PROJECT TITLE:Qibla lift station
DESIGN OF UNDERGROUND concret wetwell
CASE 1 : SOIL
-
Moment Earth Pressure
d 234.00 mm
d 244.00 mm
�_𝒖= (𝑴_𝒖^−)/
(𝒃𝒅^� ) 2.25
d 244.00 mm
Area of steel =0.003x b x h 900.00 mm 2
For one face 450.00 mm 2
No. of bar =( As/Abar) 3.98 Bar's
Space Between Two Bar's " S 251.20 mm
Provided " S " 250.00 mm
7) Base slab :
d 244.00 mm
Area of steel =0.0018x b x h 540.00 mm 2
No. of bar =( As/Abar) 4.78 Bar's
Provided " S " 209.33 mm
Made
AMY
Check
MMA
PROJECT TITLE:Qibla lift station
DESIGN OF UNDERGROUND concret wetwell
Made
AMY
Check
MMA
PROJECT TITLE:Qibla lift station
DESIGN OF UNDERGROUND concret wetwell
CASE 2 : WATER
d 244.00 mm
�_�= (�_�^−)/(��^� )
4.21
% of seel (ρ) 0.01
% of seel (ρ) minmum 0.00
Area of steel = ρ x b x h 3243.93 mm 2
No. of bar =( As/Abar) 28.70 Bars
Area of steel Provided = NO. 3243.93 mm 2
Space Between Two Bar's " S 34.85 mm
Provided " S " 25.00 mm
〖� _𝒔𝒆𝒓𝒗𝒊�^ 〗
_^−=((�_(𝑾𝒂𝒕𝒆𝒓 )×�^�)/
(��.�))
Made
AMY
Check
MMA
PROJECT TITLE:Qibla lift station
DESIGN OF UNDERGROUND concret wetwell
〖� _𝒔𝒆𝒓𝒗𝒊�^ 〗
_^−=((�_(𝑾𝒂𝒕𝒆𝒓 )×�^�)/
(��.�)) 64.48 kN.m
5) Horizontal moment Steel :
6) Base slab :
Geometrical Properties
of bottom slab " ts " 300 mm
of wall " twall " 300 mm
tank " h " 6 m
essure ' Ka' 0.29
essure ' Ka' For Water 1
Load
e " q " 10 kN/m2
: SOIL
Surcharge
de Date Sheet
MY 18-Sep-18 1
eck Date Rev.
MA 18-Sep-18 0
WATER
T12 -200
EMPTY TANK
Water Level
T12 -200
WATER IN SIDE
T12 -200
TWO LAYERS OF
APPROVED WATER
TWO LAYERS OF
APPROVED
WATERPROOFING
MEMBERANE (TYP)