STANDAR UPAH BURUH TAHUN 2018
URAIAN TENAGA, HARGA 2018
2 s a
1. [Mandor Orgitir | Rp 175,000.00
2 |Kepala Tukang OrgiHr | Rp 175,000.00
3 |Tukang Orgitr | Rp 145,000.00
4 |Sopir Orgitr | Rp 100,000.00
5 |Pembantu Sopir Orr | Rp 75,000.00
6 Operator Alat Berat OrglHr | Rp 200,000.00
7 Operator Alat Berat Semi Terlatin Orgitir | Rp 100,000.00
8 |Pembantu Operator Alat Berat OrgiHr | Rp 75,000.00
9 |Mekanik OrgiHr | Rp 200,000.00
10 |Mekanik Semi Terlatin Orgilir | Rp 100,000.00
11 |Pekeria 90,000.00HARGA SATUAN BAHAN
T.A 2018
SAT| HARGA 2018
‘Kenaikan harga akibat Kebljakan
PPemerintal untuk menetapkan rute
tam kota
3
|BAHAN BANGUNAN
[4 Tanah dan Pe
125.400
125.400
Past Pastng ——
ase ton Cr
125.400
“Situ
125.400
Pasir Plestor
125.400
tal
Tanah Urug
107.560 |
Kerik
Batu Pecah 1-2
232,800
Batu Pecah 2-3
232,000 |
Batu Pecan 3-5
232.900
Batu pecan 3-8
232,900
‘Batu Pecan 5 - 7 (Manual)
107.000
197.000,
Batu Pecan 1-2 (Manual)
Batu Pecah 2-3 (Manual)
187.000
Batu Pecah 3-5 (Manual)
197.000
‘Kerkil Sungai
152.200
148.600,
Batu Us, Bol Kal, Bau Gunung
we 168.900
atu karang
Batu Sikat
Kg 7000
Batu Alam
Me 187-500
‘Batu Anaesit Lokal Pas
‘Balu Andest Lokal Palu (RTA)
we 760,000
4. Baiu Coax
Batu Bata Be
Batu Bata Kecil
Batako Pros
Roster Beton 20/20
Roster Beton 25/25
Roster Beton 20/40
Paving Biok 8 Cm
Paving Blok § Cm
Gasting 20140
‘Casting 40/50.
‘Casting 60/45
Paving kotak —
Kanstia mut
| eanstinstan a
Kanstin wotoar
‘Kanstin U
Kansta KV
Batako Biasa
= [Bn 7000
| Beton Ready mix
Beton K 125
‘Beton K175:
‘Beton K200 -
‘Beton K 225
Beton K 250
“Beton K 275
Beton
||| |) 5) 5)
TI] Beton k 400
Beton K 450
E
5
: Beton k 5 |r Kenaikan Harge akibat Febyjavan
No. URAIAN sAT | HARGA2018 | pemerintah untuk menetapkan rute
‘container dalam kota
H z z z 5
5. Kapur E
Kapur Mi = E @_ 35.000
Semen é :
‘Semen Tonasa (60 kg) = Zak 59,000 = 100
‘Tiga Roda Zak 58.000 60.800
‘Semen Putih oe | Zak 65.000 68.200
= Semen Wama kg ci Seca Tass
Lor = 800
tbr 49.100
= Lor : 5 5
0.78 Bagus Tbe = =
0.20 Biase tbe 250 - 500
oz Ecce |r 5 -
| 5 Seng Prat : 7 is
Bus ow cm w 77.000 F500
BLS (020/40Gm mM 27.400 28.400
eae oe 03/40Cm M : z
: BLS ‘90x180%0.20 M 5 a
BLS ~90%180%0 30 M E =
[4 Seng Plastik :
lasik Gelombang Kea = 7 = 34100
Plastik Gelombang Besar Fite 94.500
8. Batu Cotak Press =
3enteng Tanah = Bh
~Genteng Beton en 2 EE |
Genteng Kodo Bh rea
Genteng Metal Tebal Bh. 2000
ig Metal Tipis ‘hr 31.000
Genteng Keramik
‘Genteng Keramik Giazur
Nok Genteng Keramik
Nok Genteng Keramik Glazur
‘Bubungan Genteng
Kass rielal 675.75
—Kaso metal 75.100
eng Ras
= Rong R.32.45 ~
Baut
cs ‘2x 5 Multi Color (040) tbr a ret
ao ‘Sok jempol crystal (1,7/pig) | Lbr 35.000
Nok raja me 3h 5 -
= Nok ratu ke ‘Bh =
zeae Nok sulan yea | Bh
a Nok pus Ke an :
=] Tutup nok al ke Bh 5
“Tutup nok ria me es aoe a
spank Nusa Pang (020x4m) Bh 3 ~
1 BARAN KAYO =
Kayu Kelas] se E we 73,000,000, mf
Kayu Kelas I a [-m® | 2.500.000,00 =
Kay Kelsi | 1.700.000,0 i
wef 1.433.300
a 15000
pdemmed ee