Lantai Dasar

1 Pondasi
Panjang Lebar Tinggi Jumlah Luas
M2
Galian Pondasi P1 1.2 1.2 1.5 2
P2 1 1 1.2 4
P3 1.2 0.7 1.5 10

Pasir Urug P1 1.2 1.2 0.05 2


P2 1 1 0.05 4
P3 1.2 0.7 0.05 10

Lantai Kerja P1 1.2 1.2 0.05 2


P2 1 1 0.05 4
P3 1.2 0.7 0.05 10

Beton K 175 P1 1.2 1.2 0.3 2


P2 1 1 0.25 4
P3 1.2 0.7 0.3 10

2 Kolom
Bekisting Kolom K1 0.15 0.4 5.56 2 12.232
K2 0.15 0.4 5.31 4 23.364
K3 0.15 0.4 5.56 10 61.16
96.76

Beton K175 K1 0.15 0.4 5.56 2


K2 0.15 0.4 5.31 4
K3 0.15 0.4 5.56 10

3 Kolom Praktis
Bekisting Kp 0.15 0.15 4.16 9 22.464

Beton K175 Kp 0.15 0.5 4.16 9


4 Sloof
Galian Sloof S1 68.5 0.2 0.4 0
S2 12.5 0.2 0.3 0

Bekisting Sloof S1 68.5 0.2 0.4 0 82.2


S2 12.5 0.2 0.3 0 12.5
94.70

Beton K175 S1 68.5 0.2 0.4 0


S2 12.5 0.2 0.3 0

5 Ring Balok
Bekisting B1 80.5 0.2 0.4 0 96.6
B2 11 0.2 0.3 0 11
107.60

Beton K175 B1 80.5 0.2 0.4 0


B2 11 0.2 0.3 0

6 Plat dak t 12
Bekisting 6 8 48

Beton K175 6 8 0.12 0

Lantai Atas
Kolom
Bekisting Kolom K1 0.15 0.4 3.5 9 34.65
K2 0.15 0.4 3.5 0 0
K3 0.15 0.4 3.5 0 0
34.65

Beton K175 K1 0.15 0.4 3.5 9


K2 0.15 0.4 3.5 0
K3 0.15 0.4 3.5 0

Kolom Praktis
Bekisting Kp 0.15 0.15 3.5 9 18.9

Beton K175 Kp 0.15 0.5 3.5 9


Ring Balok
Bekisting B1 0 0.2 0.4 0 0
B2 39.9 0.2 0.3 0 39.9
39.90

Beton K175 B1 0 0.2 0.4 0


B2 39.9 0.2 0.3 0
Volume
M3
4.32
4.80
12.60
21.72

0.14
0.20
0.42
0.76

0.14
0.20
0.42
0.76

0.86
1.00
2.52
4.38

0.67
1.27
3.34
5.28

2.81
5.48
0.75
6.23

5.48
0.75
6.23

6.44
0.66
7.10

5.76

1.89
0.00
0.00
1.89

2.36
0.00
2.39
2.39
RENCANA ANGGARAN

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI

LOKASI : Jl. Perkutut Helvetia - Medan

NO URAIAN PEKERJAAN UNIT VOLUME

A PEK. PERSIAPAN
1 Pek.pengukuran dan pemasangan bowplank M' 30.00

2 Pek. Pembersihan Tapak M3 120.00

4 Pembuatan Gudang Material M2 4.00

SUB TOTAL

B LT 1
Pekerjaan Pondasi
1 P1
a Galian tanah M3 4.32

b Lantai kerja 1:3:5 M3 0.14

c Pengecoran 1:2:3 M3 0.86

d Urukan pasir M3 0.14

e pembesian
g D12mm KG 0.00

2 P2
a Galian tanah M3 4.80

b Lantai kerja 1:3:5 M3 0.20

c Pengecoran 1:2:3 M3 1.00

d Urukan pasir M3 0.20

e pembesian
g D12mm KG 0.00

3 P3
a Galian tanah M3 12.60

b Lantai kerja 1:3:5 M3 0.42

c Pengecoran 1:2:3 M3 0.42

d Urukan pasir M3 0.00

e pembesian
g D12mm KG 0.00

4 Pekerjaan Lantai
Pemadatan tanah Timbun + 60 cm M3 49.60

Rabat Lantai 1:3:5 M3 6.20

5 S1
a Galian tanah M3 5.48

b Bekisting M2 82.20

c Pengecoran 1:2:3 M3 5.48

d pembesian
D12mm KG 0.00
Ø8 mm KG 0.00

S2
a Galian tanah M3 0.75

b Bekisting M2 12.50

c Pengecoran 1:2:3 M3 0.75

d pembesian
D12mm KG 0.00

Ø8 mm KG 0.00

6 K1
a Bekisitng M2 12.23

b Pembesian
D12mm KG 0.00

Ø8 mm KG 0.00

c Cor 1:2:3 M3 0.67

7 K2
a Bekisitng M2 23.36

b Pembesian
D12mm KG 0.00

Ø8 mm KG 0.00

c Cor 1:2:3 M3 1.27

8 K3
a Bekisitng M2 61.16

b Pembesian
D12mm KG 0.00

Ø8 mm KG 0.00

c Cor 1:2:3 M3 3.34

9 Kp
b Pembesian
Bekisitng M2 22.46

Ø 10mm KG 0.00

Ø8 mm KG 0.00

c Cor 1:2:3 M3 2.81

10 B1
a Bekisting M2 96.60

b pembesian
D 12 mm KG 0.00

Ø8mm KG 0.00

c Cor 1:2:3 M3 6.44

B2
a Bekisting M2 11.00

b pembesian
D 12 mm KG 0.00

Ø8mm KG 0.00

c Cor 1:2:3 M3 0.66

11 Cor Plat Tangga


Bekisting M2 0.00

pembesian
Ø 10mm KG 0.00

Cor 1:2:3 M3 0.00

12 Cor Kanopi
Bekisting M2 0.00

pembesian
Ø 10mm KG 0.00

Cor 1:2:3 M3 0.00

13 Cor Plat Lantai


Bekisting M2 48.00

pembesian
Ø 10mm KG 0.00

Cor 1:2:3 M3 5.76

14 PEK.DINDING 1 bata
a Pasangan dinding batu bata campuran 1:3 M2 0.00

b Plesteran 1PC:3PS tebal 15 mm M2 0.00

c. Pek. Skat dinding + kaca 6mm polos M2 0.00

d. Pintu kaca sliding + kaca 8 mm polos + acc M2 0.00

15 PEK.DINDING 1/2 bata


a Pasangan dinding batu bata campuran 1:4 M2 0.00

b Plesteran 1PC:4PS tebal 15 mm + acian M2 0.00

16 PEK. FINISHING
1. Pemasangan Keramik 60 x60 lantai M2 0.00

2. Keramik Lantai 20 x 20 M2 0.00

3. Dinding KM 20 x 40 M2 0.00

4. Keramik Meja Dapur 40 x 40 M2 0.00

18 PEK. PLAPON
a Plapon + rangka M2 0.00

b Profil Gypsum M2 0.00

19 PEK.CAT
a Pek. Cat Exterior M2 0.00

b Pek.Cat Tembok Interior M2 0.00

c Pek. Plapon M2 0.00

d Pek. Cat Kosen + Daun Pintu/Jendela M2 0.00

20 PEK.LISTRIK
a Titik lampu Titik 0.00

b Saklar Tunggal + instalasi Titik 0.00

c Saklar Ganda + instalasi Titik 0.00

d Stop Kontak + instalasi Titik 0.00

e Panel MCB Titik 0.00

21 Pek. Sanitari
a Pas Bathup Titik 1.00

b Pas Kloset Duduk + instalasi Titik 2.00


f Pas Flor drain Titik 2.00

g instalasi Pipa Air Bersih 1/2" + 3/4" AW m' 0.00

h instalasi Pipa Air Limbah 2 1/2" AW m' 0.00

i Pipa Air Kotor 4" AW m' 0.00

SUB TOTAL
C Lantai 2

1 K1
a Bekisitng M2 34.65

b Pembesian
D14mm KG 0.00

Ø8 mm KG 0.00

c Cor 1:2:3 M3 1.89

3 Kp
a Bekisitng M2 18.90

b Pembesian
Ø 10mm KG 0.00

Ø8 mm KG 0.00

c Cor 1:2:3 M3 2.36

4 B2
a Bekisting M2 39.90

b pembesian
D 12 mm KG 0.00

Ø8mm KG 0.00

c Cor 1:2:3 M3 2.39

5 Cor Plat lantai


pembesian
Ø 10mm KG 0.00

Cor 1:2:3 M3 0.00

6 Cor Kanopi
Bekisting M2 0.00

pembesian
Ø 10mm KG 0.00

Cor 1:2:3 M3 0.00

7 PEK.DINDING 1/2 bata


a Pasangan dinding batu bata campuran 1:4 M2 0.00

b Plesteran 1PC:4PS tebal 15 mm M2 0.00

8 PEK. FINISHING
a Pemasangan Keramik lantai M2 0.00

b Pemasangan Keramik lantai KM M2 0.00

c Pemasangan Keramik dinding KM M2 0.00

9 PEK.PINTU DAN JENDELA KACA


a PJ1 Unit 0.00

b P2 Unit 0.00
c P3 Unit 0.00

d PG Unit 0.00

e J1 Unit 0.00

f J2 Unit 0.00

h J3 Unit 0.00

I J4 Unit 0.00

J JM Unit 0.00

10 PEK. PLAPON
Plapon + rangka M2 0.00

Profil Gypsum M2 0.00

11 PEK.CAT
Pek. Cat Exterior M2 0.00

Pek.Cat Tembok Interior M2 0.00

Pek. Plapon M2 0.00

Pek. Cat Kosen + Daun Pintu/Jendela M2 0.00

12 PEK.LISTRIK
Downligt + instalasi Titik 0.00

Saklar Tunggal + instalasi Titik 0.00

Saklar Ganda + instalasi Titik 0.00

Stop Kontak + instalasi Titik 0.00

Panel MCB Titik 0.00

13 Pek. Sanitari
Pas Kloset Duduk + instalasi Titik 0.00

Pas Kloset Jongkok + instalasi Titik 0.00

Pas Bathup Titik 0.00

Pas Wastafel + Instatalasi Titik 0.00

Pas Florr drain Titik 0.00

Pipa Air Bersih m' 0.00

Pipa Air Limbah m' 0.00

Pipa Air Kotor m' 0.00

14 Pek. Atap
Pas Rangka Atap Baja Ringan + Atap Genteng Metal M2 0.00

Pas. Rabung M' 0.00

Pas. Listplank M' 0.00

SUB TOTAL

GRAND TOTAL

Di Setujui Oleh
JHON
Pemilik
NCANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH


MATERIAL UPAH JUMLAH MATERIAL UPAH
RP RP RP RP RP

Rp 117,626 Rp 24,150 Rp 141,776 Rp 3,528,784 Rp 724,500


Rp - Rp 10,300 Rp 10,300 Rp - Rp 1,236,000
Rp 463,295 Rp 241,500 Rp 704,795 Rp 1,853,179 Rp 966,000
Rp 5,381,963 Rp 2,926,500

Rp - Rp 57,615 Rp 57,615 Rp - Rp 248,897


Rp 454,089 Rp 255,300 Rp 709,389 Rp 65,389 Rp 36,763
Rp 644,253 Rp 255,300 Rp 899,553 Rp 556,635 Rp 220,579
Rp 261,096 Rp 33,810 Rp 294,906 Rp 37,598 Rp 4,869

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -

Rp - Rp 57,615 Rp 57,615 Rp - Rp 276,552


Rp 454,089 Rp 255,300 Rp 709,389 Rp 90,818 Rp 51,060
Rp 644,253 Rp 255,300 Rp 899,553 Rp 644,253 Rp 255,300
Rp 261,096 Rp 33,810 Rp 294,906 Rp 52,219 Rp 6,762

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -

Rp - Rp 57,615 Rp 57,615 Rp - Rp 725,949


Rp 454,089 Rp 255,300 Rp 709,389 Rp 190,717 Rp 107,226
Rp 644,253 Rp 255,300 Rp 899,553 Rp 270,586 Rp 107,226
Rp 261,096 Rp 33,810 Rp 294,906 Rp - Rp -

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -

Rp 200,000 Rp 54,500 Rp 9,920,000 Rp 2,703,200


Rp 454,089 Rp 255,300 Rp 709,389 Rp 2,815,352 Rp 1,582,860

Rp - Rp 57,615 Rp 57,615 Rp - Rp 315,730


Rp 99,493 Rp 68,747 Rp 168,240 Rp 8,178,310 Rp 5,651,003
Rp 644,253 Rp 255,300 Rp 899,553 Rp 3,530,506 Rp 1,399,044

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -

Rp - Rp 57,615 Rp 57,615 Rp - Rp 43,211


Rp 99,493 Rp 68,747 Rp 168,240 Rp 1,243,660 Rp 859,338
Rp 644,253 Rp 255,300 Rp 899,553 Rp 483,190 Rp 191,475

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -

Rp 367,438 Rp 76,590 Rp 444,028 Rp 4,494,497 Rp 936,849

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 429,846 Rp 170,336

Rp 367,438 Rp 76,590 Rp 444,028 Rp 8,584,813 Rp 1,789,449

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 821,036 Rp 325,354

Rp 367,438 Rp 76,590 Rp 444,028 Rp 22,472,487 Rp 4,684,244

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 2,149,228 Rp 851,681

Rp 367,438 Rp 76,590 Rp 444,028 Rp 8,254,119 Rp 1,720,518


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 1,809,062 Rp 716,882

Rp 367,438 Rp 78,660 Rp 446,098 Rp 35,494,477 Rp 7,598,556

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 4,148,989 Rp 1,644,132

Rp 367,438 Rp 78,660 Rp 446,098 Rp 4,041,814 Rp 865,260

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 425,207 Rp 168,498
Rp 231,306 Rp 78,660 Rp 309,966 Rp - Rp -

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 644,253 Rp 255,300 Rp 899,553 Rp - Rp -

Rp 231,306 Rp 78,660 Rp 309,966 Rp - Rp -

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 644,253 Rp 255,300 Rp 899,553 Rp - Rp -

Rp 231,306 Rp 78,660 Rp 309,966 Rp 11,102,707 Rp 3,775,680

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 644,253 Rp 255,300 Rp 899,553 Rp 3,710,897 Rp 1,470,528

Rp 83,300 Rp 46,920 Rp 130,220 Rp - Rp -


Rp 15,188 Rp 41,400 Rp 56,588 Rp - Rp -
Rp 321,417 Rp - Rp 321,417 Rp - Rp -
Rp 495,960 Rp - Rp 495,960 Rp - Rp -

Rp 83,300 Rp 46,920 Rp 130,220 Rp - Rp -


Rp 15,188 Rp 41,400 Rp 56,588 Rp - Rp -

Rp 216,393 Rp 60,000 Rp 276,393 Rp - Rp -


Rp 75,068 Rp 60,000 Rp 135,068 Rp - Rp -
Rp 132,861 Rp 71,156 Rp 204,018 Rp - Rp -
Rp 160,000 Rp 60,000 Rp 220,000 Rp - Rp -

Rp 101,692 Rp 18,975 Rp 120,667 Rp - Rp -


Rp 6,930 Rp 750 Rp 7,680 Rp - Rp -

Rp 38,188 Rp 15,704 Rp 53,892 Rp - Rp -


Rp 22,859 Rp 15,704 Rp 38,563 Rp - Rp -
Rp 22,859 Rp 15,704 Rp 38,563 Rp - Rp -
Rp 49,042 Rp 25,875 Rp 74,917 Rp - Rp -

Rp 254,925 Rp 75,000 Rp 329,925 Rp - Rp -


Rp 157,300 Rp 75,000 Rp 232,300 Rp - Rp -
Rp 157,300 Rp 75,000 Rp 232,300 Rp - Rp -
Rp 157,300 Rp 75,000 Rp 232,300 Rp - Rp -
Rp 250,000 Rp 95,000 Rp 345,000 Rp - Rp -

Rp 3,492,000 Rp 282,000 Rp 3,774,000 Rp 3,492,000 Rp 282,000


Rp 2,656,500 Rp 493,350 Rp 3,149,850 Rp 5,313,000 Rp 986,700
Rp 45,000 Rp 15,000 Rp 60,000 Rp 90,000 Rp 30,000
Rp 14,642 Rp 8,280 Rp 22,922 Rp - Rp -
Rp 58,846 Rp 18,009 Rp 76,855 Rp - Rp -
Rp 122,328 Rp 27,014 Rp 149,341 Rp - Rp -

Rp 144,913,414 Rp 42,803,712

Rp 367,438 Rp 76,590 Rp 444,028 Rp 12,731,715 Rp 2,653,844

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 1,217,638 Rp 482,517

Rp 367,438 Rp 78,660 Rp 446,098 Rp 6,944,572 Rp 1,486,674

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 1,522,048 Rp 603,146

Rp 367,438 Rp 78,660 Rp 446,098 Rp 14,660,762 Rp 3,138,534

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -
Rp 644,253 Rp 255,300 Rp 899,553 Rp 1,542,342 Rp 611,188

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 644,253 Rp 255,300 Rp 899,553 Rp - Rp -

Rp 231,306 Rp 78,660 Rp - Rp -

Rp 11,463 Rp 2,360 Rp 13,824 Rp - Rp -


Rp 644,253 Rp 255,300 Rp 899,553 Rp - Rp -

Rp 83,300 Rp 46,920 Rp 130,220 Rp - Rp -


Rp 15,188 Rp 41,400 Rp 56,588 ` Rp -

Rp 216,393 Rp 60,000 Rp 276,393 Rp - Rp -


Rp 75,068 Rp 60,000 Rp 135,068 Rp - Rp -
Rp 132,861 Rp 71,156 Rp 204,018 Rp - Rp -

Rp 1,700,000 Rp 206,173 Rp 1,906,173 Rp - Rp -


Rp 1,050,000 Rp 144,758 Rp 1,194,758 Rp - Rp -
Rp 277,500 Rp 100,000 Rp 377,500 Rp - Rp -
Rp 3,118,500 Rp - Rp 3,118,500 Rp - Rp -
Rp 780,000 Rp 96,314 Rp 876,314 Rp - Rp -
Rp 720,000 Rp 96,314 Rp 816,314 Rp - Rp -
Rp 300,000 Rp 96,314 Rp 396,314 Rp - Rp -
Rp 1,722,700 Rp 206,173 Rp 1,928,873 Rp - Rp -
Rp 850,000 Rp 96,314 Rp 946,314 Rp - Rp -

Rp 101,692 Rp 18,975 Rp 120,667 Rp - Rp -


Rp 6,930 Rp 750 Rp 7,680 Rp - Rp -

Rp 38,188 Rp 15,704 Rp 53,892 Rp - Rp -


Rp 22,859 Rp 15,704 Rp 38,563 Rp - Rp -
Rp 22,859 Rp 15,704 Rp 38,563 Rp - Rp -
Rp 49,042 Rp 25,875 Rp 74,917 Rp - Rp -

Rp 254,925 Rp 75,000 Rp 329,925 Rp - Rp -


Rp 157,300 Rp 75,000 Rp 232,300 Rp - Rp -
Rp 157,300 Rp 75,000 Rp 232,300 Rp - Rp -
Rp 157,300 Rp 75,000 Rp 232,300 Rp - Rp -
Rp 250,000 Rp 95,000 Rp 345,000 Rp - Rp -

Rp 2,656,500 Rp 429,000 Rp 3,085,500 Rp - Rp -


Rp 200,342 Rp 150,000 Rp 350,342 Rp - Rp -
Rp 3,492,000 Rp 282,000 Rp 3,774,000 Rp - Rp -
Rp 525,242 Rp 282,000 Rp 807,242 Rp - Rp -
Rp 45,000 Rp 15,000 Rp 60,000 Rp - Rp -
Rp 11,564 Rp 9,900 Rp 21,464 Rp - Rp -
Rp 51,170 Rp 15,660 Rp 66,830 Rp - Rp -
Rp 106,372 Rp 23,490 Rp 129,862 Rp - Rp -

Rp 200,000 Rp 50,000 Rp 250,000 Rp - Rp -


Rp 9,660 Rp 3,000 Rp 12,660 Rp - Rp -
Rp 39,100 Rp 19,800 Rp 58,900 Rp - Rp -

Rp 38,619,076 Rp 8,975,903

Rp 183,532,490 Rp 51,779,615

Di Buat Oleh
Rahma Deni
Pelaksana
JUMLAH
UPAH + MATRIAL
RP

Rp 4,253,284
Rp 1,236,000
Rp 2,819,179
Rp 8,308,463

Rp 248,897
Rp 102,152
Rp 777,214
Rp 42,466

Rp -

Rp 276,552
Rp 141,878
Rp 899,553
Rp 58,981

Rp -

Rp 725,949
Rp 297,943
Rp 377,812
Rp -

Rp -

Rp 12,623,200
Rp 4,398,212

Rp 315,730
Rp 13,829,314
Rp 4,929,550

Rp -
Rp -

Rp 43,211
Rp 2,102,998
Rp 674,665

Rp -
Rp -
###

Rp 5,431,346

Rp -
Rp -
Rp 600,182

Rp 10,374,262

Rp -
Rp -
Rp 1,146,390

Rp 27,156,731

Rp -
Rp -
Rp 3,000,909

Rp 9,974,637
Rp -
Rp -
Rp 2,525,945
###

Rp 43,093,033

Rp -
Rp -
Rp 5,793,121

Rp 4,907,074

Rp -
Rp -
Rp 593,705
Rp -

Rp -
Rp -

Rp -

Rp -
Rp -

Rp 14,878,387

Rp -
Rp 5,181,425
Rp 74,446,746

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp 3,774,000
Rp 6,299,700
Rp 120,000
Rp -
Rp -
Rp -

Rp 262,163,872

Rp 15,385,558

Rp -
Rp -
Rp 1,700,155

Rp 8,431,246

Rp -
Rp -
Rp 2,125,194

Rp 17,799,296

Rp -
Rp -
Rp 2,153,530

Rp -
Rp -

Rp -

Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp 47,594,979

Rp 309,758,850
###
###

Rp 309,758,850

nilai awal
###
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
1 Pondasi P1 2 Unit

Volume Beton
Panjang 1 : 1.20
2 :
1.20
Lebar :
Tinggi : 1.20
Luas : 0.30
Volume : 1.44
Keliling :
0.43
4.80

Tulangan Atas
Tulangan Atas 1.10
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
Sumbu x 0.05 0.05 7 D 8 8 0.395 0.100 2

1.10

Sumbu y 0.05 0.05 9 D 8 8 0.395 0.100 2

Tulangan Bawah

Sumbu x 7 D 12 12 0.888 0.100 2


0.20 0.20

1.10

9 D 12 12 0.888 0.10 2
Sumbu y 0.20 0.20
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

1.10

2 Pondasi P2 4 Unit

Volume Beton
Panjang 1 : 1.00
2 :
1.00
Lebar :
Tinggi : 1.00
Luas : 0.30
Volume : 1.00
Keliling :
0.30
4.00
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
Tulangan Atas
Tulangan Atas 0.90

Sumbu x 0.05 0.05 6 D 8 8 0.395 0.100 4

0.90

Sumbu y 0.05 0.05 6 D 8 8 0.395 0.100 4

Tulangan Bawah
7 D 16 16 1.578 0.10 4
Sumbu x 0.44 0.44

0.81
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
7 D 16 16 1.578 0.10 4
Sumbu y 0.44 0.44

0.81

3. Pile Cap PC3 4 Unit

Volume Beton
Panjang 1 : 2.70
2 :
2.70
Lebar :
Tinggi : 1.35
Luas : 0.60
Volume : 5.76
Keliling :
3.45
8.65
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

Tulangan Atas
Sumbu x 2.51 4.5 D 16 16 1.578 0.10 4

0.20 0.20

2.24 1 D 16 16 1.578 0.10 4

0.20 0.20

1.78 1 D 16 16 1.578 0.10 4

0.20 0.20

1.32 1 D 16 16 1.578 0.10 4


PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
0.20 0.20

0.86 1 D 16 16 1.578 0.10 4

0.20 0.20

Sumbu y 1.29 2 D 16 16 1.578 0.10 4

0.20 0.20

1.56 2 D 16 16 1.578 0.10 4

0.20 0.20

1.95 2 D 16 16 1.578 0.10 4

0.20 0.20

2.34 2 D 16 16 1.578 0.10 4


PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

0.20 0.20

2.40 2 D 16 16 1.578 0.10 4

0.20 0.20

Tulangan Bawah
Sumbu x

0.45 0.45 9 D 16 16 1.578 0.10 4

2.58

0.45 0.45 1 D 16 16 1.578 0.10 4


PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
2.50

0.45 0.45 1 D 16 16 1.578 0.10 4

2.27

0.45 0.45 1 D 16 16 1.578 0.10 4

2.04

0.45 0.45 1 D 16 16 1.578 0.10 4

1.81
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

0.45 0.45 1 D 16 16 1.578 0.10 4

1.58

0.45 0.45 1 D 16 16 1.578 0.10 4

1.35

0.45 0.45 1 D 16 16 1.578 0.10 4

1.12
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

0.45 0.45 1 D 16 16 1.578 0.10 4

0.89

Sumbu y

0.45 0.45 2 D 16 16 1.578 0.10 4

1.29

0.45 0.45 2 D 16 16 1.578 0.10 4


PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
1.46

0.45 0.45 2 D 16 16 1.578 0.10 4

1.60

0.45 0.45 2 D 16 16 1.578 0.10 4

1.79

0.45 0.45 2 D 16 16 1.578 0.10 4

1.99
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

0.45 0.45 2 D 16 16 1.578 0.10 4

2.18

0.45 0.45 2 D 16 16 1.578 0.10 4

2.38
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
0.45 0.45 5 D 16 16 1.578 0.10 4

2.43

4 Pile Cap PC4 12 Unit


PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
Volume Beton
Panjang 1 : 2.70
2 :
2.70
Lebar :
Tinggi : 1.35
Luas : 0.60
Volume : 3.65
Keliling :
2.19
8.10

Tulangan Atas
Tulangan Atas 2.48

Sumbu x 0.19 0.19 4 D 16 16 1.578 0.100 12


PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
1.13

Sumbu y 0.19 0.19 4 D 16 16 1.578 0.100 12

Tulangan Bawah
7 D 16 16 1.578 0.10 12
Sumbu x 0.44 0.44

2.51

7 D 16 16 1.578 0.10 12
Sumbu y 0.44 0.44
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
1.16

5 Pile Cap PC5 10 Unit

Volume Beton
Panjang 1 : 1.50
2 :
1.50
Lebar :
Tinggi : 1.50
Luas : 0.60
Volume : 2.25
Keliling :
1.35
6.00

Tulangan Atas
Tulangan Atas 1.28
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

Sumbu x 0.19 0.19 6 D 16 16 1.578 0.100 10

1.28

Sumbu y 0.19 0.19 6 D 16 16 1.578 0.100 10

Tulangan Bawah

Sumbu x 10 D 16 16 1.578 0.10 10


0.44 0.44

1.31

10 D 16 16 1.578 0.10 10
Sumbu y 0.44 0.44
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5

1.31
PT Pelabuhan Indonesia I (Persero)

Nama Proyek : PEMBANGUNAN TERMINAL PENUMPANG BARU DI PELABUHAN SEI KOLAK KIJANG
Pekerjaan : Pile Cap
Referensi : Gambar Detail Pile Cap
Tanggal :

Dia. Berat Jumlah Unit


No. Sket Tekuk
(mm) (kg) (bh)
1 2 3 4 5
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7
61.898

Panjang 3 : 0
4 : 0
Lebar :
0
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7
7 1.300 2 7.189

9 1.300 2 9.243

7 1.600 2 19.891

9 1.600 3 25.574
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

178.328

Panjang 3 : 0
4 : 0
Lebar :
0
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

6 1.100 3 10.428

6 1.100 3 10.428

7 1.782 5 78.736
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7
7 1.782 5 78.736

995.049

Panjang 3 : 2.70
4 : 0.91
Lebar :
1.17
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

5 3.014 6 95.122

1 2.741 1 17.301

1 2.280 1 14.391

1 1.818 1 11.475
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

1 1.357 1 8.565

2 1.786 2 22.546

2 2.064 2 26.056

2 2.454 2 30.979

2 2.844 2 35.903
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

2 2.900 2 36.610

9 3.578 11 203.259

1 3.504 2 22.114
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

1 3.273 2 20.659

1 3.043 2 19.204

1 2.812 1 17.749
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

1 2.582 1 16.294

1 2.351 1 14.840

1 2.121 1 13.385
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

1 1.890 1 11.930

2 2.286 2 28.858

2 2.457 2 31.017
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

2 2.596 2 32.772

2 2.791 2 35.234

2 2.986 3 37.695
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

2 3.181 3 40.157

2 3.376 3 42.619
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7
5 3.432 6 108.314

1,091.206
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

Panjang 3 : 0
4 : 0
Lebar :
0

4 2.966 13 224.657
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

4 1.616 7 122.402

7 3.482 25 461.546

7 2.132 16 282.601
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

1,054.609

Panjang 3 : 0
4 : 0
Lebar :
0
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7

6 1.766 9 167.205

6 1.766 9 167.205

10 2.282 20 360.100

10 2.282 20 360.100
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7
elabuhan Indonesia I (Persero)

I KOLAK KIJANG

Jml. Pot. Pjg. Pot. Jumlah Kebutuhan


(bh) per Buah (m) Batang (btg) Berat (kg)
6 7 8=5x6x7/11,8m 9 = 4x5x6x7