RAB

PEMBANGUNAN PONDOK PESANTREN

HARGA
NO NAMA BARANG VOLUME JUMALH (Rp)
SATUAN

1 Batu Belah 20 Kubik 140,000 2,800,000


2 Pasir 30 Kubik 155,000 4,650,000
3 Semen 50 Sak 75,000 3,750,000
4 Bata Merah 8,000 Buah 600 4,800,000
5 Batu Seplit 5 Kubik 350,000 1,750,000
6 Besi BOR 15 Batang 420,000 6,300,000
7 kayu Cap 4 Kubik 2,800,000 11,200,000
8 Kusen /Lubang 4 Kusen 320,000 1,280,000
9 Kalsit 6 Sak 320,000 1,920,000
10 Kusen Pintu 3 Kusen 1,200,000 3,600,000
11 Ram Kaca 3 Lubang 200,000 600,000
12 Daun Pintu 6 Lubang 400,000 2,400,000
13 Genting Pasir 15 Meter 475,000 7,125,000
14 Keramik 55 Dus 75,000 4,125,000
15 Interhnit 30 Lembar 25,000 750,000
16 Kayu Kaso 8 Kubik 1,500,000 12,000,000
17 GRC Lisbang 30 Lembar 95,000 2,850,000
18 Kayu Papan Cor 30 Lembar 15,000 450,000
19 Paku Kaso 20 Kg 15,000 300,000
20 Cat Kayu / Meni 15 Kaleng 30,000 450,000
21 Residu 10 Kaleng 25,000 250,000
22 Cat Kayu 10 Kaleng 150,000 1,500,000
23 Cat Tembok 2 Galon 250,000 500,000
24 Koas Rol 2 Buah 250,000 500,000
25 Koas Cat 2 Buah 17,500 35,000
26 Kawat Cor 2 Kg 25,000 50,000
27 Closet 1 Buah 250,000 250,000
28 Spiteng 1 Buah 1,500,000 1,500,000
29 Kendek x 30 HOK 3 Orang 80,000 4,800,000
30 Tukang x 30 HOK 2 Orang 100,000 6,000,000
31 Lampu Neon Philip 10 Buah 36,000 360,000
32 Balencong 3 Buah 80,000 240,000
33 Garphu 3 Buah 120,000 360,000
34 Martil Besar 2 Buah 90,000 180,000
HARGA
NO NAMA BARANG VOLUME JUMALH (Rp)
SATUAN

35 Martil Kecil 5 Buah 25,000 125,000


36 Cangkul 2 Buah 75,000 150,000
37 KWH 1 Buah 1,450,000 1,450,000
38 Instalasi 1 Set 1,000,000 1,000,000
39 Torn 1 Buah 650,000 650,000
40 Rangka Baja 20 Meter 350,000 7,000,000
TOTAL 100,000,000

500,000,000
496,198,000
3,802,000