DSIENSYXXDS2150 Get - SY00 -
Receipt of Approved Design and Model for the External Works
Project: BLR3UP Activity: DSIENSYXXDS2190 Get - SY14 -
Receipt of Approved Design and Model for the Wheel, Brake Pad and Current Collector
Shoe Diagnostic
Project: BLR3UP Activity: DSIENSYXXDS2200 Get - SY13 -
Receipt of Approved Design and Model for the Automatic Train Set Wash
Project: BLR3UP Activity: DSIENSYXXDS2210 Get - SY09 -
Receipt of Approved Design and Model for the Oil Supply
Project: BLR3UP Activity: DSIENSYXXDS2220 Get - SY07 -
Receipt of Approved Design and Model for the Potable Water, Fire Water & Sewerage
Project: BLR3UP Activity: DSIENSYXXDS2240 Get - SY10 -
Receipt of Approved Design and Model for the Chilled Water Plant
Project: BLR3UP Activity: DSIENSYXXDS2250 Get - SY17 -
Receipt of Approved Design and Model for the Security Building
Project: BLR3UP Activity: DSIENSYXXSD1000 SY01 - MEP Shop
Drawings Submission for Stabling Hall
Project: BLR3UP Activity: DSIENSYXXSD1010 SY05 - MEP Shop
Drawings Submission for ECC Building
Project: BLR3UP Activity: DSIENSYXXSD1020 SY00- MEP Shop
Drawings Submission for External Works
Project: BLR3UP Activity: DSIENSYXXSD1030 SY02 - MEP Shop
Drawings Submission for Light Maintenance & Corrective Maintenance Workshop
Project: BLR3UP Activity: DSIENSYXXSD1040 SY08 - MEP Shop
Drawings Submission for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXSD1050 SY04 - MEP Shop
Drawings Submission for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENSYXXSD1060 SY14 - MEP Shop
Drawings Submission for Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSIENSYXXSD1070 SY13 - MEP Shop
Drawings Submission for Automatic Train Set Wash
Project: BLR3UP Activity: DSIENSYXXSD1080 SY09 - MEP Shop
Drawings Submission for Oil Supply
Project: BLR3UP Activity: DSIENSYXXSD1090 SY07 - MEP Shop
Drawings Submission for Potable Water, Fire Water & Sewerage
Project: BLR3UP Activity: DSIENSYXXSD1100 SY12 - MEP Shop
Drawings Submission for Waste Disposal
Project: BLR3UP Activity: DSIENSYXXSD1110 SY10 - MEP Shop
Drawings Submission for Chilled Water Plant
Project: BLR3UP Activity: DSIENSYXXSD1120 SY17 - MEP Shop
Drawings Submission for Security Building
Project: BLR3UP Activity: DSIENSYXXSD1130 SY14 - MEP Shop
Drawings Review & Approval for Wheel, Brake Pad and Current Collector Shoe
Diagnostic
Project: BLR3UP Activity: DSIENSYXXSD1140 SY13 - MEP Shop
Drawings Review & Approval for Automatic Train Set Wash
Project: BLR3UP Activity: DSIENSYXXSD1150 SY09 - MEP Shop
Drawings Review & Approval for Oil Supply
Project: BLR3UP Activity: DSIENSYXXSD1160 SY07 - MEP Shop
Drawings Review & Approval for Potable Water, Fire Water & Sewerage
Project: BLR3UP Activity: DSIENSYXXSD1170 SY12 - MEP Shop
Drawings Review & Approval for Waste Disposal
Project: BLR3UP Activity: DSIENSYXXSD1180 SY17 - MEP Shop
Drawings Review & Approval for Security Building
Project: BLR3UP Activity: DSIENSYXXSD1190 SY08 - MEP Shop
Drawings Review & Approval for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXSD1200 SY10 - MEP Shop
Drawings Review & Approval for Chilled Water Plant
Project: BLR3UP Activity: DSIENSYXXSD1210 SY05 - MEP Shop
Drawings Review & Approval for ECC Building
Project: BLR3UP Activity: DSIENSYXXSD1220 SY02 - MEP Shop
Drawings Review & Approval for Light Maintenance & Corrective Maintenance Workshop
Project: BLR3UP Activity: DSIENSYXXSD1230 SY04 - MEP Shop
Drawings Review & Approval for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENSYXXSD1240 SY01 - MEP Shop
Drawings Review & Approval for Stabling Hall
Project: BLR3UP Activity: DSIENSYXXSD1250 SY00 - MEP Shop
Drawings Review & Approval for External Works
Project: BLR3UP Activity: DSIPRDTXXAC1320 Split AC Unit -
Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1400 Louvers - Approval
of technical submittal
Project: BLR3UP Activity: DSIPRDTXXAC1620 Split AC Unit -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1700 Louvers - Issue PO
/ Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1720 Flexible Duct
Connections - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1780 Aluminium Cladding
for Chilled water pipes & Ducts - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXAC1920 Split AC Unit -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXAC2000 Louvers -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXAC2020 Flexible Duct
Connections - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXAC2080 Aluminium Cladding
for Chilled water pipes & Ducts - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXAC2120 Chilled Water
Pumps - Manufacturing
Project: BLR3UP Activity: DSIPRDTXXAC2180 Chilled Water
Valves - Manufacturing
Project: BLR3UP Activity: DSIPRDTXXAC2200 Air Separator -
Delivery
Project: BLR3UP Activity: DSIPRDTXXAC2240 Chilled Water
Pumps - Delivery
Project: BLR3UP Activity: DSIPRDTXXAC2260 Chilled Water
Valves - Delivery
Project: BLR3UP Activity: DSIPRDTXXAL1000 Get - Design to
proceed with Submittals
Project: BLR3UP Activity: DSIPRDTXXEL1110 Control cables -
Submission of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1380 Lighting Control
System - Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1460 Control cables -
Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXEL1730 Lighting Control
System - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL1810 Control cables -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXEL2060 BMS System -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2080 Lighting Control
System - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2090 Street Lighting -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2120 Isolator /
Stoplock - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2160 Control cables -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2170 Fire stopping
materials - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2260 Emergency exit
light signs - Manufacturing
Project: BLR3UP Activity: DSIPRDTXXEL2270 Wiring accessories
- Manufacturing
Project: BLR3UP Activity: DSIPRDTXXEL2350 LV Termination -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2420 Wiring accessories
- Delivery
Project: BLR3UP Activity: DSIPRDTXXEL2440 Emergency exit
light signs - Delivery
Project: BLR3UP Activity: DSIPRDTXXPL1280 Electric Water
Heaters - Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1300 Water meters -
Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1340 Sanitary wares -
Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1380 Plumbing Valves -
Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1420 Water Supply Pipe
Insulation - Approval of technical submittal
Project: BLR3UP Activity: DSIPRDTXXPL1540 Electric Water
Heaters - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1560 Water meters -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1600 Sanitary wares -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1640 Plumbing Valves -
Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1680 Water Supply Pipe
Insulation - Issue PO / Establish LC
Project: BLR3UP Activity: DSIPRDTXXPL1800 Electric Water
Heaters - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL1820 Water meters -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL1840 Plumbing Pumps -
Manufacturing
Project: BLR3UP Activity: DSIPRDTXXPL1850 Solar water
heating system - Manufacturing
Project: BLR3UP Activity: DSIPRDTXXPL1860 Sanitary wares -
Manufacturing
Project: BLR3UP Activity: DSIPRDTXXPL1890 Fire Pumps -
Manufacturing
Project: BLR3UP Activity: DSIPRDTXXPL1900 Plumbing Valves -
Manufacturing
Project: BLR3UP Activity: DSIPRDTXXPL1910 Fire Valves -
Manufacturing
Project: BLR3UP Activity: DSIPRDTXXPL1940 Water Supply Pipe
Insulation - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL1970 Fire Hose Cabinets
- Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL1980 Fire
Extinguisher / Blanket - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL1990 Zone Control
Valves - Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2020 Breaching inlets -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2030 Fuel System -
Manufacturing & Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2040 Fire Valves -
Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2060 Plumbing Valves -
Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2070 Plumbing Pumps -
Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2080 Solar water
heating system - Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2090 Sanitary wares -
Delivery
Project: BLR3UP Activity: DSIPRDTXXPL2110 Fire Pumps -
Delivery
Project: BLR3UP Activity: DSITCDTXXSW1010 DT - T&C
Completion at all locations
Project: BLR3UP Activity: DSITCSYXXSW1010 SY - Completion of
T&C at all locations

Activities with unsatisfied constraints..........................114


Project: BLR3UP Activity: DSICNDT11GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICNDT21GN1000 Get - Civil
Interface - Access for MEP Works
Project: BLR3UP Activity: DSICTDTXXMS1190 202 - MEP Works
for the HPA
Project: BLR3UP Activity: DSICTDTXXMS1200 189 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1220 203 - MEP T&C for
the HPA
Project: BLR3UP Activity: DSICTDTXXMS1240 181 - MEP Works
for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1260 197 - MEP Works
for the Unloading Area
Project: BLR3UP Activity: DSICTDTXXMS1300 190 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1360 178 - MEP Works
for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1370 105 - MEP Works
for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1380 198 - MEP T&C for
the Unloading Area
Project: BLR3UP Activity: DSICTDTXXMS1400 145 - MEP Works
for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1420 146 - MEP T&C for
the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1450 191 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1460 179 - MEP T&C for
the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1470 106 - MEP T&C for
the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1510 204 - MEP Works
for the DPA
Project: BLR3UP Activity: DSICTDTXXMS1520 209 - MEP Works
for the GCA
Project: BLR3UP Activity: DSICTDTXXMS1530 148 - MEP Works
for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS1540 182 - MEP T&C for
the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1550 122 - MEP Works
for the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1560 123 - MEP T&C for
the Wheel, Brake Pad and Current Collector Shoe Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1570 147 - Inspection &
Approval (building only) for the Stabling Hall Building
Project: BLR3UP Activity: DSICTDTXXMS1610 180 - Inspection &
Approval (building only) for the SPS and Back up Area
Project: BLR3UP Activity: DSICTDTXXMS1640 88 - MEP Works in
the Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS1720 205 - MEP T&C for
the DPA
Project: BLR3UP Activity: DSICTDTXXMS1730 210 - MEP T&C for
the GCA
Project: BLR3UP Activity: DSICTDTXXMS1740 107 - Inspection &
Approval (building only) for the Traction Power Supply
Project: BLR3UP Activity: DSICTDTXXMS1760 195 - MEP Works
for the LMS Area
Project: BLR3UP Activity: DSICTDTXXMS1770 99 - MEP Works for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS1780 124 - Inspection &
Approval (building only) for the Wheel, Brake Pad and Current Collector Shoe
Diagnostic
Project: BLR3UP Activity: DSICTDTXXMS1790 172 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1820 111 - MEP Works
for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS1830 183 - Inspection &
Approval (building only) for the Admin and ICC
Project: BLR3UP Activity: DSICTDTXXMS1840 184 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1850 185 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1870 187 - MEP Works
for the WDA
Project: BLR3UP Activity: DSICTDTXXMS1880 199 - MEP Works
for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS1890 211 - Inspection &
Approval (building only) for the GCA
Project: BLR3UP Activity: DSICTDTXXMS1900 133 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1910 134 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS1920 91 - MEP Works for
the the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS1940 94 - MEP Works for
the Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS1950 119 - MEP Works
for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1960 120 - MEP T&C for
the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS1970 196 - MEP T&C for
the LMS Area
Project: BLR3UP Activity: DSICTDTXXMS1980 100 - MEP T&C for
the Admin & ECC Building
Project: BLR3UP Activity: DSICTDTXXMS2010 157 - MEP Works
for the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2020 158 - MEP T&C for
the Diesel Fuel Tank
Project: BLR3UP Activity: DSICTDTXXMS2040 149 - MEP T&C for
the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2050 89 - MEP T&C for
the MEP works for Stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2080 135 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2090 186 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2110 154 - MEP Works
for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2130 206 - MEP Works
for the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2140 212 - MEP Works
for the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2150 121 - Inspection &
Approval (building only) for the Automatic Train Set Wash
Project: BLR3UP Activity: DSICTDTXXMS2190 96 - MEP Works for
the Civil and TM Area
Project: BLR3UP Activity: DSICTDTXXMS2200 97 - MEP T&C for
the Civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2210 101 - Inspection &
Approval (building only) for the Admin & ECC building
Project: BLR3UP Activity: DSICTDTXXMS2220 173 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2260 108 - MEP Works
for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2270 109 - MEP T&C for
the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2280 90 - Inspection &
Approval (building only) for the stabling Hall
Project: BLR3UP Activity: DSICTDTXXMS2290 188 - MEP T&C for
the WDA
Project: BLR3UP Activity: DSICTDTXXMS2300 192 - MEP Works
for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2320 92 - MEP T&C for
the MEP works for the Light Maintenance
Project: BLR3UP Activity: DSICTDTXXMS2330 95 - MEP T&C for
the MEP works for Corrective Maintenance Workshop
Project: BLR3UP Activity: DSICTDTXXMS2340 112 - MEP T&C for
the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2570 200 - MEP T&C for
the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2590 207 - MEP T&C for
the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2600 213 - MEP T&C for
the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2620 102 - MEP Works
for the potable water & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2630 103 - MEP T&C for
the Potable water &Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2640 116 - MEP Works
for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2680 98 - Inspection &
Approval (building only) for the civil & TM Area
Project: BLR3UP Activity: DSICTDTXXMS2700 110 - Inspection &
Approval (building only) for the Oil Supply Building
Project: BLR3UP Activity: DSICTDTXXMS2710 151 - MEP Works
for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2730 117 - MEP T&C for
the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2740 189 - Inspection &
Approval (building only) for the WDA
Project: BLR3UP Activity: DSICTDTXXMS2750 201 - Inspection &
Approval (building only) for the Chilled Water Plant (Station)
Project: BLR3UP Activity: DSICTDTXXMS2760 208 - Inspection &
Approval (building only) for the Test Track Inspecction Shed
Project: BLR3UP Activity: DSICTDTXXMS2770 214 - Inspection &
Approval (building only) for the Oil Supply Facility
Project: BLR3UP Activity: DSICTDTXXMS2780 174 -Inspection &
Approval (building only) for the Chilled Water Plant 1
Project: BLR3UP Activity: DSICTDTXXMS2790 155 - MEP T&C for
the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS2800 93 - Inspection &
Approval (building only) for the Light Maintenance & Corrective Maintenance
Workshop
Project: BLR3UP Activity: DSICTDTXXMS2810 104 - Inspection &
Approval (building only) for the PW & Fire Water Tank
Project: BLR3UP Activity: DSICTDTXXMS2820 118 - Inspection &
Approval (building only) for the WaDA
Project: BLR3UP Activity: DSICTDTXXMS2830 193 - MEP T&C for
the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS2840 169 - MEP Works
for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2850 170 - MEP T&C for
the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2860 160 - MEP Works
for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2870 161 - MEP T&C for
the Security Building
Project: BLR3UP Activity: DSICTDTXXMS2880 163 - MEP Works
for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2890 164 - MEP T&C for
the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS2900 166 - MEP Works
for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2910 167 - MEP T&C for
the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS2920 150 - Inspection &
Approval (building only) for the Light Maintenance & Under Floor Wheel Lathe
Project: BLR3UP Activity: DSICTDTXXMS2930 152 - MEP T&C for
the HM Building
Project: BLR3UP Activity: DSICTDTXXMS2940 171 - Inspection &
Approval (building only) for the Waste Disposal area
Project: BLR3UP Activity: DSICTDTXXMS2970 162 - Inspection &
Approval (building only) for the Security Building
Project: BLR3UP Activity: DSICTDTXXMS3000 165 - Inspection &
Approval (building only) for the Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSICTDTXXMS3010 194 - Inspection &
Approval (building only) for the Chilled Water Plant 2
Project: BLR3UP Activity: DSICTDTXXMS3020 153 - Inspection &
Approval (building only) for the HM Building
Project: BLR3UP Activity: DSICTDTXXMS3030 85 - MEP Works in
the Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3040 168 - Inspection &
Approval (building only) for the PW, FW and pump station
Project: BLR3UP Activity: DSICTDTXXMS3060 86 - Prelim T&C
for the MEP works in Stabling Yard Area
Project: BLR3UP Activity: DSICTDTXXMS3070 142 - MEP Works
for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3100 87 - Submit
Inspection & Approval to Authorities (civil defence/Elec/Water/Municipality)
Project: BLR3UP Activity: DSICTDTXXMS3130 143 - MEP T&C for
the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3140 156 - Inspection &
Approval (building only) for the Civil and TM Building
Project: BLR3UP Activity: DSICTDTXXMS3150 Completion of
Stabling Yard Works
Project: BLR3UP Activity: DSICTDTXXMS3160 144 - Inspection &
Approval (building only) for the Depot area
Project: BLR3UP Activity: DSICTDTXXMS3190 Completion of
Depot Works

Activities with unsatisfied relationships........................18


Project: BLR3UP Activity: DSICNDT00FF1120 First Fix -
Pipework
Project: BLR3UP Activity: DSICNDT01AC1090 Final Fix -
Grilles and Diffusers, Louvers
Project: BLR3UP Activity: DSIENDTXXSD1010 DT14 - MEP Shop
Drawings Submission for ICC Building
Project: BLR3UP Activity: DSIENDTXXSD1050 DT17 - MEP Shop
Drawings Submission for Traction Power Supply
Project: BLR3UP Activity: DSIENDTXXSD1060 DT04 - MEP Shop
Drawings Submission for Civil & Trackwork Maintenance
Project: BLR3UP Activity: DSIENDTXXSD1070 DT16 - MEP Shop
Drawings Submission for Wheel Diagnostic
Project: BLR3UP Activity: DSIENDTXXSD1080 DT15 - MEP Shop
Drawings Submission for Automatic Train Set Wash
Project: BLR3UP Activity: DSIENDTXXSD1090 DT07 - MEP Shop
Drawings Submission for Storage Warehouse and Oil Hazard Material Store
Project: BLR3UP Activity: DSIENDTXXSD1100 DT09 - MEP Shop
Drawings Submission for Potable Water, Fire Water & Swerage
Project: BLR3UP Activity: DSIENDTXXSD1110 DT10 - MEP Shop
Drawings Submission for Waste Disposal
Project: BLR3UP Activity: DSIENDTXXSD1120 DT11 - MEP Shop
Drawings Submission for Chilled Water Plant - 1
Project: BLR3UP Activity: DSIENDTXXSD1130 DT18 - MEP Shop
Drawings Submission for Chilled Water Plant - 2
Project: BLR3UP Activity: DSIENDTXXSD1140 DT21 - MEP Shop
Drawings Submission for Chilled Water Plant for Ras Abu Fontas
Project: BLR3UP Activity: DSIENDTXXSD1160 DT06 - MEP Shop
Drawings Submission for Security Building
Project: BLR3UP Activity: DSIENSYXXSD1000 SY01 - MEP Shop
Drawings Submission for Stabling Hall
Project: BLR3UP Activity: DSIENSYXXSD1030 SY02 - MEP Shop
Drawings Submission for Light Maintenance & Corrective Maintenance Workshop
Project: BLR3UP Activity: DSIENSYXXSD1040 SY08 - MEP Shop
Drawings Submission for Traction Power Supply
Project: BLR3UP Activity: DSIENSYXXSD1050 SY04 - MEP Shop
Drawings Submission for Civil & Trackwork Maintenance

Activities with external dates...................................0