Lampiran II RKS no.

20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018

Lampiran Daftar Kuantitas Dan Harga

ANALISA HARGA BANGUNAN EDUKASI DEPO KRL DEPOK


1 1 m2 Pembuatan bedeng
Bahan
1.25000 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp
0.18600 m3 Kayu Meranti Terentang/Meranti @ Rp. = Rp
0.30000 kg Paku biasa 2" - 5 " @ Rp. = Rp
18.00000 kg Semen Portland @ Rp. = Rp
0.03000 m3 Pasir beton @ Rp. = Rp
0.05000 m3 Koral beton @ Rp. = Rp
1.50000 Lbr Seng gelombang bljs 32 @ Rp. = Rp
1.35000 Lbr Multipleks 9 mm @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
2.00000 Oh Tukang Kayu @ Rp. = Rp
1.00000 Oh Pekerja @ Rp. = Rp
0.20000 Oh Kepala Tukang @ Rp. = Rp
0.05000 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

2 Saftey APD
Bahan
1.00000 bh rompi spotlight Rp. = Rp.
1.00000 bh helm Rp. = Rp.
1.00000 bh safety shoes Rp. = Rp.
1.00000 bh Sarung Tangan Rp. = Rp.
Sub total : = Rp.
Dibulatkan : = Rp

3 Transportasi Alat dan pekerja/hari


Upah
1.00000 hr Sewa Pick Up @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

4 Listrik TDR PLN


Upah
3.50000 Kva Listrik TDR-PLN @ Rp. = Rp
Dibulatkan : = Rp

5 1 m2 Pembersihan Lapangan dan Peralatan


Upah
0.10000 Oh Pekerja @ Rp. = Rp
0.05000 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

6 BONGKAR PAVING EXSISTING/M2


Upah.
0.16000 oh Pekerja @ Rp. = Rp.
0.05000 oh Tukang batu @ Rp. = Rp.
0.00500 oh Kepela tukang batu @ Rp. = Rp.
0.00750 oh Mandor @ Rp. = Rp.
Sub Total : = Rp.
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
Dibulatkan : = Rp.

7 BONGKARAN TAMAN M2
Upah.
0.16000 oh Pekerja @ Rp. = Rp.
0.05000 oh Tukang batu @ Rp. = Rp.
0.00500 oh Kepela tukang batu @ Rp. = Rp.
0.00750 oh Mandor @ Rp. = Rp.
Sub Total : = Rp.
Dibulatkan : = Rp.

10 Sewa alat bantu scafoldhing


Bahan
2.00000 bh Main Frame 190 cm @ Rp. = Rp
2.00000 bh Crose Brase 190 cm @ Rp. = Rp
4.00000 bh Join Pint @ Rp. = Rp
1 unit scafolding 1 x @ Rp. = Rp
1.00000 bh Cat Walk @ Rp. = Rp
4.00000 bh Roller Catter / roda @ Rp. = Rp
Sub Total : = Rp
Dibulatkan : = Rp

11 1 m2 Bongkaran dinding tembok bata merah


Upah
0.25000 Oh Pekerja @ Rp. = Rp
0.03300 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

12 1 m2 Pek.Bongkaran Partisi, Plafond, Jendela Kaca, Pintu Kaca, Dll


Upah
0.25000 Oh Pekerja @ Rp. = Rp
0.03300 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

13 1 m2 Bongkaran lantai kramik


Upah
0.15000 Oh Pekerja @ Rp. = Rp
0.03300 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

14 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps


Bahan
70.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. = Rp
14.3700 Kg Semen portland @ Rp. = Rp
0.0400 m3 Pasir pasang @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
0.3200 Oh Pekerja @ Rp. = Rp
0.1000 Oh Tukang batu @ Rp. = Rp
0.0100 Oh Kepala tukang @ Rp. = Rp
0.0150 Oh Mandor @ Rp. = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
Sub total : = Rp
Dibulatkan : = Rp

15 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm


Bahan 6.4800 Kg Semen portland @ Rp. = Rp
0.0190 m3 Pasir pasang @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
0.2000 Oh Pekerja @ Rp. = Rp
0.1500 Oh Tukang batu @ Rp. = Rp
0.0150 Oh Kepala tukang @ Rp. = Rp
0.0100 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

16 1 m2 Pasang Sekat Dinding gypsum rangka metalstud/baja ringan


Bahan
0.4000 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. = Rp
0.6700 ljr Truss C75.75 SNI BMT @ Rp. = Rp
0.0500 Kg Paku Skrup gypsum @ Rp. = Rp
0.4000 Kg kompon gypsum @ Rp. = Rp
Sub total 1 Sisi = Rp
Dua Sisi ( x 2 ) = Rp
Dibulatkan = Rp
Upah
0.1000 Oh Pekerja @ Rp. = Rp
0.0500 Oh Tukang @ Rp. = Rp
0.0050 Oh Kepala tukang @ Rp. = Rp
0.0050 Oh Mandor @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

17 1 m2 Pasang plafon gypsum rangka metalstud/baja ringan


Bahan
0.4000 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. = Rp
0.6700 Btg Truss C75.75 SNI BMT @ Rp. = Rp
0.0500 Kg Skrup gypsum @ Rp. = Rp
0.4000 Kg kompon gypsum @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
0.1000 Oh Pekerja @ Rp. = Rp
0.0500 Oh Tukang @ Rp. = Rp
0.0050 Oh Kepala tukang @ Rp. = Rp
0.0050 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

18 1 Bh. Pasang pintu aluminium 3" putih ( Silver) UKURAN 0.80 X 2.00 Mtr.
( pintu isian kaca bening 5mm dan multipleks 9 mm).
Bahan
6.2500 M1 Slimar Aluminium putih 3" @ Rp. = Rp
15.0000 M1 Karet penjepit kaca/ tripleks. @ Rp. = Rp
1.0000 set Engsel @ Rp. = Rp
1.0000 Bh Kunci @ Rp. = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
1.3400 M2 Kaca bening 5 mm @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah 1.4175 Oh Pekerja @ Rp. = Rp


1.4175 Oh Tukang besi @ Rp. = Rp
0.1418 Oh Kepala tukang besi @ Rp. = Rp
0.0070 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

19 1M2 Pasang daun jendela aluminium 3" putih ( Silver) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
Bahan
4.8000 M1 Slimar Aluminium putih 3" @ Rp. = Rp
8.5000 M1 Karet penjepit kaca. @ Rp. = Rp
1.0000 set Engsel jendela. @ Rp. = Rp
1.0000 Bh Hak window. @ Rp. = Rp
0.9025 M2 Kaca bening 5 mm @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah 1.0500 Oh Pekerja @ Rp. = Rp


1.0500 Oh Tukang besi @ Rp. = Rp
0.1050 Oh Kepala tukang besi @ Rp. = Rp
0.0052 Oh Mandor @ Rp. = Rp
Sub Total : = Rp
Dibulatkan : = Rp

20 Partisi Lipat Kaca / M2


Bahan
12.0000 m Rangka besi Holo 40x40 @ Rp. = Rp.
1.7500 m2 Kaca Bening 8 mm @ Rp. = Rp.
1.8000 m2 Rockwool peredam @ Rp. = Rp.
8.0000 m1 List edging alumunium @ Rp. = Rp.
1.0000 Psg Roda @ Rp. = Rp.
1.0000 m1 Rel bagian atas @ Rp. = Rp.
6.4000 m1 Karet penjepit kaca @ Rp. = Rp.
1.0000 Set Alat bantu penggantung rel atas @ Rp. = Rp.
1.0000 Bh Pengunci pintu @ Rp. = Rp.
Sub total : = Rp.
Dibulatkan : = Rp

Upah 1.4175 Oh Pekerja @ Rp. = Rp


1.4175 Oh Tukang besi @ Rp. = Rp
0.1418 Oh Kepala tukang besi @ Rp. = Rp
0.0070 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

21 1 M' Pasang kusen aluminium 4" putih. (Silver)


Bahan
1.1000 m Aluminium putih 4". @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah 0.1040 Oh Pekerja @ Rp. = Rp


0.1040 Oh Tukang besi @ Rp. = Rp
0.0010 Oh Kepala tukang besi @ Rp. = Rp
0.0005 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

22 1M2 Pasang Kaca Bening Tebal 8 mm


Bahan
8.5000 M1 Karet penjepit kaca. @ Rp. = Rp
0.9025 M2 Kaca bening 8 mm @ Rp. = Rp
Sub total : = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
Dibulatkan : = Rp

Upah 0.1040 Oh Pekerja @ Rp. = Rp


0.1040 Oh Tukang besi @ Rp. = Rp
0.0010 Oh Kepala tukang besi @ Rp. = Rp
0.0001 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

23 1 m2 Pasang Sand Blast / Kaca Sticker


Bahan
1.10000 m2 Kaca Sticker @ Rp. = Rp
Dibulatkan : = Rp

Upah 0.01500 Oh Pekerja @ Rp. = Rp


0.15000 Oh Tukang besi @ Rp. = Rp
0.01500 Oh Kepala tukang besi @ Rp. = Rp
0.00075 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

24 1 m2 Pasang GRANIT 60 x 60 cm
Bahan
1.0500 m2 GRANIT 60 x 60 Cm @ Rp. = Rp
1.0625 Kg Semen portland @ Rp. = Rp
0.0028 Kg Kapur bubuk @ Rp. = Rp
0.0420 m3 Pasir pasang @ Rp. = Rp
0.2000 Kg Semen warna @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
0.2200 Oh Pekerja @ Rp. = Rp
0.1000 Oh Tukang batu @ Rp. = Rp
0.0120 Oh Kepala tukang @ Rp. = Rp
0.0125 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

25 1 m2 Pasang Granit uk 60x20 cm standar / Lis / Ban


Bahan 1.0000 m2 Granit 60x20 Standar cm @ Rp. = Rp
1.0625 Kg Semen portland @ Rp. = Rp
0.0028 m3 Pasir pasang @ Rp. = Rp
0.1000 Kg Semen warna @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
0.0900 Oh Pekerja @ Rp. = Rp
0.0900 Oh Tukang batu @ Rp. = Rp
0.0090 Oh Kepala tukang @ Rp. = Rp
0.0045 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

26 1 m' Pasang list gypsum


Bahan
1.1000 m List profil kamper 4x1 cm @ Rp. = Rp
0.0100 Kg Paku @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
0.0500 Oh Pekerja @ Rp. = Rp
0.0500 Oh Tukang kayu @ Rp. = Rp
0.0050 Oh Kepala tukang @ Rp. = Rp
0.0030 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
27 1 m2 Pengecatan tembok Lama ( Ngamplas, 1x cat dasar, 2x cat penutup ) Watershild
Bahan
0.0100 Kg Plamir @ Rp. = Rp
0.1200 Lbr Ampelas @ Rp. = Rp
0.0333 Bh Kuwas / roll @ Rp. = Rp
0.1100 Kg Cat dasar ( Tembok ) @ Rp. = Rp
0.2200 Kg Cat penutup 2x ( Tembok ) @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
0.0280 Oh Pekerja @ Rp. = Rp
0.0420 Oh Tukang cat @ Rp. = Rp
0.0042 Oh Kepala tukang @ Rp. = Rp
0.0025 Oh Mandor @ Rp. = Rp
. Sub total : = Rp
Dibulatkan : = Rp

28 1 m3 Galian Untuk Tanah Biasa sedalam 2 m


Upah 0.52600 Oh Pekerja @ Rp. = Rp
0.05200 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
29 1 m3 Urugan Tanah
Bahan
1.20000 m3 Tanah Merah @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
0.19200 Oh Pekerja @ Rp. = Rp
0.01900 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

30 1 m3 Urugan pasir dengan pasir urug.


Bahan
1.20000 m3 Pasir urug @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
0.30000 Oh Pekerja @ Rp. = Rp
0.01000 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

31 Sewa Stamper Untuk Pemadatan/hari


Upah
1.0000 hr Stamper @ Rp. = Rp
Dibulatkan : = Rp

32 1 m3 Pemadatan tanah
Upah
0.5000 Oh Pekerja @ Rp. = Rp
0.0500 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

33 1 m3 Membuat beton bertulang 150 Kg besi + bekisting


Bahan
0.2000 m3 Kayu terentang/Meranti 5/7 @ Rp. = Rp
1.5000 Kg Paku biasa 2" - 5" @ Rp. = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
0.4000 Ltr Minyak bekisting @ Rp. = Rp
150.0000 Kg Besi beton polos D 12 @ Rp. = Rp
2.2500 Kg Kawat bendrat @ Rp. = Rp
323.0000 Kg Semen portland @ Rp. = Rp
0.5200 m3 Pasir beton @ Rp. = Rp
0.7800 m3 Koral beton @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
3.9000 Oh Pekerja @ Rp. = Rp
0.3500 Oh Tukang batu @ Rp. = Rp
1.0400 Oh Tukang kayu @ Rp. = Rp
1.0500 Oh Tukang besi @ Rp. = Rp
0.2450 Oh Kepala tukang @ Rp. = Rp
0.1650 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

34 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps


Bahan
1.1000 m3 Batu belah ( 15/20 ) @ Rp. = Rp
202.0000 Kg Semen porland @ Rp. = Rp
0.4850 m3 Pasir pasang @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
1.5000 Oh Pekerja @ Rp. = Rp
0.6000 Oh Tukang batu @ Rp. = Rp
0.0600 Oh Kepala tukang @ Rp. = Rp
0.0750 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

35 Memasang 1 m pipa PVC Rucika 4"


Bahan
1.2000 m Pipa PVC Rucika 4" @ Rp. = Rp
35.0000 % Perlengkapan @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah
0.0810 Oh Pekerja @ Rp. = Rp
0.1350 Oh Tukang batu @ Rp. = Rp
0.0135 Oh Kepala tukang @ Rp. = Rp
0.0041 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

36 Memasang 1 buah floor drain


Bahan
1.00000 Bh Floor drain toto TX 1 AN @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
0.01000 Oh Pekerja @ Rp. = Rp
0.10000 Oh Tukang batu @ Rp. = Rp
0.01000 Oh Kepala tukang @ Rp. = Rp
0.00500 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
37 Pasang pipa besi 3" untuk cremona Dan Gording
Bahan
1.1000 m1 Pasang pipa Besi 3" @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah.
0.0700 Oh Pekerja @ Rp. = Rp
0.0700 Oh Tukang besi @ Rp. = Rp
0.0070 Oh Kepala tukang @ Rp. = Rp
0.0030 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

38 Pasang pipa besi 6" untuk Batang Join


Bahan
1.1000 m1 Pasang pipa Besi 6" @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah.
0.0700 Oh Pekerja @ Rp. = Rp
0.0700 Oh Tukang besi @ Rp. = Rp
0.0070 Oh Kepala tukang @ Rp. = Rp
0.0030 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

39 Pasang pipa besi 6" untuk Batang Kuda Kuda Lengkung + Bending
Bahan
1.1000 m1 Pasang pipa Besi 6" @ Rp. = Rp
1.1000 m1 Jasa Bending Pipa Besi 6" @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah.
0.0700 Oh Pekerja @ Rp. = Rp
0.0700 Oh Tukang besi @ Rp. = Rp
0.0070 Oh Kepala tukang @ Rp. = Rp
0.0030 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

40 Pasang pipa besi 8" untuk Tiang Utama


Bahan 1.1000 m1 Pasang pipa Besi 8" @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah.
0.0700 Oh Pekerja @ Rp. = Rp
0.0700 Oh Tukang besi @ Rp. = Rp
0.0070 Oh Kepala tukang @ Rp. = Rp
0.0030 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

41 Pasang pipa besi 10" untuk Tiang Utama ( Bentangan 14 m )


Bahan
1.1000 m1 Pasang pipa Besi 10" @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah.
0.0700 Oh Pekerja @ Rp. = Rp
0.0700 Oh Tukang besi @ Rp. = Rp
0.0070 Oh Kepala tukang @ Rp. = Rp
0.0030 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

42 Pasang Plat Besi


Bahan
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
1.1000 Kg Plat Besi @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah.
0.0060 Oh Pekerja @ Rp. = Rp
0.0600 Oh Tukang besi @ Rp. = Rp
0.0060 Oh Kepala tukang @ Rp. = Rp
0.0003 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

43 Pasang Baut M16 x 60 mm


Bahan
1.0000 Bh Baut M16 x 60 mm = Rp
Sub total : = Rp
Dibulatkan : = Rp
Upah.
0.0060 Oh Pekerja @ Rp. = Rp
0.0600 Oh Tukang besi @ Rp. = Rp
0.0060 Oh Kepala tukang @ Rp. = Rp
0.0003 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

44 Pasang Angkur D 19 Panjang 60 cm


Bahan
1.0000 Bh Angkur D 19 Panjang 60 cm = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah.
0.0060 Oh Pekerja @ Rp. = Rp
0.0600 Oh Tukang besi @ Rp. = Rp
0.0060 Oh Kepala tukang @ Rp. = Rp
0.0003 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

45 1 m2 Pasang atap spandex


Bahan 1.1000 Lbr Spandek @ Rp. = Rp
0.0500 Kg paku sekrup @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
0.1000 Oh Pekerja @ Rp. = Rp
0.0500 Oh Tukang kayu @ Rp. = Rp
0.0050 Oh Kepala tukang @ Rp. = Rp
0.0050 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

46 Pengelasan Las Listrik Untuk Tiap 10 cm / Titik


Bahan
0.4000 Kg Kawat Las @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
0.0400 Oh Pekerja @ Rp. = Rp
0.0200 Oh Tukang Las @ Rp. = Rp
0.0020 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

47 1 m Pasang talang datar rangka hollow, seng bjls 30


Bahan
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
0.5000 Lbr Seng plat @ Rp. = Rp
0.0150 Kg Paku Skrup @ Rp. = Rp
1.2000 btg Hollow 40 x 40 @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah
0.1500 Oh Pekerja @ Rp. = Rp
0.4000 Oh Tukang kayu @ Rp. = Rp
0.0250 Oh Kepala tukang @ Rp. = Rp
0.0013 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

48 1m2 wiremesh M6
Bahan
1.0500 m2 wermesh M8 @ Rp. = Rp
0.0150 kg Kawat Bendrat @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
0.0070 Oh Pekerja @ Rp. = Rp
0.0070 Oh Tukang besi @ Rp. = Rp
0.0007 Oh Kepala tukang @ Rp. = Rp
0.0003 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

49 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr


Bahan
232.0000 Kg Semen portland @ Rp. = Rp
0.5200 m3 Pasir beton @ Rp. = Rp
0.8700 m3 Koral beton @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
1.6500 Oh Pekerja @ Rp. = Rp
0.2500 Oh Tukang batu @ Rp. = Rp
0.0250 Oh Kepala tukang @ Rp. = Rp
0.0800 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

50 Sewa Concrete Pump 30-50 meter / Hari


Upah
1.0000 hr Concrete Pump @ Rp. = Rp
Dibulatkan = Rp

51 1 m Buat railing stainless stell ( Non Destabilitas )


Bahan
1.0000 m Railing stainless stell T 2"x1,5 @ Rp. = Rp
10.0000 % bahan Perlengkapan @ Rp. = Rp
Sub total : = Rp
dibulatkan = Rp

Upah
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
0.3250 Oh Pekerja @ Rp. = Rp
0.3250 Oh Tukang besi @ Rp. = Rp
0.0325 Oh Kepala tukang @ Rp. = Rp
0.0160 Oh Mandor @ Rp. = Rp
Sub total : = Rp
dibulatkan = Rp

52 1 m2 Pengecatan bidang besi


Bahan
0.1500 lbr Amplas @ Rp. = Rp
0.2000 kg Cat meni @ Rp. = Rp
0.1500 Ltr Minyak cat @ Rp. = Rp
0.0300 Kg Kuas @ Rp. = Rp
0.1700 Kg Cat dasar @ Rp. =
0.2600 Kg Cat penutup 2 x @ Rp. = Rp
Sub total : = Rp
Dibulatkan : = Rp

Upah Rp
0.0700 Oh Pekerja @ Rp. = Rp
0.0090 Oh Tukang cat @ Rp. = Rp
0.0060 Oh Kepala tukang @ Rp. = Rp
0.0025 Oh Mandor @ Rp. = Rp
. Sub total : = Rp
Dibulatkan : = Rp

53 Pemasangan Instalasi kabel Power dengan kabel NYRGBY 4x25 mm


Bahan
1.00000 m Kabel NYRGBY 4x25 mm @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. = Rp
0.04570 Oh Tukang listrik @ Rp. = Rp
0.00910 Oh Kepala tukang istrik @ Rp. = Rp
0.00300 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

54 Memasang Panel Unit uk.800X600X200


Bahan
1.00000 bh Panel Unit uk.800x600x200 @ Rp. = Rp
1.00000 bh MCCB 3 Kutub 75 amp @ Rp. = Rp
1.00000 bh MCCB 3 Kutub 25 amp @ Rp. = Rp
13.00000 bh MCB 1 Kutub 16 amp @ Rp. = Rp
8.00000 bh MCB 1 Kutub 10 amp @ Rp. = Rp
9.00000 bh MCB 1 Jutub 6 amp @ Rp. = Rp
6.00000 bh MCB 1 Kutub 4 amp @ Rp. = Rp
( 2 MCB untuk timer ) @ Rp. = Rp
2.00000 bh MCB 1 Kutub 6 amp @ Rp. = Rp
( 2 MCB untuk Timer ) @ Rp. = Rp
1.00000 bh Timer theben sul 181 coil 220v @ Rp. = Rp
1.00000 bh Kontaktor 25 ampere coil 220v @ Rp. = Rp
4.00000 bh MCB 1 Kutub 2 amp Control @ Rp. = Rp
4.00000 bh Pilot Lamp 220 v @ Rp. = Rp
10.00000 m Kabel NYAF 1x16 mm @ Rp. = Rp
1.00000 Unit Ampere volt digital 230/440 volt @ Rp. = Rp
3.00000 bh CT 150/5 amp @ Rp. = Rp
5.00000 % Perlengkapan wairing panel @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
2.00000 Oh Pembantuk tukang listrik @ Rp. = Rp
2.00000 Oh Tukang listrik/Pembatu Instalator @ Rp. = Rp
1.00000 Oh Kepala tukang istrik/Instalator @ Rp. = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
Sub total : = Rp
Dibulatkan = Rp

55 Pemasangan Instalasi kabel Power dengan kabel NYRGBY 4x10 mm


Bahan
1.00000 m Kabel NYRGBY 4x10 mm @ Rp. = Rp
0.10000 Set Sambungan Kabel Recin @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
0.04570 Oh Pembantu tukang listrik @ Rp. = Rp
0.04570 Oh Tukang listrik @ Rp. = Rp
0.00910 Oh Kepala tukang istrik @ Rp. = Rp
0.00300 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

56 Pemasangan Instalasi kabel lampu penerangan dengan kabel NYM 4x2,5 mm


Bahan
1.00000 m Kabel NYM 4x2,5 mm @ Rp. = Rp
0.33333 btg Conduit pipa dia. 25 pj 3m @ Rp. = Rp
0.03000 bh Sok pipa clipsal 25 mm @ Rp. = Rp
0.03000 bh Klem pipa 25 mm @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp
Upah
0.04570 Oh Pembantu tukang listrik @ Rp. = Rp
0.04570 Oh Tukang listrik @ Rp. = Rp
0.00910 Oh Kepala tukang istrik @ Rp. = Rp
0.00300 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

57 Pemasangan Instalasi stop kontak dan saklar dengan kabel NYM 3x2,5 mm
Bahan
8.00000 m Kabel NYM 3x2,5 mm @ Rp. = Rp
2.67000 btg Conduit pipa dia. 25 pj 3m @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
0.29629 Oh Pembantu tukang listrik @ Rp. = Rp
0.29629 Oh Tukang listrik @ Rp. = Rp
0.05920 Oh Kepala tukang istrik @ Rp. = Rp
0.03365 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

58 Pemasangan Lampu Dengan Lampu T8 termasuk balak 18 watt


Bahan
1.00000 bh Led T8 18 watt @ Rp. = Rp
1.00000 m Kabel Nym 3x2,5 mm @ Rp. = Rp
1.00000 bh T dus 20 mm @ Rp. = Rp
0.33000 bt Pipa Clipsal 25 mm @ Rp.
1.00000 bh Balak T8 18w @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
0.29629 Oh Pembantu tukang listrik @ Rp. = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
0.29629 Oh Tukang listrik @ Rp. = Rp
0.05920 Oh Kepala tukang istrik @ Rp. = Rp
0.03365 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

59 Pemasangan Lampu Gantung Industri engel 120 daya 85 watt satandar philips lumen 11000 ip 65 kabel NYM 3x2,5 mm
Bahan
1.00000 bh Lampu Gantung LED 85 watt @ Rp. = Rp
1.00000 bh Breacket led 110 @ Rp. = Rp
1.00000 m Kabel Nym 3x2,5 mm @ Rp. = Rp
1.00000 bh T doos 25 mm @ Rp. = Rp
0.33000 bt Pipa Clipsal 25 mm @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
0.29629 Oh Pembantu tukang listrik @ Rp. = Rp
0.29629 Oh Tukang listrik @ Rp. = Rp
0.05920 Oh Kepala tukang istrik @ Rp. = Rp
0.03365 Oh Mandor @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

60 Memasang Saklar engkel


Bahan
1.00000 bh Saklar engkel neon pieno putih @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp
Upah
0.03200 Oh Pembantu tukang listrik @ Rp. = Rp
0.03200 Oh Tukang listrik @ Rp. = Rp
0.00411 Oh Kepala tukang istrik @ Rp. = Rp
0.00160 Oh Mandor @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

61 Memasang Stop Kontak daya


Bahan
1.00000 bh Stop kontak Pieno Putih @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

Upah
0.03200 Oh Pembantu tukang listrik @ Rp. = Rp
0.03200 Oh Tukang listrik @ Rp. = Rp
0.00411 Oh Kepala tukang istrik @ Rp. = Rp
0.00160 Oh Mandor @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

62 Memasang Stop Kontak AC


Bahan
1.00000 bh Stop kontak ac clipsal @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp
Upah
0.03200 Oh Pembantu tukang listrik @ Rp. = Rp
0.03200 Oh Tukang listrik @ Rp. = Rp
0.00411 Oh Kepala tukang istrik @ Rp. = Rp
Lampiran II RKS no. 20/LL/NONSAR/KCI/I/2018 tanggal 31 Januari 2018
0.00160 Oh Mandor @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

63 Memasang Exhaustfan 10'/25cm


Bahan
1.00000 Unit Exhaustfan 10'/25cm @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

Upah
0.11196 Oh Pembantu tukang listrik @ Rp. = Rp
0.11196 Oh Tukang listrik @ Rp. = Rp
0.02238 Oh Kepala tukang istrik @ Rp. = Rp
0.01126 Oh Mandor @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

64 1 m' Pasang instalasi ac


Bahan
1.00000 m Pipa AC Tembaga 1/4x3/8 ( 1 1/2 Pk ) @ Rp. = Rp
1.00000 m Pipa Pembuangan @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

Upah
0.07500 Oh Pembantu Tukang Listrik @ Rp. = Rp
0.03500 Oh Tukang Listrik @ Rp. = Rp
Sub total : = Rp
Dibulatkan = Rp

65 Memasang 1 buah AC 1 1/2 pk setara daikin


Bahan
1.00000 UNIT AC 1 1/2 Pk @ Rp. = Rp
5.00000 % Perlengkapan instalasi @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

Upah
1.14286 Oh Pembantu tukang listrik @ Rp. = Rp
1.14286 Oh Tukang listrik @ Rp. = Rp
0.18515 Oh Kepala tukang istrik @ Rp. = Rp
0.11370 Oh Mandor @ Rp. = Rp
Sub total = Rp
Dibulatkan = Rp

Jakarta, ...... 2018

PT.......
Ttd, Cap, Stempel Perusahaan