You are on page 1of 1

Kick Control Guideline

In case of total losses, change over to drill water & continue drilling with drill water
treated with lime.
 Inform NTP / Co. Man in case of any tight pulls
 Run water well & keep the lagoon full [keep a watch on the lagoon level], mobilize
water tanks if required, in time [before tanks go empty].

 Pump & sweep hole with Hi-Vis pill 30 bbl every single down [30'] or in case of
severe torque & continue drilling with water.

 Pump 20 bbl 9.5 ppg mud cap in to the annulus [thru kill line] every 1/2 hr &
continue drilling.

 Follow the instructions from the DD regarding RPM, WOB, sliding rotation, survey
etc.

1. .

You might also like