1750-310
Revision: July 2007
ae Hi-Voltage Supersedes: June 2007
VBM Fault Interrupter
Instructions
THREE PHASE THREE PHASE THREE PHASE
15KVI25KV Grounded 4008 25KV 2008 3BKV 3008
‘5RVI25KV Grounded 600A 25KV 300A
Zak 400A
d ts
ONE POLE® ONE poLe* ONE PotE®
38LV 400A SS SKV 300 SKY 5008
S8kV 600A BB SKV 008
48.5kV 200A,
(ih anger alate)
‘Three poles required fora three phase installation.
Joslyn Hi-Voltage
4000. 116" S.
Cleveland, OH 44105
Ph (216) 271-6600 Fax (216) 341-3615
Email: infv@joslynbv.com
www joslynbivoliage-comVBM Instruction Manual
1750.
TABLE OF CONTENTS:
1. Safety
Hazard Statement Definitions
I, General
Description.
IIL. Installation ......
Inspection and Unerating,
Mounting,
Clearance Requirements.
Clearance Requirements - Continued. 10
Control Valge.. in
Contol Wiring. — a 2
High Voltage Connections = eal
YVACSTAT™ Operational in B
‘Vaca Interupter Integrity Test u
igh Potential Withstand e 4
‘Vaciaum Contet Resistance Test 1s
IV. Se 2 cree anle)
Tools Required 6
Replacement Pans 0
Removal and Replacement f the Housing Cover and Breather Bag 0
Removal and Replacement of a Vacuum Module Assembly
‘Synchronization of Replacement Module Assembly
Switch Operators
‘The Solenoid Operator
The Motor Operator
Servicing ~ Electial ae
Removal and Installation of Control Assembly - Brief
Installation of Control Assembly - Detaled.
Servicing ~ Mechanical
Install Motor Mechanism
Install and Pre-adjust two Power springs into the assembly
Setup tripping
Replacement of Motor
Auiliary Switch Adjustment
V. Switches Rated 1,000 Amperes and HigherBM Instruction Manual
1750-310
TABLE OF FIGURES:
Figure 1: Diagram VBM Switch
Figure 2: Cuaway Drawing of Single
Figure 3: VBM Switch with VACSTAT™ yacuumn monitor
° s
“uum Module on ISKV Line-o-Ground Insulator, 3
= 6
Figure 4a: Motor Operator Figute 4b: Solenoid Operate. it
‘
9
9
Figure 5: Typical Erecting Sling
Figure 6a: 32" Clearance Around interrupiers Front View (38 kV Single Phase shown)
Figure 6b: 32° Clearance Around Inerrupers- Side View
Figure 7: Terminal Pad Diagram, 2
Figure 8: VACSTAT™ Operational Information 3
Figure 9: AC High Potential Test Set Connections =a 4
Figure 10; Coniaet Resistance Test Connections. 1s
Figure 11: Replacement Module with Temporary Bolts 2
Figure 12: Synchronization of Replacement Module Assembly 26
Figure 13: Description of Operation 2
Figure 14: VBM Motor Operator Picture. . ee tee
Figure 15: VM Motor Operator Diagram reirar a
Figure 16: Sequence of Motor Operation 3
Figure 17; Sequence of Motor Operation... 31
Figure 18: Sequence of Motor Operation 31
Figure 19: Sequence af Motor Operation 2
Figure 23: Shim Placement ~ %
Figure 24: Auxiliary Switch Adjustment a= : A
Figure 25: Auxiliary Switch Adjustment (Prior to 1997), - 4
Figure 26: Wiring Hamess and Auxiliary Contact Adjustment. 45