You are on page 1of 7

Maximum Load

200 kg

2.50 m

2.
00
m m
00
2.

No Inspected By Date Checked By Date Engineer Approved Method


Typical Independent Scaffolding Work For
1 Firma Maskup Visual Lifting 200 Kg
Other
Sheet Rev
Reference BCI.022.18 1 of 1
CALCULATION SCAFFOLDING

Job Information
Job Name = Independent Scaffolding Work for Lifting Load 200 Kg

Client = PT Pertamina Hulu Mahakam


Engineer = Firma
Approved = Maskub
Date Prepared = 6/21/2018
Location = SPU Area

Data Input
Section Properties
2
Yield Strength ( fy ) = 23.5 kgf/mm
Outside Diameter = 48.26 mm
Thickness = 2.8 mm (-10% wall thickness )
3 𝜋 𝐷 4 −𝑑 4
Modulus Section (W) = 4289 mm W= 32 𝐷
Loading =
Dead Load
Selfweight Y-1.25
Live Load
Lifting Load = 200 kgf/m
Transversal Load X = 20 kgf/m
Transversal Load Z = 20 kgf/m
Wind Load
Wind Speed Load X = 15 m/s
Wind Speed Load Z = 15 m/s
Combination Load Case
1.1 DL + 1.0 LL + 1.0 Wx
1.1 DL + 1.0 LL + 1.0 Wz
DATA PROCESSING
Using Staad Pro With Current code API

REPORT
Stress Check
Momen Inner Force (Mx) = 12914 kgfmm Momen Maximum direct X at Beam 55
Utility Check (σ) = M/W
2
= 3.011 < 23,5 kgf/mm
Allowable ratio = 12.813% < 1 ( OK )

Momen Inner Force (My) = 12889 kgfmm Momen Maximum direct Y at Beam 10
Utility Check (σ) = M/W
2
= 3.005 < 23,5 kgf/mm
Allowable ratio = 13% < 1 ( OK )

Momen Inner Force (Mz) = 45542 kgfmm Momen Maximum direct Z at Beam 66 & 67
Utility Check (σ) = M/W
2
= 10.618 < 23,5 kgf/mm
Allowable ratio = 45% < 1 ( OK )

Displacement Check
Allowable displacement Vertikal = 20 mm ( L/100 )
Max Displacement = 8.109 mm Displacement Maximum direct Y
at Beam 66 & 67
Max Displacement < Allowable displacement
8.109 < 20 ( OK )

APPENDIX
Job No Sheet No Rev
BCI.022.18 1 0.1

Part
Software licensed to
Job Title Independent Scaffolding Ref

By Firma Date21-Jun-18 Chd Maskup


Client PT. Pertamina Hulu Mahakam File Lifting Load 200.std Date/Time 21-Jun-2018 09:09

Job Information
Engineer Checked Approved

Name: Firma Maskup Maskup


Date: 21-Jun-18 21-Jun-18 21-Jun-18

Comments
Lifting Load 200 Kg

Structure Type SPACE FRAME

Number of Nodes 29 Highest Node 43


Number of Elements 44 Highest Beam 73

Number of Basic Load Cases -2


Number of Combination Load Cases 2

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 DEAD
Primary 2 LIVE
Primary 3 WIND X
Primary 4 WIND Z
Combination 5 1.1DL + 1 LL + 1 Wx
Combination 6 1.1DL + 1 LL + 1 Wz

2.50m

Y 2.00m
X
Z 2.00m Load 5

Structure Dimention, Beam Release And Support Reaction

Print Time/Date: 21/06/2018 09:34 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 4
Job No Sheet No Rev
BCI.022.18 3 0.1

Part
Software licensed to
Job Title Independent Scaffolding Ref

By Firma Date21-Jun-18 Chd Maskup


Client PT. Pertamina Hulu Mahakam File Lifting Load 200.std Date/Time 21-Jun-2018 09:09

X = -20.4 kg
Y = 94.6 kg
Z = -3.4 kg
MX = FREE
X = 10.4 kg MY = FREE
Y = 69.6 kg MZ = FREE
Z = -3.4 kg
MX = FREE
MY = FREE
MZ = FREE X = -23.8 kg
Y = 124.6 kg
Z = -10.4 kg
MX = FREE
MY = FREE
MZ = FREE
X = 13.8 kg
Y = 99.6 kg
Z = -10.4 kg
Y MX = FREE
X
Z MY = FREE Load 6
MZ = FREE

Support Reaction

Max: -45.542 kg-m

Y
X Load 6 : Bending Z
Z Moment - kg-m

Whole Structure Mz 200kg-m:1m 6 1.1DL + 1 LL + 1 Wz

Max: -12.889 kg-m

Y
X Load 6 : Bending Y
Z Moment - kg-m

Whole Structure My 25kg-m:1m 6 1.1DL + 1 LL + 1 Wz

Print Time/Date: 21/06/2018 09:34 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 4
Job No Sheet No Rev
BCI.022.18 2 0.1

Part
Software licensed to
Job Title Independent Scaffolding Ref

By Firma Date21-Jun-18 Chd Maskup


Client PT. Pertamina Hulu Mahakam File Lifting Load 200.std Date/Time 21-Jun-2018 09:09

-200.0 kg

20.0 kg
20.0 kg

0.472 kg/m

0.472 kg/m

0.472 kg/m

0.472 kg/m

0.472 kg/m 0.472 kg/m

0.472 kg/m
Y
X
Z
0.472 kg/m
Load 5
0.472 kg/m

Load Combination 1

0.472kg/m
0.472
0.472 kg/m
kg/m -200.0 kg

0.472 kg/m

20.0 kg
20.0 kg

0.472 kg/m

0.472 kg/m
0.472 kg/m

0.472 kg/m

0.472 kg/m
0.472 kg/m

0.472 kg/m

0.472 kg/m

Y
X
Z Load 6

Load Combination 2

Max: 8.109 mm

Y
X Load 6 : Displacement
Z Displacement - mm

Whole Structure Displacements 30mm:1m 6 1.1DL + 1 LL + 1 Wz

Print Time/Date: 21/06/2018 09:34 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 4
Job No Sheet No Rev
BCI.022.18 4 0.1

Part
Software licensed to
Job Title Independent Scaffolding Ref

By Firma Date21-Jun-18 Chd Maskup


Client PT. Pertamina Hulu Mahakam File Lifting Load 200.std Date/Time 21-Jun-2018 09:09

Beam End Force Summary


The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest
tension value for an beam.
Axial Shear Torsion Bending
Beam Node L/C Fx Fy Fz Mx My Mz
(kg) (kg) (kg) (kg-m) (kg-m) (kg-m)
Max Fx 44 25 6:1.1DL + 1 LL 124.6 23.8 -10.4 -0.000 0.000 0.000
Min Fx 17 6 6:1.1DL + 1 LL -13.3 4.3 -0.0 0.000 0.000 0.827
Max Fy 72 39 5:1.1DL + 1 LL -10.0 100.1 -10.0 -0.000 0.015 0.064
Min Fy 73 42 6:1.1DL + 1 LL 10.0 -100.1 10.0 -0.000 0.015 0.066
Max Fz 73 43 2:LIVE 10.0 -100.0 10.0 -0.000 -0.226 -2.361
Min Fz 7 6 6:1.1DL + 1 LL 27.0 -4.7 -13.2 0.000 3.323 -2.207
Max Mx 55 10 6:1.1DL + 1 LL 1.6 2.4 -5.5 12.914 0.000 0.944
Min Mx 69 41 6:1.1DL + 1 LL -0.7 1.4 5.5 -12.914 -5.322 -0.493
Max My 10 8 6:1.1DL + 1 LL 12.2 -1.6 -12.1 0.000 5.265 -1.475
Min My 10 10 6:1.1DL + 1 LL 6.3 -1.6 -12.1 0.000 -12.889 0.940
Max Mz 66 38 6:1.1DL + 1 LL 5.5 60.4 -5.0 -0.034 0.000 12.915
Min Mz 66 39 5:1.1DL + 1 LL 5.0 56.3 -5.0 -0.033 -4.992 -45.719

Print Time/Date: 21/06/2018 09:34 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 4 of 4

You might also like