You are on page 1of 6

CLIENT

STATE OF QATAR
CLIENT PROJECT TEAM PROGRAMME MANAGEMENT CONSULTANT

New Naval Base Project

ENGINEERING DESIGN CONSULTANT SUB-CONSULTANT

MAIN CONTRACTOR

SUB-CONTRACTOR

DISCLAIMER
THIS DRAWING IS CONFIDENTIAL AND SHALL ONLY BE USED FOR THE PURPOSE OF THIS PROJECT.
THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN
PREPARED AND CHECKED IN ACCORDANCE WITH THE COMPANY QUALITY ASSURANCE SYSTEM.

PROJECT TITLE

QENFB Infrastructure & Utility Buildings

DRAWING MARINE FUEL SYSTEM, BLOCK 44


TITLE
PIPING ISOMETRIC DRAWING

PREPARED CHKD APPR VERF DATE


- - - -
NOTES ENGINEERING DATA FABRICATION / INSPECTION DATA SHOP DRAWING REFERENCES DRAWING HISTORY -
- TEAS MEDIUM WATER DRAWING NO. DESCRIPTION REV DATE STATUS CSRC / DOC REF.
ORIG SIZE A2
OPP. TEMPARETURE (Deg. C) - - P&ID DWG. No. 9254-03-FF-PF-DRG-2005 00 29-05-2018 IFI - CAD REF SCALE 1:1
- PIPING GA DWG. No. NPP0050-QMJ-FF-PI-SD-2006 DWG STATUS Issued for Information
DESIGN TEMPARETURE (Deg. C) - SUPPORT DWG. No. - DWG NO. Sheet REV.
9254-03-FF-PI-DRG-ISO-1212-Sht.001 1 OF 1 00
CLIENT

STATE OF QATAR
CLIENT PROJECT TEAM PROGRAMME MANAGEMENT CONSULTANT

New Naval Base Project

ENGINEERING DESIGN CONSULTANT SUB-CONSULTANT

MAIN CONTRACTOR

SUB-CONTRACTOR

DISCLAIMER
THIS DRAWING IS CONFIDENTIAL AND SHALL ONLY BE USED FOR THE PURPOSE OF THIS PROJECT.
THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN
PREPARED AND CHECKED IN ACCORDANCE WITH THE COMPANY QUALITY ASSURANCE SYSTEM.

PROJECT TITLE

QENFB Infrastructure & Utility Buildings

DRAWING MARINE FUEL SYSTEM, BLOCK 44


TITLE
PIPING ISOMETRIC DRAWING

PREPARED CHKD APPR VERF DATE


- - - -
NOTES ENGINEERING DATA FABRICATION / INSPECTION DATA SHOP DRAWING REFERENCES DRAWING HISTORY -
- TEAS MEDIUM WATER DRAWING NO. DESCRIPTION REV DATE STATUS CSRC / DOC REF.
ORIG SIZE A2
OPP. TEMPARETURE (Deg. C) - - P&ID DWG. No. 9254-03-FF-PF-DRG-2029 00 30-05-2018 IFI - CAD REF SCALE 1:1
- PIPING GA DWG. No. NPP0050-QMJ-FF-PI-SD-2006/2007 DWG STATUS Issued for Information
DESIGN TEMPARETURE (Deg. C) - SUPPORT DWG. No. - DWG NO. Sheet REV.
9254-03-FF-PI-DRG-ISO-1218-Sht.001 1 OF 1 00
CLIENT

STATE OF QATAR
CLIENT PROJECT TEAM PROGRAMME MANAGEMENT CONSULTANT

New Naval Base Project

ENGINEERING DESIGN CONSULTANT SUB-CONSULTANT

MAIN CONTRACTOR

SUB-CONTRACTOR

DISCLAIMER
THIS DRAWING IS CONFIDENTIAL AND SHALL ONLY BE USED FOR THE PURPOSE OF THIS PROJECT.
THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN
PREPARED AND CHECKED IN ACCORDANCE WITH THE COMPANY QUALITY ASSURANCE SYSTEM.

PROJECT TITLE

QENFB Infrastructure & Utility Buildings

DRAWING MARINE FUEL SYSTEM, BLOCK 44


TITLE
PIPING ISOMETRIC DRAWING

PREPARED CHKD APPR VERF DATE


- - - -
NOTES ENGINEERING DATA FABRICATION / INSPECTION DATA SHOP DRAWING REFERENCES DRAWING HISTORY -
- TEAS MEDIUM WATER DRAWING NO. DESCRIPTION REV DATE STATUS CSRC / DOC REF.
ORIG SIZE A2
OPP. TEMPARETURE (Deg. C) - - P&ID DWG. No. 9254-03-FF-PF-DRG-2005 00 29-05-2018 IFI - CAD REF SCALE 1:1
- PIPING GA DWG. No. NPP0050-QMJ-FF-PI-SD-2007 DWG STATUS Issued for Information
DESIGN TEMPARETURE (Deg. C) - SUPPORT DWG. No. - DWG NO. Sheet REV.
9254-03-FF-PI-DRG-ISO-1178-Sht.001 1 OF 2 00
CLIENT

STATE OF QATAR
CLIENT PROJECT TEAM PROGRAMME MANAGEMENT CONSULTANT

New Naval Base Project

ENGINEERING DESIGN CONSULTANT SUB-CONSULTANT

MAIN CONTRACTOR

SUB-CONTRACTOR

DISCLAIMER
THIS DRAWING IS CONFIDENTIAL AND SHALL ONLY BE USED FOR THE PURPOSE OF THIS PROJECT.
THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN
PREPARED AND CHECKED IN ACCORDANCE WITH THE COMPANY QUALITY ASSURANCE SYSTEM.

PROJECT TITLE

QENFB Infrastructure & Utility Buildings

DRAWING MARINE FUEL SYSTEM, BLOCK 44


TITLE
PIPING ISOMETRIC DRAWING

PREPARED CHKD APPR VERF DATE


- - - -
NOTES ENGINEERING DATA FABRICATION / INSPECTION DATA SHOP DRAWING REFERENCES DRAWING HISTORY -
- TEAS MEDIUM WATER DRAWING NO. DESCRIPTION REV DATE STATUS CSRC / DOC REF.
ORIG SIZE A2
OPP. TEMPARETURE (Deg. C) - - P&ID DWG. No. 9254-03-FF-PF-DRG-2005 00 29-05-2018 IFI - CAD REF SCALE 1:1
- PIPING GA DWG. No. NPP0050-QMJ-FF-PI-SD-2007 DWG STATUS Issued for Information
DESIGN TEMPARETURE (Deg. C) - SUPPORT DWG. No. - DWG NO. Sheet REV.
9254-03-FF-PI-DRG-ISO-1178-Sht.002 2 OF 2 00
CLIENT

STATE OF QATAR
CLIENT PROJECT TEAM PROGRAMME MANAGEMENT CONSULTANT

New Naval Base Project

ENGINEERING DESIGN CONSULTANT SUB-CONSULTANT

MAIN CONTRACTOR

SUB-CONTRACTOR

DISCLAIMER
THIS DRAWING IS CONFIDENTIAL AND SHALL ONLY BE USED FOR THE PURPOSE OF THIS PROJECT.
THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN
PREPARED AND CHECKED IN ACCORDANCE WITH THE COMPANY QUALITY ASSURANCE SYSTEM.

PROJECT TITLE

QENFB Infrastructure & Utility Buildings

DRAWING MARINE FUEL SYSTEM, BLOCK 44


TITLE
PIPING ISOMETRIC DRAWING

PREPARED CHKD APPR VERF DATE


- - - -
NOTES ENGINEERING DATA FABRICATION / INSPECTION DATA SHOP DRAWING REFERENCES DRAWING HISTORY -
- TEAS MEDIUM WATER DRAWING NO. DESCRIPTION REV DATE STATUS CSRC / DOC REF.
ORIG SIZE A2
OPP. TEMPARETURE (Deg. C) - - P&ID DWG. No. 9254-03-FF-PF-DRG-2005 00 29-05-2018 IFI - CAD REF SCALE 1:1
- PIPING GA DWG. No. NPP0050-QMJ-FF-PI-SD-2007 DWG STATUS Issued for Information
DESIGN TEMPARETURE (Deg. C) - SUPPORT DWG. No. - DWG NO. Sheet REV.
9254-03-FF-PI-DRG-ISO-1179-Sht.001 1 OF 1 00