APPENDIX 2
operated by gravity flow to minimize the power requirement
(4) the system design should preferably have no or minimal
need for chemicals and pumping and also allow for minimal
operator's attendance;
(5) operation, maintenance and repair work should be within the
competence of the operators from the local community;
(6) operational, maintenance and repair costs should be minimal
and within the payment capability of the local community as
these costs will be borne by them;
(7) appropriate monitoring system should be provided to monitor
the performance of the proposed system;
(8) the contractor to consider using Slow Sand Filtration (SSF)
system as priority system for SAWAS if deemed suitable.
(Detailed justifications to be given if system proposed is
otherwise. The Contractor is required to do a life cycle cost
Comparison analysis including the pros and cons of the two
systems. However, the employer has the right to decide
which of the above two water supply systems is to be
recommended for use in the project.)
Collection of Data, Investigation and Survey
The Contractor shall collect and analyze all available records, data,
maps and drawings and shall carry out all necessary study, site
investigation and survey required for the design, construction and
completion of the whole works under the Contract. The Contractor
shall also be responsible to carry out all necessary feasibility study
to identify the location of the proposed raw water intake source as
well as carry out all necessary tests to ascertain the suitability of the
raw water quality at the proposed raw water intake site, so as to
ensure that the proposed water supply system is able to treat the
raw water from the proposed source to provide the required
clean/safe water supply
The Contractor shall carry out survey and submit the proposed sites
for the raw water intake, treatment facilities, storage tank and
booster pumping station (where necessary) to the Project Director
for submission of siting application to Land and Survey Department.
The contractor shall liaise with the local YB & Ketua Kampung in
identifying suitable proposed sites. The contractor shall obtain the
letter of consent from the Ketua Kampung to kick start the proposed
site while waiting for siting application to be approved
Power Supply
Power supply for lighting is required to be provided. However, for the
components of the proposed water supply system, power supply is
to be proposed only when gravity flow is not feasible in respect of