You are on page 1of 14
OIL & GAS DEVELOPMENT COMPANY LIMITED ‘ ‘PROCUREMENT DEPARTMENT, ISLAMABAD TOREIGN SECTION C ASNPNURE 4+ one Cte ae oe ae ae eee ee eT aaa ise al ee on “hun” Gkpnvam Cabin Tmsaboaiiao 1 St curarpecerocaracap, Se : I SIDDER 1S ADVISED THAT PAYMENT WiLL BE MADE AS PER THE FOREIGN PROCUREMENT PAYIVENT TERMS AVAILABLE AT OGDCL WEBSITE ~ {Tenens Ta) erecnve ROM FEBRUARY 27,2038 1) PURSUANT TOTENDER CLAUSE # 22,14, 13 £3532, 10 BOND AMOUNTING TO USO 50,000/- OF EQUIVALENT TO PAK RUPEES MUST BE SUBMITED \WrTH-THE TECHNICAL ID AND VAUD FOR 250 DAYS FROM THE DATE OF OPENING OFTHE 8. 2) TERMS AND CONDITIONS: BIDDERIS ADVISED TO CAREFULLY READ ALL THE TERN'S AND CONDITIONS OF THE TENDER DOCUMENT AVAILABLE ‘AT OGDCL WEBSITE INTHE MASTER TENDER DOCUMENT. 5) TERMS OF REFERENCE: The attached TR is integral pat of SOR ACQUIRING OF DRILLING ENGINEERING SOFTWARE TERMS OF REFRENCE ‘OGDCL intonds to acquire Ding Engineering Sofware licenses through compli bidding {ora period of 2 years extondable win mutual consent General instructions for the software: ‘+ Software should be capatie to handle collaboration among «ferent departments and ‘ross validation copabiies, ‘+ Software should be capable to have a risk management tooMworfiow that can cate offset wel analysis + Risk mtigaton process shouldbe covered using the engineering processes. ‘+ Software should also highlight at any time to tho user the coherency impact of any change made ina specific warkllow versus other related design tasks inthe well ‘+ Appicaton/funconaity anc number of icensas summary is placed at Annexure 1. SOFTWARE REQUIREMENT. 1) Torque & Drag Analysis ‘+ Software should be able to calculate ciical bucking forces (Helical and Sinusoida) and able to analyze tr-xtally the torque and drag while ailing, tipping in & out an rotating off. botom. + To assist In designng the corect dit sting / casing & liner assembly to avoid bucking and fatigue &. able to compare the planned and actual values, and model the effects of comparison, failures while follwing @ epectic path in achioving the desired target. + Able to compare the measured and predicted values, and model the effects of the comparison, *+ Provides analysis of load data in assccition with a wide range of fton factors teach forthe open hole and cased hole scenarios + Prediction of BHA tendency and vibration modes during diferent dling oping !) Stuck Pipe Calculations + Provides information to ree up stuck point ‘+ To be able to perform complex stuck pipe calculations and generate detailed cutout report using fiction model ‘+ Assistin ar positonng seting and ble to calculate forces acting while tipping, + Conducts fast and accurate falure analysis and calculates beck-of foros, free dalvered to stuck points, '+ Provides tatur table fora range of hook loads and toque, which canbe apaled to atompt ote te ating, ‘+ Enable to moda the stuck pipe scenarios and provie graphical epar. Bottom Hole Assembly ‘+ To analyze forces and determine tendency & behavior of BHA. aged of 13 ACQUIRING OF DRILLING ENGINEERING SOFTWARE ‘+ Holos in solcton of optimized BHA for aferent borehole types ‘+ Utiize Finte Element Analysis to soe the structural problem of a restrained BHA, ‘+ Able to locate contact points & forces to assist in BHA stabilzation, 1+ Able to determine behavior of BHA prior to running in hole by anatyzing the ‘contact forces an the BHA forthe bulking, dropping and walking scenarios ‘+ Produce plots & graphs displaying momentary effect of @ new BHA in wellbore for dil ahead preaicton 'v) Well Control Calculations ‘+ To-be able to perform complex wall contol caleutatons and generate kil shost and graph using drilers method, Walt & Walt Method and ete, ‘+ Provide an accurate decision while soloctng the kling metnod ‘+ Enable to model the wel contol scenarios and provde kck supped va pumping and prossure schedules ‘+ Provides model to visualize well contol scenario and perceive as the well is killed ¥) Casing and Tubular Seat Selection, Design & Stress Analysis ‘+ Provides with a graphical representation ofthe traxil load capacity of the pipe body, the API load capacity and the anticipated loading fer each condition on a 20 plot + Provides Von Mises citeria pot for analysis. + Designs the stings fran entire well, using a tue triaxial algorithm. + Considers the effects of balooning (Posson effect), nonlinear bucking and buoyancy. ‘+ Should be able to analyze thermally induced loads by ding, production and injecton cases with an opton for user-defined sence load temperatures, ‘+ Have aiterent oui in external load profies such a8 Partial and compete Mud evacuation behind casing, poor cement behind casing, hydrocarbon infu + Provide comparison of two cases for the same string side by side ‘+ Both string and load case-spectic design factor specication, with dependent design factors for pipe bady and connection ‘+ Standard API connections and default proprietary connections catalogs with Drovsion fr user-specifed proprietary connections, + API well ubulrs catalog, with provision or user-speciedadatins. ‘+ Drag and Drop selection of casing and tubing sections within plots ‘Burst, colapse, ial, and taxi safety factors for each lead case, 0° _appropiata, with buts and aal safety factors, based onthe esse of pipe body lor connectons ratings. ‘+ Both sting and load case spectc design factor specification, with independent ‘design factors for pipe body and connection ‘Should be able to generate pore pressure and facture pressure calculations and iF various curves ete ing setting depth selection based on estimated pore pressures. atte ould have an opion of operating constants such ae cerenial sting, Ge minimum over balance, and welbore stabi for e=sing seat elton oes % ACQUIRING OF DRILLING ENGINEERING SOFTWARE vi) vil) ‘+ Presents all permissible casing scheme solitons for user evaluation and selection, ++ Bottor up and top-down solution methods fr casing schemes, ‘Advanced Tubular Design (Pressure & Temperature Effects on Tubular [BOP and return tne temperatures ‘Accurate cementing temperature schedules ‘An unalistube temperatuce gradient from actual lag temperatures Modo uid low hydraulics during ering and crouiation operations Wilbore temperatures and fu pressures that can be used in tubular tress and bucking analyte Ina seting conditions of casings that can be use in tubular stress analysis ‘Inia annular fu temperatures used in annular uid expansion analysis Model a temperature history of the well that can be used while performing \wethead movement analysis, Detail analysis of Fracture and acid stimulation jobs Water shut-off operations Effects of Production of 0, ga¢ and water on wall if, Anais of Gas it operations Coiled tubing cperations Wier injection Shutin temperatures and pressures Forward and reverse culation Kil operations ‘Squeeze cementing Spoting Cement Pues Use of predicted temperatures and pressures in tubular stress, Movement and bucking analysis Inuence of the thermal expansion of annul fuds, andlor the infuenos of loacs imparted on the wethead during the ife ofthe wel, onthe integty of a wells tubulas, + Effects of lading condtions on all he load bearing strings inthe wel system, Ether affect can be modeled independent, or the combines effacte of both can be modeled. Wollbore Schematics Generation + Enables user to enter welbore information including survey, hole sections, casing, cement, dill sings, completion stings, perforated, and stimulated intervals + Could generate schematics of down hole completion tole, completion schematics, welhead / BOPS schematics, ‘+ Drag and Orop feature to qucky constuet cil strings or completion stings, through selection of components rom a symbol palette, ACQUIRING OF DRILLING ENGINEERING SOFTWARE vil) by es e's xe + Losded with highly detailed mut-dimensional symbols with cutaways and a rich set of equipment section types. Allows users to modify provided symbols or create custom symbos. ‘+ Enables user to create or customize dawn hole equipment of well operations symbols ‘Displays 10 and 20 schematics. ‘+ Should be able to generate hard copy wa pls of high resolution Hydraulic, Swab & Surge Calculati ‘= Sofware snould be able to portorm optimum bit hydrauics along with pressure Joss analysis considering each compononts ofthe crouating syelem invidually ‘+ Takes into account rheological models such as Power Law, Bingham Plastic and Herschel-Buckey for calculations. ‘Assist inthe selection of et sizes & flow rates for optimized results ‘+ Software should be capable enough to calculate trp schedule for swab and Surge analysis against respective tip margins ‘+ Able to calculate circulating densities and pres both tiling & cementing operation. ‘+ Assist in the selection of cillng fuids and sting movement to avoid evab & surge pressures. ‘+ Able to model the analysis and leo provide detaled reports Incusing ‘comprehensive plots & graphs. ‘+ Enablo to model ciferent scenarios in graphical format enabling to vieuaize ll the factors affecting hycraules. ‘+ Also able to model the effect of BHA components inclidedin the dil sting, Well Operations Reporting, Data Managemont and Oporational Data Analysis ‘+The mode! shoul inctuse comprehensive data capture sytem, eneurng well ste supensor engineer to quickly and panissy capture al eral ifomaton. ‘+ Should have the wel operations reporting format for Ding Operatona, Test geologist Mud engnacring, Mud logging, Dally well cost, APE, Formation tostng, Comenting jes, Casing tay, Dri ting, Drectonal Equpment, Corina Welineac, Well compiston, Dil stem tesing, Diectonal survey, Pressure survey, Ding related pobloms, Lessons eames uch as BOP, shale shakers hydrocodone; mod pumps; desander, Rig equpment dota desitercenitupes an Safety + Uses a empl intrtaco, with customizable language and rect fama + Track key perfomance iniators, compare acial resus wih the operational plan, and track and manage dfiling costs by option of comprehensie AFE linkage sity to unit systems, Customize deta-enty screens, or har copy ead reports ‘o support acl workow needs. feports should be save in POF or Mxosot Word for easy intemal and externa -8 for specte trp speeds for ation é tomatic and mania fd to Olce & Ofce to Fed data tansorcopbity Mp rough dl wnt. FTP raha nore Page $0413 ACQUIRING OF DRILLING ENGINEERING SOFTWARE + Easy generate charts and production quality graphs for improved reporting, ‘+ Wide selection of graph types and viewing options enable you to quickYy visualze resus and Pie Chan ding progress relative to the operations! plan, track time, manage GHSE incidents, and perform addtonal analyses to opimize Ailing operations. Track productwe and ron-productve te and anomalies and wwends. ‘+ Chart ding progress relative to the operational plan rack time, manage QHSE incidents, and perform addtional analyses to optimize dling operations. Track silig performance can be qusifed/ quantified eotly and accurately productive and non-productve tine + Dring pertoemance can be qualified / quantified eary and accurately, + Solution should be able fo provide easy access through a web poral t provide secure envionment to view wel operations information, ouput report, wellbore schematic diagrams and analycal resus ‘+ The web Portal should be compelely customizable according to company requirements ‘+ The web Portal should be able to display operational rigs actives In tabular ‘and graphical formats x) Databi '+ Well operations reporting data module shouldbe compatible with hid party dat management sofware avalable in marke. ‘+ Reporting data should be searchable and shareable vey other ding engineering modules to avoid retyping af previously entored data ‘+ Easiy maimanadie database tat allow muliole users to access data ‘simultaneously and suppors rapid, robust data synetonizaton, ‘+ Database adminickator should be able Yo contigure eystem access based on user logn and password ‘+ Should have powerful query too for users, enabling them to realize maximum value tom alot the wel information capture. 2. HARDWARE ‘Supplier should provide recommendations for hardware epacticatone required fo run the proposed sofware applications 3. MAINTENANCE & SUPPORT REQUIREMENT During 02 years term of this Agreement, Supplier wil provide OGDCL with Sofware Maiotenance and Support Services for all Software Products lsted on 2 Quotation referencing this Agreement. Maintenance and support serves are inclusive of software version update, palches and technical support services va telephone, emai or the web. ‘Supplier should have an establshed! suppor portal thal should be globaly certified Pago of 13 ACQUIRING OF DRILLING ENGINEERING SOFTWARE 4, ONSITE SUPPORT SERVICES REQUIREMENT Supplier should have coneultants to provide OGOCL onsite support. Constants should be traned on proposed sofware and provide adequate suppor to OGDCL office and fel sal forthe required work mentioned above |A. Supole to provide quote fr onsite support consutat for operational wells data leading ‘and application suppor fer he contract te period 8. Supple 10 proude quote for onsite support consultant for historcal well data gathering ‘nd lacing into proposed database © Supplier should have resources hited or contracted via 3rd party with experince of providing suppor fo Ol & Gas companies in Pakistan or Goeally 5. TRAININGS REQUIREMENT ‘Supplier should have consultants ready to deliver classroom traning within 45 days after award of contact fo OGOCL engineers on acquired software. Supplier to provide quote for tranings slong nth Cvs of waners, highlghing course content and numberof days per proposed safare module ‘+ Suppfer wil ensure capabilty & avalabilty of atleast 3 training sessions for acquired Software solution n Pakistan vithn 45 days after award of contract + Supplier traine(s) should have experence of minenum 05 years delivering trainings to (O18 Gas companies in Pakistan or Globally 6, TECHNOLOGY FORUM VISIT REQUIREMENT ‘Supplier wil arrange vist tothe main offee ln North Amerca/Europe for traning expertise ‘once (1) a yer for 02 GGDCL Engineers for minimum 2 weeks for wiinessing case studies, intematonal wel data gaitonng, evaluation and elated trainingtorumiseminars. 7. SUPPLIER PROFILE + Supplar should have support oes in Pakistan (provide C's of technical offoers) {Supplar proposed software technology should be tested and deployed gobally for at east 10 (Ten) years in English language + Supaler should have the proposed softwaro soluton doployed in 03 (tee) E&P companies In Pakstan under acwe Maintenance & Support + Supplier should have the proposed software soliton deplayed frat least 05 (ve) E&P companies abroad. ‘+ Performance certificate fom minimum 03 (tee) EBP companies operating in or abroad ‘must be submited 8. IMPLEMENTATION Supple wil rovide detiimplementsten len, The plan shoud ince VA + Ganttehart + Project eam tobe deployed {Resources required fam OGDCL 3 1 Project dependencies and probable sks OF Page 6 of 13 is ANNEXURE-| ACQUIRING OF DRILLING ENGINEERING SOFTWARE ‘TECHNICAL EVALUATION CRITERIA Sofware should be sble to preset and montor tha trque and ual orcs generated by 8 Gr sing beng un mi, plea cut ‘St angretated = 2 dmorlons ware Sofware must assist designing the correct aa snng | eating Einar assomaly wth voepec to 0 freseand atgue falas ‘hl oloning 2 secte natninacseving the dosed target ‘Safware must determine Row dA eng Toads, eave Gade, fretonal ona contac ores vary wih mud properties, wells Iajeory and otter operatonal ring parametars ‘Sefvare rust be cle to calibrate thes actors SSREE OF FEIT dia wih 3 wide range of con factors each fort open Mele ‘Sofare must be sie to GETAE SMaGs RGD and Toraues for several i Gepins to compare surface resaings wh sng ‘berating ent o prevent bucking andr everpul These reste must ve dep graphical aeulations SE aa ‘Sofware mist be abe fo delerrine We location ofthe stuck pipe Ibo vorieal and davated welbore Sofware must inckce the ‘ioral eG oF he aa ang Asplaying m2 hoo-cmansiona walters and must adres te Imodeston for svetcnes hen the sing buch ‘Sofware mu ‘lets ot curfaco, sc pent snd mnman overpul cr sak {oload such po elo vie oad analy to eau We HR] Sefkare rust pei ASCOF Gree anal 1S SATS ‘optimum condone pvr to bacon sulace action er back setup and final surface action forback of ‘Sefvare musi doarane the ast ol a ean Be BppT@T | freaing the sting with charts for sete, lox up lack of st wth oettac reper ‘Sofware must be able to presicl the drecional ening paformance of toon hole asserbies ‘Sofware must be alc eis the SlaGadeRape avd wort {ores the BHA experiences wile hte welbore ‘Sofware us be abe to analyze conta! forese 3d SGDRS tape of ho BHA ana pedet te GHA uid drop and wat ates, ‘Setware musi be suit address Ewing Predlcton af Buld and Walt rates vera specie ileal Calton of enematonwetin ts welbore Galeton of re ota resutant oe stig on he bit Galeton ofan foeas ans torques In each eesocates + Cafelaton of aplacement of ne BHA cross scton wenn ‘efivare must aasress 3 Tulipe BE hyper aid pedal ‘ormaten data, locate conse! ponts and ape etemine proper Bra ttilaton Page 70f 13 ACQUIRING OF DRILLING ENGINEERING SOFTWARE TECHNICAL EVALUATION CRITERIA rom Compliant M Sofware mat be abe W cakuine fe estimated Ax Volume ard to design ard montor @ wel that can | wtntand the macmum ‘pressures expected when on 1 Infuxofkrown voume 9 culated ou ot welbore ‘Sefiare mut perfor conelex wel con ealaiors | and generte set and raph using aritars method, ‘Wat Weigh Hstnos ond vaumetre method et Sofware nus seurnine paneues Wile ETURITG He 1 | selon of fc wre Grit. swab induced ek or ater the pumps nave shat ow ‘Sofwate musi be able wo prone KA seanaTOg WATE Ding ara Aer Purp ‘Shutdown to telat postion 5 tv] tn gendes vane wn and pees 1 ‘Sofivare rusi be able t provide « dla Wl sheet w generate 2 stardppe pressure scheaue Dated on atest Sondre ADE toe || Wanat load capacty ot he pe beay the AP) bad apacty and the aiopates loan each conan, 1) Satvare mus vie Von Mies elena plat or ana 7 ‘Designs te enga or an etre Wel aang 9 ae Fa | age a | Safiware asl prove > coreker the eects of Datooning,nonings buckling and buoyancy 1 ‘Sofivare musi be able salyza hemnaly nauced ade \y| BF siting, preaucton and jection ease wth an option forveordelned serves load fempersires ‘Satware fuel provide compatcen GT we cases fr the | same sting sae by se 1 ‘Sefware sl provide bath sing and oad case-speaife yy | Sesion tactor spoccaton. wih Independent” d58gn {actrsfor pee boa ana connection, ‘yn | Sfware should have Stanaavé APL connectors. wah provision fr user-specited popetry comactone ‘Sehware st provide API Uber lao, wih provision | for userspectod soatons 1 >| SERRE pois Org > Diop wasn a easng | ana ing seevene wan pte Page of 13, ACQUIRING OF DRILLING ENGINEERING SOFTWARE ‘TECHNICAL EVALUATION CRITERIA Total ‘rascal ety ek xt | aoroprate, wth bust anc aval sey factor 1 ‘aings 2 ‘Sofware Tin be able 19 generate pore pressure xe | are facture pressure caleuatons ana thelr vous 1 Su [Share Tus peas a ng_aating cap etc based on etted pot rem 4 Seuls have on opton of operating cosas fr XV | casing seat seention 1 6 “yy | Sars pevde a pomecb cara | — fetus elon fr sm evuuion sn sna ae yo | Setar must have ooh casing aoe dep 7 Selecion methods 'e Bstomp 8 Top-coun, [eee 1 rests cetaed therbal ard pressure emulators 1 Feeding in selechon 0! inproved ste and botom | hate equipment, ener 1 | Sefwore must conser an undisturbed temperature gfadient rom seu og torperatures 11 | Setware must ie able te cel Fue Row hyeras a Iv. | Rd pressures that can be used in ubuar eters | 1 rg v, | condtora'ot casings tt con Be used in tubule 1 Sofiars ust be Soe Wo Wedel 3 eee \y | hisny ofthe wl nat can be sed while porerming 5 ‘nmr fld expansion, snrae pressure buloup 08 lol ae welhaas movement sraies | Sotwore shoua be" able 10” gve dealed ——j sm | tetperahze salves n te were ae wal ae in \welbore sureunginas dung al ling operators ‘ast stmslaonoo= “ Sofiare need tobe capable of rang OmCOn vm, | aeeratons ana ts efects on cesng ange wh 1 {an elp in cost cetve easing design Sofware must be le to use of pradelad 1k |temperauses and’ pressures in tuba stens 1 movement ana bucking analy Sofware must addfess the intuance of a ermal x. | stparsen of anise tude. andor te nluence ot toads pared onthe wehoad curng the Me ofthe \Wel onthe egy ofa wels Nbr age 9 of 13 ACQUIRING OF DRILLING ENGINEERING SOFTWARE ‘TECHNICAL EVALUATION CRITERIA Pony rT aT Sofware must fave aily 1 ovale user to ener welbore || sfomaton incising survey, hele stone, casing, cement rising. cnplctan segs pebrated. on stnaed 11 | Coula cenarate schematics of down Fae conpleton Tl, ‘ompleton schema, and welRead /BOPS sehemsti Sotiware must Rave eb of 3rog and do qdety canst isting or work stings tug selecton iu |S eomponents tom’ a symbol paiete wih ‘etsled ‘euaizaon options te, 20190 and having te rosom to Ue either a dela st cf symbol oF allow user to ody ‘oats custor symbole, wy | Setare must have ably To eSaBles User TS ceale OF fuetomize drole eqapmert symbols [yo [Selmar shou be able to generate wal lo of Bah B:Hyaaies wit Swab 8 surge Calculations |_| Setar shoud bo abl to prom optimum be mycoutes | 1. | Sng nth pressure os anit onsdering exch omganents ofthe chelatng stem nelvaualy | meclges' modes ucn as Poner Law, ingham Mastic Sotuare eres be ble asst nthe RECON TH sizes & flow rats for optimised results | Satware stout have the abaya ake to account] |] | | dnatrstna Bucy tor esetations Wy. | Setrate shou have the abate cleats ip sehedule for swa and sue analysis agit especie ¢9 marae 0 / Softer shou beable cleuateerelaingdersies ¥. | sna pressures for specie ip spends for bth aiing 8 ‘Sofware should have Te ably to asst in he salacon af Vi eng fags an song reverent io svold Swab & surge pressures. Sotrare must have Be ably fo adel he aay anS ‘wi,_| aio provide cetaiea repens ncuang comprehensive los Sgaphs. in Efable rade aren seanaros gapheal format — tnabing to visualize al the factors sien haus, Tae) Satvave sro Seo motel he etee of BHA |_%S | components nuda in hoa tng. Model must have the aby for mid weight pa X Cala the amount weight op ar Shton mater sired 6 achowe desires md weigh. |[HlWalfoperations Reporting, Data Management andl Operat@ral “The rede should clue comprafensiv dts capture 1 | system ensuring war ste supensr engineer to quchy land palesly caplue al ef intorneton, ‘Should have the wel epersons paring erm Or Ong ‘Speratons, geologist, Mug engineering, Mud foggng, Daly wal cost AZE. Formation esi, Coronng js, casi | tay. Or sting, Drectonl Equipment, Conny, Welpead, | 1 | Wecompleton, Oni stem testing Drsctonalsuney, Pressure survey, Dig relates problems, Lessons lssmed, such ob BOP. shale shaker; hyroeyones mud pumps, desanae Ri equipment data ses canes ACQUIRING OF DRILLING ENGINEERING SOFTWARE TECHNICAL EVALUATION CRITERIA perry Ca ses smote rice, wit eatoreable language an ener ‘ay peiooarcs neato ‘compare aca ests wt the operational plan, and ack and | }4 | raege ding con oto coroners APE age ‘ustomga diaenty steens 2 has copy ready reports 0 1 Suppor loal woron needs, ieaeeectaed Sonare shoud beable generate pots POF or zosoR 7 ‘Word eneynereal and extoal Serouton ‘Should Rave the ably of aerate and manual fe OFce & | Otic to Fi transfer eapabty trough al up note, 1 PIP mechensm and erat | ‘Should beable to easy genwate hats ana proaucion ually {pacts lor imeroves reparing Ce [ee Hig I Sotwareshoua have «wise slaclon oT Graph pee an tx | vewing options wricn enable tho sero aucly ausiae 4 ‘eau and ind som Stare shoud ai ca sng Hae eae OTe % | Serr adstonal analyse to optimize cing operations, Track 1 rosie and non productive te Bring germane canbe aulted santo ay oo | Soutien shoul/be abe fo pres easy accassowgh a web xj | Baal fo provide a secure evronnerto view wel operations if Information, ouput report, walboreechamatis dagrams and snaiica rests sau he web Pov shoe be conploaly cuREMEzabe aerIng TS company requments She wab Por! sheud be alee dl AO jatioetabulr an gropheal erate Database ‘Wa opeains epoing dea mosule shouldbe compatible ‘wen tes pary data management sofware avatsse fh artet FReporing data shoul be searchacie and shareable wih athe 1 ng egeing mses atasreyprg of peu 1 Ey matinable database at lon mune ueas Yo acess 1 gata smustaneouty ane euppets apd, rust Sas 1 ‘synchronization, lebase sdiiaatr ad De abi Yo cnlgre yaa ‘sczets based on ute gn oh patewore ‘Shel rave power query tl or user, enabling em to ‘als maxirum vats rem alc te we nematon captured Note: Qualifying marks will be 80% for each section. Page 13 of 13 ANNEXURE-|I ACQUIRING OF DRILLING ENGINEERING SOFTWARE NUMBER OF LICENSE SUMMAARY. | No. | License + | Wel Engineering Torque & Drag Analysis i fae |erers | Stuck pipe calculations OF Batiom hale Assembly @ | Wat conver cateuaions | 07 _| Hydraulic wit Swab & Surge) caleulavons 2 Prubutar Design Casing shoe depth w [Gasngdeson —Ss*~<“C*~i‘SSC*ét:*C*C*d 3 | Tubular Design (HPIAT) Tubular Design SST (ForHPIMT wels) (7 | Weitere Schemate —/Waltore Schemate 3] 5 | Operational Data ‘Operations data reporting Feld) 0 Reporting ‘Operations data reporting (Office) 0 | Data Query? Analysis 70 16 | Web Dashboard Wb Dashboard for management 20 [7 | Weirengineering Data Wall Engineering Data Base 0 Page 2 ol 23 ANNEXURE-lI| ACQUIRING OF Di RATE FORMAT/FINANCIAL EVALUATION/YEAR |G ENGINEERING SOFTWARE SH Price User ‘ani Total (USSY (Us8) | Maintenance & Support oN Tser (USS), AB 1) | Software Name [62 Advanced Tubular Design (Pressure Tomparature Effects on TubUlare) =| 1) | Software Name se 7. Welloore Schomaties Gonoration Software Name. a.) Hydraulics Calculations 1) Sofware Name. = ——————— gam erin ns Software Name etme [10 Database z 1) Sofware Name T Woll Data gathering ar 2 Souths Lonpaun) | cote Wet Cot mp Sun) | Neth wel cot ue wm) 2. Service / Maintenance zs Marner & Supa Cos installation & Onsite Support 9 | salon Borst spat 4A Classroom Trainin z Pp uameaecrapens peers | ere ere | Grand Total USS Note: Evaluation citria wal beled in by each patipantBidder, Page a3 of 13

You might also like