Jadual 1 : Harga unit purata bagi bar keluli dan simen 1


Table 1 : Average unit prices for steel bars and cement

Jadual 2 : Harga unit purata bagi bitumen, minyak bahan api dan diesel 5
Table 2 : Average unit prices for bitumen, fuel oil and diesel

Jadual 3 : Harga unit purata bagi : 7


Table 3 : Average unit prices for :
-Pasir/Sand
-Batu baur/Aggregates
-Premix
-Fabric Reinforcement
-Guardrail
-Paip air/Water pipe
-Paip pembetungan/Sewerage pipe

Lampiran A Jadual faktor pelarasan bagi paip air & paip pembetungan 31
Appendix A Adjustment factor table for water pipe & sewerage pipe

Nota Teknikal 39
Technical Notes

Jadual tarikh pengeluaran Siaran Khas 1 (Untuk Kerja-kerja Kejuruteraan Awam), 40


Semenanjung Malaysia, Januari-Disember 2015
Schedule of release dates for Special Release 1 (For Civil Engineering Works),
Peninsular Malaysia, January-December 2015

i
JADUAL
TABLE
Jadual 1: Harga unit purata bagi bar keluli dan simen
Table 1: Average unit prices for steel bars and cement

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(1) Bar Bulat Keluli Lembut BS-4449 RM Per Tan Metrik
Mild Steel Round Bars BS-4449 RM Per Metric Ton

10mm (3/8") 2014 Dis 2321.66 2289.47 2608.75


2015 Jan 2327.50 2276.97 2608.75
Feb 2281.66 2258.94 2608.75
Mac 2280.66 2258.94 2608.75
Apr 2324.77 2350.62 2726.65
Mei 2348.51 2358.90 2707.53
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

12mm (1/2") 2014 Dis 2313.54 2318.56 2602.50


2015 Jan 2319.37 2318.56 2602.50
Feb 2273.54 2297.73 2602.50
Mac 2272.54 2297.73 2602.50
Apr 2319.21 2367.99 2726.65
Mei 2347.92 2380.62 2707.40
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

16mm (5/8") 2014 Dis 2193.33 2260.50 2510.21


2015 Jan 2199.44 2260.50 2510.21
Feb 2177.22 2243.00 2510.21
Mac 2176.11 2243.00 2510.21
Apr 2221.68 2327.84 2636.07
Mei 2248.08 2341.10 2631.99
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

1
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(1) Bar Bulat Keluli Lembut BS-4449 (samb.) RM Per Tan Metrik
Mild Steel Round Bars BS-4449 (cont'd) RM Per Metric Ton
20mm−25mm 2014 Dis 2242.03 2311.79 2576.92
(3/4"−1") 2015 Jan 2249.56 2311.79 2576.58
Feb 2221.25 2276.81 2576.58
Mac 2219.42 2276.81 2576.58
Apr 2269.47 2362.25 2638.76
Mei 2305.58 2373.30 2636.14
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

32mm (1 1/4") 2014 Dis 2219.42 2370.60 2566.25


2015 Jan 2227.75 2370.60 2566.00
Feb 2186.08 2336.22 2566.25
Mac 2182.75 2336.22 2566.25
Apr 2220.13 2436.49 2615.75
Mei 2242.82 2453.07 2584.83
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
(2) Mycon 60
High Tensile Deformed Bars
10mm (3/6") 2014 Dis 2290.56 2358.10 2591.75
2015 Jan 2296.67 2335.20 2600.08
Feb 2249.44 2312.70 2600.08
Mac 2248.33 2312.70 2600.08
Apr 2296.73 2385.16 2704.19
Mei 2323.75 2398.42 2685.06
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

2
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(2) Mycon 60 (Samb.) RM Per Tan Metrik
High Tensile Deformed Bars (Cont'd) RM Per Metric Ton
12mm (1/2") 2014 Dis 2293.33 2369.66 2591.75
2015 Jan 2299.44 2346.76 2600.08
Feb 2252.22 2321.76 2600.08
Mac 2251.11 2321.76 2600.08
Apr 2299.51 2399.52 2704.19
Mei 2330.07 2414.96 2685.06
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

16mm−25mm 2014 Dis 2189.85 2271.36 2556.35


(5/8"−1") 2015 Jan 2196.81 2256.09 2556.27
Feb 2170.31 2229.24 2557.46
Mac 2168.86 2229.24 2557.46
Apr 2215.57 2293.30 2635.07
Mei 2249.34 2303.12 2624.44
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

32mm (1 1/4") 2014 Dis 2183.33 2256.08 2526.00


2015 Jan 2195.00 2256.08 2526.00
Feb 2145.00 2227.95 2526.00
Mac 2141.67 2227.95 2526.00
Apr 2185.27 2299.46 2652.00
Mei 2233.37 2316.04 2607.83
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

3
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
23

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Simen RM Sekarung 50 Kg
Cement RM Per 50 Kg Bag
Portland Biasa 2014 Dis 18.20 18.57 18.33
BS 12 2015 Jan 18.26 18.60 18.39
Ordinary Portland Feb 18.07 18.58 18.45
BS 12 Mac 18.07 18.63 18.48
Apr 18.92 19.56 19.48
Mei 19.04 19.71 20.40
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

4
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel
Table 2: Average unit prices for bitumen, fuel oil and diesel

Tempoh Semenanjung Malaysia


Item
Period Peninsular Malaysia

(1) Minyak Bahan Api RM Seliter


Fuel Oil RM Per Litre

Sederhana 2014 Dis 2.17


Medium 2015 Jan 2.17
Feb 2.17
Mac 2.17
Apr 2.17
Mei 2.17
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

(2) Bitumen Penembusan 80/100 RM Per Tan Metrik


Bitumen 80/100 Penetration RM Per Metric Ton

2014 Dis 2000.00


2015 Jan 2000.00
Feb 1980.00
Mac 1980.00
Apr 1650.00
Mei 1650.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Harga bitumen penembusan 80/100 adalah berdasarkan harga purata ex-Kuala Lumpur.
The price for bitumen 80/100 penetration is based on average ex-Kuala Lumpur.

5
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel (samb.)
Table 2: Average unit prices for bitumen, fuel oil and diesel (cont'd)

Tempoh Semenanjung Malaysia


Item
Period Peninsular Malaysia

RM Seliter
(3) Minyak Gas Automotif RM Per Litre
Automotive Gas Oil Runcit* Sebenar
Retail Actual

Diesel 2014 Jan 2.000 2.728


Diesel Feb 2.000 2.728
Mac 2.000 2.765
Apr 2.000 2.765
Mei 2.000 2.739
Jun 2.000 2.712
Jul 2.000 2.712
Ogos 2.000 2.590
Sept 2.000 2.590
Okt 2.200 2.319
Nov 2.200 2.319
R
Dis 2.230 2.230

2015 Jan 1.930 1.930


Feb 1.700 1.700
Mac 1.950 1.950
Apr 1.950 1.950
Mei 1.950 1.950
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Harga diesel adalah ex-Kuala Lumpur.


The price for diesel is ex-Kuala Lumpur.

* Harga runcit ialah harga selepas ditolak subsidi kerajaan.


Retail price is the price less government subsidy.

R = Kemaskini/Revised

6
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(1) Pasir RM Per Tan Metrik
Sand RM Per Metric Ton

Pasir Sungai 2014 Dis 43.52 43.91 22.97


River Sand 2015 Jan 43.52 44.11 22.95
Feb 44.77 44.16 22.93
Mac 44.77 44.16 24.73
Apr 49.18 46.68 25.96
Mei 50.23 46.87 26.55
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Pasir Lombong 2014 Dis 30.93 44.62 29.25


Mining Sand 2015 Jan 30.93 44.62 29.25
Feb 31.78 44.72 29.25
Mac 31.78 44.95 29.25
Apr 32.74 48.02 29.25
Mei 32.74 48.98 29.25
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

(2) Batu Baur


Aggregates

Granite 2014 Dis 32.67 30.26 33.27


10mm (3/8") 2015 Jan 32.67 30.31 33.02
Feb 32.67 30.42 33.02
Mac 32.67 30.42 33.02
Apr 32.75 31.06 35.61
Mei 33.09 31.24 35.62
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.

7
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(2) Batu Baur (Samb.) RM Per Tan Metrik
Aggregates (Cont'd) RM Per Metric Ton
Granite 2014 Dis 34.43 26.24 27.56
20mm (3/4") 2015 Jan 34.43 26.22 27.57
Feb 34.43 26.22 27.57
Mac 34.96 29.11 30.70
Apr 37.22 31.71 32.15
Mei 37.53 31.49 33.56
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Granite 2014 Dis 27.80 29.08 27.53


40mm (1 1/2") 2015 Jan 27.80 29.31 28.20
Feb 27.50 29.68 28.30
Mac 27.50 30.73 28.30
Apr 27.97 30.90 29.68
Mei 28.36 31.04 29.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Crushed Aggregate (Crusher Run)


Crushed Aggregate (Crusher Run)

Crusher Run 2014 Dis 22.41 23.51 21.76


2015 Jan 22.41 23.63 21.80
Feb 22.41 23.61 21.80
Mac 22.77 23.61 21.94
Apr 22.96 24.93 22.13
Mei 21.92 25.05 21.83
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

8
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete RM Per Tan Metrik
Premix Asphaltic Concrete RM Per Metric Ton

AC 10 (Wearing Course) 2014 Dis 178.50 194.73 213.00


2015 Jan 178.75 194.73 213.00
Feb 175.40 193.82 213.00
Mac 174.40 193.82 213.00
Apr 181.97 204.19 220.26
Mei 181.97 202.49 220.26
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

AC 14 (Wearing Course) 2014 Dis 181.83 187.67 198.80


2015 Jan 181.83 187.67 198.80
Feb 181.83 186.83 196.80
Mac 177.88 186.83 190.20
Apr 187.44 197.94 201.28
Mei 187.44 196.52 202.07
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

AC 28 (Binder Course) 2014 Dis 175.90 190.82 194.00


2015 Jan 176.22 190.82 194.00
Feb 176.00 189.91 191.40
Mac 176.13 189.91 184.80
Apr 185.85 201.20 197.45
Mei 185.85 199.76 197.72
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

9
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete (samb.) RM Per Tan Metrik
Premix Asphaltic Concrete (cont'd) RM Per Metric Ton

ACW 20 (Wearing Course) 2014 Dis 178.75 190.27 194.33


2015 Jan 179.00 190.27 194.33
Feb 178.71 189.36 194.33
Mac 177.38 189.36 194.33
Apr 186.91 197.81 201.67
Mei 186.91 197.81 202.73
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

10
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam RM Per Tan Metrik
Premix Bituminous Macadam RM Per Metric Ton
BMR40 (Bound Roadbase) 2014 Dis 172.00 192.33 153.00
2015 Jan 172.00 192.33 153.00
Feb 172.00 190.67 157.50
Mac 172.00 190.67 129.00
Apr 178.08 195.11 136.74
Mei 178.08 196.78 139.92
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

BMR28 (Bound Roadbase) 2014 Dis 172.50 183.63 153.00


2015 Jan 172.50 183.63 153.00
Feb 172.50 182.38 153.00
Mac 172.50 182.38 153.00
Apr 178.08 192.02 153.00
Mei 178.08 192.02 153.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

BML10 (Levelling Course) 2014 Dis 166.50 201.33 176.50


2015 Jan 166.50 201.33 176.50
Feb 166.50 201.33 176.50
Mac 166.50 201.33 160.00
Apr 180.20 204.09 164.44
Mei 180.20 204.09 166.03
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

R = Kemaskini/Revised

11
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.) RM Per Tan Metrik
Premix Bituminous Macadam (cont'd) RM Per Metric Ton

BMB28 (Binder Course) 2014 Dis 180.67 184.22 171.50


2015 Jan 180.67 184.67 171.50
Feb 180.67 183.56 171.50
Mac 180.67 183.56 155.00
Apr 182.03 199.28 159.26
Mei 182.03 199.28 160.85
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

BMB20 (Binder Course) 2014 Dis 172.50 181.25 196.67


2015 Jan 172.50 181.25 196.67
Feb 172.50 181.25 196.67
Mac 172.50 181.14 183.00
Apr 178.08 192.68 191.17
Mei 178.08 192.68 191.80
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

BMW14 (Wearing Course) 2014 Dis 176.67 188.22 202.67


2015 Jan 176.67 188.22 202.67
Feb 176.67 185.44 202.67
Mac 176.67 183.40 191.67
Apr 180.20 195.03 203.17
Mei 180.20 194.03 204.23
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

12
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.) RM Per Tan Metrik
Premix Bituminous Macadam (cont'd) RM Per Metric Ton

BMW20 (Wearing Course) 2014 Dis 173.50 185.70 201.00


2015 Jan 173.50 185.70 201.00
Feb 173.50 184.00 201.00
Mac 173.50 183.10 201.00
Apr 180.20 194.72 207.96
Mei 180.20 193.72 207.96
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

13
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement RM Per Kg
Fabric Reinforcement RM Per Kg

A4, MS145 2014 Dis 2.45 2.97 3.43


2015 Jan 2.45 2.97 3.63
Feb 2.45 2.97 3.63
Mac 2.45 2.97 3.63
Apr 2.45 2.97 3.77
Mei 2.30 3.03 3.73
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

A5, MS145 2014 Dis 2.44 2.95 3.40


2015 Jan 2.44 2.95 3.60
Feb 2.44 2.95 3.60
Mac 2.44 2.95 3.60
Apr 2.44 2.95 3.73
Mei 2.29 2.99 3.70
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

A6, MS145 2014 Dis 2.18 2.60 3.05


2015 Jan 2.18 2.60 3.23
Feb 2.18 2.60 3.23
Mac 2.18 2.60 3.23
Apr 2.18 2.60 3.35
Mei 2.05 2.66 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

14
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

A7, MS145 2014 Dis 2.18 2.60 3.05


2015 Jan 2.18 2.60 3.23
Feb 2.18 2.60 3.23
Mac 2.18 2.60 3.23
Apr 2.18 2.60 3.35
Mei 2.05 2.65 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

A8, MS145 2014 Dis 2.19 2.60 3.05


2015 Jan 2.19 2.60 3.23
Feb 2.19 2.60 3.23
Mac 2.19 2.60 3.23
Apr 2.19 2.60 3.35
Mei 2.05 2.66 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

A9, MS145 2014 Dis 2.18 2.60 3.05


2015 Jan 2.18 2.60 3.23
Feb 2.18 2.60 3.23
Mac 2.18 2.60 3.23
Apr 2.18 2.60 3.35
Mei 2.05 2.65 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

15
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

A10, MS145 2014 Dis 2.36 2.52 3.05


2015 Jan 2.36 2.52 3.23
Feb 2.36 2.52 3.23
Mac 2.36 2.52 3.23
Apr 2.36 2.52 3.35
Mei 2.09 2.57 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

B5, MS145 2014 Dis 2.63 2.94 3.39


2015 Jan 2.63 2.94 3.59
Feb 2.63 2.94 3.59
Mac 2.63 2.94 3.59
Apr 2.63 2.94 3.72
Mei 2.33 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

B6, MS145 2014 Dis 2.36 2.62 3.05


2015 Jan 2.36 2.62 3.23
Feb 2.36 2.62 3.23
Mac 2.36 2.62 3.23
Apr 2.36 2.62 3.35
Mei 2.09 2.65 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

16
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

B7, MS145 2014 Dis 2.36 2.65 3.05


2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

B8, MS145 2014 Dis 2.37 2.65 3.05


2015 Jan 2.37 2.65 3.23
Feb 2.37 2.65 3.23
Mac 2.37 2.65 3.23
Apr 2.37 2.65 3.35
Mei 2.10 2.69 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

B9, MS145 2014 Dis 2.36 2.65 3.05


2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.69 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

17
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

B10, MS145 2014 Dis 2.36 2.64 3.04


2015 Jan 2.36 2.64 3.22
Feb 2.36 2.64 3.22
Mac 2.36 2.64 3.22
Apr 2.36 2.64 3.34
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

B12, MS145 2014 Dis 2.61 2.90 3.37


2015 Jan 2.61 2.90 3.57
Feb 2.61 2.90 3.57
Mac 2.61 2.90 3.57
Apr 2.61 2.90 3.70
Mei 2.32 2.94 3.66
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

C5, MS145 2014 Dis 2.63 2.84 3.39


2015 Jan 2.63 2.84 3.59
Feb 2.63 2.84 3.59
Mac 2.63 2.84 3.59
Apr 2.63 2.84 3.72
Mei 2.33 2.88 3.69
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

18
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

C6, MS145 2014 Dis 2.63 2.84 3.39


2015 Jan 2.63 2.84 3.59
Feb 2.63 2.84 3.59
Mac 2.63 2.84 3.59
Apr 2.63 2.84 3.72
Mei 2.33 2.88 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

C7, MS145 2014 Dis 2.63 2.94 3.39


2015 Jan 2.63 2.94 3.59
Feb 2.63 2.94 3.59
Mac 2.63 2.94 3.59
Apr 2.63 2.94 3.72
Mei 2.33 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

C8, MS145 2014 Dis 2.62 3.01 3.38


2015 Jan 2.62 3.01 3.58
Feb 2.62 3.01 3.58
Mac 2.62 3.01 3.58
Apr 2.62 3.01 3.71
Mei 2.32 3.05 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

19
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

C9, MS145 2014 Dis 2.62 2.94 3.38


2015 Jan 2.62 2.94 3.58
Feb 2.62 2.94 3.58
Mac 2.62 2.94 3.58
Apr 2.62 2.94 3.71
Mei 2.32 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

C10, MS145 2014 Dis 2.63 2.94 3.38


2015 Jan 2.63 2.94 3.58
Feb 2.63 2.94 3.58
Mac 2.63 2.94 3.58
Apr 2.63 2.94 3.72
Mei 2.33 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

DA4, MS145 2014 Dis 2.65 2.97 3.42


2015 Jan 2.65 2.97 3.62
Feb 2.65 2.97 3.62
Mac 2.65 2.97 3.62
Apr 2.65 2.97 3.72
Mei 2.35 3.01 3.72
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

20
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

DA5, MS145 2014 Dis 2.64 2.95 3.40


2015 Jan 2.64 2.95 3.60
Feb 2.64 2.95 3.60
Mac 2.64 2.95 3.60
Apr 2.64 2.95 3.73
Mei 2.34 2.99 3.70
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

DA6, MS145 2014 Dis 2.36 2.64 3.05


2015 Jan 2.36 2.64 3.23
Feb 2.36 2.64 3.23
Mac 2.36 2.64 3.23
Apr 2.36 2.64 3.35
Mei 2.09 2.67 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

DA7, MS145 2014 Dis 2.36 2.65 3.05


2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

21
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

DA8, MS145 2014 Dis 2.37 2.65 3.05


2015 Jan 2.37 2.65 3.23
Feb 2.37 2.65 3.23
Mac 2.37 2.65 3.23
Apr 2.37 2.65 3.35
Mei 2.10 2.68 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

DA9, MS145 2014 Dis 2.36 2.65 3.05


2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

DA10, MS145 2014 Dis 2.36 2.64 3.03


2015 Jan 2.36 2.64 3.21
Feb 2.36 2.64 3.21
Mac 2.36 2.64 3.21
Apr 2.36 2.64 3.33
Mei 2.09 2.68 3.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

22
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(5) Guardrail RM Per Meter
Guardrail RM Per Metre

Single Mounted 2014 Dis 138.35 140.05 143.00


i) 1.95m Post Spacing 2015 Jan 138.35 140.05 143.00
Feb 138.35 140.05 143.00
Mac 138.35 140.05 143.00
Apr 139.95 141.75 145.50
Mei 139.95 141.75 145.50
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

ii) 3.80m Post Spacing 2014 Dis 98.10 99.25 101.40


2015 Jan 98.10 99.25 101.40
Feb 98.10 99.25 101.40
Mac 98.10 99.25 101.40
Apr 99.30 100.55 103.20
Mei 99.30 100.55 103.20
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

23
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(5) Guardrail (samb.) RM Per Meter
Guardrail (cont'd) RM Per Metre

Double Mounted 2014 Dis 212.10 214.60 219.20


i) 1.95m Post Spacing 2015 Jan 212.10 214.60 219.20
Feb 212.10 214.60 219.20
Mac 212.10 214.60 219.20
Apr 214.95 217.60 223.30
Mei 214.95 217.60 223.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

ii) 3.80m Post Spacing 2014 Dis 163.85 165.85 169.30


2015 Jan 163.85 165.85 169.30
Feb 163.85 165.85 169.30
Mac 163.85 165.85 169.30
Apr 166.15 168.20 172.60
Mei 166.15 168.20 172.60
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

R = Kemaskini/Revised

24
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6a) Paip Air RM Per Meter
Water Pipe RM Per Metre

Mild Steel Pipe 2014 Dis 196.00


300mm 2015 Jan 196.00
Feb 196.00
Mac 196.00
Apr 189.00
Mei 189.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Stainless Steel Pipe 2014 Dis 27.00


25mm 2015 Jan 27.00
Feb 27.00
Mac 27.00
Apr 27.00
Mei 27.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Ductile Iron Pipe 2014 Dis 283.30


300mm 2015 Jan 283.30
Feb 283.30
Mac 283.30
Apr 283.30
Mei 283.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Harga bagi paip air dan paip pembetungan adalah harga di kilang.
The prices for water pipe and sewerage pipe are ex-factory prices.

25
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6a) Paip Air (samb.) RM Per Meter
Water Pipe (cont'd) RM Per Metre

High Density Polyethylene 2014 Dis 1.50


(HDPE) Pipe 2015 Jan 1.50
i. Compression Fitting Using Feb 1.50
For Jointing Mac 1.50
25mm Apr 1.50
Mei 1.50
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

ii. Electrofusion Jointing 2014 Dis 72.30


160mm 2015 Jan 72.30
Feb 72.30
Mac 72.30
Apr 72.30
Mei 72.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

iii. Butt Fussion 2014 Dis 57.63


160mm 2015 Jan 57.63
Feb 57.63
Mac 57.63
Apr 57.63
Mei 57.63
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

26
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

Mild Steel Pipe 2014 Dis 211.68


300mm 2015 Jan 211.68
Feb 211.68
Mac 211.68
Apr 204.12
Mei 204.12
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Ductile Iron Pipe 2014 Dis 185.00


250mm 2015 Jan 185.00
Feb 185.00
Mac 185.00
Apr 185.00
Mei 185.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

High Density Polyethylene 2014 Dis 19.30


(HDPE) Pipe 2015 Jan 19.30
i. Profile Pipe Feb 19.30
150mm Mac 19.30
Apr 27.50
Mei 27.50
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

27
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

High Density Polyethylene 2014 Dis 68.80


(HDPE) Pipe 2015 Jan 68.80
ii. Solid Pipe Feb 68.80
250mm Mac 68.80
Apr 98.20
Mei 98.20
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

Vitrified Clay Pipe 2014 Dis 66.00


i. Standard Pipe 2015 Jan 66.00
225mm Feb 66.00
Mac 66.00
Apr 66.00
Mei 66.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

ii. Jacking Pipe 2014 Dis 302.00


225mm 2015 Jan 302.00
Feb 302.00
Mac 302.00
Apr 302.00
Mei 302.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

28
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

Reinforced Concrete Pipe 2014 Dis 185.30


i. Without Lining 2015 Jan 185.30
900mm Feb 185.30
Mac 185.30
Apr 185.30
Mei 185.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

ii. With Lining (High Alumina) 2014 Dis 241.70


900mm 2015 Jan 241.70
Feb 241.70
Mac 241.70
Apr 241.70
Mei 241.70
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

iii. With Lining (Sacrificial Lining) 2014 Dis 213.60


900mm 2015 Jan 213.60
Feb 213.60
Mac 213.60
Apr 213.60
Mei 213.60
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

29
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

ABS Pipe 2014 Dis 28.92


i. Gravity 2015 Jan 28.92
110mm Feb 28.92
Mac 28.92
Apr 28.92
Mei 28.92
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

ii. Force Main 2014 Dis 81.65


225mm 2015 Jan 81.65
Feb 81.65
Mac 81.65
Apr 81.65
Mei 81.65
Jun
Jul
Ogos
Sept
Okt
Nov
Dis

30
LAMPIRAN
APPENDIX
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip air
Water pipe

1. Mild Steel Pipe

100 mm Ø 0.25
150 " 0.36
200 " 0.47
250 " 0.59
300 " 1.00
350 " 1.16
400 " 1.32
450 " 1.48
500 " 1.63
600 " 2.18
700 " 2.80
750 " 2.99
800 " 3.18
900 " 3.56
1000 " 4.25
1100 " 5.53
1150 " 5.83
1200 " 6.40
1300 " 7.60
1400 " 8.16
1500 " 10.32
1600 " 10.98
1700 " 11.64
1800 " 12.30
1900 " 12.96
2000 " 14.74
2100 " 16.01
2200 " 17.33

2. Stainless Steel Pipe

13 mm Ø (1/2") 0.53
20 " (3/4") 0.69
25 " (1") 1.00
32 " (1 1 4 ") 1.34
38 " (1 1 2 ") 1.59
50 " (2") 2.14
63 " (2 1 2 ") 3.42
75 " (3") 4.66
100 " (4") 6.72

31
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip air
Water pipe

3. Ductile Iron Pipe

100 mm Ø 0.35
150 " 0.45
200 " 0.60
250 " 0.79
300 " 1.00
350 " 1.25
400 " 1.50
450 " 1.78
500 " 2.05
600 " 2.70
700 " 3.50

4. High Density Polyethylene (HDPE) Pipe

i. Compression Fitting Using For


Jointing

20 mm Ø 0.69
25 " 1.00
32 " 1.63
40 " 2.59
50 " 3.93
63 " 6.18
75 " 8.83
90 " 12.68

ii. Electrofusion Jointing

110 mm Ø 0.48
125 " 0.63
140 " 0.80
160 " 1.00
180 " 1.30
200 " 1.54
225 " 1.96
250 " 2.46
280 " 3.27
315 " 3.97
355 " 6.29
400 " 7.80
450 " 12.98
500 " 17.76
560 " 21.02

32
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip air
Water pipe

iii. Butt Fussion

110 mm Ø 0.48
125 " 0.62
140 " 0.76
160 " 1.00
180 " 1.25
200 " 1.56
225 " 1.94
250 " 2.38
280 " 2.97
315 " 3.76
355 " 4.79
400 " 6.06
450 " 7.90
500 " 7.90
560 " 12.61

33
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

1. Mild Steel Pipe

100 mm Ø 0.40
125 " 0.50
150 " 0.59
200 " 0.79
250 " 0.99
300 " 1.00
350 " 1.38
400 " 1.58
450 " 1.78
500 " 1.98
550 " 2.20
600 " 2.37
650 " 2.50
700 " 2.77
750 " 2.96
800 " 3.16
850 " 3.40
900 " 3.56
950 " 3.80
1000 " 3.95
1200 " 4.74
1400 " 5.53
1600 " 6.32
1800 " 7.11
2000 " 7.91
2100 " 8.30
2200 " 8.70

2. Ductile Iron Pipe

80 mm Ø 0.35
100 " 0.40
150 " 0.60
200 " 0.80
250 " 1.00
300 " 1.20
350 " 1.40
400 " 1.60
450 " 1.80
500 " 2.00
600 " 2.40
700 " 2.80
800 " 3.20
1000 " 3.40
1200 " 3.60

34
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

i. HDPE (Profile) Pipe

100 mm Ø 0.64
125 " 0.80
150 " 1.00
200 " 1.73
250 " 1.28
300 " 4.10
350 " 7.50
400 " 10.55
450 " 12.00
500 " 17.00
550 " 19.31
600 " 19.32
650 " 19.50
700 " 20.25
750 " 21.27
800 " 25.60
850 " 31.07
900 " 35.00
950 " 38.19
1000 " 54.82
1200 " 74.00
1400 " 94.00
1600 " 123.23
1800 " 165.00
2000 " 207.35
2100 " 300.00
2200 " 400.00

ii. HDPE (Solid) Pipe

100 mm Ø 0.20
125 " 0.25
150 " 0.50
200 " 0.65
250 " 1.00
300 " 1.50
350 " 2.00
400 " 2.69
450 " 3.51
500 " 4.48
550 " 5.50
600 " 6.00
650 " 7.50
700 " 8.50
750 mm Ø 10.00

35
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

800 " 11.75


850 " 15.00
900 " 16.50
950 " 18.00
1000 " 20.40
1200 " 24.00
1400 " 26.00
1600 " 32.00
1800 " 36.00
2000 " 38.00
2100 " 42.00
2200 " 45.00

4. Vitrified Clay Pipe

i. Vitrified Clay (Standard) Pipe

100 mm Ø 0.40
150 " 0.52
200 " 0.84
225 " 1.00
300 " 2.37
375 " 4.24
400 " 4.95
450 " 5.63
500 " 7.96
600 " 11.78
700 " 14.33
800 " 14.50

ii. Vitrified Clay (Jacking) Pipe

100 mm Ø 0.80
150 " 0.85
200 " 0.90
225 " 1.00
300 " 1.60
375 " 1.87
400 " 2.17
450 " 2.60
500 " 3.22
600 " 3.75
700 " 4.15
800 " 4.65

36
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

5. Reinforced Concrete Pipe (RCP)

i. Without Lining

375 mm Ø 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59

ii. With Lining (High Alumina)

375 mm Ø 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59

iii. With Lining (Sacrificial Lining)

375 mm Ø 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59

37
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

6. ABS Pipe

i. Gravity

90 mm Ø 0.67
110 " 1.00
150 " 2.07
225 " 3.64
315 " 7.10

ii. Force Main

15 mm Ø 0.01
20 " 0.02
25 " 0.03
32 " 0.04
40 " 0.05
50 " 0.08
65 " 0.15
80 " 0.18
100 " 0.30
150 " 0.61
200 " 1.13
225 " 1.00
250 " 3.73
280 " 1.48
315 " 1.87
355 " 2.37
400 " 3.01
450 " 3.81
500 " 4.71
630 " 7.47

38
NOTA TEKNIKAL
TECHNICAL NOTES
NOTA TEKNIKAL TECHNICAL NOTES

Harga bar keluli, simen dan fabric reinforcement The prices for steel bars, cement and fabric
yang diterbitkan dalam Siaran Khas 1 ini reinforcement published in this Special Release 1
diperoleh dari pungutan harga yang dibuat oleh are obtained from the price collection conducted
Jabatan Perangkaan Malaysia. by Department of Statistics, Malaysia.

Harga yang dilaporkan adalah mengikut 3 Prices are reported according to 3 regions in
kawasan di Semenanjung Malaysia seperti Peninsular Malaysia as follows:
berikut:

Utara = Perlis, Kedah, Pulau Pinang North = Perlis, Kedah, Pulau


dan Perak Pinang and Perak

Tengah = Wilayah Persekutuan Kuala Central = Wilayah Persekutuan Kuala


Lumpur, Melaka, Negeri Lumpur, Melaka, Negeri
Sembilan, Selangor dan Sembilan, Selangor and
Johor Johor

Timur = Pahang, Terengganu dan East = Pahang, Terengganu and


Kelantan Kelantan

Harga bitumen penembusan 80/100 adalah The Bitumen 80/100 Penetration is based on the
berdasarkan harga purata ex-Kuala Lumpur. average ex-Kuala Lumpur.

Harga diesel diperoleh daripada Kementerian The price for diesel is obtained from the Ministry
Perdagangan Dalam Negeri, Koperasi dan of Domestic Trade, Co-operatives and
Kepenggunaan. Consumerism.

Harga paip air dan paip pembetungan diperoleh The prices for water pipe and sewerage pipe are
daripada persatuan pembekal. Faktor pelarasan obtained from the supplier associations. The
bagi kategori dan saiz paip yang tidak diterbitkan adjustment factors for the other categories and
dalam Siaran Khas 1 ini adalah seperti di sizes not published in this Special Release 1 are
Lampiran A. shown in Appendix A.

Harga bagi bahan-bahan binaan lain (yang tidak The prices for other building materials (not stated
dinyatakan di atas) adalah diperoleh dari above) are obtained from the price collection
pungutan harga yang dibuat oleh Jabatan conducted by Department of Statistics, Malaysia.
Perangkaan Malaysia.

Semua harga yang tersebut di atas adalah bagi All prices mentioned above are relevant for
tujuan pengiraan kadar perubahan harga sahaja escalation purposes only and should not be used
dan tidak boleh digunakan untuk mewakili to represent actual price levels.
kedudukan harga yang sebenar.

39
Jadual Tarikh pengeluaran Siaran Khas 1 (Untuk Kerja-Kerja Kejuruteraan Awam),
Semenanjung Malaysia, Januari - Disember 2015
Schedule Of Release Dates For Special Release 1 (For Civil Engineering Works),
Peninsular Malaysia, January - December 2015

Bulan Rujukan Tarikh


Reference Month Date

Januari 2015 10 Februari 2015


January 2015 10 February 2015

Februari 2015 10 Mac 2015


February 2015 10 March 2015

Mac 2015 10 April 2015


March 2015 10 April 2015

April 2015 11 Mei 2015


April 2015 11 May 2015

Mei 2015 10 Jun 2015


May 2015 10 June 2015

Jun 2015 10 Julai 2015


June 2015 10 July 2015

Julai 2015 10 Ogos 2015


July 2015 10 August 2015

Ogos 2015 10 September 2015


August 2015 10 September 2015

September 2015 12 Oktober 2015


September 2015 12 October 2015

Oktober 2015 11 November 2015


October 2015 11 November 2015

November 2015 10 Disember 2015


November 2015 10 December 2015

Disember 2015 11 Januari 2016


December 2015 11 January 2016

40

You might also like