A PROCUREMENT & DISPOSAL UNIT
KCCA
The Senior Project Engineer
Givtec Attica Lid
P 0 Box 8520
KAMPALA
26™ October 2017
Dear Sir,
RE: CONFIRMATION OF ARITHIMETIC ERRORS IN YOUR BID.
Reference is made to your bid for the construction of a wall fence with
‘hard burt clay pompeii grill (700LM) at Kisaasi Primary School.
We inform you that you bid contained the following errors:
Preliminaries [tem A
2 Tem | Items 8, €,6, |, and S were introduced by
Item6_| bidder but not provided for in original Bid
tem Document, thus not considered.
em S
Preliminary total taken to Grand sumimary Is
171,864,000/= not 250,974,242/=
This is therefore to request you confirm and accept the corrections
made which have changed the bid price from UGX 1,209,005,500/=
to UGX1,110,987,911/=V.AT inclusive.
Please provide the response not later than 2:00 pm, 30° October
2017.
Esuku David
Chairman Evaluation Committee.
ene
iti
Cone
Cee un en
emer seercattsA PROCUREMENT & DISPOSAL UNIT
KCCA
Vinee toe
The Managing Director
Mobi-Tex Engineering Company Works Ltd
P.O Box 29735
KAMPALA
26™ October 2017
Dear Sir,
RE: CONFIRMATION OF ARITHMETIC ERRORS IN YOUR BID.
Reference is made to your bid for the Construction of a wall fence
with hard burnt clay pompeii grill (700LM) at Kisaasi Primary School
We inform you that you bid contained the following errors:
Computation error I 575,000/= not
Main Bog. | 1b _ | 1,050,000/
Sub-total for site clearance (item i) is 6,575,000/= not
6,050,000/=
Ttem_| Item A was introduced by bidder but not provided for in
Preliminaries| A | original Bid Document, thus not conside-ed.
Item | Item M was introduced by bidder but nct provided for in
M__| original Bid Document, thus not conside’ed.
Preliminary total taken to Grand summary is
116,450,000/= not 21,450,000/=
‘This Is therefore to request you confirm and accept the corrections
‘made which have changed the bid price from UGX 346, 364,928/= to
UGX 340,820,403 /= V.A.T Inclusive.
Please provide the response not later than 2:00 pm, 30" October
2017.
Esuku David
Chairman Evaluation Committee.
en
ie dora
Tomine
eer nee
ercenemete ccsi PROCUREMENT & DISPOSAL UNIT
KCCA
‘The Managing Director
‘Alma Connexious Uganda Ltd
P.O Box 5095
Kampala
26™ October 2017
Dear Sir,
RE: CONFIRMATION OF ARITHIMETIC ERRORS IN YOUR BID.
Reference is made to your bid for the construction of a wall fence
with hard burnt clay pompeii grill (700LM) at Kisaasi Primary Schoo!
We inform you that your bid contained the following errors:
wilt
ITEM __| ERROR IDENTIFIED.
Main ‘Computation error 10°50,000 = 500,000/= not
Bog. _|1.c | 300,000/= -
Sub total for site clearance (Item 1) 5,200,000 not
5,000,000/=
“Summation Error, Sub-total for plinth walling
2 108,253,000 not 101,533,000/=
Grand total amounts to 363,656,412/= net
355,082,593/=
This is therefore to request you confirm and accept the corrections
made which have changed the bid price from UGX 355,082,593/=
to UGX 363,656,412/= V.AT inclusive
Please provide the response not later than 2:00 pm, 30 October
2017.
'suku David
Chairman Evaluation Committee. See