You are on page 1of 14
STANDAR UPAH BURUH TAHUN 2018 URAIAN TENAGA, HARGA 2018 2 s a 1. [Mandor Orgitir | Rp 175,000.00 2 |Kepala Tukang OrgiHr | Rp 175,000.00 3 |Tukang Orgitr | Rp 145,000.00 4 |Sopir Orgitr | Rp 100,000.00 5 |Pembantu Sopir Orr | Rp 75,000.00 6 Operator Alat Berat OrglHr | Rp 200,000.00 7 Operator Alat Berat Semi Terlatin Orgitir | Rp 100,000.00 8 |Pembantu Operator Alat Berat OrgiHr | Rp 75,000.00 9 |Mekanik OrgiHr | Rp 200,000.00 10 |Mekanik Semi Terlatin Orgilir | Rp 100,000.00 11 |Pekeria 90,000.00 HARGA SATUAN BAHAN T.A 2018 SAT| HARGA 2018 ‘Kenaikan harga akibat Kebljakan PPemerintal untuk menetapkan rute tam kota 3 |BAHAN BANGUNAN [4 Tanah dan Pe 125.400 125.400 Past Pastng —— ase ton Cr 125.400 “Situ 125.400 Pasir Plestor 125.400 tal Tanah Urug 107.560 | Kerik Batu Pecah 1-2 232,800 Batu Pecah 2-3 232,000 | Batu Pecan 3-5 232.900 Batu pecan 3-8 232,900 ‘Batu Pecan 5 - 7 (Manual) 107.000 197.000, Batu Pecan 1-2 (Manual) Batu Pecah 2-3 (Manual) 187.000 Batu Pecah 3-5 (Manual) 197.000 ‘Kerkil Sungai 152.200 148.600, Batu Us, Bol Kal, Bau Gunung we 168.900 atu karang Batu Sikat Kg 7000 Batu Alam Me 187-500 ‘Batu Anaesit Lokal Pas ‘Balu Andest Lokal Palu (RTA) we 760,000 4. Baiu Coax Batu Bata Be Batu Bata Kecil Batako Pros Roster Beton 20/20 Roster Beton 25/25 Roster Beton 20/40 Paving Biok 8 Cm Paving Blok § Cm Gasting 20140 ‘Casting 40/50. ‘Casting 60/45 Paving kotak — Kanstia mut | eanstinstan a Kanstin wotoar ‘Kanstin U Kansta KV Batako Biasa = [Bn 7000 | Beton Ready mix Beton K 125 ‘Beton K175: ‘Beton K200 - ‘Beton K 225 Beton K 250 “Beton K 275 Beton ||| |) 5) 5) TI] Beton k 400 Beton K 450 E 5 : Beton k 5 | r Kenaikan Harge akibat Febyjavan No. URAIAN sAT | HARGA2018 | pemerintah untuk menetapkan rute ‘container dalam kota H z z z 5 5. Kapur E Kapur Mi = E @_ 35.000 Semen é : ‘Semen Tonasa (60 kg) = Zak 59,000 = 100 ‘Tiga Roda Zak 58.000 60.800 ‘Semen Putih oe | Zak 65.000 68.200 = Semen Wama kg ci Seca Tass Lor = 800 tbr 49.100 = Lor : 5 5 0.78 Bagus Tbe = = 0.20 Biase tbe 250 - 500 oz Ecce |r 5 - | 5 Seng Prat : 7 is Bus ow cm w 77.000 F500 BLS (020/40Gm mM 27.400 28.400 eae oe 03/40Cm M : z : BLS ‘90x180%0.20 M 5 a BLS ~90%180%0 30 M E = [4 Seng Plastik : lasik Gelombang Kea = 7 = 34100 Plastik Gelombang Besar Fite 94.500 8. Batu Cotak Press = 3enteng Tanah = Bh ~Genteng Beton en 2 EE | Genteng Kodo Bh rea Genteng Metal Tebal Bh. 2000 ig Metal Tipis ‘hr 31.000 Genteng Keramik ‘Genteng Keramik Giazur Nok Genteng Keramik Nok Genteng Keramik Glazur ‘Bubungan Genteng Kass rielal 675.75 —Kaso metal 75.100 eng Ras = Rong R.32.45 ~ Baut cs ‘2x 5 Multi Color (040) tbr a ret ao ‘Sok jempol crystal (1,7/pig) | Lbr 35.000 Nok raja me 3h 5 - = Nok ratu ke ‘Bh = zeae Nok sulan yea | Bh a Nok pus Ke an : =] Tutup nok al ke Bh 5 “Tutup nok ria me es aoe a spank Nusa Pang (020x4m) Bh 3 ~ 1 BARAN KAYO = Kayu Kelas] se E we 73,000,000, mf Kayu Kelas I a [-m® | 2.500.000,00 = Kay Kelsi | 1.700.000,0 i wef 1.433.300 a 15000 pdemmed ee

You might also like