You are on page 1of 1
Make a dream start in the Power Sector with NTPC RECRUITMENT OF ENGINEERING EXECUTIVE TRAINEES-2019 THROUGH GATE-2019 NTPC Limted, India's largest power congiomerate with an installed sapacily of 83651 MW and is presently contibullng to 14th of the olocrcily needs. Commensurate with ou county's growth ‘a total ‘hallonges, NTPC has embarked upon an ambitous plan to ata installed capacity of 1.30 GW by 2032. ‘oval ts ambitious growth plan, NTPC is looking for promising, energetc and dedicated yourg Graduate Engineers wih Belliat academic record nes of Electrical, Mechanical, Electronics, Commencement of anline apolation far 01.00.2018 GATE-2019 04.10.2011 ecutive 2013. ine Registration of eae tad ‘Step 1: Al intarestec and okgible candidates are for GATE-2019. Candidates wil be shortlisted for further sel process based on the 2019 performance and the Fequirement. Detailed information regarding GATE-2019 is available on the website: https:l/appagate.litm.ac.in ‘Step 2: Candidates need to apply online for the post of ET-2019) c their GATE-2019 Registration Number/id by visiting at. The Online app ess will 2018. ation pf pplcaton by candidates for RTPC 10.01.2019 Last date fr orine egisvaton of application by conddates for NTPC 34012018 NTPC Limited. Road, New Delhi 110003 ween ntpecoln evi. No, -0si18

You might also like