v ob No, Doe. No. Rev
IGC / Kellogg Joint Venture 09000 $00-1310-001 1
Project Speci WCE Ne,
e Ras Laffan Onshore Fac Dae ‘May.9, 96 Sheet of 35
Pea _M. Homma
Civil Detailed Engineering
Design Data
N. Takezawa
INDEX
PAGE
1. GENERAL 3
1.1 Scope... 3
1.2. Applicable Specitatins, Standards and Drawings
and Priotity se. ecevevv eres 7 3
1.3 Language and Unite =. ia 3
Design Groundwater Levels . 4
2. MATERIALS... 20-02 e eee eee 4
e 21 Concrete | . 4
2.2 Reinforcement . 6
23° Structural Stee! 7
24 Connection Bolt. 22... 7
2.5 Steel Pipe for Structural Use” 7
2.6 Welding Electrode . 7
27 Painting System - 7
2.8 Anchor Bolt and Nut ait 7
219 Flooring for Platform, Walkway and Staircase 3
2.10 Reinforced Concrete Pipe for Drainage . 8
2:11 Duile ron Pie for Drange 8
2.12 PVC Pipe fs 8
213 Joint Sealant. : 8
2.14 Cast-In-Place Concrete Drilled Shaft . 8
3. DESIGN LOAD .... 9
3 General .... 3
3.2. Dead Load (D) . 9
3.3. Operating Load (OL) 10,
3.4 Live Load (Ll) ..... . 10,
3.5 Thermal Load (TF) sees W
316 Test Load (TL) ; ry
3.7 Impact Load ( 2
namic Load-oF Vi 3
Vehicle Load (V) 13,
Soil and Water Pressure (H) 3B
Wind Load (W) 3
SASPECSons1310001,W0s
Formonsion] Portier [_[oorma_[ 3 pe toanaon
[ev T_ bate Page Descripion Pred_[ _Chkd | _Appd
O_| aia 8 Ta or Aspro ox S-01= 1310-001 MaRS [NE
1 | may 10/36 | All |e or cnsacion norporaing COMPANYS commen
Tine ba ndcees ecto | th
nied eV
{
l ToitRas Laffan Onshore Facilities Project JGC Job No. 0-9000
Civil Detailed Engineering Design Data Doc. No. $-00-1310-001 _Sheet 2 of 35
LN DEX (Cont'd)
PAGE
AAI Earthquake Load (6) «2.0... eee 14
3.12 Erection Load or Maintenance Load (M) ....... 15
12 Snow and Ice Load S) ..........0ec cscs 5
4. LOAD COMBINATION ...... peseeaon 15
41 General . Ieee elle tte 15
4.2 Loading Combination for Concrete Structure. 8
4.3 Loading Combinations for Steel Structure... 16
5. ALLOWABLE STRESSES AND BEARING CAPACITY 38
5.1 Basic Strength ..... _ 19
5.2 Allowable Bearing Capacity of Soil... .. 19
5.3 Increase of Allowable Stress for Steel Member. 2
5.4 Increase of Allowable Soil Bearing Capacity
and Pile Capacity. pDTESEeTeeESees Better T
6 STABILITY oo eee eee ee eee eee eee Pe le llelltettstttact at 2a
7. CONCRETE STRUCTURE AND FOUNDATION 2
7.1, Design and Calculation... 2B
7.2 Details for Concrete and Reinforcement B
7.3. Other Requirements for Foundation. 4
8 STEEL STRUCTURES ....... . 2
8.1 Design and Calculation : 2
82 Connections ........2.005 Auer lg
83 Allowable Stress... 0... + 27
8.4 Allowable Deflection at Design... + 7
9. FIRE PROOFING FOR STEEL STRUCTURE... 28
9.1 Materials and Thickness ......0... 0000. 28
9.2 Extent of Fireproofing... FF + 28
10. DRAINAGE ...... 1 29
10.1. Types of Sewer and Drinage 129
10.2 Design Basis . . 29
10.3 Materials... + 30
10.4 Design Consideration. eel 30
10.5 Drainage Area Layout RB
10.6 Drainage of Fire Water tee BB
1. PAVING 2.2... “
11.1 Type of Paving 4
11.2 Paving Slope . : 34
11.3 Design Consideration. 4Ras Laffan Onshore Facilities Project JGC Job No. 0-9000
Civil Detailed Engineering Design Data Doc. No. $-00-1310-001__ Sheet 3 of 35,
1 GENERAL
uw Scope
This specification covers Suiifiafiz@s the contractual requirements for the detailed
design and engineering of general civil, foundation, structure and fireproofing work in
RAS LAFFAN LIQUEFIED NATURAL GAS COMPANY, LTD., at RAS LAFFAN ,
QATAR. For building design work, t
case of concer :
1.2 Applicabl
The following specifications, standards and drawings shall be applied to the design
and details of the above mentioned work in conjunction with this specification and in
the priority listed.
fications, Stan wing ciorit
(1) Project Specifications (S-xx-xx)
(2) EGE and EGS of Mobil Engineering Guide
@) Project Standard drawings
(4) Technical requirements specified in this specification
(5) Relevant intemational-codes-or equivalent
Government and local authority requirements, laws and regulations shall prevail, if
these are more stringent than those listed above.
1.3 Language and Units $-00-02
2.0/Rev.1
The following language and unit shall be used for specifications, calculation sheets
and drawings throughout the project.
Language = English
Unit: S.1 Unit
Conventional conversion of the unit system used in various engineering documents
into Meter/Yard/Pound Unit system shall be made as follows:
Table 1
Sa Unit ‘Meter/Yard/Pound Unit
Mass 1 kg. 0.4536 bf
1 Timm 25.4 inch
Length im 170.30480 foot
779.806 Tonffm*
Pressure, Stress ikPa 116.894 _ psi
16.019 tif
it 3 2
Density 1 kg/m’ = 1/27680. tbvin’
770.0929 tf
Area Lm? = 1/0.00064516 i
19.806 kgfm
‘Moment, Torque Nm 11.3558 frtbf
0.1130 _in-tbf
$-00-02
5.0/Rev.1
TABLE