You are on page 1of 45
1750-310 Revision: July 2007 ae Hi-Voltage Supersedes: June 2007 VBM Fault Interrupter Instructions THREE PHASE THREE PHASE THREE PHASE 15KVI25KV Grounded 4008 25KV 2008 3BKV 3008 ‘5RVI25KV Grounded 600A 25KV 300A Zak 400A d ts ONE POLE® ONE poLe* ONE PotE® 38LV 400A SS SKV 300 SKY 5008 S8kV 600A BB SKV 008 48.5kV 200A, (ih anger alate) ‘Three poles required fora three phase installation. Joslyn Hi-Voltage 4000. 116" S. Cleveland, OH 44105 Ph (216) 271-6600 Fax (216) 341-3615 Email: infv@joslynbv.com www joslynbivoliage-com VBM Instruction Manual 1750. TABLE OF CONTENTS: 1. Safety Hazard Statement Definitions I, General Description. IIL. Installation ...... Inspection and Unerating, Mounting, Clearance Requirements. Clearance Requirements - Continued. 10 Control Valge.. in Contol Wiring. — a 2 High Voltage Connections = eal YVACSTAT™ Operational in B ‘Vaca Interupter Integrity Test u igh Potential Withstand e 4 ‘Vaciaum Contet Resistance Test 1s IV. Se 2 cree anle) Tools Required 6 Replacement Pans 0 Removal and Replacement f the Housing Cover and Breather Bag 0 Removal and Replacement of a Vacuum Module Assembly ‘Synchronization of Replacement Module Assembly Switch Operators ‘The Solenoid Operator The Motor Operator Servicing ~ Electial ae Removal and Installation of Control Assembly - Brief Installation of Control Assembly - Detaled. Servicing ~ Mechanical Install Motor Mechanism Install and Pre-adjust two Power springs into the assembly Setup tripping Replacement of Motor Auiliary Switch Adjustment V. Switches Rated 1,000 Amperes and Higher BM Instruction Manual 1750-310 TABLE OF FIGURES: Figure 1: Diagram VBM Switch Figure 2: Cuaway Drawing of Single Figure 3: VBM Switch with VACSTAT™ yacuumn monitor ° s “uum Module on ISKV Line-o-Ground Insulator, 3 = 6 Figure 4a: Motor Operator Figute 4b: Solenoid Operate. it ‘ 9 9 Figure 5: Typical Erecting Sling Figure 6a: 32" Clearance Around interrupiers Front View (38 kV Single Phase shown) Figure 6b: 32° Clearance Around Inerrupers- Side View Figure 7: Terminal Pad Diagram, 2 Figure 8: VACSTAT™ Operational Information 3 Figure 9: AC High Potential Test Set Connections =a 4 Figure 10; Coniaet Resistance Test Connections. 1s Figure 11: Replacement Module with Temporary Bolts 2 Figure 12: Synchronization of Replacement Module Assembly 26 Figure 13: Description of Operation 2 Figure 14: VBM Motor Operator Picture. . ee tee Figure 15: VM Motor Operator Diagram reirar a Figure 16: Sequence of Motor Operation 3 Figure 17; Sequence of Motor Operation... 31 Figure 18: Sequence of Motor Operation 31 Figure 19: Sequence af Motor Operation 2 Figure 23: Shim Placement ~ % Figure 24: Auxiliary Switch Adjustment a= : A Figure 25: Auxiliary Switch Adjustment (Prior to 1997), - 4 Figure 26: Wiring Hamess and Auxiliary Contact Adjustment. 45

You might also like