VSLSingapore Pte Ltd
25 Senako Way
‘Woodlands East Industrial Estate
Singapore 758087
PROVECT:
‘cA1702-DEFU SOUTH
POST-TENSIONING INSTALLATION REPORT
even: 3
hocaTiON OF INSTALLATION:
PTBcAMNO.: 145 16,
Jonoune: 32% ye/Q-R
BIKE Z
DOCUMENT NO.
VSLSG/CAI7O2/INSTALLATION/ 0 §
Prepared by
Almas udd’n
[Witnessed By (Optional
Sono
[Witnessed By (Optional):
A Run,
(Date:
26-06-18
Date: 2606] 008
aaa [10
rr a
VStsingapore Pte Ld
Jb convert neened
tent sth prope San mst fob coped epee, ped, pty rly aed a any hd Pay red
psy man when any ez wen po aren saan er anent Seee TOD 5...
CONTENT PAGE
1) Tendon instalation Summary
2) Teron installation Checklist
3) Tendon Intlation RecordsVSL SINGAPORE PTE LTD
25 Senco Way, Woosands East ndutil Estate ASG ean
Singapore 758087 “w
TENDON INSTALLATION SUMMARY
PROJECT TITLE (CA1702 - DEFU SOUTH DATE I U6-O6~&
[L_tocarion | Bile 2 ES CL 42~38/Q~R
DRAWINGS LIST FOR INSTALLATION WORKS
T
PT She |
etiam] “eS
Part print issued) me
‘CONSULTANT'S REPRENTATIVES COMMENTS (F ANY):
Prepared By ed tiddin NaS _24-06-1
‘name Appomntment/ Satire
‘witnessed By Sarno