Analisa Perawatan Jalan
Analisa Perawatan Jalan
Rawat Jalan
GD 410,601
Panjang 2627 2.627
Rotasi 6 63.048
HM / KM 4 25,887,572
40,151,432
Luas Tanaman KS Rasio Jalan Meter / HA
TSM TBM POROS POROS Jalan Kebun
Total
( Ha ) ( Ha ) WIL KEBUN MR CR ALT
3,404 7 3,411 7.1 0.8 6.8 33.6 14.5
awat Jalan
CM 274,228
2627 2.627
6 52.0146
3.3 14,263,860
HA
Kebun
Total
54.9
ANALISA KEGIATAN PEN
JENIS KEGIATAN
(Lebar x Tebal awal) PRODUKTIVITY SAT
Wilayah
Kebun Cost / Ha
Cost / Ha
Umum Umum capital
Rp 178,876 Rp 14,894 Rp 698,604
Rp 50,803,511
AN
Jalan Kebun
MR CR ALT Rata- rata
Rp/mtr 4 X 0,12 Rp/mtr 3 X 0,1 Rp/mtr Rp/mtr
Rp 1,642 0.0029 Rp 1,191 0.0029 Rp 1,191 Rp 1,341
Rp 905 0.0029 Rp 795 0.0029 Rp 795 Rp 832
2627 Rp 14,171,911
18,719.72 77,724,440.11
JALAN PER METER PANJANG JALAN (10%)
11.2563
Rp 60,725
Kebun Cost / Ha
Umum Upkeep
Rp 4,155 Rp 227,931
Rp 187,252
40125000
15,274
PEMBUATAN ROAD SIDE DRAINE PER METER PANJANG JALAN
RP/Sat
JENIS KEGIATAN PRODUKTIVITY SAT POROS WILAYAH POROS KEBUN
(Lebar x Tebal awal) 7 x 0,2 Rp/mtr 6 x 0,2
Greader 4 Hm/km Hm/mtr 410,601 0.004 1,642 0.004
Compactor 3 Hm/km HM/mtr 274,228 0.0033 905 0.0033
Total Biaya Pemel Mekanis per meter/rot 2,547
ETER PANJANG JALAN ANALISA BIAYA PERAWATAN JALAN M
Rasio Poros
POROS KEBUN Jalan Kebun No Kebun Wilayah Mtr
Rp/mtr 4 X 0,15 Rp/mtr / Ha
Rp 5,303,596
63,643,152.30