PN star Wa
CENTRAL GOVERNMENT EMPLOYEES
WELFARE HOUSING ORGANISATION
eae ean arart
- a
GREATER” NOIDA
HOUSING SCHEME
ats. say. vest. Parract
CGEWHO RULES2h
INDEX TO CONTENTS
PART A : GREATER NOIDA 26. [Delay in Taking Over 7
HOUSING SCHEME 29. [Hending Over 72
1. [introduction / Background fee eee tee
2. [Location o2|
Sane res C2} (32. [Adalvons & Alterations 7
4_| Definitions [oa] | Sp ounerstie 4
5._[ Elgiilty 03
G._| Tentative Detals of Dweling Unis/FTats 0a] | 25 {Transfer 4g
ee Ct} | 36. [Licitty ofthe GSEWHO 14
apa ones ts] | [Amendnetsio te er oi Opn 4
9. [ Construction Schedule 06|
70, Loan Arrangements 05] 92 4Arbluation a
ee Co} [46. [Misrepresentation or Suppression of Facts 7a]
41. [Other Salient Features Regarding Loans From
PART B : CGEWHO RULES Financial Insttutons 14
2. |General Procedure for obtaining Loan 4
1. | Preamble 8]
2. | Definitions 08} | PART C : ANNEXURES
3_| Elatity 08} [4 [Layout Pian (Annexure |) 15]
| Seecial EMMY Srteris 98] 12—Typical Floor Plan Type A (Annemare I) 76
2} Housing Concept £2! [3._ [Typical Floor Plan Type B (Annexure tl) 17|
S| Type ot Houses, 08] a. [Typical Floor Pian Type C (Annexure IV) a)
7._| Option to apply for type of unit a] [eric eee i ree Fee cc
8._[ Plans and Spectfcations og] yeieal Hoorn ype: near
a Cats and Specs oe) [6 [Proterma for Payment Deposit (Annexure VI) | 20
an LT) _[7._[ Proforma for Change of Address (Annexure VIN_| 21
Tc er Hie] [8-_[ Format of Pre-eceipt (Annexure Vil) 22]
12.| How to Apply 10] |* |penetciay (annexed 2a
13 Fegisaion of pean 10] [aOR Doel TD a
14.| Reservation for SC/ST Applicants il Hriscakaecone Ae 3
1 | Confirmation of Booking {#0} [52-[rparite Agreement fr Financia insttuton
16.| Cost of Owellng Units 10 other than HUDCO (Annexure Xil) 2s
17.| Payment Schedule 11] [73-[Tparite Agreement in case of Loan Wom HUDCO
76.| Late Payments 11 (Annexure Xill) 30]
18.| Changes in Payment Schedule 71] [74 [Undertaking about Loan details (Annexure xiv) _| 33]
20. | Mode of Payment 71] _[75. [Application for Membership in AOA (Annexure XV)| 34
21. Payment of interest 11] _[[16. [Acceptance And Undertaking (Annexure xv) | 38
22. Rebate Tt] _[717. [Format of Afdavit to be enclosed with
231] CoanArianpaTerne 7a Applicaton Form (Annexure. XVI) 37|
24.| Allotment of Specifc Uni T1| [PART D: Application Kit (Application Formwith | ()
25. Withdrawal from a Scheme 12| | one copy of CGEWHO Rules to be submitted to | to
26.| Cancellation Charges 12| | CGEWHO duly signed by applicant Gav
27-| Possession 72PART A: GREATER NOIDA HOUSING SCHEME
1, INTRODUCTION/BACKGROUND:
a
2, LOCATION:
i) Gentrat Government Employees Welfare Housing
Organisation (CGEWHO), an autonomous body of the
Ministry of Housing & Urban Poverty Alleviation, Govt. of
India and registered under the Societies Registration
‘Act 1860, was specifically created for execution of housing
projects through out the country for Central Govemment
employees, on 'No-profit-No loss’ and ‘seff financing’
basis. It has at present, to its credit, on-going housing
schemes at Mohali PH-lI (615), Bhubaneshwar PH-II
(240) besides Greater Noida Housing Scheme Ph. (2130)
and further 2316 dwelling units are under various stages of
construction and planning. 30 Projects at the following
locations havebeen completed by the Organisation -
No. [Project Completed No. of DU
1,2 [Chennai (Pnase | & 1) 1096.
3 Nerul, Navi Mumbai 384
45 [Panchkula (Phase 1 Il) 338
6 Kokata (Phase 1) 576
78 _|Noida, Sector-51 (Phase 18 Il) 41200
8 IKharghar, Navi Mumbai 1230
10,11 _ [Gurgaon at Sector-56 (Phase 1&1) | 1940
2 [Chandigarh 305
13 Banglore (Phase !) 603
14,15,16 | Hyderabad (Phase 1,118 I) 902
a7 Koshi 43
10,19 [Pune (Phase | & Il) 307
20.21.22 [Noda at Sector-82 (Phase ILIV &V)|_ 2276
23 [Ahmedabad 310
24,25 _ | Jaiour (Phase | & I) 756
26 [Lucknow 130
ar Mohali (Phase) 603
28 [Bhubaneswar (Phase |) 256
29 Meorut (Phase |) 80
30 Kokata Pht 582
[TOTAL 13927
i) This brochure, outlines, details and ‘Rules and
Regulations’ governing the Greater Noida Housing
Scheme.
The site 1s located on Plot No. 7, Sector P-4 (Phr2, Builders
Area, Near Unitech Heights), Greater Noida and approx.
5 kms. from Pari Chowk of Greater Noida. Please refer to the
location plan at back cover page of his Brochure.
3. SALIENT FEATURES:
The estimated cost includes the salientsas under:
a) One covered car parking under stits/ basement for each
bu.
b) Community Hall (G+4) around 45000 sq ft. area which
includes:
(Swimming poot
(i) Banquet Ha,
(i) Kidspley area,
(v) Gymnasium etc.
¢) Religious Building (Ground floor) having 3300 sq t. area.
4) Nursery Schoo! (G+1) havingaround 9200 sq ftarea
e) Nursing Home (G+3)around 14000 sqft. area,
1) Commercialcomplex (G+3) of around 38000 sq ftarea.
9) The cost calculated is with the assumption that CGEWHO
shall be able to dispose off approximately 1500 covered
car parking under stits) basement @300,000/-. This shall
ive credit of Rs 45 crores tothe project cost.
h) The cost also includes the enhancement amount
demanded by GNIDA on the land as per the order of
Hon'ble Allahabad High Court, which inter-alia works out
Rs. 74/- por sq. ft. Although CGEWHO has already
informed GNIDA thet the demand raised by them is not
chargeable to CGEWHO. In case same is not charged by
GNIDAitwillbe oftloaded to Beneficiaries.
+ [tis also to be informed that Ancillary building blocks i.e
Nursery School, Commercial Complex, Nursing Home etc.
‘as mentioned in para (4), (e) & f) above may be disposed in
order to subsidise the cost of DU at the time of demancing
final installment.
+ AllDUsare provided with balcony(ies).
+ Fully developed project with roads, paved walk ways,
electrification, water supply, sewage disposal system, area
drainage system, community facilities,
horticulture/plantations, parks, boundary wall, security gates
Kpostsetc
+ Allthe blocks shall be provided with lft faciity
+ Planning by professionalfirm of Architects.
+ Township planned with open spaces.
+ Rainwaterharvesting for augmenting water resources.
+ Construction as per approved plans of Greater Noida
Industrial Development Authority.