You are on page 1of 1

Plan of desilting from Jajmau Chungi to CSPS, Jajmau (2100x2300 mm dia),Total Stretch=2710 m approx.

Grit Chamber
MH
In front of In front (650.5m) (504m) CSPS
Opp. Asif Durga New Light
of ColicoTasmania Globe Premises
In front of Popular In front of Gazala Gold Star Mandir Tanner Leather Open Land MH-3643B

52m
Leather Trade DIA-2300X2100MM
GS Telecom Dharkanta H.No. 101/87 Lari house Leather Tanner Nr. CSPS
In front of Farm MH-3643A Proposed

55m
32m 101m 105.2m 93.5m 97.5m 96m 75.8m 100m 78.6m Middle Drain Mona Leater House 103m New MH
100m 192m 66.8m 216m MH-3884A MH-3643 CSPS
66.6m MH-3496B Gerent Industries m Premises
MH-3453A MH-3492C 106m SUMP
PIPAL
MH-3906 Forest 100m 93
TREE
MH-2085A MH-3492A MH-3492B International MH-3884G
MH-2085B MH-2085C MH-3453 MH-3492D MH-3493A MH-3496 MH-3496A MH-3496C MH-3904 94 106m 99m CSPS
.2m MH-3884B MH-3884DCMH-3884E
In front of MH-3884F
In front of S/W shinking MH-3884C MH-3884DMH-3884DA MH-3884DB 93m 95m MH-3884H
Police Chowki TEMPORARY STANKING 83.5m 68m 101m
House No. 83 well Shalimar STP Near STP Elec.
Leather Open land of Main Gate Sub Stn.
DIA-2300X2100MM In front of Primary
House No. 90/76-A
PERMANENT STANKING Taj Darbar
School
Hotel
(591m) (617m)
321.1m

NEXT WORKING STRETCH=1208M PRESENT WORKING STRETCH=1168M

NAME OF PROJECT- SEWERAGE WORKS IN SEWERAGE DISTRICT-1 KANPUR

)
(UNDER NAMAMI GANGE

Plan to desilting for Trunk Sewer line from


Jajmau Chungi to CSPS (2300x2100 mm)

GANGA POLLUTION CONTROL UNIT, UP JAL NIGAM

SHRISTI-SAM-LAIN-YOGI-JV
LEGEND SITE ENGINEER/
PROJECT INCHARGE PROJECT HEAD
SITE INCHARGE
Line

Desilting
Existing Manholes

Grouting

You might also like