 COMPLETED INSTALL OF ADDITIONAL DUCTWORK TO


ENSURE MAXIMUM PROTECTION AGAINST ICE DAMS

 REBUILT STORM DRAINS AROUND BLDG. 19, 25 AND


CLEANED ALL DRAINS

 REPLACED ROOF ON BUILDING 70

 REPLACED SIDING ON BUILDING 125

 REPLACED OLD WIRING AROUND BUILDING 78

 PAINTED POOL HOUSE AND UPGRADED BATHROOMS

 REPAIRED COLLAPSING STONE WALL BEHIND


BUILDING 49

 TREE TRIMMING AND ADDED MULCH IN CERTAIN


AREAS—MORE TO BE DONE IN 2018!

 CEMENT SIDEWALK RESURFACING TO BEGIN IN SPRING


NEAR BUILDING 70

 REFURBISHED ENTRANCE SIGNS

OTHER NOTABLE ACTIVITIES


 REPLACED G&W MANAGEMENT CO. WITH ELITE
 WORKING ON RESERVE STUDY FOR LONG TERM
PLAN
 CONTINUING ROOF REPLACEMENT- 2 BLDGS IN
SUMMER
 DECK REPLACEMENT WHERE NEEDED MOST IN
SUMMER/FALL