RMD DPR dated 15.10.2018


OIL (Prod)- 27 m3 (20T)
Gas sales (SCM)
(DM ARKAY):- 225000
(DM CORO):- 31500
(DM SRPCL):- 85000
(DM Pioneer):- 20000
DM total :- 361500
MDP to Gail :- 166070
N.Tr Total :- 527570
APM to Gail :- 352711
Total sales:- 880281
Oil Desp. :- 73 m3 *(03Tankers)*
Oil closing stock:- 247 m3
LC No. - 494
Effldesp.: 0 m3 *(00 Tankers)*
LC No -79

Remarks
Consumer load status
1.M/s TANGEDCO PH-I : 63 MW
2.M/s TANGEDCO Ph-II :
10.12 hrs : tripped due to EB feeder problem. Partial load diverted to deficiency consumer .
14.25 hrs : GT started
14.43 hrs : FSNL
14.45 hrs : GT sync.
15.07 hrs : 20 MW awaiting STG Program.
Currently at 20 MW
3. M/s Pioneer =
10.12 hrs : Load reduced due to EB feeder problem ( GT FSNL mode)
10.27 hrs : GT SYNC
10.55 hrs : LOAD INCREASED TO 31 MW
11.50 hrs : STG SYNC
12.18 hrs : Attained N/M load 32 MW
Currently load at 32 MW .
4. M/s SRPCL = 36 MW
5. M/s Coromandel =
10.22 hrs : All engines tripped due to EB feeder problem.
10.49 hrs : engines started one by one
11.17 hrs : All engines reached N/M Load
Currently load at 25.5 MW
(03 engines)
6. M/s Arkay
10.08 hrs = all engines tripped due to EB feeder problem
10.42 hrs = 9 engines started one by one
11.22 hrs : 9 engines reached full load
16.10 hrs : 6 engines started one by one
18.02 hrs : all 15 engines attained N/M load
Currently load maintaining @ 117 MW.
(15 engines)

Activity
1. Civil work for underground cable for CCTV camera connection as part of Sercurity
Surveilllance Project carried out near Main Gate by M/S BEL/STAN INDIA LTD
2.Safety checking of fire engine carried out by M/S Powerica

Regards