beasmany onna
+ ASNUE NALSIA NEDENBH
evan:
“TSHR NLA NDNEM
SENN,
eee dro 25
cag TE ee oy :(> Royal
HaskoningDHV
hang Soc eter
REQUEST FOR DOCUMENT APPROVAL
‘YEU CAU PHE DUYET HO SO
Project. Helaekcn View Brewery-Vang Taw Phase 5.1 Date: osoer2018
Tandy an: _TEVICN SILO BLOGS & WWTP Nor
‘Contractor, Hoa Binh Consracson Groyp Join Stock Company | Nos VT2MBCATPVRDAISDNO' yf /o1)
nna Th: 88
‘We submit heftlowing fx your approvat
‘Chg i esau evn om tv
= Shop Drawing (inv ict)
Desargton:
"Mba dong: Bin ve trig Ha thdng tnt mirc tha ng thc 18E
‘Shop drawing of waste water drainage system for 18E Secondary Cltifer
Reference specication or Drawings
Bune heb nda ot ha is: RECEIVED By Ajupl Ei Beh Ming
[Dae OF. 0?
REJECTED
Your submision for approval Is subject to folowing candons en din pb dy co Kc ql hu a):
pero (op ty eprowdon onion ted nd ttn wha ns)
ier nd renin) Netgproved acted fxn mut itch)
Noto (oie
no ites
Wee eld CLE ef gon lg
‘Wiese by Owner ‘egroved by Constant Requested bj Conacor
(chang neta Cho uw) (Phe supe Tran) "bg when
askoningDHW Vetnam a, Ltd. | Hoa Binh Consraton Group
ane can;Tran Huu Khanh
Name (te
Poston che Postion chacw): ota
Date Nod: Date Nao
Date: Nor, 2005 Code: TEC-00.05
Raw oe so