Make a dream start in the
Power Sector with NTPC
RECRUITMENT OF
ENGINEERING
EXECUTIVE TRAINEES-2019
THROUGH GATE-2019
NTPC Limted, India's largest power congiomerate with an installed
sapacily of 83651 MW and is presently contibullng to 14th of the
olocrcily needs. Commensurate with ou county's growth
‘a total
‘hallonges, NTPC has embarked upon an ambitous plan to ata
installed capacity of 1.30 GW by 2032.
‘oval ts ambitious growth plan, NTPC is looking for promising, energetc
and dedicated yourg Graduate Engineers wih Belliat academic record
nes of Electrical, Mechanical, Electronics,
Commencement of anline apolation far 01.00.2018
GATE-2019
04.10.2011
ecutive 2013.
ine Registration of
eae tad
‘Step 1: Al intarestec and okgible candidates are
for GATE-2019. Candidates wil be shortlisted for further sel
process based on the 2019 performance and the
Fequirement. Detailed information regarding GATE-2019 is
available on the website: https:l/appagate.litm.ac.in
‘Step 2: Candidates need to apply online for the post of ET-2019)
c their GATE-2019 Registration Number/id by visiting
at. The Online app ess will
2018.
ation pf
pplcaton by candidates for RTPC 10.01.2019
Last date fr orine egisvaton of application by
conddates for NTPC 34012018
NTPC Limited.
Road, New Delhi 110003
ween ntpecoln
evi. No, -0si18