You are on page 1of 11

SULIT

UNIVERSITI MALAYSIA PERLIS


Peperiksaan Semester Pertama
Sidang Akademik 2012/2013

Disember/Januari 2012

EET414 – Rekabentuk Pencawang [Substation Design]


Masa : 3 jam

Please make sure that this question paper has ELEVEN (11) printed pages including this front
page before you start the examination.
[Sila pastikan kertas soalan ini mengandungi SEBELAS (11) muka surat yang bercetak termasuk muka hadapan
sebelum anda memulakan peperiksaan ini.]

This question paper has SIX (6) questions. Answer any FIVE (5) questions only. Each question
contributes 20 marks.
[Kertas soalan ini mengandungi ENAM (6) soalan. Jawab mana-mana LIMA (5) soalan sahaja. Markah bagi tiap-
tiap soalan adalah 20 markah.]

SULIT
SULIT
(EET414)
-2-

Question 1
[Soalan 1]

(a) Discuss FIVE (5) factors considered in substation design.


[Bincangkan LIMA (5) faktor yang dipertimbangkan dalam reka bentuk pencawang.]

(10 marks / markah)

(b) A substation transformer is supplied by two identical generators which connected in


parallel. To fulfill requirement protection systems, the transformer is completed with two
circuit breakers at primary side (CB3) and secondary side (CB4) as shown in Figure 1.
The data for generator and transformer is tabulated in Table 1.
[Satu pengubah pencawang dibekal oleh dua penjana serbasama yang mana terhubung secara selari.
Untuk memenuhi syarat sistem perlindungan, pengubah dilengkapi dengan dua pemutus litar pada sisi
primer (CB3) dan sisi sekunder (CB4 ) ditunjukkan dalam Rajah 1. Data-data penjana dan pengubah
seperti dalam Jadual 1.]

Table 1
[Jadual 1]

Generator: 50 MVA, 3 phase, 20 kV, 50 Hz, Xd” = 0.25 p.u; Xd‟= 0.15 p.u and X0 = 0.1 p.u

Transformer: 80 MVA, 3 phase, 20/200 kV, X = 0.16 p.u.

CB-1
G

CB-3 T-1
CB-4
G
CB-2 Bus-2

Bus-1

Figure 1
[Rajah 1]

At the circuit breaker 4 (CB4), calculate rating making current (kA) and breaking
capacity (MVA).
[Pada pemutus litar 4 (CB4), kirakan kadaran arus sambungan (kA) dan kemuatan pemutus (MVA).]

(10 marks / markah)

….3/-

SULIT
SULIT
(EET414)
-3-

Question 2
[Soalan 2]

(a) When designing the layout of high voltage primary equipment in an Air Insulated
Substation (AIS), the design engineer has to consider the clearance and creepage distance
of the equipment. Discuss what are the clearances prescribe by the relevant standards.
[Apabila merekabentuk susun atur peralatan voltan tinggi utama di Pencawang Penebat Udara, seorang
Jurutera Rekabentuk perlu mempertimbangkan kelegaan dan jarak rayap peralatan tersebut. Bincangkan
apakah kelegaan-kelegaan yang telah ditetapkan oleh piawaian yang relevan.]
(5 marks / markah)

(b) The constrution of a rigid busbar is normally made up of aluminium tube to reduce skin
effect. Explain what is skin effect?
[Di dalam pembinaan basbar tegar biasanya diperbuat dari tiub aluminium untuk mengurangkan kesan
kulit. Terangkan apakah itu kesan kulit?]
(5 markah / markah)

(c) Describe the phenomena “Vibration Attenuation or Aeolian vibration” that is present in
the busbar. Discuss the remedy to reduce/minimise this occurrence.
[Jelaskan fenomena "Getaran Atenuasi atau Getaran Aeolian" yang wujud di palang bas. Bincangkan
remedi untuk mengurangkan /meminimumkan kejadian ini.]
(10 marks / markah)

….4/-

SULIT
SULIT
(EET414)
-4-

Question 3
[Soalan 3]

The design data for ground grid model of a substation is given in Table 3:
[Data rekabentuk untuk model grid pembumian satu pencawang diberikan seperti Jadual 3:]

Table 3
[Jadual 3]

Parameter Value
Fault current occur 3180 A
Clearing time 0.5 sec
Available grounding area 100 x 100 m2
Soil resistivity 500 Ω-m
Crush rock resistivity at surface 2500 Ω-m
Conductor spacing in parallel 7m
Depth of grid conductor 0.5 m
Diameter conductor grid 10 mm
The thickness of the crushed rock surfacing 250 mm
Body resistance and weight body are respectively 1000 Ω and 70 kg

(a) Based on the data above, evaluate the design of the grid grounding system has fulfilled
the requirements according to Std. IEEE 80-2000? Give your reason.
[Berdasarkan data di atas, evaluasi rekabentuk sistem grid pembumian telah memenuhi syarat merujuk
kepada piawai IEEE 80-2000 ? Berikan alasan anda.]
(14 marks / markah)

(b) What will happen on mesh voltage and step voltage if the grid is beneath of 0.75 m
depth? Give your comment on design for safety.
[Apakah akan berlaku pada voltan jejaring dan voltan langkah, jika grid ditanam kedalam 0.75 m?
Berikan ulasan anda pada rekabentuk untuk keselamatan.]
(6 marks / markah)

….5/-

SULIT
SULIT
(EET414)
-5-

Question 4
[Soalan 4]

Two substation transformers identical in parallel are supplied by a generator. Circuit breakers are
installed at the sides of the transformer and the generator as in Figure 4. Parameters of generator
and transformer are given in Table 4a.
[Dua pengubah pencawang sama selari dibekal oleh satu penjana. Pemutus litar- pemutus litar dipasang pada ke
dua Sisi daripada pengubah dan penjana seperti dalam Rajah 4. Parameter-parameter untuk penjana dan
pengubah diberikan dalam Jadual 4.]

Table 4a
[Jadual 4a]

Generator : 25 MVA, 3-phase, 13.8 kV, 50 Hz, Xd” = 20%; Xd‟= 15% and X0 = 12%

Transformer : 10 MVA, 3-phase, 13.8/33 kV, X = 12%

Bus-1 Bus-2
T-1

CB-2 CB-3

G
CB-1
CT
CB-4 CB-5
T-2

Figure 4
[Rajah 4]

(a) Evaluate whether the current transformer CT used (for choosing use Figure Appendix)
will saturate if the current transformers have rating Class C200, 5P20 and burden Zb = 0.7
Ω for fault occur at bus-2.
[Evaluasi apakah pengubah arus CT yang digunakan (untuk pemilihan guna Rajah Lampiran) akan
menepu jika pengubah arus mempunyai kadaran Class C100, 5P20 dan beban Zb = 0.7 Ω untuk gangguan
terjadi pada palang-2.]
(6 marks/ markah)

….6/-

SULIT
SULIT
(EET414)
-6-

(b) An over current relay (OCR) is located at the high side of a three-phase substation
transformer T2 in Figure 4 with the characteristic of over current relay used as follow:
[Satu geganti arus lebih ditempatkan pada sisi voltan tinggi satu pengubah pencawang tiga-fasa T2 dalam
Rajah 4 dengan ciri-ciri geganti arus lebih yang digunakan seperti berikut:]

Available current taps: 0.5 to 12.5 A with a steps 0.5.


[Tap arus tersedia: 0.5 ke 12.5 A dengan langkah 0.5]

Available time dial setting TD : 0.1, 0.2, 0.3, ……1.0 (with a steps 0.1)
[Pengesetan dail masa tersedia TD: 0.1, 0.2, 0.3, ….1.0 dengan langkah 0.1]

The IEEE Standard relay operation characteristic of time current curve by the folowing
equation (1)
[Ciri-ciri operasi geganti piawai IEEE lengkung arus-masa mengikut persamaan (1)]

 A 
t  TD P  B  sec .........(1)
 M 1 
where constant A, B and p such as Table 4b.
[di mana pemala A,B and p seperti dalam jadual 4b]

Table 4b
[Jadual 4b]

A B p
Moderately inverse 0.0515 0.114 0.02

Very inverse 19.61 0.491 2.0

Extremely inverse 28.2 0.122 2.0

Calculate the operating time of the relay if time dial setting is 0.4 and the characteristic
used is very inverse. What will happens on the operating time of the relay if time dial
setting selected is 0.6.
[Kirakan masa operasi geganti jika masa dial pengesetan ialah 0.4 dan ciri-ciri geganti yang digunakan
adalah sangat songsang. Apa yang berlaku terhadap masa operasi geganti jika masa dial pengesetan ialah
0.6.]
(9 marks / markah)

….7/-

SULIT
SULIT
(EET414)
-7-

(c) Fixed angles is a one of the empirical design method used in protection system of
substation equipments caused by external faults such as direct lightning strokes. With the
aid of suitable diagram, discuss briefly how this method is used as a protection system to
the substation equipments.
[Sudut tetap adalah salah satu kaedah rekabentuk empirikal yang digunakan dalam sistem perlindungan
peralatan pencawang yang disebabkan oleh kerosakan luaran seperti sambar kilat terus. Dengan bantuan
gambarajah yang sesuai, bincangkan secara ringkas bagaimana kaedah ini digunakan sebagai sistem
perlindungan peralatan pencawang.]
(5 marks / markah)

….8/-

SULIT
SULIT
(EET414)
-8-

Question 5
[Soalan 5]

(a) Discuss briefly the perpendicular bisector rule in order to locate a new substation to as
many customer loads as possible and to determine an optimum substation service area.
[Bincangkan secara ringkas peraturan bisektor serenjang untuk menempatkan pencawang baru kepada
beban pelanggan sebanyak mungkin dan untuk menentukan kawasan perkhidmatan pencawang optimum.]
(5 marks / markah)

(b) Assume four square shaped distribution substation service areas as shown in Figure 5.
Substations are located at the center of each square. The service area for each substation
has one main and nine (9) laterals. Each substation is served by four three-phase four-
wire 7.62/13.2 kV grounded-wye. The primary feeder main is made of #2/0 copper
overhead conductors and the laterals are of #4 copper conductors. Each lateral serves
equal loading area. The K constant for main feeders and laterals are 0.0004 and 0.00095,
respectively. The feeder mains have maximum current rating 230 Amps. The load power
factor is 0.9 lagging, with an average value applicable for all loads and a 1000 KVA/mi2
uniformly distributed load density. Calculate the following:
[Anggap empat pencawang pengagihan berbentuk empat segi perkhidmatan kawasan seperti yang
ditunjukkan dalam Rajah 5. Pencawang-pencawang diletakkan di pusat pada setiap kawasan segiempat.
Kawasan perkhidmatan bagi setiap pencawang mempunyai satu sisi utama dan sembilan (9) sisi. Setiap
pencawang dilayani oleh empat penyuap tiga fasa empat wayar 7.62/13.2 kV wye-terbumikan. Penyuap
utama diperbuat daripada konduktor tembaga saluran atas #2/0 manakala sisi tepi daripada konduktor
tembaga #4. Setiap sisi tepi mempunyai kawasan pembebanan yang sama. Pemalar K untuk penyuap
utama dan sisi tepi masing-masing adalah 0.0004 dan 0.00095. Penyuap utama mempunyai kadaran arus
maksimum 230 Amps. Faktor kuasa beban adalah tertinggal 0.9 dengan nilai purata yang digunakan
untuk semua beban dan kepadatan beban 1000KVA/mi 2 teragihkan merata. Kira berikut:]

(i) substation saiz.


[saiz pencawang.]
(4 marks / markah)

(ii) spacing between two substations and percentage voltage drop from feed point to
the end of main.
[ruang di antara dua pencawang dan peratus kejatuhan voltan dari titik penyuap utama ke titik
hujung.]
(6 marks / markah)

(iii) percentage voltage drop by assume that the distribution substation service areas is
hexagon shaped. Comment on the result.
[peratus kejatuhan voltan dengan aggapan bahawa kawasan perkhidmatan pencawang
pengagihan berbentuk enam segi. Komen terhadap keputusan.]
(5 marks / markah)

….9/-

SULIT
SULIT
(EET414)
-9-

Substations

Figure 5
[Rajah 5]

….10/-

SULIT
SULIT
(EET414)
-10-

Question 6
[Soalan 6]

(a) A distribution substation is to be refurbished with a new battery charger configuration


comprising 110V Nickle cadmium battery and charger unit for 3 hour autonomy with the
following duties as shows in Table 6:
[Satu pencawang pengagihan akan diubahsuai dengan konfigurasi pengecas bateri baru yang terdiri
daripada 110V bateri Nikel Kadmium dan unit penngecas untuk 3 jam autonomi dengan tugas-tugas
seperti yang ditunjukkan dalam Jadual 6:]

Table 6
[Jadual 6]

No DC Load Watt/Unit Quantity Duration


1. Switchgear closing 15000 17 units 1 minute
2. Switchgear tripping 150 17 units 1 minute
3. Control and switchgear 40 15 units 3 hours
building emergency lighting
4. Indicator lamps 15 37 Units 3 hours
5. Trip circuit healthy 60 4 units 3 hours
6. Control panel transducers 230 1 set 3 hours
7. Relay panel components 270 1 set 3 hours

Based on the table, determine the number of cell is required if the minimum cell voltage
for Nickel Cadmium battery is 1.14V/cell and calculate the ampere capacity of battery
charger for 3 hours recharge if the continuous load is 1700 W.
[Berdasarkan jadual berikut, tentukan bilangan sel yang diperlukan jika voltan sel minimum bagi bateri
Nikel Kadmium ialah 1.14V/sel dan kirakan kapasiti ampere bagi pengecas bateri untuk mengecas semula
selama 3 jam jika beban berterusan ialah 1700W.]
(12 marks / markah)

(b) Differentiate between „Primary Injection Tests‟ and „Secondary Injection Tests‟ on
current transformer in testing and commissioning of distribution substation.
[Bezakan di antara ‘Ujian Suntikan Utama’ dan ‘Ujian Suntikan Kedua’ pada pengubah arus dalam
pengujian dan pentauliahan pencawang pengagihan.]
(8 marks / markah)

-ooOooo-

SULIT
SULIT
(EET414)
-11-

Appendix 1
[Lampiran 1]

Figure Appendix

SULIT

You might also like