You are on page 1of 14

Panjang Jalan ( METER)

No Nama Estate POROS


POROS WIL KEBUN MR CR ALT

2 PMSE 24,208 2,627 23,207 114,548 49,507

Rawat Jalan
GD 410,601
Panjang 2627 2.627
Rotasi 6 63.048
HM / KM 4 25,887,572
40,151,432
Luas Tanaman KS Rasio Jalan Meter / HA
TSM TBM POROS POROS Jalan Kebun
Total
( Ha ) ( Ha ) WIL KEBUN MR CR ALT
3,404 7 3,411 7.1 0.8 6.8 33.6 14.5

awat Jalan
CM 274,228
2627 2.627
6 52.0146
3.3 14,263,860
HA
Kebun
Total
54.9
ANALISA KEGIATAN PEN

JENIS KEGIATAN
(Lebar x Tebal awal) PRODUKTIVITY SAT

GREAD AWAL 3/KM HM/m


COMPACT AWAL 3/KM HM/m
LOADING LATERIT
LATERIT M3/m
LOADING PC 200 5 menit/4 M3 Menit/m
ANGKUTAN 4 M3/RIT Rit/m
HAMPAR-FINISHING
Greader 5 HM/km HM/m
Compact 6 HM/km HM/m
TOTAL BIAYA PER METER PANJANG JALAN

Rasio Panjang Jalan kebun


Rasio Poros Mtr/ Ha
No Kebun
Wilayah Mtr / Ha
Poros Kebun
2 PMSE 7.1 0.8 54.9
ANALISA KEGIATAN PENGERASAN JALAN PER METER PANJANG JALAN

POROS WIL POROS KEBUN


Rp/sat MR
6 x 0,2 Rp/mtr 5 X 0,17 Rp/mtr 4 X 0,15
Rp 410,601 0.004 Rp 1,642 0.004 Rp 1,642 0.004
Rp 274,228 0.0033 Rp 905 0.0033 Rp 905 0.0033

Rp 5,000 1.2 Rp 6,000 0.85 Rp 4,250 0.6


Rp 444,440 0.025 Rp 11,111 0.02 Rp 7,870 0.01
Rp 600,000 0.005 Rp 3,000 0.004 Rp 2,125 0.0025

Rp 410,601 0.004 Rp 1,642 0.004 Rp 1,642 0.004


Rp 274,228 0.0033 Rp 905 0.0033 Rp 905 0.0033
Rp 25,206 Rp 19,340

Wilayah
Kebun Cost / Ha
Cost / Ha
Umum Umum capital
Rp 178,876 Rp 14,894 Rp 698,604

Rp 50,803,511
AN

Jalan Kebun
MR CR ALT Rata- rata
Rp/mtr 4 X 0,12 Rp/mtr 3 X 0,1 Rp/mtr Rp/mtr
Rp 1,642 0.0029 Rp 1,191 0.0029 Rp 1,191 Rp 1,341
Rp 905 0.0029 Rp 795 0.0029 Rp 795 Rp 832

Rp 3,000 0.6 Rp 3,000 0.3 Rp 1,500 Rp 2,500


Rp 5,556 0.013 Rp 5,556 0.006 Rp 2,778 Rp 4,630
Rp 1,500 0.0025 Rp 1,500 0.00125 Rp 750 Rp 1,250

Rp 1,642 0.0029 Rp 1,191 0.0029 Rp 1,191 Rp 1,341


Rp 905 0.0029 Rp 795 0.0029 Rp 795 Rp 832
Rp 15,150 Rp 14,028 Rp 9,000 Rp 12,726
ANALISA BIAYA KONSOLIDASI LATERIT JALAN PER METER PA

JENIS KEGIATAN POROS WIL


PRODUKTIVITY SAT Rp/sat
(Lebar x Tebal awal) 4 x 0,15
GREAD 4/KM HM/m Rp 410,601 0.004
COMPACT 3/KM HM/m Rp 274,228 0.0033
LOADING LATERIT
LATERIT M3/m Rp 5,000 0.06
LOADING PC 200 5 menit/4 M3 Menit/m Rp 410,601 0.004
ANGKUTAN 4 M3/RIT Rit/m Rp 274,228 0.0033
TOTAL BIAYA PER METER PANJANG JALAN

ANALISA BIAYA KONSOLIDASI LATERIT (10%) :"


L
Rasio Poros Rasio Panjang Jalan Wilayah Cost / Ha
No Kebun Wilayah Mtr / kebun Mtr/ Ha
Ha Poros Kebun Umum
2 PMSE 7.1 0.8 54.9 Rp 38,284
3411.18 Rp 777,513,360
PMSE 2,627 187,262
14,171,911 777,513,360
4152.0082

2627 Rp 14,171,911
18,719.72 77,724,440.11
JALAN PER METER PANJANG JALAN (10%)

POROS WIL POROS KEBUN Jalan Kebun


Rp/mtr 4 x 0,15 Rp/mtr 3 X 0,12 Rp/mtr
Rp 1,642 0.004 Rp 1,642 0.0029 Rp 1,191
Rp 905 0.0033 Rp 905 0.0029 Rp 795
Rp - Rp -
Rp 300 0.06 Rp 300 0.036 Rp 180
Rp 1,642 0.004 Rp 1,642 0.0029 Rp 1,191
Rp 905 0.0033 Rp 905 0.0029 Rp 795
Rp 5,395 Rp 5,395 Rp 4,152

11.2563
Rp 60,725
Kebun Cost / Ha

Umum Upkeep
Rp 4,155 Rp 227,931

Rp 187,252

40125000
15,274
PEMBUATAN ROAD SIDE DRAINE PER METER PANJANG JALAN

JENIS KEGIATAN PRODUKTIVITY SAT Norma Rp/sat


PANJANG (mtr)
Road side draine 1 UNIT/100 mtr unit/mtr 0.01
PC 100 15 menit/unit Hm/mtr 0.0025 Rp 404,506
3411.18
187262
Rp 189,371,506
ANG JALAN ANALISA BIAYA ROAD SIDE DRAINE
Rasio Panjang Jalan
Rp/mtr No Kebun Rasio Poros kebun Mtr/ Ha
Wilayah Mtr / Ha
Poros

1 PNBE 9.7 0.9


Rp 1,011 2 PMSE 7.1 0.8
3 PHRE 2.7 0.2
4 PNRE 1.9 3.7
5 KAGE 6.1 1.4
6 KRYE 5.1 0.0
7 PAGE 2.8 2.9
8 RBYE 0.5 1.4
9 WILAYAH 3 4.5 1.5
YA ROAD SIDE DRAINE
Rasio Panjang Jalan Wilayah Cost / Ha Kebun Cost / Ha
kebun Mtr/ Ha
Kebun Umum Umum Upkeep

76.0 Rp 9,806 Rp 960 Rp 76,832


54.9 Rp 7,177 Rp 779 Rp 55,515
48.7 Rp 2,767 Rp 187 Rp 49,279
63.9 Rp 1,879 Rp 3,745 Rp 64,595
47.0 Rp 6,147 Rp 1,411 Rp 47,486
49.9 Rp 5,175 Rp - Rp 50,427
52.9 Rp 2,881 Rp 2,958 Rp 53,539
45.2 Rp 460 Rp 1,403 Rp 45,671
54.1 Rp 4,512 Rp 1,470 Rp 54,742
ANALISA KEGIATAN REGULAR MEKANIS JALAN PER METER PANJANG JAL

RP/Sat
JENIS KEGIATAN PRODUKTIVITY SAT POROS WILAYAH POROS KEBUN
(Lebar x Tebal awal) 7 x 0,2 Rp/mtr 6 x 0,2
Greader 4 Hm/km Hm/mtr 410,601 0.004 1,642 0.004
Compactor 3 Hm/km HM/mtr 274,228 0.0033 905 0.0033
Total Biaya Pemel Mekanis per meter/rot 2,547
ETER PANJANG JALAN ANALISA BIAYA PERAWATAN JALAN M

Rasio Poros
POROS KEBUN Jalan Kebun No Kebun Wilayah Mtr
Rp/mtr 4 X 0,15 Rp/mtr / Ha

1,642 0.004 1,642 1 PNBE 9.7


905 0.0033 905 2 PMSE 7.1
2,547 2,547 3 PHRE 2.7
AYA PERAWATAN JALAN MEKANIS PER METER PANJANG JALAN

Rasio Panjang Jalan Wilayah Cost / Kebun Cost / Ha


kebun Mtr/ Ha Ha
Poros Kebun Umum Umum Upkeep
0.9 76.0 Rp 24,702 Rp 2,418 Rp 193,538
0.8 54.9 Rp 18,078 Rp 1,962 Rp 139,841
0.2 48.7 Rp 6,969 Rp 470 Rp 124,132

Rp 5,303,596
63,643,152.30

You might also like