Date 11072018 11:31:47 AM
From "Nicole Kustok"
To "Robin Rue Simmons"
Subject : MOU vote
Attachment : ELDP One Pager (1).pafy
(hod Moming Robin,
"hope you are having a good star to 2018. We have had some more people on our group t advocate fora faancaly responsible answer to the Harley Cake
Propety.ouroption serves the most people and woull cost the ety nothing
Im advance ofthe January 22nd MOU vote-we put together short summary page of isks most conceming to ourgroup. You will fad it attached below. Ourhope
' that once you see the MOU terns this document will make it easier to vet those ss.
you are abs, hope we can havea bie meeting. Our goals to speak wth alloftheaklemen,Pessonaly,Tamstil very concemed about the low renovation
estimates and the group's perpetual lance on fundraising to operate
"elev the ety has bigger fiscal hurdles than saving this butling and many important need-based prograns that rely on charitable giving. I don think Evanston
can sk having anyofthose sue.
‘Thank you again or yourtins,
NicoleEvanston Lighthouse Dunes Proj ec
t- MOU Analysis and Concerns
‘There is significant financial risk and exposure to Evanston should the Lakehouse Gardens project move forward. While
the ELHG project is well intentioned, the long-term financial viability is highly questionable. The MOU must contain
necessary safeguards and controls so risk to the city is completely mitigated Such risks include but are not limited to the
following:
Fundraising Concerns
Risk
Unspecified time window for reising hard cash
Lisbility and risk remains with city in interim
Reguited proof of cesh-in-hand to start construction
industry standard is 70% of vetted total project cost)
Potential for on-going construction zone in public park
‘Money invested fails to result in finished product
Leck of clear claw-back provision
Fundkaising shortfall yields structure in limbo
Any money reised could legelly stall future naturalization effort
Unclear wording prevents city from seteining seid funds
Construction Cost Concerns
Construction cost are unrealistically low
Current estimated cost of $149/sq, ft is fer below comparable
senovations range (which range from $500/sq ft to $1000/sq ft)
IDNR bid for mein-house only was $270/ sq, ft
Using direct comps yields a totel spend that exceeds $10M
Insurance/Indemnification Concerns
Leck of required inswance
Claims arising out of construction and ongoing operations
represent potentiel for significant self insured losses to the city
Failure to obtain builders risk, environmental Lsbility,
construction lability and general lsbility with liquor Kebility
vumecessasily exposes city funds to new loss exposes
Operating Cost Concerns
‘Two yeer operating spend not cwrently included in
capital reise
Revenue raised from operations falls short of projection
Reliance on $220K in ongoing ennuel donor contribution
for operstion
Perpetual competition with Evanston-based charitable giving
City could be celled upon to fund any operating shortfalls
Programmatic Concerns
Duplication of Evanston E cology Center
Cannibelizes current environmental education demand
Siphons current city programming revenue
‘We believe that our Evanston Lighthouse Dunes Proposal is a more responsible altemative for our community — both
financially and ecologically. Our proposal can be done for $20
10,000 and provides green space for future generations of
Evanstonians to enjoy. We are prepared to provide the City of Evanston a successful Plan B
ws
ey