You are on page 1of 6
4) 6) ARAMCO VENDOR INSPECTION EXAMINATION VESSELS What is the difference between a Certificate of Conformity and a CMTR? Is there any specific NDT requirement for vessels made of stainless steel, wall thickness over Ya"? second manufacturer, In & vessel where one of its two heads have been provided by ‘what document should accompany the second head? For a test pressure equal to 5000 psi, which of the following would be the most appropriate gauge? a- S000 psi b = 15000 psi © 10000 psi d— 20000 psi What is the difference between hydrotesting stainless steel vessels as compared to carbon steel Can weld repair be curried out on a vessel after heat treutment with the approval of the approved inspector’? adustrieweg 14, 2712 LB Zoetermcer, ‘The Netherlands MMI BV. tuow nat R@piman | pana aes THE INTERNATIONAL INSPECTION, EXPEDITING AND PROCUREMENT SPECIALISTS PRESSURE RETAINING EQUIPMENT PRESS ~ 02/119 INSPECTORS NAME: 6.0.6.0 e 6 cece ee eee eee QUESTION 1 What ASME code covers the "welding aspects" of pressure vessels ? a) ASME section I; b) ASME section II; c) ASME section V; d) ASME section VIII; e) ASME section IX ANSWER : QUESTION 2 Does ASME code allow openings through welded joints to accomodate nozzles ? ANSWER : QUESTION 3 What is meant by the term "floating header" in relation to an aircooled heat exchangex ? ANSWER + QUESTION 4 The drawing in “attachment 1" shows a typical floating head type heat exchanger. Can you identify at least 18 parts by assigning the correct numbers to the circles based on the part name-number list given below ? 1 Channel 11 Channel flange 17 Floating head~ 2 Support saddle 12 Channel nozzle backing 3° Shell 13 Instrument ~ 18 Drain connection 4 Vent connection connection 19 Floating head 5 Shell cover 14 Shell nozzle flange 6 Floating tube sheet 15 Impingement- 20 Shell flange 7 Floating head cover plate 21 Shell cover~ @ ‘Transverse baffles 16 Tierods and- flange 8 Tubes spacers device 22 Pass partition 10 Channel cover 23 Tube sheet MMI BV. Reg.nr, K.v.K. DEN HAAG 134040 * Bank: AMRO, Rekeningar. 43.00.15.3596 THE INTERNATIONAL INSPECTION, EXPEDITING AND PROCUREMENT SPECIALISTS PRESSURE RETAINING EQUIPMENT 02/119 QUESTION 5 How can you ensure the tube bundle will fit properly in the shell ? ANSWER + QUESTION 6 fhe surface preparation of plate material prior to application of paint, etc. is critical. What is a reasonable time prior to application of primer in a well heated shop, after blasting ? a) 1 hour ; b) 2 hours ; c) 4 hours ; d) 8 hours ANSWER + QUESTION 7 What would you look for when checking a piping joint fit~up prior to welding ? ANSWER + QUESTION 8 what are some of the precautions which should be taken when welding piping materials of alloy material such as 1 1/4 chrome, 5 chrome etc. ? ANSWER = QUESTION 9 Name three (3) types of heat exchangers ( shell and tube ) ! ANSWER = QUESTION 10 If a pressure vessel or heat exchanger is to be designed for sour service conditions, what additional standard should be included in the design ? ANSWER = MMI D.Y, Reg.ar. K.v.K, DEN HAAG 134040 * Bank: AMRO, Rekeningnr. 43.00.15,356

You might also like