Site Preparation drawings

Table of contents
Sheet Type Subject

General
1 C-1 Cover sheet / Table of content
2 A-1 Site layout
3 AD-1 Schematic cross section(s)
Building works
4 X-1 Floor provisions (all disciplines)
X-2 Ceiling provisions (all disciplines)
5 X-3 Wall provisions (all disciplines)
Technical details
6 XD-1 Details 1 (all disciplines)
All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

Ingenuity CT Elite - iMR


RSUD Bontang Hospital
Bontang , Indonesia
Project
Typical configuration shown (not site specific) Revision history
H
G
F

Table of contents
E
D
C

Cover sheet
B 11 Apr 2018 ATT TTH Proposal Installation Drawing [Config given]

Sheet Subject
A 09 Apr 2018 ATT TTH Proposal Layout amendment [Config given]
0 20 Mar 2018 ATT TTH Proposal Site layout [No Config given]
Rev Date Drw Chk Proj. phase Description

Important notes
The information in this package is provided as a customer convenience,
and is not to be construed as architectural drawings or
construction documents.

Philips assumes no liability nor offers any warranty for the fitness
or adequacy of the premises or the utilities available at the premises
© Koninklijke Philips Electronics N.V. 2018

in which the equipment is to be installed, used or stored.

ID-18-00029

Quote No
Order No
Drawing
Philips contact Customer ID Technical ID
Mr. Y. Septiyana, +62 811 858 812, yosep.septiyanna@philips.com

Philips Healthcare A3 mm
a business of Royal Philips N.V.
PT Philips Indonesia
C-1
Gedung Philips, Jl. Buncit Raya, Kav 99-100, Pasar Minggu, Jakarta Seletan 12510, Indonesia Sheet 1/6
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED
0 1 2 3 4 5m Ingenuity CT Elite - iMR
Mass Heat Noise
Resp No Description [kg] [W] [dB(A)]
Examination area
1m
A 1.1 Scanner Gantry (Ingenuity) 1950 5270 69
6000 2000
A 1.2 Patient table standard 389 ≈0 -
Y A 1.3 Dual head injector 69,4 - -
2000
Control area
A 2.1 Server recon cabinet iMR 127 2600 55
A 2.2 Operating station with desk 88 290 -
B 2.3 Emergency power OFF switch - - -
4.2 2.5
A 2.4 Server recon cabinet iMR 127 2600 55
3.1 1.3 A 2.5 Dry Printer 2 - -
Examination area 2.4 Technical area
2000

3.2 A 3.1 PDU 115KVA PLUS 375 650 50

Technical area 2.1 A 3.2 Console UPS 3kVA 70 249 55


General
4.1 B 4.1 Lead glass window - - -
4000

X X B 4.2 Mains switch - - -


B 4.3 X-ray ON warning light - - -

1.1 1.2
2.3 2.2
Control area

4.3
Y Responsibilities
A Delivered and installed by philips
B Delivered and installed by customer/contractor
C (Pre) Delivered by Philips, installed by customer
All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

D (Pre) Delivered by customer and installed by Philips


E Existing

Ingenuity CT Elite - iMR


RSUD Bontang Hospital
Site requirements
Mains power

Bontang , Indonesia
· Supply configuration with Isotran: 3 phase delta, 3 wire (U1, V1, W1, PE1) into LM
3 phase wye, 4 wire (U2, V2, W2, N2, PE2, PE4 - electrode ground) output to CT gantry.
3000

Waiting Room · Nominal Line Voltage with Isotran: 200, 208, 240, 380, 400, 415, 440, 480, 500 VAC delta
UPS Room Pre / Post input to LM 480 VAC wye output to CT gantry.
· Maximum/momentary power required: 110 kVA
· Mains resistance: 160 mOhm line to line max. 80kW scan at 480 VAC

Project
Remote service diagnostics
To establish this feature, a RJ45 type Ethernet connector must be
installed with access to the customer's network (1000 Mbps)

Environmental requirements
Examination room:
Operating temperature range is 18°C-24°C
at 35%-70% relative humidity (non-condensing)
1850 2500 3500 Temperature change should not exceed 4.1°C per hour.
Verify on Site
Control room:

Site layout
Sheet Subject
Operating temperature range is 15°C-24°C
at 35%-70% relative humidity (non-condensing)
Temperature change should not exceed 3°C per hour.

Technical room:
Operating temperature range is 15°C-28°C
at 20%-80% relative humidity (non-condensing)
Temperature change should not exceed 5°C per hour.
Legend

B
© Koninklijke Philips Electronics N.V. 2018

Walls

ID-18-00029
Project notes
· The feasibility of this project is based on site information (like drawings) provided to

11 Apr 2018

Technical ID
New walls Philips. Philips cannot assume any liability for the accuracy of this information and the

Quote No
Order No
Drawing
consequences.
Existing doors/walls to be removed

ATT
· The equipment proposed in this room layout produces X-ray radiation. It is the
Beams or other building construction elements customer's responsibility to comply with the local regulation. Normally X-ray shielding has
to be applied to avoid hazards to patients, visitors and staff. Consult the Philips contact for A3 1 : 50 mm
Columns (materials and strength unknown) details and support.
A-1
Preferred service area Sheet 2/6
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED
© Koninklijke Philips Electronics N.V. 2018 All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.
0

1m

A
1
2

Suspended ceiling

B
B

Situation (scale 1:100)


3

Schematic cross section A-A


4

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED
5m

2740 (min. 2430)

? To verify on site
Suspended ceiling

Schematic cross section B-B

2740 (min. 2430)

? To verify on site

Drawing Sheet Subject Project


A3

Sheet

ID-18-00029 B Schematic cross sections Ingenuity CT Elite - iMR


11 Apr 2018
ATT RSUD Bontang Hospital
1 : 50

Quote No
AD-1

Bontang , Indonesia
Order No
mm

3/6

Technical ID
0 1 2 3 4 5m

1m
6000 2000

Y
2000

430 4 5
2000

6
1
2171
4000

X X
340

600
2 3

Y
All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

Ingenuity CT Elite - iMR


RSUD Bontang Hospital
Bontang , Indonesia
3000

UPS Room Pre / Post Waiting Room Floor covering Open cable duct with cover

Shroud layer Through filled with cement or epoxy

Project
Building floor

Typical floor duct installation (not to scale)

Floor provisions
1850 2500 3500

(all disciplines)
Verify on Site

Sheet Subject
Item list:
Resp No Description Qty Detail Text ref

B 1 Base plate provision for CT - XD-1 § 2.2


B 2 200 x 200 Cable outlet 2 - -
B 3 200 x 50 Floor duct flush mounted - - § 3.3

B
B 4 100 x 50 Floor duct flush mounted - - § 3.3
© Koninklijke Philips Electronics N.V. 2018

B 5 100 x 100 Cable outlet 2 - -

ID-18-00029
B 6 100 x 50 Wall duct - - § 3.3

11 Apr 2018

Technical ID
Quote No
Order No
Drawing
Responsibilities

ATT
A Delivered and installed by philips Works symbology
B Delivered and installed by customer/contractor Construction works A3 1 : 50 mm
C (Pre) Delivered by Philips, installed by customer Electrical works
D (Pre) Delivered by customer and installed by Philips Mechanical works X-1
E Existing Equipment works Sheet 4/6
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED
0 1 2 3 4 5m

1m

Suspended ceiling Suspended ceiling

(3200) To verify on site

(3200) To verify on site


7 430

1
3

2740 (min. 2430)

2740 (min. 2430)


2
900

4
6

1500

1500
900

440
5 Floor duct see X-1
Floor duct see X-1

Elevation A Elevation B
All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

Ingenuity CT Elite - iMR


RSUD Bontang Hospital
Wall

Bontang , Indonesia
Open cable duct with cover

Typical wall duct installation (not to scale)

Project
B

Wall provisions
(all disciplines)
Item list:

Sheet Subject
A Resp No Description Qty Detail Text ref

B 1 Mains switch 1 - § 3.2


B 2 Lead glass window 1 - § 1.6
B 3 Emergency power OFF switch 1 - § 3.2
B 4 Ø 19mm Conduit - - § 3.3

B
B 5 100 x 50 Wall duct - - § 3.3
© Koninklijke Philips Electronics N.V. 2018

B 6 200 x 50 Wall duct - - § 3.3

ID-18-00029
B 7 X-ray ON warning light 1 - § 3.2

11 Apr 2018

Technical ID
Quote No
Order No
Drawing
Responsibilities

ATT
A Delivered and installed by philips Works symbology
B Delivered and installed by customer/contractor Construction works A3 1 : 50 mm
C (Pre) Delivered by Philips, installed by customer Electrical works
D (Pre) Delivered by customer and installed by Philips Mechanical works X-3
E Existing Equipment works
Situation (scale 1:100) Sheet 5/6
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED
Floor plate Floor plate Y

Total floor area


for waviness and
>50.8mm embedment in concrete levelness boundary

>45mm embedment in concrete


Screed layer Screed layer

2743

610
Hilti HIT-HY 200 with HIT-V X
Red Head RL-12 drop in anchor
110 / 8.8
bolt diameter: 12,7mm
bolt diameter: 12mm
drill bit size: 15.9mm
drill bit size: 14mm
Concrete tension
Concrete quality ≥C20
>13.8N/mm²

610
Gantry and patient table fixing detail Gantry and patient table fixing detail 975
(not to scale) (not to scale) 3658
Delivered by Philips Not delivered by Philips
B
Y A
1 2

See note 1 for max. waviness span


Base frame outline See note 2 for max. levelness span

Cable entry area Notes:


All rights reserved. Reproduction in whole or in part is prohibited without prior written consent of the copyright holder.

Ingenuity CT Elite - iMR


RSUD Bontang Hospital
Couch plinth 1. Floor waviness (A) of exam room shall not exceed 6.3 mm when
outline measured within 300 mm from any point within the shaded
2 1 area on layout.

2. Floor levelness (B) of exam room shall not exceed 6.3 mm

Bontang , Indonesia
when measured between any two boundary points across the

183
140
shaded area on layout.
X 3. Apply self leveling grout material as required to meet specifications.

Project
508
708

1105
885
913

1137 4
1037
1071

1764
2407
2617 Detail - Floor levelness and waviness (not to scale)

(all disciplines)
Sheet Subject
Details 1
Item list:
294 181 Resp No Description Qty Detail Text ref
384 197 A Expansion anchor M12 8 - § 2.2
1

B
422 232 B Drill hole for M12 anchor 8 - § 2.2
2
438 338
© Koninklijke Philips Electronics N.V. 2018

A 3 Base plate for gantry 1 - § 2.2

ID-18-00029
473 A Base plate for patient table 1 - § 2.2
Always apply the Philips drill template 4

11 Apr 2018

Technical ID
553

Quote No
Order No
Drawing
Responsibilities

ATT
A Delivered and installed by philips Works symbology
B Delivered and installed by customer/contractor Construction works A3 1 : 50 mm
C (Pre) Delivered by Philips, installed by customer Electrical works
Detail - Scanner gantry/patient table base frame (scale 1:20) D (Pre) Delivered by customer and installed by Philips Mechanical works XD-1
E Existing Equipment works Sheet 6/6
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C-1 AND SHOULD NOT BE SEPARATED