/ |_No.DOCUMENT | REV
oe | AA-767814-004, 0
PT. HARTONO ISTANA TEKNOLOGI
JL. K.H.R. ASNAWI PO BOX 126 KUDUS - INDONESIA
PHONE NO : ( 0291 ) 433255 ( 4 lines ) ; 433266 (5 lines )
FAXNO : (0291) 431001 / 431030
SPECIFICATION FOR APPROVAL
DESCRIPTION = = LE IC LAT8141-E (VERTICAL DEFLECTION)
PARTNUMBER = LATSI4I-E _
SUPPLIER = POLYCORE
MANUFACTURER = SHIN.
APPROVED BY :
Date Serf
XpTSUSaNTo
R&D MANAGER
F-ROOA7-RYTo : PT Hartono Indonesia
Issue No. 20051224 0
or Amended Lead-free External Terminals
DELIVERY SPECIFICATION
‘YOUR PRODUCT NAME:
YOUR PART NO. ~
OUR TYPE NO. LAT8141.
RECEIVED/AFPROVED BY:
(irene)
Note
‘Any modification including touchup, correction, aldition, and delete invalidates this
delivery specifications.
“Any ad all SANYO Semicondecor Co Ld, prods deed or Gnaae! bein wi, wih spac “end pplication,
Inte forthe wea general electronics aime! (some appliances, AVequpmant, communication device, ofr equipment,
fad eqepment cle). Tae pods mesioned heen salle iatended for we for any “spc applica” (medial
egupment whose pupae ist son lie, aeosacefactunent, acer contol device, busing splices, portion
machin tale sigs, sft gupnit extremely hgh eel of elibily an ant theaten
ua ves in ese of fare or malfunction of he producto may cause harm to buman bodies, nor sal hey grant ay
‘arate theo. Ifyou oad intend to ue ou produc applications ote the stndat aplication of our atone Wa
‘considering sch we andlor ould the scope of outed andar ppicaans, please coast with spo tte need
‘se. there sno contin o gsr before the intended we, our cate sal be solely eon forthe
‘Teephone:_0276-61.8058
Sales Representative
Perron: MOHAMED ASHRAFE
Oitice “SANYO SEMICONDUCTORS) PTE, LTD
‘SUPPLIER: Approved Signature
‘SANYO Semiconductor Co,L14 Sales HO. _ AKIRA SHIRAKAWA
‘Sales Promoting Dept, Sales Promoting Sec, Prepared Signature
SANYO SANYO Semiconductor Co.,Ltd.Revision Record
To: _PT Hartono Indonesia
Product Name : LA78141-E
Time of ‘Reason for ‘Marking on
of entry Contents of re nek e
implementation revision product
Feb.20, 2009 “Newly adopted
‘The effective period of this delivery specification i a follows: final delivery specification -3 years, provisional delivery
specication - 3 months and temporary delivery specification ~ 1 month
‘The period is extended by one more year when the description content is not changed by addition, alteration, ce. even
after expitation date. The same applies to subsequent periods.
‘When i isnot returned, we will regard this as you having received and approved the specification,