You are on page 1of 1

Basic Supplier Evaluation Form

Review Date
Review By
Attendees, if Meeting Called

Supplier
Supplier Location
Supplier Quality Contact
Contact Phone

Quality Rating Comments


A. Quality System
B. Concern for Quality
C. Company History

Price
A. Price - Quality
B. Price - Negotiation/quote
= Actual Price

Performance
A. Technical Ability
B. Capability
C. Technical Assistance

Rating system: Very Good 5 Supplier is rated as appropriate.


Good 4 Only applicable blocks as determined by
Average 3 the VP OP are rated.
Poor 2
Very Poor 1 Quality item A, Price item A and
Negative 0 Performance item B are requsite.

Take the total points from each rated block and divide by the total blocks rated for the supplier.

Total Points from Blocks / Total Blocks Rated = Must be > 2. If < or = 2, supplier development
must be considered.

Revision Date:
Elsmar.com Date of Origin:
Originator:

Disk File Name: sup_eval.xls Page 1 Of 1 Printed On 3/11/05 At 7:14 PM.

You might also like