You are on page 1of 147

GUDANG JOS - 12 M

dag 488 kg/m2 sloof 240 kg/m


tembok : 250 kg/m2 t.pancang 96 kg/m
atap : 50 kg/m2 POER 600 /titik

no no. kolom TEMBOK ATAP


arah x tinggi arah y tinggi berat span lebar berat

1 1 tepi 3 7.5 3 7.5 11250 3 3 450


1 1 tengah 6 7.5 3 7.5 16875 3 6 900
1 2 tepi 6 7.5 0 7.5 11250 6 6 1800
1 2 6 7.5 0 7.5 11250 6 12 3600
JOS - 12 M

DAG sloof tiang pancang TOTAL


span lebar berat panjang berat panjang berat

0 3 0 6 1440 18 1728 14868


0 0 0 9 2160 18 1728 21663
0 0 0 6 1440 18 1728 16218
0 0 0 6 1440 18 1728 18018
PERHITUNGAN PEMBEBANAN
PROYEK : BANGUNAN SEKOLAH
LOKASI : SURABAYA

Beban Plat Portal Gempa


No Lokasi Jenis Beban & Balok Lr1=0,90 Lr2=0,5
( kg/m2) ( kg/m2) ( kg/m2) ( kg/m2)

01 * RUANG KELAS Finishing 90


Plafond 20
110
Plat beton t=120 mm 288
Beban Mati = 398 398.0 398.0 398.0
Beban Hidup = 250 250.0 225.0 125.0
648.0 623.0 523.0

02 * R. SERBAGUNA Finishing 90
* R. OLAH RAGA Plafond 20
* HALL 110
* R. PERTEMUAN Plat beton t=120 mm 288
Beban Mati = 398 398.0 398.0 398.0
Beban Hidup = 400 400.0 360.0 200.0
798.0 758.0 598.0

03 * LOBBY Finishing 90
* KORIDOR Plafond 20
* TANGGA 110
Plat beton t=120 mm 288
Beban Mati = 398 398.0 398.0 398.0
Beban Hidup = 300 300.0 270.0 150.0
698.0 668.0 548.0

04 * KM/WC Finishing ( keramik )+ mortar 90


Waterproofing 15
Concrete prot. t=50 120
Plafond 20
245
Plat beton t=120 mm 288
Beban Mati = 533 533.0 533.0 533.0
Beban Hidup = 250 250.0 225.0 125.0
783.0 758.0 658.0

Beban Plat Portal Gempa


No Lokasi Jenis Beban & Balok Lr1=0,90 Lr2=0,5
( kg/m2) ( kg/m2) ( kg/m2) ( kg/m2)

5 * DAPUR/ PANTRY Finishing 90


Plafond 20
110
Plat beton t=120 mm 288
Beban Mati = 398 398.0 398.0 398.0
Beban Hidup = 250 250.0 225.0 125.0
648.0 623.0 523.0

6 * GUDANG Finishing 90
Plafond 20
110
Plat beton t=120 mm 288
Beban Mati = 398 398.0 398.0 398.0
Beban Hidup = 400 400.0 360.0 200.0
798.0 758.0 598.0

7 * PLAT ATAP Finishing 90


Plafond 20
110
Plat beton t=120 mm 288
Beban Mati = 398 398.0 398.0 398.0
Beban Hidup = 100 100.0 90.0 50.0
498.0 488.0 448.0
TRIBUTARY AREA
(cooling machine room)

g.beam : 300 kg/m


roof : 37 kg/m2
wall : 800 kg/m
No roof Wall G.Beam Q total Footing Size s footing
P(m) L(m) kg L(m) Q(kg) L(m) Q(kg) kg B(m) L(m) kg/m2

1 2.2 2.8 227.9 4.5 3600 2 600 4427.9 1.4 1.4 2259.143

2 4.3 2.8 445.5 5.8 4640 5 1500 6585.5 1.4 1.4 3359.939
TRIBUTARY AREA
(cooling tower)

q (u1) slab = 980 kg/m2


q (u2) slab = 1640 kg/m2
q (l) slab = 4060 kg/m2
q beam = 450 kg/m'
q wall = 2160 kg/m'
No Upper Slab (1) Upper Slab (2) Lower Slab Wall Beam Q total
P(m) L(m) kg P(m) L(m) kg P(m) L(m) kg L(m) Q(kg) L(m) Q(kg) kg

1 3.5 1 3430.0 0.0 0.0 0 0.0 0.0 0.0 4.5 9720 2 4320 17470.0

2 3.5 2 6860.0 0.0 0.0 0 0.0 0.0 0.0 5.8 12528 5 10800 30188.0

4 0 0 0 3.5 1.0 5740 0.0 0.0 0.0 0 0 1 2160 7900.0


TRIBUTARY AREA
(cool water tank)

q (u) slab = 830 kg/m2


q (l) slab = 4060 kg/m2
q wall = 2160 kg/m'
No Area Upper Slab Lower Slab Wall Q total
P(m) L(m) kg kg L(m) Q(kg) kg

1 1.75 1.5 2178.8 10657.5 3.25 7020 19856.3

2 3.5 1 2905.0 14210.0 4.5 9720 26835.0

4 1.75 3 4357.5 21315.0 3 6480 32152.5


BEAM CALCULATION

cooling tower
Type Size L (m) q (kg/m') M=1/8ql2 Mu=1.5M
(cmxcm) kgm kgm

B1 30/60 3.5 1940 2970.63 4455.94

B2 30/70 3 1310 1473.75 2210.63

B4 25/50 3.5 2570 3935.31 5902.97


EQUIVALEN LOAD

add - office
Code q Dimensions p q-seg q-trp
of lx ly ly/lx
slab (kg/m2) (m) (m) (kg/m') (kg/m')

bm
A 510.00 2.50 8.00 3.20 637.50 425.00 616.75

B 510.00 3.00 8.00 2.67 765.00 510.00 729.14

G 510.00 1.50 2.00 1.33 382.50 255.00 310.78

EQUIVALEN LOAD

add - office
Code q Dimensions p q-seg q-trp
of lx ly
slab (kg/m2) (m) (m) ly/lx (kg/m') (kg/m')

bh
A 300.00 2.50 8.00 3.20 375.00 250.00 362.79

B 400.00 3.00 8.00 2.67 600.00 400.00 571.88

G 400.00 1.50 2.00 1.33 300.00 200.00 243.75


PERHITUNGAN PEMBEBANAN

Beban Plat Portal Gempa


No Lokasi Jenis Beban & Balok Lr1=0,75 Lr2=0,3
( kg/m2) ( kg/m2) ( kg/m2) ( kg/m2)

1 * HALL UTAMA Finishing 100


Plafond 20
120
Plat beton t=120 mm 288
Beban Mati = 408 408.0 408.0 408.0
Beban Hidup = 400 400.0 300.0 120.0
808.0 708.0 528.0

2 KM/WC Finishing ( keramik )+ mortar 100


Waterproofing 15
Concrete prot. t=50 120
Plafond 20
255
Plat beton t=120 mm 288
Beban Mati = 543 543.0 543.0 543.0
Beban Hidup = 250 250.0 187.5 75.0

3 * LOBBY Finishing 100


* KORIDOR Plafond 20
* TANGGA 120
Plat beton t=120 mm 288
Beban Mati = 408 408.0 408.0 408.0
Beban Hidup = 300 300.0 225.0 90.0
708.0 633.0 498.0

4 * HALL UTAMA Finishing 100


Plafond 20
120
Plat beton t=120 mm 288
Beban Mati = 408 408.0 408.0 408.0
Beban Hidup = 400 400.0 300.0 120.0
808.0 708.0 528.0

5 * MULTIPURPOSE Finishing 100


* PANGGUNG Plafond 20
120
Plat beton t=120 mm 288
Beban Mati = 408 408.0 408.0 408.0
Beban Hidup = 400 400.0 300.0 120.0

Beban Plat Portal Gempa


No Lokasi Jenis Beban & Balok Lr1=0,75 Lr2=0,3
( kg/m2) ( kg/m2) ( kg/m2) ( kg/m2)

6 * DAPUR/ PANTRY Finishing 100


Plafond 20
120
Plat beton t=120 mm 288
Beban Mati = 408 408.0 408.0 408.0
Beban Hidup = 250 250.0 187.5 75.0
658.0 595.5 483.0

7 * GUDANG Finishing 100


Plafond 20
120
Plat beton t=120 mm 360
Beban Mati = 288 288.0 288.0 288.0
Beban Hidup = 400 400.0 300.0 120.0

8 * RUANG M/E Finishing 100


Plafond 20
120
Plat beton t=120 mm 288
Beban Mati = 408 408.0 408.0 408.0
Beban Hidup = 800 800.0 600.0 240.0
1,208.0 1,008.0 648.0

9 * PARKIR BASEMENT Finishing 100


Plafond 20
120
Plat beton t=150 mm 360
Beban Mati = 480 480.0 480.0 480.0
Beban Hidup = 800 800.0 600.0 240.0
1,280.0 1,080.0 720.0
PEMBEBANAN PELAT LANTAI

Proyek : Slipi View


Gedung : Apartemen
Lokasi : Jakarta - Indonesia

No Jenis B.J. Tebal B. Mati B. Hidup Beban Total


Lokasi Pembebanan t/m 3
cm kg/m 2
kg/m 2
kg/m2
Pelat Balok Gempa
1 R. Apartment Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 50
B.S. Pelat 2.4 12 288 0.75 0.3
443 200 643 482.25 192.9
2 Balkon Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 30
B.S. Pelat 2.4 12 288 0.75 0.3
423 300 723 542.25 216.9
3 Corridor/Lobby/Ent.Hall Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 50
B.S. Pelat 2.4 15 360 0.75 0.3
515 300 815 611.25 244.5
4 R. Mesin Lift Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 0
B.S. Pelat 2.4 15 360 0.75 0.3
465 400 865 648.75 259.5
5 R. M/E Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 0
B.S. Pelat 2.4 15 360 0.75 0.3
465 400 865 648.75 259.5
6 Fire Tank/Substation/ Partisi - - -
Pump Station Finishing 2.1 5 105
Ceil/ducting/p.rack - - 0
B.S. Pelat 2.4 20 480 0.75 0.3
585 800 1385 1038.75 415.5
7 R. Generator Partisi - - -
Finishing 2.1 0 0
Ceil/ducting/p.rack - - 0
B.S. Pelat 2.4 20 480 0.75 0.3
480 2000 2480 1860 744
8 R. STP Partisi - - -
Finishing 2.1 0 0
Ceil/ducting/p.rack - - 0
B.S. Pelat 2.4 50 1200 0.75 0.3
1200 4000 5200 3900 1560
9 Atap Beton Waterprofing - - 15
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 50
B.S. Pelat 2.4 12 288 0.75 0.3
443 100 543 407.25 162.9
PEMBEBANAN PELAT LANTAI

Proyek : Slipi View


Gedung : Apartemen
Lokasi : Jakarta - Indonesia

No Jenis B.J. Tebal B. Mati B. Hidup Beban Total


Lokasi Pembebanan t/m 3
cm kg/m 2
kg/m 2
kg/m2
Pelat Balok Gempa
10 Carpark/driveway (atas) Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 25
B.S. Pelat 2.4 15 360 0.75 0.3
490 400 890 667.5 267
11 Carpark/driveway (base) Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 25
B.S. Pelat 2.4 20 480 0.75 0.3
610 800 1410 1057.5 423
12 R. Olah Raga Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 50
B.S. Pelat 2.4 15 360 0.75 0.3
515 400 915 686.25 274.5
13 Storage Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 50
B.S. Pelat 2.4 15 360 0.75 0.3
515 400 915 686.25 274.5
14 Service Yard Partisi - - -
Finishing 2.1 5 105
Ceil/ducting/p.rack - - 25
B.S. Pelat 2.4 20 480 0.75 0.3
610 800 1410 1057.5 423
U24 BRC U50 PILE(cm) L (m) P (ton)

f8-75 M8-150 15X15 4,6 25


f8-100 M7-150 20X20 4,6,8 45
f8-150 M6-150 25X25 4,6,8 70
f8-200 M5-150 30X30 4,6,8,12 105
f10-75 M10-150 35X35 4,6,8,10,12 145
f10-100 M9-150 40X40 4,6,8,10,12 180
PERHITUNGAN PERBANDINGAN TULANGAN LUNAK U24 DENGAN BRC

A. TUL. PLAT f10 -150


Tulangan lunak U-24 BRC U-50

s= 1400 kg/cm2 s= 2900 kg/cm2


f= 10 mm ---------> konversi ke BRC Luas tul = 1400 x Luas Tulangan Lunak
jarak = 150 mm 2900
Luas = 5.23 cm2
= 1400 x 5.23
2900

= 2.53 cm2

Dipakai BRC 8-150 = 3.35 cm2

B. TUL. PLAT f10 -200


Tulangan lunak U-24 BRC U-50

s= 1400 kg/cm2 s= 2900 kg/cm2


f= 10 mm ---------> konversi ke BRC Luas tul = 1400 x Luas Tulangan Lunak
jarak = 200 mm 2900
Luas = 3.93 cm2
= 1400 x3.93
2900

= 1.89 cm2

Dipakai BRC 7-150 = 2.57 cm2


Project : Slipimas Project
Location : Jakarta - Indonesia

TENSION LOAD

Location Area n-pile Uplift Found Slab 2nd - Base 1st- Base 1st- Floor Ret. Wall Pilecap Pile Tension Tension 1Pile
m2 kg/m2 kg/m2 kg/m2 kg/m2 kg/m2 kg kg kg kg

(11,C) 64 1f 100 8500 1200 1500 1000 1000 0 12902 43353 186945 186945

( 13,A) 32 1f 80 8500 1200 1500 1000 1000 51840 9878 15680 44202 44202

(23,E) 44 2f 80 8500 1200 1500 1000 1000 0 26812 31364 109024 54512
PERENCANAAN PELAT DASAR

Beban yang bekerja :

1. Beban Statik ( Beban yang bersifat tetap/ diam )


2. Beban Dinamik ( beban yang bergerak/ dinamis )

Pada perencanaan ini beban bergerak ( forklift ) lebih menentukan karena adanya beban terpusat
yang besar pada suatu titik yang menyebabkan terjadinya konsentrasi tegangan pada titik tersebut
yang dapat menimbulkan terjadinya pumping pada pelat lantai.

Data Perencanaan :

P = 3 ton = 6744 lb : P = besarnya gaya pada roda forklift


K = 225 : Mutu beton
sb = 74 kg/cm2 = 1073.24 psi : Tegangan lentur beton
50 % sb = 536.62 psi : Tegangan lentur beton ijin
tb pelat ( h ) = 20 cm 7.87 in : tebal pelat
a = 50 cm 19.69 in : jari2 beban kontak
b = 50 cm 19.69 in : jari2 penyebaran tekanan yang ekivalent
E beton = 2.10E+05 kg/cm2 = 3045671.33 psi : Modulus elastisitas beton
u = 0.2 : poison ratio beton
CBR = 85% .-----> k = 700 lb/m3 = 0.0114709 lb/cu.in : modulus subgrade
L = E.h / ( 12 ( 1 - u ). k )
3 2
: jari2 kekenyalan relatif
= 325.7

RUMUS WESTERGAARD

1. Tegangan yang terjadi akibat beban roda pada tepi pelat

s = 0.572.P / h2 . ( 4log( L/b ) + log b )

= 384.21 psi < 536.62 psi

2. Tegangan yang terjadi akibat beban roda pada tengah2 pelat

s = 0.316.P / h2 . ( 4log( L/b ) + 1.069 )

= 204.51 psi < 536.62 psi

3. Tegangan yang terjadi akibat beban roda pada ujung pelat

s = 4.3P / h2 . ( 1- aV2/L).1.2

= 513.82 psi < 536.62 psi


TABEL PENULANGAN PLAT
TEBAL PLAT TULANGAN ARAH ( X ) TULANGAN ARAH ( Y ) TULANGAN
NO KODE
( mm ) ( BENTANG PENDEK ) ( BENTANG PANJANG) BAGI

1 S1 12 Ø8-100 Ø8-100 Ø8-200

2 S2 12 Ø8-100 Ø8-150 Ø8-200

6 S6 12 Ø8-100 Ø8-200 Ø8-200


KONTROL LENDUTAN PELAT
( PBBI 1971 Pasal 10.5)

300

750

Mutu Bahan :
Beton : K 250 ----> s'bk = 250 kg/cm2
Tulangan : U 50 ----> sa = 2900 kg/cm2
s*au = 4350 kg/cm2
Dimensi Plat:
Bentang Plat ( lo ) = 300 cm
Tebal plat ( h ) = 10 cm ( tebal efektif)

Penulangan Plat:
Diameter tulangan = 0.6 cm
Jarak tulangan = 15 cm

Beban Yang Bekerja :


g = 408 kg/m2 ( beban mati terbagi rata per m2)
p = 250 kg/m2 ( beban hidup terbagi rata per m2)
g' = 508 kg/m2 ( beban mati + sebagian beban hidup yg bersifat tetap per m2)
p' = 250 kg/m2 ( beban hidup sementara yang kontinu per m2 )

Lendutan f = fe g'.k1.k2+p'
g+p

k1 = 2 ( balok persegi )
k2 = 1 --------> A'/A = 1
1 + A'/A

k2 = 0.5

x = 2.5.A.s*au = 0.02732
b.h.s'bk

a = 20.8 ( batang polos)

fe = sa.lo2 1E-07 = 1.290


a.(1-x) h

f = 1.486 cm < f ijin = lo


250

1.486 cm < 1.200 cm ( OK )


Tabel koefisien plat lantai

ly/lx Ctx Cty Clx Cly

1.00 51.00 51.00 25.00 25.00


1.01 51.60 51.15 25.45 24.85
1.02 52.20 51.30 25.90 24.70
1.03 52.80 51.45 26.35 24.55
1.04 53.40 51.60 26.80 24.40
1.05 54.00 51.75 27.25 24.25
1.06 54.60 51.90 27.70 24.10
1.07 55.20 52.05 28.15 23.95
1.08 55.80 52.20 28.60 23.80
1.09 56.40 52.35 29.05 23.65
1.10 57.00 52.50 29.50 23.50
1.11 57.60 52.65 29.95 23.35
1.12 58.20 52.80 30.40 23.20
1.13 58.80 52.95 30.85 23.05
1.14 59.40 53.10 31.30 22.90
1.15 60.00 53.25 31.75 22.75
1.16 60.60 53.40 32.20 22.60
1.17 61.20 53.55 32.65 22.45
1.18 61.80 53.70 33.10 22.30
1.19 62.40 53.85 33.55 22.15
1.20 63.00 54.00 34.00 22.00
1.21 63.45 54.05 34.40 21.80
1.22 63.90 54.10 34.80 21.60
1.23 64.35 54.15 35.20 21.40
1.24 64.80 54.20 35.60 21.20
1.25 65.25 54.25 36.00 21.00
1.26 65.70 54.30 36.40 20.80
1.27 66.15 54.35 36.80 20.60
1.28 66.60 54.40 37.20 20.40
1.29 67.05 54.45 37.60 20.20
1.30 67.50 54.50 38.00 20.00
1.31 67.95 54.55 38.40 19.80
1.32 68.40 54.60 38.80 19.60
1.33 68.85 54.65 39.20 19.40
1.34 69.30 54.70 39.60 19.20
1.35 69.75 54.75 40.00 19.00
1.36 70.20 54.80 40.40 18.80
1.37 70.65 54.85 40.80 18.60
1.38 71.10 54.90 41.20 18.40
1.39 71.55 54.95 41.60 18.20
1.40 72.00 55.00 42.00 18.00
1.41 72.30 54.95 42.35 17.85
1.42 72.60 54.90 42.70 17.70
1.43 72.90 54.85 43.05 17.55
1.44 73.20 54.80 43.40 17.40
1.45 73.50 54.75 43.75 17.25
1.46 73.80 54.70 44.10 17.10
1.47 74.10 54.65 44.45 16.95
1.48 74.40 54.60 44.80 16.80
1.49 74.70 54.55 45.15 16.65
1.50 75.00 54.50 45.50 16.50
1.51 75.30 54.45 45.85 16.35
1.52 75.60 54.40 46.20 16.20
1.53 75.90 54.35 46.55 16.05
1.54 76.20 54.30 46.90 15.90
1.55 76.50 54.25 47.25 15.75
1.56 76.80 54.20 47.60 15.60
1.57 77.10 54.15 47.95 15.45
1.58 77.40 54.10 48.30 15.30
1.59 77.70 54.05 48.65 15.15
1.60 78.00 54.00 49.00 15.00
1.61 78.15 54.00 49.20 15.00
1.62 78.30 54.00 49.40 15.00
1.63 78.45 54.00 49.60 15.00
1.64 78.60 54.00 49.80 15.00
1.65 78.75 54.00 50.00 15.00
1.66 78.90 54.00 50.20 15.00
1.67 79.05 54.00 50.40 15.00
1.68 79.20 54.00 50.60 15.00
1.69 79.35 54.00 50.80 15.00
1.70 79.50 54.00 51.00 15.00
1.71 79.65 54.00 51.20 15.00
1.72 79.80 54.00 51.40 15.00
1.73 79.95 54.00 51.60 15.00
1.74 80.10 54.00 51.80 15.00
1.75 80.25 54.00 52.00 15.00
1.76 80.40 54.00 52.20 15.00
1.77 80.55 54.00 52.40 15.00
1.78 80.70 54.00 52.60 15.00
1.79 80.85 54.00 52.80 15.00
1.80 81.00 54.00 53.00 15.00
1.81 81.05 53.95 53.25 15.00
1.82 81.10 53.90 53.50 15.00
1.83 81.15 53.85 53.75 15.00
1.84 81.20 53.80 54.00 15.00
1.85 81.25 53.75 54.25 15.00
1.86 81.30 53.70 54.50 15.00
1.87 81.35 53.65 54.75 15.00
1.88 81.40 53.60 55.00 15.00
1.89 81.45 53.55 55.25 15.00
1.90 81.50 53.50 55.50 15.00
1.91 81.55 53.45 55.75 15.00
1.92 81.60 53.40 56.00 15.00
1.93 81.65 53.35 56.25 15.00
1.94 81.70 53.30 56.50 15.00
1.95 81.75 53.25 56.75 15.00
1.96 81.80 53.20 57.00 15.00
1.97 81.85 53.15 57.25 15.00
1.98 81.90 53.10 57.50 15.00
1.99 81.95 53.05 57.75 15.00
2.00 82.00 53.00 58.00 15.00
2.01 82.02 52.96 58.08 14.98
2.02 82.04 52.92 58.16 14.96
2.03 82.06 52.88 58.24 14.94
2.04 82.08 52.84 58.32 14.92
2.05 82.10 52.80 58.40 14.90
2.06 82.12 52.76 58.48 14.88
2.07 82.14 52.72 58.56 14.86
2.08 82.16 52.68 58.64 14.84
2.09 82.18 52.64 58.72 14.82
2.10 82.20 52.60 58.80 14.80
2.11 82.22 52.56 58.88 14.78
2.12 82.24 52.52 58.96 14.76
2.13 82.26 52.48 59.04 14.74
2.14 82.28 52.44 59.12 14.72
2.15 82.30 52.40 59.20 14.70
2.16 82.32 52.36 59.28 14.68
2.17 82.34 52.32 59.36 14.66
2.18 82.36 52.28 59.44 14.64
2.19 82.38 52.24 59.52 14.62
2.20 82.40 52.20 59.60 14.60
2.21 82.42 52.16 59.68 14.58
2.22 82.44 52.12 59.76 14.56
2.23 82.46 52.08 59.84 14.54
2.24 82.48 52.04 59.92 14.52
2.25 82.50 52.00 60.00 14.50
2.26 82.52 51.96 60.08 14.48
2.27 82.54 51.92 60.16 14.46
2.28 82.56 51.88 60.24 14.44
2.29 82.58 51.84 60.32 14.42
2.30 82.60 51.80 60.40 14.40
2.31 82.62 51.76 60.48 14.38
2.32 82.64 51.72 60.56 14.36
2.33 82.66 51.68 60.64 14.34
2.34 82.68 51.64 60.72 14.32
2.35 82.70 51.60 60.80 14.30
2.36 82.72 51.56 60.88 14.28
2.37 82.74 51.52 60.96 14.26
2.38 82.76 51.48 61.04 14.24
2.39 82.78 51.44 61.12 14.22
2.40 82.80 51.40 61.20 14.20
2.41 82.82 51.36 61.28 14.18
2.42 82.84 51.32 61.36 14.16
2.43 82.86 51.28 61.44 14.14
2.44 82.88 51.24 61.52 14.12
2.45 82.90 51.20 61.60 14.10
2.46 82.92 51.16 61.68 14.08
2.47 82.94 51.12 61.76 14.06
2.48 82.96 51.08 61.84 14.04
2.49 82.98 51.04 61.92 14.02
2.50 83.00 51.00 62.00 14.00
2.51 83.00 50.96 62.06 14.00
2.52 83.00 50.92 62.12 14.00
2.53 83.00 50.88 62.18 14.00
2.54 83.00 50.84 62.24 14.00
2.55 83.00 50.80 62.30 14.00
2.56 83.00 50.76 62.36 14.00
2.57 83.00 50.72 62.42 14.00
2.58 83.00 50.68 62.48 14.00
2.59 83.00 50.64 62.54 14.00
2.60 83.00 50.60 62.60 14.00
2.61 83.00 50.56 62.66 14.00
2.62 83.00 50.52 62.72 14.00
2.63 83.00 50.48 62.78 14.00
2.64 83.00 50.44 62.84 14.00
2.65 83.00 50.40 62.90 14.00
2.66 83.00 50.36 62.96 14.00
2.67 83.00 50.32 63.02 14.00
2.68 83.00 50.28 63.08 14.00
2.69 83.00 50.24 63.14 14.00
2.70 83.00 50.20 63.20 14.00
2.71 83.00 50.16 63.26 14.00
2.72 83.00 50.12 63.32 14.00
2.73 83.00 50.08 63.38 14.00
2.74 83.00 50.04 63.44 14.00
2.75 83.00 50.00 63.50 14.00
2.76 83.00 49.96 63.56 14.00
2.77 83.00 49.92 63.62 14.00
2.78 83.00 49.88 63.68 14.00
2.79 83.00 49.84 63.74 14.00
2.80 83.00 49.80 63.80 14.00
2.81 83.00 49.76 63.86 14.00
2.82 83.00 49.72 63.92 14.00
2.83 83.00 49.68 63.98 14.00
2.84 83.00 49.64 64.04 14.00
2.85 83.00 49.60 64.10 14.00
2.86 83.00 49.56 64.16 14.00
2.87 83.00 49.52 64.22 14.00
2.88 83.00 49.48 64.28 14.00
2.89 83.00 49.44 64.34 14.00
2.90 83.00 49.40 64.40 14.00
2.91 83.00 49.36 64.46 14.00
2.92 83.00 49.32 64.52 14.00
2.93 83.00 49.28 64.58 14.00
2.94 83.00 49.24 64.64 14.00
2.95 83.00 49.20 64.70 14.00
2.96 83.00 49.16 64.76 14.00
2.97 83.00 49.12 64.82 14.00
2.98 83.00 49.08 64.88 14.00
2.99 83.00 49.04 64.94 14.00
3.00 83.00 49.00 65.00 14.00
Pengecekan saat kondisi tandon kosong Gaya keatas tekanan air :

Berat sendiri Konstruksi Beton kolam renang :


plt lt = 6*10*0.25*2.4 t = 38.4 ton =3,6*1*4,5*8,75
dinding 45.6
tutup 0

Berat urugan :
urugan atas tandon 0.000

84 128

BERAT YANG DIPERLUKAN AGAR TIDAK MELAYANG 44

PELAT DIPERLEBAR 0,5 M KELILING + URUGAN

TAMBAHAN PELAT BETON = TAMBAHAN TEKANAN AIR


=(0,5*9,75+0,5*4,5)*2*0,25*2,4 8.55 =(0,5*9,75+0,5*4,5)*2*0,25*2
TAMBAHAN URUGAN = 49.875
=(0,5*9,75+0,5*4,5)*2*1,6*3,25 74.1

166.65 177.875

perhitungan Tekanan air & tanah kedinding :

Tanah :
1.546875 ton-m Tebal dinding = 25 cm
Air
=3,5*1*0,5*3,5*1/3*3,5 2.6041666667 CU =

4.1510416667 q =

A =
dipakai D-13 jarak =

Momen ke pelat dasar Momen ke pelat tutup


tekanan kepelat dasar = Berat kepelat tutup =
2.5 urugan = 0,5*1800
beban parkir 400
berat sendiri tutup
lx/ly = 1.666667

Momen = 5310 Momen = 1157.445

Tebal lantai= 25 cm Tebal lantai= 25 cm


CU = 3.361463 CU = 5.399912

q = 0.09583 q = 0.049

A = 15.901 A = 6.504425
dia 13 8.345389 dia 13 20.4015
Gaya keatas tekanan air :

=3,6*1*4,5*8,75

TAMBAHAN TEKANAN AIR


=(0,5*9,75+0,5*4,5)*2*0,25*2,4

Tebal dinding = 25 cm Tebal dinding = 30 cm

3.801868 CU = 4.752335

0.075 q = 0.13125

9.955752 A = 21.77821
13.32898 d13 6.093247

Dia 16 9.183492

900
400
480
1780
PERENCANAAN DINDING STRUKTURAL

Data Perencanaan :
Panjang ( B ) = 350 mm
tebal ( h ) = 6700 mm
fc' = 30 Mpa
fy = 420 Mpa

Gaya dalam pada Dinding Struktural


Beban Beban Aksial Momen Gaya Geser
kN kNm kN
Mati ( D ) 3401.41 0 0
Hidup ( L ) 999 0 0
Gempa (E) 0 34341 4148.95
1.4D 4761.974 0 0
1.2D+1.6L 5680.092 0 0
1.2D+0.5L+1E 4581.192 34341 4148.95
1.2D+0.5L-1E 4581.192 -34341 -4148.95
0.9D+1E 3061.269 34341 4148.95
0.9D-1E 3061.269 34341 4148.95

Tulangan Horisontal
Geser Rencana
Vu = 4148.95 > 1/6.Acv.fc'^2
2140.68 kN
Sehingga diperlukan 2 lapis tulangan
Dipakai : f Tulangan = 12 mm
Jarak = 100 mm

Kuat Geser Dinding Struktural batas = f. 2/3.Acv.fc'^0.5 dimana : f = 0.55


= 4709.50 > Vu

rn = 0.00646

f Vn = f.Acv [ 1/6.fc'^0.5+ rn.fy ]

4676.42 > Vu (ok)

Tulangan Vertikal
Tulangan vertikal DS harus---------------> r v > 0.0025

Dipakai : f Tulangan = 12 mm
Jarak = 250 mm

rv = 0.00258 > 0.0025 ( ok )


PERHITUNGAN PENULANGAN DINDING BETON
Fy = 4000 kg/cm2 = 400.00 MPa
Fc' = 210 kg/cm2 = 21.00 MPa

Diameter tulangan 1.30 cm Lx


Tebal selimut 4.00 cm
Ly
Type qbm Wu ht hx (m) Dimensions Koefisien Momen (kNm) Rn (MPa) r r X- direc. reinforcement Y- direc. reinforcement
Pelat qbh (cm) hy (m) lx ly ly/lx Ctx Cty Mtx Mty t-x t-y max t-x t-y At-x(cm2) Dia(mm) jrk(cm) At-y(cm2) Dia(mm) jrk(cm)
(kg/m2) (kN/m2) (m) (m) Clx Cly Mlx Mly l-x l-y min l-x l-y Al-x(cm2) Dia(mm) jrk(cm) Al-y(cm2) Dia(mm) jrk(cm)

W1 3606 54.09 20 0.154 3 3.4 1.13 42.00 37.00 20.45 18.01 1.08 1.14 0.0171 0.0028 0.0029 4.30 13.00 30.87 4.14 13.00 32.02
0.141 42.00 37.00 20.45 18.01 1.08 1.14 0.0018 0.0028 0.0029 4.30 13.00 30.87 4.14 13.00 32.02
PERHITUNGAN MOMEN NOMINAL BALOK

Type balok : B9

Fy : 350 Mpa cover : 40 mm d' : 53 mm


Fc' : 15 Mpa b : 130 mm
Tul utama : 12 mm h : 250 mm
Sengkang : 7 mm d : 186 mm

Tul tarik : 2 As : 226.08 mm2


Tultekan : 2 As' : 226.08 mm2

T = 79128 N
Cs = 76245 N
Cc = 1657.5 a
a = 1.73907692 mm

Mn = 10674291 Nmm
1067 kgm

Type balok : B2

Fy : 400 Mpa cover : 40 mm d' : 56 mm


Fc' : 18.6 Mpa b : 200 mm
Tul utama : 16 mm h : 450 mm
Sengkang : 8 mm d : 378 mm

Tul tarik : 5 As : 565.2 mm2


Tultekan : 3 As' : 339.12 mm2

T = 226080 N
Cs = 130287 N
Cc = 3162 a
a = 30.2952205 mm

Mn = 76711153 Nmm
7671 kgm
LENDUTAN TIE BEAM

tinggi dinding : 9 m
q : 2250 kg/m
E beton : 210000 kg/cm2

f = 5/384*(q.L^4)/EI

Type Dimensi Q tb Q tot I L f


b (cm) d (cm ) kg/m kg/m cm4 (m) cm

TB1 30 80 576 2826 1280000 10 1.37

TB1A 30 70 504 2754 857500 10 1.99

TB2A 30 70 504 2754 857500 10 1.99


PERHITUNGAN SLOOF

fy = 4000 Kg/cm2
fc' = 210 kg/cm2
TYPE Dimensi Mu As required As min Dia Tul jumlah As design a M cap M cap > Mu
B (cm) D(cm) kgm cm2 cm2 mm mm cm2 cm kgm kgm

GB1 30 65 28000 12.67 0.68 16 8 16.08 12.01 34145 ok


GB2 30 50 7800 4.59 0.53 16 4 8.04 6.00 13600 ok
GB5a 30 80 15000 5.51 0.84 16 8 16.08 12.01 42826 ok
BEAM CAPACITY ANALYSIS

Material properties :
Fc = 200 kg/cm2 swy 2400 kg/cm2 As 1-D19 = 2.84 cm2
sy = 4000 kg/cm2 dc 4 cm As 2f10 = 1.57 cm2

beam axis A,5-7


Beam used Earthquake motion 200 gal Mu Qsu under 200 gal
Storey Dimension Reinforcement Bar Moment (M2) Shear ( Q2) kgm kg earthquake motion
B ( cm ) D ( cm ) Tens. Bar Stirrups kg.m kg

2 20 60 4D19 f10-75 19895 20654 22901.76 18242.99 shear failure

3 20 60 4D19 f10-75 20440 22356 22901.76 18466.23 shear failure

PENT 20 60 4D19 f10-75 185 287 22901.76 20304.11 safe

Mu = 0.9 x At x sy x d ( JCI - 1982 )

Qsu={ 0.053 x Pt0.23(Fc+180) / ( M/Q x d + 0.12) + 2.7VPw x swy } x b x j ( JCI - 1982 Appendix 2.14 )

Pt = At/b.d

Pw = Aw/b.x
PERHITUNGAN TULANGAN BALOK

fc' = 21 Mpa
fy = 400 Mpa

Lokasi : Lt1
Type Mu B D d r min Rn m r perlu
balok kgm cm cm cm

B1 16000 20 40 38 0.0035 6.925208 22.40896 0.0235

B2 16000 20 40 38 0.0035 6.925208 22.40896 0.0235

B5 16000 20 40 38 0.0035 6.925208 22.40896 0.0235


r pakai As perlu f Tulangan Jumlah Jumlah
cm2 pakai ( perlu) ( disain )

0.0235 17.86 16 8.89 6

0.0235 17.86 16 8.89 6

0.0235 17.86 16 8.89 6


PERHITUNGAN GAYA DALAM GROUND BEAM

P1 = 38 ton
P2 = 76 ton
P3 = 114 ton
TYPE q dinding q sloof q total L koef Mu 10% P1 10% P2 10% P3
kg/m2 kg/m kg/m kgm kg kg kg

1 1000 250 1250 2 0.1 750 3800 7600 11400

2 1000 250 1250 3 0.1 1688 3800 7600 11400

6 1000 250 1250 7 0.1 9188 3800 7600 11400

Selanjutnya perencanaan ground beam dilakukan dengan menggunakan diagram interaksi M-N
PERHITUNGAN GESER BALOK

Beban Mati
* Plat : 288 kg/m2
* plafond : 20 kg/m2
* finishing : 100 kg/m2
408 kg/m2

Beban Hidup
* B. Hidup : 400 kg/m2

q eqivalent BM : 300 kg/m


q eqivalent BH : 275 kg/m
575 kg/m

Tabel perhitungan Momen Lentur Mungkin ( Mpr )


Jumlah f Tulangan As fy fc' B H L a Mpr
Tulangan mm (mm2) N/mm2 N/mm2 mm mm mm mm kNm

4 19 1133.54 420 30 500 700 6000 46.68 384.83

5 19 1416.93 420 30 500 700 6000 58.34 476.70

6 19 1700.31 420 30 500 700 6000 70.01 566.84

Perhitungan Tulangan Geser


Daerah sendi plastis dujung balok ( 2xH)
Karena Geser akibat Gempa ( Mpr) > 0.5 ( Mpr + M Grav ) maka = Vc = 0

B= 500 mm Tulangan utama = 19 mm


H= 700 mm Sengkang = 10 mm
fc' = 30 Mpa cover = 30 mm
fy = 420 Mpa
d= 641.0 mm

Vu = 290.54 kN
Vs = Vu/f =Vu/0.75 = 387.39 kN

Vs = Av x fy x d
S

Sengkang ---------> Jumlah kaki : 3 bh


f sengkang : 10 mm
Av : 235.5 mm2

S perlu = Av x fy x d = 165.96 mm
Vs
Kontrol S max
S max1 = d/4 = 160.25 mm
S max2 = 8.db tul = 152 mm
S max3 =24 db hoop = 240 mm
S max 4 = 300 mm
Sehingga S pakai = 150 mm

Kontrol Vs max
Vs max1 = 2/3xbwxd.fc'^0.5 = 1170.3 kN
Vs max2 = 1/3xbwxd.fc'^0.5 = 585.2 kN
Vs ada = 422.68 kN < Vs Max1,2……. (OK)

Daerah diluar sendi plastis ( diluar H )

Vu = 204.97 kN

Vn = Vu/f = 273.29 kN

Vc diluar sendi plastis ( 2H)


Vc =1/6*bw*d*fc'^0.5 = 292.58 kN

karena Vn < Vc, maka tulangan geser dapat dipakai praktis

Kontrol Smax = 1/2 x d


= 320.5 mm

jarak Tulangan geser = 300 mm


Perhitungan Tulangan Geser Balok

Balok : B30(elemen no.74&75)


Bangunan : Multi Purpose

Data Perencanaan :
fc = 21 MPa
fy = 240 MPa
dc = 4 cm ( selimut beton )
Lokasi Vu bw h d Vc 0.5Vc Vs Tulangan Geser s max ( d/2 ) s pakai
kN mm mm mm kN kN kN dia s ( mm ) (mm) ( mm )

Tumpuan 114 200 600 542 82.79 41.40 107.21 10 182.87 271 100

Keterangan :

Vc = ( fc'^2/6).bw*d

Jika Vc > Vu/f > 0.5Vc………………dipakai tulangan geser minimum ( Av = bw.s/3.fy )

Jika Vu/f > Vc……….…….……..…dipakai tulangan geser perlu ( Av = Vs.s/fy.d )

Vs = Vu/f - Vc

Vu diperoleh dari hasil 9 kombinasi pembebanan yang paling besar nilainya.


PERHITUNGAN GAYA DALAM SLOOF
Type L(m) q dinding qs sloof q total M Mu 10% Aksial
( kg/m') ( kg/m' ) ( kg/m' ) kgm kgm kg

GB1 9.5 1000 576 1576 18000 27000 17500

GB2 4.8 1000 300 1300 2995 4493 17500

GB6 3 1000 300 1300 1170 1755 0

keterangan :
selanjutnya dilakukan analisa dengan diagram M-N
PERHITUNGAN TULANGAN GESER BALOK
A. TUMPUAN
Mutu Bahan :
fc' = 21 Mpa
fy = 400 Mpa

Tulangan Balok :
tulangan utama = 16 mm
sengkang = 10 mm
cover = 30 mm

Dimensi Balok :
bw = 300 mm
H= 700 mm
d= 652 mm

Hasil Analisa :
Vu = 120 kN

Perhitungan Tulangan Geser Balok :


Vc = 1/6*Vfc'*bw*d
Vc = 149391.97 N
Vc = 149.39 kN
Vc = 0.5Vc = 74.70 kN
Vs = Vu/f -Vc
Vs = 120 - 74.70
0.6

Vs = 125.30 kN

Vs = Av x fy x d
S

Sengkang ---------> Jumlah kaki : 2 bh


f sengkang : 10 mm
Av : 157 mm2

S perlu = Av x fy x d = 326.77 mm
Vs
Kontrol S max
S max1 = d/4 = 163 mm
S max2 = 8.db tul = 128 mm
S max3 =24 db hoop = 240 mm
S max 4 = 300 mm

Sehingga S pakai = 125 mm


PERHITUNGAN TULANGAN GESER BALOK
B. LAPANGAN
Mutu Bahan :
fc' = 21 Mpa
fy = 400 Mpa

Tulangan Balok :
tulangan utama = 16 mm
sengkang = 10 mm
cover = 30 mm

Dimensi Balok :
bw = 300 mm
H= 700 mm
d= 652 mm

Hasil Analisa :
Vu = 120 kN

Perhitungan Tulangan Geser Balok :


Vc = 1/6*Vfc'*bw*d
Vc = 149391.97 N
Vc = 149.39 kN

Vs = Vu/f -Vc
Vs = 120 - 149.39
0.6

Vs = 50.61 kN

Vs = Av x fy x d
S

Sengkang ---------> Jumlah kaki : 2 bh


f sengkang : 10 mm
Av : 157 mm2

S perlu = Av x fy x d = 809.07 mm
Vs
Kontrol S max
S max1 = d/2 = 326 mm
S max 4 = 600 mm

Sehingga S pakai = 125 mm


c:\qpro4\b­kurita

TABEL PERHITUNGAN GESER & TORSI BALOK
======== = ========= = ========== = ===== = =    

GRAVITY STATIC LOAD :  1.5  x ( M + H )
SEISMIC LOADING     : 1.05  x (M+Hr+Ex) 
                    : 1.05  x (M+Hr+Ey) 

MUTU BAJA : U24 SIGMAAU* = 20 2080  kg/cm2 T*bu  = 12.0  kg/cm2


MUTU BETON: K175 SIGMABK  = 175  kg/cm2 T*bmu = 30.0  kg/cm2
T*bu,s= 13.0  kg/cm2
= ======== = ========= = ========== = ===== = ====== = ====== = ===== = ======= =
| BEAM | SHEAR | TORQUE | MAT. PROPERTY | Tbu | koef. | Tbu' |
| NUMBER |   | | ­­­­­ ­ ­­­­­­ | | | |
| |  (kg) | (kgcm) | b(cm) | ht(cm) | kg/cm2 | | kg/cm2 |
= ======== = ========= = ========== = ===== = ====== = ====== = ===== = ======= =
|   | | | | | | | |
| 33  | 10462.00  | 0.00  | 30  | 50  | 8.61  | 4.23  | 0.00  |
| 24  | 23300.00  | 0.00  | 30  | 80  | 11.51  | 3.83  | 0.00  |
| 108  | 8500.00  | 150000.00  | 30  | 50  | 7.00  | 4.23  | 14.09  |
= ======== = ========= = ========== = ===== = ====== = ====== = ===== = ======= =
    ]   CHOOSE
    ]   THE MAXIMUM
    ]   RESULT

kg/cm2  
kg/cm2    
kg/cm2
======= = ====== = ====== = ===== = ====== =
Tbsum | Tbu'' | Ts |  STRIRRUPS |
| | | ­­­­­ ­ ­­­­­­ |
kg/cm2 | kg/cm2 | kg/cm2 | d(mm) | as(cm) |
======= = ====== = ====== = ===== = ====== =
| | | | |
8.61  | 0.00  | 8.61  | 10  | 12.6  | 30  ||| 50 
11.51  | 0.00  | 11.51  | 12  | 13.6  | 30  ||| 50 
21.09  | 4.73  | 11.73  | 10  | 15.0  | 30  ||| 50 
======= = ====== = ====== = ===== = ====== =
20  | 50 
20  | 50 
PERENCANAAN SLOOF

TYPE DIMENSI TULANGAN Mu N


cm Atas Bawah Kgm Kg

GB1 200X500 3D16 3D16 1800 8500

GB2 250X500 3D16 3D16 1400 9250

GB8 200X500 5D16 5D16 2100 8000

keterangan : -N adalah aksial tarik yang diperoleh dari 10% aksial kolom
akibat kombinasi beban gempa

-Selanjutnya perhitungan sloof dilakukan dengan menggunakan


-Diagram DINT
BEAM CALCULATION

cooling tower
Type Size L (m) q (kg/m') M=1/8ql2 Mu=1.5M
(cmxcm) kgm kgm

B1 30/60 3.5 1940 2970.63 4455.94

B2 30/70 3 1310 1473.75 2210.63

B4 25/50 3.5 2570 3935.31 5902.97


PERHITUNGAN TULANGAN LENTUR BALOK
DATA PERENCANAAN :
Mutu Bahan :
fy = 400 Mpa
fc' = 21 Mpa
Dimensi Balok :
bw = 600 mm
H = 1000 mm
d = 949
Tulangan :
Tul. Utama = 22 mm
Sengkang = 10 mm
As = 379.94 mm2
Hasil Analisa :

Mu = 1500 kN

Perhitungan Tulangan Balok :


Rn = Mn / bw.d2 r min = 1.4/fy r b = 0.85*fc'/fy*0.85*(600/(600+fy))

Mn = Mu / f r min = 0.0035 r b = 0.02276

f = 0.8 r max = 0.75rb = 0.01707

Mn = 1500 Mn = 1875 kNm


0.8

Mn = 1875000000 Nmm

Rn = 1875000000
600 x 949 2

Rn = 3.469905

m = fy/ (0.85*fc')

m = 400
0.85 x 21

m = 22.40896

r = 1/m( 1- (1-2.m.Rn/fy)^0.5

r = 0.0097

r pakai = 0.009737

As perlu= r.bw.d

= 5544.284 mm2

Tulangan Perlu = 14.59253 D 22

Tulangan Pakai = 8 D 22
TABEL PENULANGAN LENTUR BALOK
Balok Mu fc' fy B H Rn m r r min r pakai rb r maks As perlu f tul Jumlah Tul r ada a fMn
kgm kg/cm2 kg/cm2 cm cm 0.75 rb mm2 mm pakai kNm

220000 210 4000 70 100 4.1753 22.41 0.0121 0.0035 0.0121 0.0228 0.0171 8196.1 25 16.7 14 0.0101 0.0090 2132.05
Perencanaan Penulangan Lentur Balok

Balok : B30 (elemen no. 74 & 75)


Bangunan : Multi Purpose

Data Perencanaan :
fy = 400 MPa
fc = 21 MPa
dc = 4 cm ( selimut beton )
Letak Mu bw h d m Rn r perlu r min r max r pakai As perlu Penulangan As ada
kgm cm cm cm cm2 dia ( mm ) jumlah cm2

Tumpuan kiri - 13259.00 20 60 54.2 22.41 2.655 0.00722 0.00350 0.01707 0.00722 7.83 16 4 8.04

Lapangan + 6879.00 20 60 54.2 22.41 1.377 0.00359 0.00350 0.01707 0.00359 3.89 16 4 8.04

Tumpuan kanan - 13500.00 20 60 54.2 22.41 2.703 0.00737 0.00350 0.01707 0.00737 7.98 16 4 8.04

Keterangan :

m = fy / 0.85.fc'

Rn = Mu/f.bw.d2

r perlu = 1/m { 1 - [ 1- ( 2.m.Rn / fy )]^0.5 }

r min = 1.4/ fy

r max = 0.75 rb = 0.75 * 0.85.b.fc'/ fy *(600/(600+fy))

As perlu = r.bw.d

Mu diperoleh dari hasil 9 kombinasi pembebanan yang paling besar nilainya.


PERHITUNGAN GESER BALOK

Mutu Bahan :
Beton : 15 Mpa
Baja : 240 Mpa

Tul utama : 13 mm
Sengkang : 8 mm

No Dimensi Balok D Jumlah kaki jarak Vc Vs fVn


B ( cm ) H ( cm ) cm mm kg kg kg

1 13 35 30.55 2 75 2564 9823 7432


2 13 35 30.55 2 100 2564 7367 5958
3 13 35 30.55 2 150 2564 4911 4485
4 13 35 30.55 2 200 2564 3684 3748

5 13 40 35.55 2 75 2983 11431 8648


6 13 40 35.55 2 100 2983 8573 6934
7 13 40 35.55 2 150 2983 5715 5219
8 13 40 35.55 2 200 2983 4286 4362

9 13 45 40.55 2 75 3403 13038 9865


10 13 45 40.55 2 100 3403 9779 7909
11 13 45 40.55 2 150 3403 6519 5953
12 13 45 40.55 2 200 3403 4889 4975

13 13 50 45.55 2 75 3822 14646 11081


14 13 50 45.55 2 100 3822 10984 8884
15 13 50 45.55 2 150 3822 7323 6687
16 13 50 45.55 2 200 3822 5492 5589

17 13 55 50.55 2 75 4242 16254 12297


18 13 55 50.55 2 100 4242 12190 9859
19 13 55 50.55 2 150 4242 8127 7421
20 13 55 50.55 2 200 4242 6095 6202

21 13 60 55.55 2 75 4661 17861 13514


22 13 60 55.55 2 100 4661 13396 10834
23 13 60 55.55 2 150 4661 8931 8155
24 13 60 55.55 2 200 4661 6698 6816
TABEL PENULANGAN BALOK SLOOF

Kode UKURAN PENULANGAN UTAMA TULANGAN PENULANGAN SENGKANG Catatan


Lebar ( B ) Tinggi ( H ) TUMPUAN LAPANGAN TUMPUAN SAMPING TUMPUAN LAPANGAN TUMPUAN
( mm ) ( mm )
3 3 3
GB1 300 500 ------ - Ø12 ------ - Ø12 ------ - Ø12 - Dia 8-100 Dia 8-150 Dia 8-100
3 3 3
2 2 2
GB2 200 500 ------ - Ø12 ------ - Ø12 ------ - Ø12 - Dia 8-100 Dia 8-150 Dia 8-100
2 2 2
3 3 3
GB3 300 500 ------ - Ø12 ------ - Ø12 ------ - Ø12 - Dia 8-100 Dia 8-100 Dia 8-100
3 5 3
2 2 2

------ - Ø12 ------ - Ø12 ------ - Ø12

TABEL PENULANGAN BALOK

Kode UKURAN PENULANGAN UTAMA TULANGAN PENULANGAN SENGKANG Catatan


Lebar ( B ) Tinggi ( H ) TUMPUAN LAPANGAN TUMPUAN SAMPING TUMPUAN LAPANGAN TUMPUAN
( mm ) ( mm )

B10 ------ - D16 ------ - D16 ------ - D16 - Dia 10- . Dia 10- . Dia 10- .

B11 ------ - D16 ------ - D16 ------ - D16 - Dia 10- . Dia 10- . Dia 10- .
B18 ------ - D16 ------ - D16 ------ - D16 - Dia 10- . Dia 10- . Dia 10- .
PERHITUNGAN GROUND BEAM
GB 1

Data Bahan :
fc' = 21 Mpa
fy = 400 Mpa

Ukuran Penampang :
B = 30 cm
H = 90 cm
d = 88 cm

Beban Pelat = Bs Plat ( t=20 cm ) : 480 kg/m2


Finishing : 100 kg/m2
( DL) 580 kg/m2

Live Load (LL) 2000 kg/m2

qu: ( 1.2DL+1.6LL) : 3896 kg/m2

Plat 2 arah ---------> luas plat yang masuk sloof (b ) = 1.75 m

qu plat = 6818 kg/m'


qu sloof = 777.6 kg/m'
q dinding = 1500 kg/m'
qu tot = 9095.6 kg/m'

Momen Sloof ===> Mu = 1/10*qu tot*L2


Mu = 14552.96

r min = 1.4/fy
= 0.0035

Rn = 0.783023
m = 22.40896

r = 1/m(1-V(1-2mRn/fy)
= 0.002002

r pakai = 0.0035

As perlu = 9.24 cm2

As pakai---> dia = 16 mm
jumlah = 5 mm
As ada = 10.048 cm2
PERHITUNGAN TULANGAN GESER KOLOM
A. TUMPUAN
Mutu Bahan :
fc' = 21 Mpa
fy = 400 Mpa

Tulangan Balok :
tulangan utama = 16 mm
sengkang = 10 mm
cover = 30 mm

Dimensi kolom :
B= 400 mm 1/2 b = 200
H= 500 mm 1/2h = 250
d= 452 mm
Ag = 200000 mm2
Hasil Analisa :
Vu = 120 kN
Nu = 200 kN
Perhitungan Tulangan Geser Kolom :

Vc = (1+Nu/14.Ag)*(1/6*Vfc'*bw*d

(1+Nu/14Ag) = 1.0714285714
1/6*Vfc'.B.d = 138088.28 N
1/6*Vfc'.B.d = 138.09 kN

Vc = 147951.73 N
Vc = 147.95 kN

Vc pakai = 0.5 Vc
= 73.98 kN
Vs = Vu/f -Vc
Vs = 120 - 73.98
0.6
Vs = 126.02 kN

Vs = Av x fy x d
S

Sengkang ---------> Jumlah kaki : 2 bh


f sengkang : 10 mm
Av : 157 mm2
S perlu = Av x fy x d = 225.24 mm
Vs
Kontrol S max
S max1 = 1/2 B atau H= 200 mm ( yang terkecil)
S max2 = 10.db tul = 160 mm
S max 3 = 200 mm

Sehingga S pakai = 200 mm


PERHITUNGAN TULANGAN GESER KOLOM
B. LAPANGAN
Mutu Bahan :
fc' = 21 Mpa
fy = 400 Mpa

Tulangan Balok :
tulangan utama = 16 mm
sengkang = 10 mm
cover = 30 mm

Dimensi kolom :
B= 400 mm 1/2 b = 200
H= 500 mm 1/2h = 250
d= 452 mm
Ag = 200000 mm2
Hasil Analisa :
Vu = 120 kN
Nu = 200 kN
Perhitungan Tulangan Geser Kolom :

Vc = (1+Nu/14.Ag)*(1/6*Vfc'*bw*d

(1+Nu/14Ag) = 1.0714285714
1/6*Vfc'.B.d = 138088.28 N
1/6*Vfc'.B.d = 138.09 kN

Vc = 147951.73 N
Vc = 147.95 kN

Vs = Vu/f -Vc
Vs = 120 - 147.95
0.6
Vs = 52.05 kN

Vs = Av x fy x d
S

Sengkang ---------> Jumlah kaki : 2 bh


f sengkang : 10 mm
Av : 157 mm2
S perlu = Av x fy x d = 545.37 mm
Vs
Kontrol S max
S max1 = 1/2 B atau H= 200 mm ( yang terkecil)
S max2 = 10.db tul = 160 mm
S max 3 = 200 mm

Sehingga S pakai = 200 mm


TABEL REAKSI GAYA KOLOM
q tembok : 200 kg/m2
q sloof : 432 kg/m
Column Axis Output SAP L H P Dinding L P Sloof Jumlah Qall 1pile
kg m m kg m kg kg f 30,L=30
kg

C1 A1 8700 4.75 7.2 6840 4.75 2052 17592 30000


C1 A2 19000 4.5 7.4 6660 4.5 1944 27604 30000
C1 F4 400 4.5 7.2 6480 4.5 1944 8824 30000
PERHITUNGAN TULANGAN LENTUR KOLOM

DATA PERENCANAAN :
Mutu Bahan :
fy = 400 Mpa
fc' = 21 Mpa
Dimensi Balok :
B = 600 mm
H = 600 mm
d = 549
Tulangan :
Tul. Utama = 22 mm
Sengkang = 10 mm
As = 379.94 mm2
Hasil Analisa :

Mu = 1500 kN
Nu = 1500 kN

Perhitungan Tulangan Lentur Kolom :

Perencanaan kolom dilakukan dengan diagram Interaksi M-N


project :Slipimas-Project
location :Jakarta - Indonesia

office area
axis C1 DIM
storey LUAS Q MATI Q HIDUP L1 DIND.1 L2 DIND.2 H KOL Q KOL L BAL Q BAL Q LT - i Q KUM KOLOM

B3F 20.76 560 800 5.5 600 4.5 1100 4 1940 15 700 44778.8 139541 34.1
B2F 20.76 560 800 5.5 600 4.5 1100 4 1940 15 700 44778.8 94762 28.1
PH 20.76 560 800 5.5 600 4.5 1100 5 600 15 700 49983.6 49984 20.4

axis C2 DIM
storey LUAS Q MATI Q HIDUP L1 DIND.1 L2 DIND.2 H KOL Q KOL L BAL Q BAL Q LT - i Q KUM KOLOM

B3F 34.7 560 800 0 600 8 1100 4 1940 12 700 55496 178384 38.6
B2F 34.7 560 800 0 600 8 1100 4 1940 12 700 55496 122888 32.0
PH 34.7 560 800 0 600 8 1100 5 600 12 700 67392 67392 23.7
Project : Sakura Residence - Myanmar

A. COLUMN AXIAL LOAD


Area Load Nu
Code Floor lx ly A Storey D.L. L.L. ( kg )
(m) (m) ( m2 ) ( kg/m2 ) ( kg/m2 )

C48 6 6 6.15 36.9 1 950 250 64759.5

C44 5 6 6.15 36.9 2 950 250 129519.0

C1 base 6 6.15 36.9 7 950 250 453316.5

B. COLUMN AXIAL LOAD CAPACITY


Nu Mu Nu allow Description
Code ( kg ) ( kgm ) ( kg )

C48 64759.5 5600 100000 OK

C44 129519.0 11500 70000 not OK

C1 453316.5 7000 520000 OK

Project : Sakura Residence - Myanmar

A. COLUMN AXIAL LOAD


Area Load Nu
Code Floor lx ly A Storey D.L. L.L. ( kg )
(m) (m) ( m2 ) ( kg/m2 ) ( kg/m2 )

C48 6 7.2 6.55 47.16 1 950 250 82765.8

C45 5 7.2 6.55 47.16 2 950 250 165531.6

C5 base 7.2 6.55 47.16 7 950 250 579360.6


B. COLUMN AXIAL LOAD CAPACITY
Nu Mu Nu allow Description
Code ( kg ) ( kgm ) ( kg )

C48 82765.8 2900 130000 OK

C45 165531.6 9600 140000 not OK

C5 579360.6 1500 600000 OK


PERHITUNGAN GESER KOLOM

Mutu Beton : 25 Mpa


Mutu Tulangan : 240 Mpa

Type Dimensi Kolom f sengkang jumlah jarak Vc Vs f Vn


B ( cm ) H ( cm ) mm ( kaki ) ( mm ) kg kg kg

1 50 50 12 3 100 7825.4 37764.4 27353.88

2 50 50 12 3 100 7825.4 37764.4 27353.88

3 50 60 12 3 100 9511.9 45903.3 33249.11

4 60 50 12 3 100 9390.5 37764.4 28292.93

5 40 40 12 2 100 4911.1 19750.3 14796.88

6 40 50 12 2 100 6260.3 25176.3 18861.95

7 25 60 12 2 100 4756.0 30602.2 21214.88

8 60 25 12 3 100 4331.0 17417.2 13048.89

9 20 50 12 2 100 3130.2 25176.3 16983.86

10 50 20 12 3 100 2765.9 13347.8 9668.182

11 20 40 12 2 100 2455.6 19750.3 13323.54

12 40 20 12 2 100 2212.7 8898.5 6666.724


Tabel Ukuran Kolom

Kode
Lt. 1 Lt. 2 Lt. 3 Lt. 4 Lt. 5 Lt. 6 Lt. 7
Kolom
C1 500 x 500 500 x 500 450 x 450 450 x 450 - - -

C2 500 x 500 500 x 500 450 x 450 450 x 450 400 x 400 400 x 400 -

C15 - - - - - - 600 x 200


600 x 200
PENULANGAN PILE CAP

type Mu fy fc' b d As required As min f spacing As design a M cap Mu


kgm kg/cm2 kg/cm2 cm cm cm2 cm2 mm mm cm2 cm kgm kgm

P1 0 4000 210 70 50 0.00 6.30 16 200 7.03 2.25 12375 0 ok

P1a 0 4000 210 70 50 0.00 6.30 16 200 7.03 2.25 12375 0 ok

P3 23712 4000 210 160 70 9.96 20.16 16 150 21.44 3.00 52860 23712 ok
Calculation sheet : Foundation Pile

Sample : Building : Station A


Pile cap : P4a ( axis C,7)

Reaction Force :
Data : Fx = 1500 kg
Fy = 5000 kg
Fz = 30500 kg
Mx = 27000 kgm
Mz = 7500 kgm

A. AXIAL LOAD
Fz = 30500 kg Mx = 27000 kgm
R/C column = 53460 kg My = 7500 kgm
Pilecap = 47376 kg x max = 1.585 m
V total = 131336 kg S x2 = ( 4X1.5852)
= 10.048 m2
y max = 1 m
S y2 = (4x1^2)
= 4 m2

P all = V/n + Mx.xmax/Sx2+My.ymax/Sy2

Case I : P all = 131336/4+27000*1.585/10.048+7500*1/4


= 32834 + 4259.05 + 1875
= 38968.05 kgm < Bearing Capacity Pile = 95130 kg (ok)

Case II : P all = 131336/4-27000*1.585/10.048-7500*1/4


= 32834 - 4259.05 - 1875
= 26699.95 kgm < Bearing Capacity Pile = 95130 kg ( ok )

B. LATERAL LOAD

F allowable = 2200 kg ( Lateral Load Capacity = 2200 kg )for lateral displacement max = 1/4"

Fix = Fx/n = 1500/4 = 375 kg < F all =2200 kg ( ok )

Fiy = Fy/n = 5000/4 = 1250 kg < F all =2200 kg ( ok )

where : Fx = Lateral Load x-direction


Fy = Lateral Load y-direction
Fix = Lateral Load each pile x-direction
Fiy = Lateral Load each pile y-direction
n = number of pile
C. PILE MOMENT REACTION

M = Factor*cr*D2

Data : cu = 0.01 kg/cm2


= 100 kg/m2

cr = 0.5*cu
= 50 kg/m2

Ho = 1250 kg ( Lateral load max each pile )


D = 0.4 m ( Diameter of pile )
e = 0 m
L = 24 m ( length of pile )

e/L = 0 m
Ho/cr*D = 1250/50*0.4 ^------------> from atached table M/cr*D2 = 150
= 62.5

M = 150*cr*D2
= 150*50*0.42
= 1200 kgm

Mu = 1.5*1200 kgm
1800 kgm < Pile Moment Capacity = 10600 kgm ( ok )
Type Pu Vu Mu Panjang Tinggi Tebal f'c fPnw (Mu/Vu-lw/2) Vc1 Vc2 Vc fVc fVs
Newton Newton Newton mm lw hw h Mpa Newton mm Newton Newton Newton Newton Newton
mm mm mm

S1 13412200 3656200 64152900000 9000 4000 250 29 21101850 13046 5105764 44337390 5105764 3063458 592741.5

S1 13412200 3656200 64152900000 9000 4000 250 29 21101850 13046 5105764 44337390 5105764 3063458 592741.5

S1 13412200 3656200 64152900000 9000 4000 250 29 21101850 13046 5105764 44337390 5105764 3063458 592741.5
ok
not
rh min Sh max Tul h pakai fVs ada rh rh min < rh rv min Sv max Tul v pakai rv rv min < rv
lw/5 3h 500 Dia Jarak Newton lw/3 3h 500 Dia Jarak
mm mm mm mm mm mm mm mm mm mm

0.0025 1800 750 500 12 200 1904498 0.0045 ok 0.004578 3000 750 500 16 150 0.010718 ok

0.0025 1800 750 500 12 200 1904498 0.0045 0 0.004578 3000 750 500 16 150 0.010718 0

0.0025 1800 750 500 12 200 1904498 0.0045 #REF! 0.004578 3000 750 500 16 150 0.010718 #REF!
ok
not
PROYEK : SHOWROOM GRESIK

PERHITUNGAN MOMEN NOMINAL PILE CAP

Type PILECAP BORE PILE 2 P 40 @ 35 TON

GAYA REAKSI BOREPILE : 40 ton


JARAK AS KOLOM-AS BORE PILE: 0.6 m
MOMEN ULTIMATE YG TERJADI : 36 tm

Fy : 400 Mpa cover : 50 mm d' : 71 mm


Fc' : 18.6 Mpa b : 800 mm
Tul utama : 16 mm h : 700 mm
Sengkang : 13 mm d : 618 mm

Tul tarik : 8 As : 1607.68 mm2


Tultekan : 4 As' : 803.84 mm2

T = 643072 N
Cs = 308827 N
Cc = 12648 a
a = 26.4266849 mm

Mn = 371075269 Nmm
37108 kgm lebih besar dari M ultimate = 36000 kgm

DIPAKAI TUL. UTAMA D16 - 100 MM

Type PILECAP BORE PILE 3 P 40 @ 40 TON

GAYA REAKSI BOREPILE : 42.5 ton


JARAK AS KOLOM-AS BORE PILE: 0.6 m
MOMEN ULTIMATE YG TERJADI : 38.25 tm

Fy : 400 Mpa cover : 60 mm d' : 81 mm


Fc' : 18.6 Mpa b : 800 mm
Tul utama : 16 mm h : 750 mm
Sengkang : 13 mm d : 658 mm

Tul tarik : 8 As : 1607.68 mm2


Tultekan : 4 As' : 803.84 mm2

T = 643072 N
Cs = 308827 N
Cc = 12648 a
a = 26.4266849 mm

Mn = 393709876 Nmm
39371 kgm lebih besar dari M ultimate = 38250 kgm

DIPAKAI TUL. UTAMA D16 - 100 MM


Type PILECAP BORE PILE 1 BP' @ 35 TON

GAYA REAKSI BOREPILE : 42.5 ton


JARAK AS KOLOM-AS BORE PILE: 0.7 m ( jarak existing )
MOMEN ULTIMATE YG TERJADI : 44.625 tm

Fy : 400 Mpa cover : 60 mm d' : 81 mm


Fc' : 18.6 Mpa b : 800 mm
Tul utama : 16 mm h : 700 mm
Sengkang : 13 mm d : 608 mm

Tul tarik : 10 As : 2009.6 mm2


Tultekan : 4 As' : 803.84 mm2

T = 803840 N
Cs = 308827 N
Cc = 12648 a
a = 39.1376273 mm

Mn = 454032898 Nmm
45403 kgm lebih besar dari M ultimate = 44625 kgm

DIPAKAI TUL. UTAMA D16 - 75 MM


KONTROL PENULANGAN PILE CAP EXISTING

Data Pilecap existing :

Live Load Lt1 = 600 kg/2


Live Load Lt Dasar = 600 kg/2 ( asumsi live load yang bekerja = 50% )

Beban : * aksial kolom ( b. lt 2 ) : = 25.00 ton


* beban pelat lt 1 : ( 780*4.7*5.4 ) = 19.79 ton
* bs pile cap : (0.5*1.1*0.4*2400)-(0.5*1.1*0.2*2400) = 0.26 ton
P total = 45.05 ton

M = (22525*0.35)-(1/8*(780*4.7)*2.7^2-(0.5*(0.5*0.2*2400)*0.55^2
M = 6552 - 3340 - 36.3 = 3175.7 kgm

Mu = 1.5*3175.7 kgm
Mu = 4763.55 kgm
Rn = Mu/fb.d2 r min = 1.4/fy
Rn = 47635500/(0.8*500*3002) r min = 1.4/400
Rn = 1.32 r min = 0.0035 (menentukan)

m = fy/(0.85*fc')
m = 400/(0.85*18.6)
m = 25.3

r = 1/m(1-V(1-2mRn/fy)
r = 1/25.3(1-V(1-2.25.3*1.32/400)
r = 0.00345

As perlu = 0.0035*500*300
As perlu = 525 mm2

Dipakai tul D13 ( as = 132.73mm2--------> Tulangan =pakai = 525/132.73= 3.95 ( 4D13)

Tulangan ada ( existing ) = 3D13

Kesimpulan : -Penulangan pilecap existing kurang memenuhi syarat


q dyn = S/C1*(-1+V1+2C1xCA)
S2
q all = q dyn/ SF

SF = 2.1

A. Pile Data : C1=L/E*F


where :
L = Length of Pile ( cm ) Grade Concrete Eb(t/cm2)
F = Cross section Area ( cm2) K-100 220
E = Modulus Elasticity (t/cm2) K-150 260
E steel = Ee = 2100 t/cm2 K-250 300
E concrete=Eb ( tabel ) K-350 340
K-450 370
K-550 390

For Concrete Pile :


F = Fb + m x Fc
Fb = Cross section Area
m = Fc/Fb
Fc = Area of Reinforced Pile ( ignored, very small )

Driving Machine Data :


A = R x h ( t.cm )
R = Hammer weight (t)
h = ramstroke (cm)
Err:522 h
EFFISIENSI PILE GROUP
Daya Dukung Tiang = 37.5 ton
Type n - pile D(m) S(m) m n D/S arc tg(D/S) m-1 n-1 Eff P ijin Pijin X Eff
( ton ) ( ton )
P1 1 0.25 0.75 - - 0.333333 18.43 - - 1.00 37.5 37.50
P2 2 0.25 0.75 2 1 0.333333 18.43 1 0 0.90 75 67.32
P12 12 0.25 0.75 4 3 0.333333 18.43 3 2 0.78 450 351.00

Eff = 1- (arc tg (D/S)*((n-1).2+(m-1).2)/(90.m.n)) ( Converse - Labarre equation )

Keterangan :
D : dimensi tiang
S : jarak antar tiang
m : jumlah baris tiang arah - x
n : jumlah baris tiang arah - y
EFFISIENSI PILE GROUP
Type n - pile D(m) S(m) m n Eff

P2 2 0.2 0.8 2 1 1
P3 3 0.2 0.8 - - 1
P6 6 0.2 0.8 3 2 1

Eff = 2(m+n-2)S + 4D
m.n.p.D

Ket :
D : dimensi tiang
S : jarak antar tiang
m : jumlah baris tiang arah - x
n : jumlah baris tiang arah - y
EFFISIENSI PILE GRUP

Type n-pile Lr Br Luas Kel qc fs.L Qfb Qcb Tahanan S tahanan Eff
(m) (m) (m2) (m) t/m2 t/m ( ton ) ( ton ) ijin blok ijin tiang tunggal
( ton ) ( ton )

P2 2 0.80 1.50 1.20 4.60 57.5 25.8 119 69 188 46 1.0


P3 3 1.39 1.50 1.31 5.16 57.5 25.8 133 75 208 69 1.0
P6 6 2.30 1.50 3.45 7.60 57.5 25.8 196 198 394 138 1.0

Ket :

Eff = Tahanan Ijin Blok / S Tahanan Ijin Tiang Tunggal

Tahanan Ijin Blok = Qcb + Qfb

Qcb : Luas x qc

Qfb : Keliling x L x fs
KONTROL GESER PONS

Perumusan yang dipakai untuk kontrol geser pons :


Vc = ( 1 + 2/bc).(1/6 V fc' ).bo.d
tetapi tidak lebih dari :
1/3Vfc'.bo.d
dimana:
bc : rasio sisi panjang terhadap sisi pendek dari daerah beban terpusat atau reaksi
bo : keliling / perimeter penampang yang terdapat tegangan geser sehingga menurut
pasal 3.4.11.1.2 SKSNI T15-1991 boleh dianggap terletak pada jarak d/2 terhadap sisi kolom
d : tebal effektif poer

Data pilecap existing :


b= 500 mm
h= 400 mm
d= 300 mm
fc' = 18.6 Mpa ( mutu pengecoran lama K225 )

bo = 2*390+2*250+4*300
bo = 2480 mm

bc = 250/390
bc = 0.64

Vc1 = ( 1+2/0.64)*(1/6V18.6)*2480*300
Vc1 = 2205.98 kN

Vc2 = 1/3V18.6*2480*300
Vc2 = 1069.56 kN ( menentukan )

fVc = 0.6*1069.56
fVc = 641 kN = 64.173 ton > Vu=36 ton

Kontrol Geser Pons ………………..( ok )


Type fc' dimensi kolom d bc bo fVc1 fVc2 fVc Vu
( Mpa ) A ( mm ) B ( mm ) ( mm ) ( cm ) kN kN kN kN

P2 21 390 250 350 0.641026 2680 1771 860 860 200

keterangan:
Vc1 : ( 1 + 2/bc).(1/6 V fc' ).bo.d
Vc2 : 1/3Vfc'.bo.d
ok
not
fVc > Vu

ok
KONTROL GESER PONS
( blk-d )

Perumusan yang dipakai untuk kontrol geser pons :


Vc = ( 1 + 2/bc).(1/6 V fc' ).bo.d
tetapi tidak lebih dari :
1/3Vfc'.bo.d
dimana:
bc : rasio sisi panjang terhadap sisi pendek dari daerah beban terpusat atau reaksi
bo : keliling / perimeter penampang yang terdapat tegangan geser sehingga menurut
pasal 3.4.11.1.2 SKSNI T15-1991 boleh dianggap terletak pada jarak d/2 terhadap sisi kolom
d : tebal effektif poer

Type fc' dimensi kolom d bc bo fVc1 fVc2 fVc


( Mpa ) A ( mm ) B ( mm ) ( mm ) ( cm ) kN kN kN

P2 25 370 370 492 1 3448 2545 1696 1696

P3 20 370 370 492 1 2464 1626 1084 1084

P4 20 370 370 592 1 2664 2116 1411 1411

keterangan:
Vc1 : ( 1 + 2/bc).(1/6 V fc' ).bo.d
Vc2 : 1/3Vfc'.bo.d
ok
not

Vu fVc > Vu
kN

671.33 ok

811.97 ok

863.86 ok
PERHITUNGAN DAYA DUKUNG TIANG PANCANG

Proyek : KANWIL XII DJP


Daya dukung ijin 1 tiang = 37500 kg

Type jumlah ukuran jarak jarak jarak jarak jarak jarak P Effisiensi P Ijin Ket
Lokasi poer tiang tiang X1 X2 Y1 Y2 terjauh terjauh P total Mx My 1 Tiang Pile Grup 1 tiang
( Axis ) pancang pancang (m) (m) (m) (m) X Y (kg) (kgm) (kgm) (kg) kg

A,4 P2 2.0 0.250 0.000 0.000 0.375 0.375 0.000 0.375 51292.4 296.0 0.0 26040.9 0.9 33750 ok

B,4 P3 3.0 0.250 0.375 0.375 0.200 0.450 0.375 0.450 81024.6 114.0 106.0 27331.1 0.85 31875 ok

I,1b P1 1.0 0.250 0.300 0.300 0.300 0.300 0.300 0.300 6359.7 172.0 67.0 6558.9 1 37500 ok
BEARING CAPACITY OF PILE PONDATION
CALCULATION

Soil Data : BH-1 ( STATION A AREA)

DEPTH N-SPT VALUE


1.5 19
3 0
7 2
10 1
12 6
13 8
14.5 18
16.5 34
18 12
19.5 11
21 14
22.5 20
24 50 ( must be taken 40 )

N-SPT average = 14

Pile Data :

Size : f 40 cm
Length : 24 m ( from existing ground level)

Bearing Capacity Calculation :

Q ult = 40.Nb.Ab + 0.2N ave.As ( Meyyerhof Formula )

Q all = (40.Nb.Ab + 0.2N ave.As)/SF

where :
Nb = N-SPT value at bottompile
Ab = area of pile tip ( m2)
N ave = N-SPT value average as long pile
As = are of pile shaft ( m2)
SF = safety factor ( this case is taken 3 )
Q all = allowable capacity of pile
Q ult = ultimate pile capacity

Ab = 0.25*3.14*0.4*0.4 = 0.1256 m2
As = 3.14*0.4*24 = 30.16 m2

Q ult = ( 40*40*0.1256)+(0.2*14*30.16) = 285.4 ton


Q all = 285.4/3 = 95.13 ton
PERHITUNGAN DAYA DUKUNG PONDASI
( MEYERHOF )

Section Pondasi L Ab As Nb 0.2N 40.Nb.Ab 0.2N.As P ult P all


m m2 m2 <40 <10 ton ton ton ton

I 0.3 18 0.07065 16.96 40 0 113.04 0.00 113.04 37.68

II 0.3 19 0.07065 17.90 40 0 113.04 0.00 113.04 37.68

II 0.3 12 0.07065 11.30 40 0 113.04 0.00 113.04 37.68

Pult = 40.Nb.Ab + 0,2N.As

dimana : Ab = luas penampang dasar tiang


As = luas selimut tiang
Nb = nilai N-SPT pada dasar tiang
N = nilai N-SPT rata2 sepanjang tiang
P all = P ult / SF ( diambil SF = 3 )

Dalam perhitungan daya dukung ini lekatan diabaikan

Section 1 : Multipurpose,Office,Canteen,Classroom
Section 2 : Power house,Guest House,GM house
Section 3 : Apartment, Trainee Dormitory
BLKG-91

PERHITUNGAN GAYA PONDASI


( CANTEEN & MUSHOLLA )

Daya dukung 1 tiang = 38000 kg ( BEBAN GRAVITASI )


Type jumlah ukuran jarak jarak jarak jarak jarak jarak P
Axis poer tiang tiang X1 X2 Y1 Y2 terjauh terjauh P* P dinding P total Mx My 1 TIANG
pancang pancang (m) (m) (m) (m) X Y (kg) (kg) (kg) (kgm) (kgm) (kg)

A-10 P1 1.0 0.300 0.000 0.000 0.000 0.000 0.000 0.000 15691.0 5000.0 20691.0 0.0 0.0 20691.0

B-10 P2 2.0 0.300 0.000 0.000 0.450 0.000 0.000 0.450 26543.0 0.0 26543.0 23.0 191.0 13483.7

H-10 P1 1.0 0.300 0.000 0.000 0.000 0.000 0.000 0.000 9674.0 5000.0 14674.0 0.0 0.0 14674.0

Daya dukung 1 tiang = 57000 kg ( BEBAN GEMPA )


Type jumlah ukuran jarak jarak jarak jarak jarak jarak P
Axis poer tiang tiang X1 X2 Y1 Y2 terjauh terjauh P* P dinding P total Mx My 1 TIANG
pancang pancang (m) (m) (m) (m) X Y (kg) (kg) (kg) (kgm) (kgm) (kg)

A-10 P1 1.0 0.300 0.000 0.000 0.000 0.000 0.000 0.000 16505.0 5000.0 21505.0 0.0 0.0 21505.0

B-10 P2 2.0 0.300 0.000 0.000 0.450 0.000 0.000 0.450 27000.0 0.0 27000.0 2299.0 5378.0 19475.6

H-10 P1 1.0 0.300 0.000 0.000 0.000 0.000 0.000 0.000 7295.0 5000.0 12295.0 0.0 0.0 12295.0

P* Aksial hasil output Etabs belum termasuk dinding lt bawah ( output terlampir )
Proyek : Ruko Pengampon Permai
Blok C
GAYA LATERAL TIANG

No. Type jumlah H H


poer tiang ( kg ) 1 tiang
pancang ( kg )

502 P2 2.0 4297.0 2148.5

503 P3 3.0 3910.0 1303.3

51 P3 3.0 4290.0 1430.0


PERHITUNGAN DAYA DUKUNG TIANG PANCANG

Office
Type n- pile P eff- pile Pall
kg kg

P3 3 70000 0.93 25090


P5 5 99000 0.90 22000

factory
Type n- pile P eff- pile Pall
kg kg

P2 ( tepi ) 2 25000 0.95 13158


P2 ( tengah ) 2 18000 0.95 9474
P1 1 13000 1.00 13000

electric room
Type n- pile P eff- pile Pall
kg kg

P2 2 35000 0.95 18421


P3 3 60000 0.93 21505
P4 4 77000 0.92 20924
Bending Moment of Pile

BH1 : Cu = 0.01 kg/cm2


= 100 kg/m2

Cr = 0.5 x 100 kg/cm2


= 50 kg/m2

F max = 1250 kg
D = 0.4 m

F/Cr.D = 62.5
from tabel = M/Cr.D2 = 140
e/D = 0
M= 140*Cr*D^2

M= 140*50*0.4^2

M= 1120 kgm

Mu = 1.5*1120

Mu = 1680 kgm

Mu = 1.680 tm < 10.6 tm ( ok )


Project   :  
Buiding   :  
Location  :  

TABEL PERHITUNGAN REAKSI KOLOM & JUMLAH TIANG PANC
==================================================
      PRELIMINARY BERDASARKAN TRIBUTARY AREA

= ====== = ===== = ===== = ======= = ===== = ===== = ======= = ===== = ===== =


|   | Basement |     PH floor |      Typical floor 
| Column  | q = 1623  kg/m2 | q = 1113  kg/m2 | q = 1263  kg/m2
| code | ­­­­­ ­ ­­­­­ ­ ­­­­­­­ | ­­­­­ ­.­­­­­ ­ ­­­­­­­ | ­­­­­ ­ ­­­­­ ­
|   | lx | ly | Pcolumn | lx | ly | Pcolumn | lx | ly |
| ====== = ===== = ===== = ======= = ===== = ===== = ======= | ===== = ===== =
|   | | | | | | | | |
| C100 | 6.0  | 8.0  | 77904  | 6.0  | 8.0  | 53424  | 6.0  | 8.0  |
|   | | | | | | | | |
| C101 | 6.0  | 10.3  | 100301  | 6.0  | 10.0  | 66780  | 6.0  | 10.0  |
|   | | | | | | | | |
| C121 | 8.0  | 10.3  | 133086  | 8.0  | 10.3  | 91266  | 8.0  | 10.3  |
|   | | | | | | | | |
|   | | | | | | | | |
= ====== = ===== = ===== = ======= = ===== = ===== = ======= = ===== = ===== =
I KOLOM & JUMLAH TIANG PANCANG
==============================
SARKAN TRIBUTARY AREA

========= = ===== = ========= = ============ = ========= = ========= =


Typical floor    no. of |   | | | |
kg/m2  storeys| special | | | |
­­­­­­­­­ ­ ­­­­­ | loading | TOTAL | Piling  | Column BF |
Pcolumn | n |   | [kg] |   |   |
========= | ===== | ========= | ============ | ========= | ========= |
| | | | | |
53904  | 10  | 0  | 670,368.0  | 7.4  | 77.0  |
| | | | | |
67380  | 10  | 0  | 840,881.4  | 9.3  | 86.1  |
| | | | | |
92086  | 10  | 0  | 1,145,212.0  | 12.7  | 100.6  |
| | | | | |
| | | | | |
========= = ===== = ========= = ============ = ========= = ========= =
================ ======== ========= = ========= = ========= =
| | | |
| | | |
Column 1st | Col.3rd | Col. 4st | Col. 5st |
  | | | |
================ | ========= | ========= | ========= |
| | | |
69.7  | 61.4  | 51.9  | 40.2  |
| 0.0  | 0.0  | 0.0  |
77.9  | 68.7  | 58.0  | 45.0  |
| 0.0  | 0.0  | 0.0  |
91.0  | 80.3  | 67.9  | 52.6  |
| | | |
| | | |
================ ======== = = =

= =
Project : PT YASUNAGA INDONESIA, CIKANDE - SERANG
Client : KUMAGAII KADII JOINT OPERATION

PERHITUNGAN DAYA DUKUNG PONDASI STRAUSS

No. Diameter Panjang penamp. SPT end Daya dukung SPT rata2 selimut Daya dukung Daya dukung Safety Daya Dukung
Strauss Ab Nb Pend Navg As Pskin Pultimate SF P ijin
(m) (m) (m2) ( ton ) (m2) ( ton ) ( ton )

BORE HOLE B3

1 0.3 3 0.07065 7 19.782 6.66667 2.826 3.768 23.55 3 7.85

2 0.3 4 0.07065 8 22.608 7 3.768 5.2752 27.8832 3 9.2944

1 0.3 3 0.07065 25 70.65 25 2.826 14.13 84.78 3 28.26


Project : Rumah Tinggal Jalan Raffles Garden Blok TB 9 - 5

safety factor end bearing : 3


safety factor friction : 6

PERHITUNGAN DAYA DUKUNG PONDASI TIANG

No. dimensi Panjang penamp. qc Daya dukung JHP selimut Daya dukung Daya Dukung
Ab qonus As Pskin P ijin
(m) (m) (m2) ( ton ) (m2) ( ton )

berdasarkan S1
1 0.25 6 0.0491 16 2.617 300 0.785 3.925 6.542
2 0.25 7 0.0491 22 3.598 380 0.785 4.972 8.570
5 0.25 10 0.0491 40 6.542 1000 0.785 13.083 19.625
PROYEK : GEDUNG CRITICAL & MEDICAL CENTER, RSUD DOK II, JAYAPURA
GEDUNG : BLOK E

PERHITUNGAN PONDASI

PERUMUSAN : MEMAKAI METODA MEYERHOF

FORMULA : Pult = 40.Nb.Ab + 0,2.Navg. As

Pijin = Pult / SF

dimana :

Pult = Daya Dukung Batas Pondasi Borepile ( ton )


Nb = Nilai N-SPT pada elevasi dasar tiang
Ab = Luas penampang dasar tiang ( m2 )
Navg = Nilai N-SPT rata-rata
As = Luas selimut tiang ( m2 )
Nilai batas untuk Nb = 40 dan nilai batas untuk 0,2 Navg = 10 ton/m2
SF = SAFE FACTOR ( DIAMBIL= 4 )

PERHITUNGAN DAYA DUKUNG PONDASI BOREPILE

No. Diameter Panjang penamp. Daya dukung selimut Daya dukung Daya Dukung
Ab Nb end bearing Navg As Pskin P ijin
(m) (m) (m2) ( ton ) (m2) ( ton )

berdasarkan borehole 1 :

1 0.8 6 0.5024 40 803.840 26.8 15.072 80.786 221.156

berdasarkan borehole 2 :

1 0.8 7 0.5024 40 803.840 17.8 17.584 62.599 216.610


0
PERHITUNGAN DAYA DUKUNG TIANG PANCANG HASIL KALENDERING
( RUMUS HILEY )

Data Alat Pancang :


Jenis : Drop hammer Berat Hammer : 1.9 ton
Effisiensi Hammer : 0.6

Data Tiang Pancang : Dimensi tiang : 20 x 20 cm2


Luas tiang : 0.04 m2
Kedalaman tiang : 11 m
koefisien restitusi (n) : 0.5
Berat total tiang : 1.056 ton
Effisiensi pukulan : 0.732

Ram ( cm ) 20 30 40 50 60 70 80 90 100 110 120 130


stroke (inch) 7.874 11.811 15.748 19.685 23.622 27.559 31.496 35.433 39.370 43.307 47.244 51.181

s/blow+c/2 DRIVING RESISTANCE/ DAYA DUKUNG ULTIMATE

( cm) ( inch) ( ton ) ( ton ) ( ton ) ( ton ) ( ton ) ( ton ) ( ton ) ( ton ) ( ton ) ( ton ) ( ton ) ( ton )
0.1 0.039 166.9 250.4 333.8 417.3 500.7 584.2 667.6 751.1 834.6 918.0 1001.5 1084.9
0.2 0.079 83.5 125.2 166.9 208.6 250.4 292.1 333.8 375.6 417.3 459.0 500.7 542.5
0.3 0.118 55.6 83.5 111.3 139.1 166.9 194.7 222.5 250.4 278.2 306.0 333.8 361.6
0.4 0.157 41.7 62.6 83.5 104.3 125.2 146.0 166.9 187.8 208.6 229.5 250.4 271.2
0.5 0.197 33.4 50.1 66.8 83.5 100.1 116.8 133.5 150.2 166.9 183.6 200.3 217.0
0.6 0.236 27.8 41.7 55.6 69.5 83.5 97.4 111.3 125.2 139.1 153.0 166.9 180.8
0.7 0.276 23.8 35.8 47.7 59.6 71.5 83.5 95.4 107.3 119.2 131.1 143.1 155.0
0.8 0.315 20.9 31.3 41.7 52.2 62.6 73.0 83.5 93.9 104.3 114.8 125.2 135.6
0.9 0.354 18.5 27.8 37.1 46.4 55.6 64.9 74.2 83.5 92.7 102.0 111.3 120.5
1 0.394 16.7 25.0 33.4 41.7 50.1 58.4 66.8 75.1 83.5 91.8 100.1 108.5
1.1 0.433 15.2 22.8 30.3 37.9 45.5 53.1 60.7 68.3 75.9 83.5 91.0 98.6
1.2 0.472 13.9 20.9 27.8 34.8 41.7 48.7 55.6 62.6 69.5 76.5 83.5 90.4
1.3 0.512 12.8 19.3 25.7 32.1 38.5 44.9 51.4 57.8 64.2 70.6 77.0 83.5
1.4 0.551 11.9 17.9 23.8 29.8 35.8 41.7 47.7 53.7 59.6 65.6 71.5 77.5
1.5 0.591 11.1 16.7 22.3 27.8 33.4 38.9 44.5 50.1 55.6 61.2 66.8 72.3
1.6 0.630 10.4 15.6 20.9 26.1 31.3 36.5 41.7 46.9 52.2 57.4 62.6 67.8
1.7 0.669 9.8 14.7 19.6 24.5 29.5 34.4 39.3 44.2 49.1 54.0 58.9 63.8
1.8 0.709 9.3 13.9 18.5 23.2 27.8 32.5 37.1 41.7 46.4 51.0 55.6 60.3
1.9 0.748 8.8 13.2 17.6 22.0 26.4 30.7 35.1 39.5 43.9 48.3 52.7 57.1
2 0.787 8.3 12.5 16.7 20.9 25.0 29.2 33.4 37.6 41.7 45.9 50.1 54.2
2.1 0.827 7.9 11.9 15.9 19.9 23.8 27.8 31.8 35.8 39.7 43.7 47.7 51.7
2.2 0.866 7.6 11.4 15.2 19.0 22.8 26.6 30.3 34.1 37.9 41.7 45.5 49.3
2.3 0.906 7.3 10.9 14.5 18.1 21.8 25.4 29.0 32.7 36.3 39.9 43.5 47.2
2.4 0.945 7.0 10.4 13.9 17.4 20.9 24.3 27.8 31.3 34.8 38.3 41.7 45.2
2.5 0.984 6.7 10.0 13.4 16.7 20.0 23.4 26.7 30.0 33.4 36.7 40.1 43.4
2.6 1.024 6.4 9.6 12.8 16.0 19.3 22.5 25.7 28.9 32.1 35.3 38.5 41.7
2.7 1.063 6.2 9.3 12.4 15.5 18.5 21.6 24.7 27.8 30.9 34.0 37.1 40.2
2.8 1.102 6.0 8.9 11.9 14.9 17.9 20.9 23.8 26.8 29.8 32.8 35.8 38.7
2.9 1.142 5.8 8.6 11.5 14.4 17.3 20.1 23.0 25.9 28.8 31.7 34.5 37.4
3 1.181 5.6 8.3 11.1 13.9 16.7 19.5 22.3 25.0 27.8 30.6 33.4 36.2
3.1 1.220 5.4 8.1 10.8 13.5 16.2 18.8 21.5 24.2 26.9 29.6 32.3 35.0
3.2 1.260 5.2 7.8 10.4 13.0 15.6 18.3 20.9 23.5 26.1 28.7 31.3 33.9
3.3 1.299 5.1 7.6 10.1 12.6 15.2 17.7 20.2 22.8 25.3 27.8 30.3 32.9
3.4 1.339 4.9 7.4 9.8 12.3 14.7 17.2 19.6 22.1 24.5 27.0 29.5 31.9
3.5 1.378 4.8 7.2 9.5 11.9 14.3 16.7 19.1 21.5 23.8 26.2 28.6 31.0
3.6 1.417 4.6 7.0 9.3 11.6 13.9 16.2 18.5 20.9 23.2 25.5 27.8 30.1
3.7 1.457 4.5 6.8 9.0 11.3 13.5 15.8 18.0 20.3 22.6 24.8 27.1 29.3
3.8 1.496 4.4 6.6 8.8 11.0 13.2 15.4 17.6 19.8 22.0 24.2 26.4 28.6
3.9 1.535 4.3 6.4 8.6 10.7 12.8 15.0 17.1 19.3 21.4 23.5 25.7 27.8
4 1.575 4.2 6.3 8.3 10.4 12.5 14.6 16.7 18.8 20.9 23.0 25.0 27.1
4.1 1.614 4.1 6.1 8.1 10.2 12.2 14.2 16.3 18.3 20.4 22.4 24.4 26.5
4.2 1.654 4.0 6.0 7.9 9.9 11.9 13.9 15.9 17.9 19.9 21.9 23.8 25.8
4.3 1.693 3.9 5.8 7.8 9.7 11.6 13.6 15.5 17.5 19.4 21.3 23.3 25.2
4.4 1.732 3.8 5.7 7.6 9.5 11.4 13.3 15.2 17.1 19.0 20.9 22.8 24.7
4.5 1.772 3.7 5.6 7.4 9.3 11.1 13.0 14.8 16.7 18.5 20.4 22.3 24.1
4.6 1.811 3.6 5.4 7.3 9.1 10.9 12.7 14.5 16.3 18.1 20.0 21.8 23.6
4.7 1.850 3.6 5.3 7.1 8.9 10.7 12.4 14.2 16.0 17.8 19.5 21.3 23.1
4.8 1.890 3.5 5.2 7.0 8.7 10.4 12.2 13.9 15.6 17.4 19.1 20.9 22.6
4.9 1.929 3.4 5.1 6.8 8.5 10.2 11.9 13.6 15.3 17.0 18.7 20.4 22.1
5 1.969 3.3 5.0 6.7 8.3 10.0 11.7 13.4 15.0 16.7 18.4 20.0 21.7
PERHITUNGAN GESER TIANG PANCANG

Mutu Beton : K250


Sengkang : f8-100
Tul utama : D22
Decking : 35 mm
d : 246 mm

Vu = fVn

Vu = fVc + fVs

Kuat geser beton :

1. Untuk komponen yang dibebani aksial tekan : SKSNI 3.4.3-1.2

Vc = (1 +Nu/14.Ag).(Vfc'/6).bw.d

2. Untuk komponen yang dibebani aksial tarik : SKSNI 3.4.3-1.3

Vc = 0

Karena Nu = 0, maka untuk mutu beton K250 :

Vc = 1/6(vfc')bw.d

Vc = 1/6*V21.300.246

Vc = 56365 N = 5636 kg

Vs = Av.fy.d/s

Vs = 2.0,25.p.8.8.240.246/100

Vs = 59353 N = 5935 kg

fVn = 0,6*5636 + 0,6*5935 = 6943 kg


Daya dukung pondasi berdasrakan Kalendering

Pile = 0.4 m W = 3.5 ton


Pi = 199 kg/m H = 176.6 cm

No Pile L(m) P ( ton ) S ( cm ) K ( cm ) R ( ton ) P kerja Ket


( ton )
1 36.5 7.2635 0.25 2.5 48.72 20 ok
2 37 7.363 0.25 1.3 85.66 24 ok
61 36.25 7.21375 0.24 1.2 93.48 27 ok
GAYA GESER DASAR & GESER TINGKAT
LOCKER

A. METODE STATIK EKIVALEN


( Arah - X )
JUMLAH LANTAI = 2
PERIODE BANGUNAN = 0.86
KOEFISIEN GEMPA DASAR = 0.05
FAKTOR KEUTAMAAN = 1
TIPE STRUKTUR = 1

S Wi = 234205 kg
S Wi x hi = 1237040 kgm
GAYA GESER DASAR = 11710.25 kg
0.9*GAYA GESER DASAR = 10539.225 kg

LANTAI TINGGI LANTAI ( hi ) BERAT LANTAI ( Wi ) Wi x hi Fi F Kumulatif


m kg kg.m kg kg

ATAP 8 75055 600440 5115.58 5115.58


LT1 4 159150 636600 5423.65 10539.23

A. METODE STATIK EKIVALEN


( Arah - Y )

JUMLAH LANTAI = 2
PERIODE BANGUNAN = 0.91
KOEFISIEN GEMPA DASAR = 0.05
FAKTOR KEUTAMAAN = 1
TIPE STRUKTUR = 1

S Wi = 234205 kg
S Wi x hi = 1237040 kgm
GAYA GESER DASAR = 11710.25 kg
0.9*GAYA GESER DASAR = 10539.225 kg

LANTAI TINGGI LANTAI ( hi ) BERAT LANTAI ( Wi ) Wi x hi Fi F Kumulatif


m kg kg.m kg kg

ATAP 8 75055 600440 5115.58 5115.58


LT1 4 159150 636600 5423.65 10539.23
IV. PERHITUNGAN GAYA LATERAL

DATA GEMPA :
WG 6, pakai SNI 1726 gambar 2, Tanah Lunak
Faktor keutamaan (I) : 1
Nilai R : untuk arah U-S, Sistem Ganda ( SG ) : 8.5
untuk arah B-T, Sistem Ganda ( SG ) : 8.5

BEBAN TINGKAT LANTAI


Lantai Balok Plat Reduksi 30% Komponen Vertikal Jumlah
Tingkat (N) (N) B Hidup (N) (N)

8 2973600 2891700 283500 2021880 8170680


7 2973600 3316950 708750 2077320 9076620
6 2973600 3316950 708750 2077320 9076620
5 2973600 3316950 708750 2077320 9076620
4 2973600 3316950 708750 2077320 9076620
3 2973600 3316950 708750 2077320 9076620
2 2973600 3316950 708750 2077320 9076620
1 2973600 3316950 708750 2298120 9297420
Jumlah ( W) : 71927820

WAKTU GETAR ALAMI ( T ) EMPIRIS

Rumus T Empiris pakai Method A dari UBC 1997 section 1630.2.2


Tinggi gedung ( hn) = 29 m

Pada arah U-S untuk SG……T=Cc*(hn)3/4 =


Cc = 0.0488 T = 0.610 detik

Pada arah B-T untuk SG……T=Cc*(hn)3/4 =


Cc = 0.0488 T = 0.610 detik

Kontrol Pembatasan T sesuai Ps. 5.6


z = 0.15
n = 8
n = z x n = 1.2 detik > T empiris ( OK )

PERHITUNGAN GAYA GESER DASAR (V)


WG 6, Tanah Lunak dari gbr 2 SNI 1726 diperoleh :
Arah U-S : T1 = 0.61 C1 = 0.95
Arah B-T : T 1
= 0.61 C1 = 0.95

Gaya Geser Dasar :


Arah U-S ……………. V = C1x I x W = 8038991.6 N
R

Gaya Geser Dasar :


Arah B-T ……………. V = C1x I x W = 8038991.6 N
R

DISTRIBUSI GAYA GESER TINGKAT ( Fi )

Gaya Fi dan Vi untuk Arah U-S


Tingkat Tinggi Berat Tingkat Wi.hi Gaya Fi Gaya geser Vi
( m) (N) ( N.m) (N) (N)

LT-8 29 8170680 236949720 1599374.76 1599374.76


LT-7 25.5 9076620 231453810 1562278.20 3161652.96
LT-6 22 9076620 199685640 1347847.86 4509500.82
LT-5 18.5 9076620 167917470 1133417.52 5642918.34
LT-4 15 9076620 136149300 918987.18 6561905.51
LT-3 11.5 9076620 104381130 704556.84 7266462.35
LT-2 8 9076620 72612960 490126.49 7756588.84
LT-1 4.5 9297420 41838390 282402.80 8038991.65
Jumlah 71927820 1190988420

Gaya Fi dan Vi untuk Arah B-T


Tingkat Tinggi Berat Tingkat Wi.hi Gaya Fi Gaya geser Vi
( m) (N) ( N.m) (N) (N)

LT-8 29 8170680 236949720 1599374.76 1599374.76


LT-7 25.5 9076620 231453810 1562278.20 3161652.96
LT-6 22 9076620 199685640 1347847.86 4509500.82
LT-5 18.5 9076620 167917470 1133417.52 5642918.34
LT-4 15 9076620 136149300 918987.18 6561905.51
LT-3 11.5 9076620 104381130 704556.84 7266462.35
LT-2 8 9076620 72612960 490126.49 7756588.84
LT-1 4.5 9297420 41838390 282402.80 8038991.65
Jumlah 71927820 1190988420
PERHITUNGAN GAYA LATERAL

1. BEBAN RENCANA

PERENCANAANPERENCANAANPERENCANAAN
PLAT PORTAL GEMPA
kg/m2 kg/m2 kg/m2
BEBAN MATI

Slab self-weight t= 120 288.00 288.00 288.00

Finishing,ceiling 110.00 110.00 110.00

BEBAN HIDUP 250.00 187.50 75.00

TOTAL LOAD 648 585.5 473


PERHITUNGAN GAYA LATERAL

A. BERAT LANTAI

LANTAI BERAT ( KG )

ATAP 165539.79
5TH 699083.19
4TH 1098799.07
3RD 1439006.60
2ND 1499221.62
1ST 1312481.43
GRD 2054554.32

TOTAL 2054554.32

B. GAYA GEMPA DASAR ( V )

JUMLAH LANTAI = 7
FAKTOR KEUTAMAAN STRUKTUR ( I ) = 1
FAKTOR TYPE STRUKTUR ( K ) = 1
BERAT TOTAL ( Wt ) = 2054554.32 kg

V = C X I X K X Wt

ARAH - X
PERIODE GETAR BANGUNAN - X = 1.930
KOEFISIEN GEMPA DASAR ( C ) = 0.030
GAYA GEMPA DASAR ( V ) = 61636.63 kg
REDUKSI 10% ( 0.9 V ) = 55472.97 kg

ARAH - Y
PERIODE GETAR BANGUNAN - Y = 1.860
KOEFISIEN GEMPA DASAR ( C ) = 0.030
GAYA GEMPA DASAR ( V ) = 61636.63 kg
REDUKSI 10% ( 0.9 V ) = 55472.97 kg

C. GAYA GESER TINGKAT RENCANA

LANTAI ARAH - X ARAH - Y


GEMPA GEMPA GEMPA GEMPA
DINAMIS STATIK DINAMIS STATIK

ATAP 8030.00 2186.22 8286.00 2504.94


5TH 30449.00 8289.92 29128.00 8805.68
4TH 38525.00 10488.66 35897.00 10852.02
3RD 40345.00 10984.17 35354.00 10687.87
2ND 34127.00 9291.28 29052.00 8782.71
1ST 24971.00 6798.50 20970.00 6339.44
GRD 27306.00 7434.22 24810.00 7500.31

TOTAL 203753.00 55472.97 183497.00 55472.97


B. ANALISA DINAMIK
( STAFF APARTMENT - A )

Lantai Geser Tingkat Geser Tingkat Geser Tingkat Rencana Geser Tingkat Beban Gempa ( Fi )
Analisa Dinamik dengan Faktor Koreksi 0.9 * V ( Final ) ( Final )
kg kg kg kg kg
X - dir Y - dir X - dir Y - dir X - dir Y - dir X - dir Y - dir X - dir Y - dir

ROOF 10839 10577 10839 11391 8385 8385 10839 11391 10839 11391
1ST-FL 48674 41012 48674 44169 44169 44169 48674 44169 37835 32778

Faktor Koreksi : Gaya Geser Dasar Analisa Statik = 44169 = 0.91 dipakai 1
( X - dir ) Gaya Geser Dasar Analisa Dinamik 48674

Faktor Koreksi : Gaya Geser Dasar Analisa Statik = 44169 = 1.08


( Y - dir ) Gaya Geser Dasar Analisa Dinamik 41012
PERHITUNGAN GAYA LATERAL

1. BEBAN RENCANA

PERENCANAANPERENCANAANPERENCANAAN
PLAT PORTAL GEMPA
kg/m2 kg/m2 kg/m2
BEBAN MATI

Slab self-weight t= 120 288.00 288.00 288.00

Finishing,ceiling 110.00 110.00 110.00

BEBAN HIDUP 250.00 187.50 75.00

TOTAL LOAD 648 585.5 473


PERHITUNGAN GAYA LATERAL
( BAGIAN 2 )

A. BERAT LANTAI

LANTAI BERAT ( KG )

LT-8 1632823.40
LT-7 1748198.73
LT-6 1748198.73
LT-5 1748208.54
LT-4 1716339.24
LT-3 1716339.24
LT-2 1697906.67

TOTAL 12008014.53

B. GAYA GEMPA DASAR ( V )

JUMLAH LANTAI = 7
FAKTOR KEUTAMAAN STRUKTUR ( I ) = 1
FAKTOR TYPE STRUKTUR ( K ) = 1
BERAT TOTAL ( Wt ) = 12008014.53 kg

V = C X I X K X Wt

ARAH - X
PERIODE GETAR BANGUNAN - X = 1.187
KOEFISIEN GEMPA DASAR ( C ) = 0.045
GAYA GEMPA DASAR ( V ) = 540360.65 kg
REDUKSI 10% ( 0.9 V ) = 486324.59 kg

ARAH - Y
PERIODE GETAR BANGUNAN - Y = 1.202
KOEFISIEN GEMPA DASAR ( C ) = 0.045
GAYA GEMPA DASAR ( V ) = 540360.65 kg
REDUKSI 10% ( 0.9 V ) = 486324.59 kg
C. GAYA GESER TINGKAT RENCANA

LANTAI ARAH - X ARAH - Y


GEMPA GEMPA GEMPA GEMPA
DINAMIS STATIK DINAMIS STATIK

LT-8 102943.00 97202.41 103478.00 97847.02


LT-7 97909.00 92449.13 97590.00 92279.43
LT-6 88569.00 83629.97 87992.00 83203.72
LT-5 78354.00 73984.61 77815.00 73580.53
LT-4 65599.00 61940.89 65445.00 61883.67
LT-3 52571.00 49639.39 52790.00 49917.32
LT-2 29101.00 27478.19 29202.00 27612.91

TOTAL 515046.00 486324.59 514312.00 486324.59


KONTROL DRIFT RATIO & DISPLACEMENT

DRIFT RATIO
Lantai Drift Ratio Drift Ratio Drift Ratio Drift Control
x Faktor koreksi Ijin
X - dir Y - dir X - dir Y - dir X - dir Y - dir

ROOF 0.00045 0.00029 0.000450 0.000312 0.00500 ok ok


1ST-FL 0.00199 0.0006 0.001990 0.000646 0.00500 ok ok

DISPLACEMENT
Lantai Displacement Displacement Tinggi Lantai Displacement Displacement
x Factor koreksi m Ijin
X - dir Y - dir X - dir Y - dir X - dir Y - dir

ROOF 0.00980 0.00360 0.00980 0.00388 4 0.02000 ok ok


1ST-FL 0.00800 0.00240 0.00800 0.00258 4 0.02000 ok ok

Faktor Koreksi : Gaya Geser Dasar Analisa Statik = 44169 = 1.00


( X - dir ) Gaya Geser Dasar Analisa Dinamik 48674 ( harus > 1)

Faktor Koreksi : Gaya Geser Dasar Analisa Statik = 44169 = 1.08


( Y - dir ) Gaya Geser Dasar Analisa Dinamik 41012
s > 1)
SIMPANGAN TINGKAT & DRIFT RATIO

DRIFT RATIO
Lantai Drift Ratio Drift Ratio Drift Ratio Kontrol Drift
x Faktor Koreksi Ijin
arah - X arah - Y arah - X arah - Y arah - X arah - Y

ATAP 0.00034 0.00036 0.00036 0.00038 0.005 ok ok


LT2 0.00038 0.00046 0.00041 0.00049 0.005 ok ok
LT1 0.00033 0.00038 0.00035 0.00041 0.005 ok ok

Faktor Koreksi : Gaya Geser Dasar Statik = 22500 = 1.07


( arah - x ) Gaya Geser Dasar Dinamis 20978

Faktor Koreksi : Gaya Geser Dasar Statik = 22500 = 1.07


( arah - y ) Gaya Geser Dasar Dinamis 21073

SIMPANGAN TINGKAT
Lantai Simpangan Simpangan Tinggi Lantai Simpangan Simpangan
x Faktor Koreksi m Ijin
arah - X arah - Y arah - X arah - Y arah - X arah - Y

ATAP 0.00410 0.00470 0.00440 0.00502 12.000000 0.060 ok ok


LT2 0.00280 0.00330 0.00300 0.00352 8.000000 0.040 ok ok
LT1 0.00130 0.00150 0.00139 0.00160 4.000000 0.020 ok ok

Faktor Koreksi : Gaya Geser Dasar Statik = 22500 = 1.07


( arah - x ) Gaya Geser Dasar Dinamis 20978

Faktor Koreksi : Gaya Geser Dasar Statik = 22500 = 1.07


( arah - y ) Gaya Geser Dasar Dinamis 21073
EKSENTRISITAS

POSISI BEBAN

es

I G
L1
L2

ebA
ebB

TITIK REFERENSI

ebA = es - 0.05b
ebB = 1.5es + 0.05b

DIMANA : G = PUSAT MASSA


I = PUSAT KEKAKUAN
es = JARAK EKSENTRISITAS
b = LEBAR BANGUNAN

a. ARAH - X
LANTAI b G I es ebA ebB L1 L2
(m) (m) (m) (m) (m) (m) (m) (m)

ATAP 15.3 7.502 7.510 -0.01 -0.77 0.75 6.74 8.26


LT2 15.3 7.627 7.500 0.13 -0.64 0.96 6.86 8.46
LT1 15.3 7.646 7.492 0.15 -0.61 1.00 6.88 8.49

b. ARAH - Y
LANTAI b G I es ebA ebB L1 L2
(m) (m) (m) (m) (m) (m) (m) (m)

ATAP 9.47 5.000 4.993 0.01 -0.47 0.48 4.53 5.48


LT2 9.47 4.944 4.991 -0.05 -0.52 0.40 4.47 5.39
LT1 9.47 4.926 4.995 -0.07 -0.54 0.37 4.45 5.37
Project : SURABAYA CONSULATE GENERAL OFFICE
Lokation : SURABAYA

DRIFT RATIO CONTROL

Story Drift Ratio Drift Ratio Drift Ratio Drift Control


x Corection Factor Allowable
X - dir Y - dir X - dir Y - dir X - dir Y - dir

Roof 0.0078 0.00028 0.011188 0.000487 0.005 ok ok


4th 0.00088 0.00038 0.001262 0.000661 0.005 ok ok
1st 0.00013 0.00005 0.000186 0.000087 0.005 ok ok

Corection Factor : Base Shear Static Analysis = 414756.9 = 1.43


( X - dir ) Base Shear Dynamic Analysis 289162

Corection Factor : Base Shear Static Analysis = 414756.9 = 1.74


( Y - dir ) Base Shear Dynamic Analysis 238336
LATERAL DISPLACEMENTS AND INTERSTORY DRIFTS

Dm = 0.7RDs
Drifts max = 0.02 x 4 = 0.08m

Gempa Arah - X Gempa Arah - Y


LANTAI Ds Drifts Dm Drifts Ds Drifts Dm Drifts
(m) (m) (m) (m) (m) (m) (m) (m)
LT ATAP 0.0611 0.001800 0.1796 0.005292 0.0618 0.002100 0.18169 0.006174
LT10 0.0593 0.003000 0.1743 0.008820 0.0597 0.003400 0.17552 0.009996
LT9 0.0563 0.050800 0.1655 0.149352 0.0563 0.051000 0.16552 0.149940
LT2 0.0055 0.005500 0.0162 0.016170 0.0053 0.005300 0.01558 0.015582
STOREY EXIST BRACE S.WALL
1 79.253 81.201 83.287
2 73.549 75.316 77.108 STOREY
3 64.089 65.305 66.775 1 1.5 2 2.5 3 3
4 50.046 50.535 51.604

0
SHEAR STOREY FORCE
5 29.315 29.1 29.548

15
30
ton

45
60
75
90
EXIST
BRAC
S.WAL
STOREY
1.5 2 2.5 3 3.5 4 4.5 5

EXIST
BRACE
S.WALL
STOREY EXIST BRACE S.WALL
1 1070 1090 1120
2 840 855 874
STOREY
3 560 566 578
1 1.5 2 2.5 3 3.5 4 4.5
4 312 313 319

0
OVERTURNING MOMEN
5 116 115 117

250
t.m.

500
750
1000
EXIST
BRACE
S.WALL
OREY
.5 3 3.5 4 4.5 5

EXIST
BRACE
S.WALL
STOREY EXIST BRACE S.WALL
1 0.0019 0.001 0.0009
2 0.0024 0.0014 0.0012
STOREY
1 1.5 2 2.5 3 3.5 4 4.5
3 0.0026 0.0013 0.0011

0
4 0.0026 0.0012 0.001

storey deformation angle


5 0.0023 0.001 0.0009

0.001 0.002 0.003 0.004 0.005


rad
EXIST
BRACE
S.WALL
OREY
.5 3 3.5 4 4.5 5

EXIST
BRACE
S.WALL
TEGANGAN PONDASI PLAT SETEMPAT

NO KOLOM Aksial Kolom Aksial Kolom Ukuran Pondasi Luas Pondasi Tegangan Pondasi
( output ETABS ) ( 0.80 X OUTPUT ETABS ) L(m) B(m) m2 kg/m2

1 25553 20442.4 2 2 4 5110.60


2 43054 34443.20 2 2.3 4.6 7487.65
30 21632 17305.60 1.6 1.6 2.56 6760.00
BAB IX
PERHITUNGAN PONDASI

Jenis Pondasi : Plat lajur

Lebar Pondasi : 0.6,0.7,1 m

Daya Dukung : 2500 kg/m2 ( asumsi tanah sedang )

Perhitungan Momen Pondasi Lajur :

a. Lebar 0.6 m :
Mu = 1/2*2500*0.3^2*1.5
Mu = 169 kgm

b. Lebar 0.7 m :
Mu = 1/2*2500*0.35^2*1.5
Mu = 230 kgm

c. Lebar 1 m (tengah) :
Mu = 1/2*2500*0.5^2*1.5
Mu = 469 kgm

d. Lebar 1 m (tepi) :
Mu = 1/2*2500*1^2*1.5
Mu = 1875 kgm
PERHITUNGAN PONDASI PELAT LAJUR

Type pelat lajur lebar 1.500 m [ simetris, tumpuan tengah ]

Tegangan tanah yang terjadi = 3500 kg/m2


Lebar kantilever pelat = 0.75 m
Momen yang tejadi = 984.375 kgm
Momen ultimate = 1476.563 kgm
Fy : 240 Mpa cover : 25 mm d' : 38 mm
Fc' : 15 Mpa b : 1000 mm
Tul utama : 10 mm h : 150 mm
Sengkang : 8 mm d : 105 mm
Tul tarik : 10 As : 785 mm2
Tultekan : 0 As' : 0 mm2
T = 188400 N
Cs = 0 N
Cc = 12750 a
a = 14.7764706 mm
Mn = 18390056 Nmm
1839 kgm > 1476.563 kgm [ O.K ]

JADI DIPAKAI TULANGAN UTAMA DIAMETER 10 mm JARAK 100 mm

Type pelat lajur lebar 1.200 m [ simetris, tumpuan tengah ]

Tegangan tanah yang terjadi = 3500 kg/m2


Lebar kantilever pelat = 0.6 m
Momen yang tejadi = 630 kgm
Momen ultimate = 945 kgm

Fy : 240 Mpa cover : 25 mm d' : 38 mm


Fc' : 15 Mpa b : 1000 mm
Tul utama : 10 mm h : 150 mm
Sengkang : 8 mm d : 105 mm

Tul tarik : 6 As : 471 mm2


Tultekan : 0 As' : 0 mm2

T = 113040 N
Cs = 0 N
Cc = 12750 a
a = 8.86588235 mm

Mn = 11368100 Nmm
1137 kgm > 945 kgm [ O.K ]

JADI DIPAKAI TULANGAN UTAMA DIAMETER 10 mm JARAK 150 mm


PROYEK : JEMBATAN WISATA BUKIT EMAS

PERHITUNGAN DINDING PENAHAN

GAYA GULING :

A. AKIBAT TEKANAN TANAH :

TINGGI : 2.5 meter


kedalaman dasar pondasi : 0 meter
Berat Jenis Tanah : 1800 kg/m3
Ka : 0.333

Gaya Tekan ( 1 ) = 1873.13 kg


Tinggi Guling (1 ) = 0.83333 meter
Momen Guling (1 ) = 1560.94 kg-m

Gaya Tekan ( 2 ) = 0 kg
Tinggi Guling (2 ) = 0 meter
Momen Guling (2 ) = 0 kg-m

B. AKIBAT TEKANAN AIR

TINGGI : 2.5 meter


kedalaman dasar pondasi : 0 meter
Berat Jenis Air : 1000 kg/m3

Gaya Tekan ( 3 ) = 3125 kg


Tinggi Guling (3 ) = 0.83333 meter
Gaya Guling (3 ) = 2604.17 kg-m

Gaya Tekan ( 4 ) = 0 kg
Tinggi Guling ( 4 ) = 0 meter
Momen Guling ( 4 ) = 0 kg-m

C. AKIBAT BEBAN DIATAS TANAH --------> TIDAK ADA

TINGGI : 2.5 meter


kedalaman dasar pondasi : 0 meter
Berat Jenis Tanah : 1800 kg/m3
Ka : 0.333
BEBAN DIATAS TANAH : 1080 kg/m2

Gaya Tekan ( 1 ) = 1498.5 kg


Tinggi Guling (1 ) = 1.25 meter
Momen Guling (1 ) = 1873.13 kg-m

Gaya Tekan ( 2 ) = 0 kg
Tinggi Guling (2 ) = 0 meter
Momen Guling (2 ) = 0 kg-m
TOTAL MOMEN GULING = 1560.94 + 0 + 2604.167 + 0 +

= 6038.23 kgm

Fy : 400 Mpa cover : 70 mm d' 86.5 mm


Fc' : 18.6 Mpa b : 1000 mm
Tul utama : 13 mm h : 300 mm
Sengkang : 10 mm d : 204 mm

Tul tarik : 8 As : 1061.32 mm2


Tultekan : 4 As' : 530.66 mm2

T = 424528 N
Cs = 203874 N
Cc = 15810 a
a = 13.95659 mm

Mn 67428801 Nmm
6743 kgm > 6038.23 kgm [ ok ]

Dipakai tulangan D-13 jarak 12.5 cm


1873.125
PERHITUNGAN DINDING PENAHAN

KONDISI :
- BEBAN AIR TIDAK ADA
- ADA BEBAN KENDARAAN DI ENTRANCE

GAYA GULING :

A. AKIBAT TEKANAN TANAH :

TINGGI : 3 meter
kedalaman dasar pondasi : 1.5 meter
Berat Jenis Tanah : 1800 kg/m3

Gaya Tekan ( 1 ) = 2700 kg


Tinggi Guling (1 ) = 2.5 meter
Momen Guling (1 ) = 6750 kg-m

Gaya Tekan ( 2 ) = 2700 kg


Tinggi Guling (2 ) = 0.75 meter
Momen Guling (2 ) = 2025 kg-m

B. AKIBAT TEKANAN AIR

TINGGI : 0 meter
kedalaman dasar pondasi : 0.6 meter
Berat Jenis Air : 1000 kg/m3

Gaya Tekan ( 3 ) = 0 kg
Tinggi Guling (3 ) = 0.6 meter
Gaya Guling (3 ) = 0 kg-m

Gaya Tekan ( 4 ) = 0 kg
Tinggi Guling ( 4 ) = 0.3 meter
Momen Guling ( 4 ) = 0 kg-m

C. AKIBAT BEBAN KENDARAAN

TINGGI : 4.5 meter


kedalaman dasar pondasi : 0 meter
Beban Kendaraan : 800 kg/m2

Gaya Tekan ( 1 ) = 1198.8 kg


Tinggi Guling (1 ) = 2.25 meter
Momen Guling (1 ) = 2697.3 kg-m

TOTAL MOMEN GULING = 6750 + 2025 + 0 + 0 +

= 11472.3 kgm
COUNTER LOAD :

TINGGI : 3 meter
kedalaman dasar pondasi : 1.5 meter
lebar batu kali atas : 0.5 meter
lebar batu kali bawah : 2.5 meter
Berat Jenis Batu : 2000 kg/m3

Berat Batu kali(1) = 4500 kg


Jarak lengan (1 ) = 0.25 meter
Momen Counter (1 ) = 1125 kg-m

Berat Batu kali(2) = 6000 kg


Jarak lengan (2 ) = 1.16667 meter
Momen Counter (2 ) = 7000 kg-m

Berat Batu kali(3) = 6000 kg


Jarak lengan (3 ) = 1.5 meter
Momen Counter (3 ) = 9000 kg-m

TOTAL MOMEN COUNTER = 17125

SAFETY FACTOR ( SF ) : 1.49273 harus lebih besar dari


1, minimal 1,5
2697.3
KONTROL RETAINING WALL
Penggerak

No f c gt gw q Ka Kp H tanah TINGGI H air q1=gt.H.Ka q2=gw.H q3 = Ka.q M1 M2 M3 M. Guling F geser


kg/cm2 kg/m3 kg/m3 kg/m2 (m) c ( m) kg/m kg/m kg/m kgm kgm kgm M1+M2+M3 kg
kgm

1 40 0.17 1600 1000 400 0.22 4.5989 9 8 0 3131.17678 0 86.98 42270.9 0.0 3522.6 45793.5 14873.1

Penahan
L.Ret. H tanah qa=Kp.gt.H W tanah W kend. Kohesi M(a) M(b) M(c) M(d) M.penahan F.penahan
(m) (m) kg/m kg kg 2cVKa kgm kgm kgm kgm M(a+b+c+d) kg
kg/m2 kgm

2.6 0 0.00 37440 1040 1585.4 0.00 48672 1352 50734.3 100758.27 34209.2708

SF Guling = M.Guling/M.Penahan
= 2.20

SF Geser = F Penahan/F geser


= 2.30
PERHITUNGAN DINDING PENAHAN TANAH W1

KONDISI :
- BEBAN AIR SETINGGI 2 METER
- DIAREA TAMAN ADA BEBAN TAMBAHAN 100 kg/m2

GAYA GULING :

A. AKIBAT TEKANAN TANAH :

TINGGI : 2.9 meter


kedalaman dasar pondasi : 0 meter
Berat Jenis Tanah : 1800 kg/m3

Gaya Tekan ( 1 ) = 2523 kg


Tinggi Guling (1 ) = 0.966667 meter
Momen Guling (1 ) = 2438.9 kg-m

B. AKIBAT TEKANAN AIR

TINGGI : 2 meter
kedalaman dasar pondasi : 0 meter
Berat Jenis Air : 1000 kg/m3

Gaya Tekan ( 3 ) = 2000 kg


Tinggi Guling (3 ) = 0.666667 meter
Gaya Guling (3 ) = 1333.333 kg-m

C. AKIBAT BEBAN DIATAS TANAH

TINGGI : 2.9 meter


kedalaman dasar pondasi : 0 meter
Beban diatas tanah : 200 kg/m2

Gaya Tekan ( 1 ) = 193.14 kg


Tinggi Guling (1 ) = 1.45 meter
Momen Guling (1 ) = 280.053 kg-m

TOTAL MOMEN GULING = 2438.9 + 280.053 + 1333.333


= 4052.286 kgm
Momen Ultimate = 6078.43 kgm
PENULANGAN DINDING PENAHAN

Fy : 350 Mpa cover : 25 mm d' : 41.5 mm


Fc' : 18.6 Mpa b : 1000 mm
Tul utama : 13 mm h : 250 mm
Sengkang : 10 mm d : 199 mm

Tul tarik : 10 As : 1326.65 mm2


Tultekan : 5 As' : 663.325 mm2

T = 464328 N
Cs = 221677 N
Cc = 15810 a
a = 15.3479392 mm

Mn = 81339499 Nmm
8134 kgm

DIPAKAI DINDING PENAHAN TEBAL 250 mm dengan tulangan utama Dia 13-100
+ 0 0
PENULANGAN TANGGA ( MULTI PURPOSE )

Material Properties :
fy = 400 Mpa
fc' = 21 Mpa

Mu b d m Rn r As required As min Reinforcement As design


kgm cm cm cm2 f spacing cm2

6280.00 120 18.00 22.41 1.900 0.00503 10.9 3.888 13 125 12.74
Proyek : Office Buliding ( Slipi Mas )

ECCENTRICITY DESIGN

LEVEL DIRN FORCE A FORCE B CORy CORx COMy COMx ecY ecX edY edX COMy Dsg COMx Dsg

PH X 43803.31 0 38.4 26
PH Y 0 47289.32 22.87 1.90 -10.24 19.00 28.52 16.20
PH ROT -553235.81 808647.37 12.63 17.10 26.6 17.5 13.97 0.40 12.05 -0.90 0.58 16.20

ROOF X 168004.94 0 38.4 26


ROOF Y 0 170215.17 20.84 1.99 -8.18 19.03 -8.18 16.20
ROOF ROT -2126870 2900845.34 12.66 17.04 25.27 17.5 12.61 0.46 10.69 -0.84 1.97 16.20

GENSET X 853884.73 0 44 35
GENSET Y 0 828669.34 6.78 11.73 19.15 29.37 19.15 29.37
GENSET ROT -22145240 14615604 25.93 17.64 22.88 24.29 3.05 6.65 0.85 4.90 25.08 22.54

400819341.xls
PERHITUNGAN PONDASI

Tegangan tanah yang terjadi : s = (P/A ) + ((M - P.e) / W)

Beban Axial (P) :

*). Beban reaksi 1565 kg

*). Berat sendiri pondasi : 600 kg

*). Berat balok rip pondasi : 480 kg

*). Berat sendiri kolom beton : 1267.2 kg


+
3912.2 kg

Beban Momen (M) :

M = H x d

Gaya reaksi horisontal (H) : 661 kg


Jaraknya (d) 4.4 m

Momen (M) 2908.4 kgm

Ukuran Pondasi :

B = 1 m
H = 2 m
Jarak as - kolom ke tepi pondasi (1) : ### m
Jarak as - kolom ke tepi pondasi (2) : ### m
Jarak eksentrisitas (e) ### m

Tegangan tanah yang terjadi :

s1 = ### kg/m2
s2 = 234 kg/m2

Perhitungan Balok Rib Pondasi :

M = 1/2.q.l.l

q = ### kg/m'
l = 1.45 m

M = ### kgm
Mu = ### kgm
PERHITUNGAN PEMBEBANAN :

BEBAN MATI :

Berat Sendiri Pelat = 0,15*2400 360


Finishing 10 cm 200
560
BEBAN HIDUP :

Beban merata D 2200 800 0.933333

Beban garis P 4363.6363636


keof kejut 1.3614479605

momen akibat beban merata

q = 1463.47 + ( bs ) 396 2090.667


= 3950.13

P = 15525.5

M = 14080.1 + 20726.485722
34806.5
Mu = 52209.8

Fy 390 Mpa cover 100 mm d' 121 mm


Fc' 18.6 Mpa b : 300 mm
Tul u 22 mm h : 700 mm
Seng 10 mm d : 556 mm

Tul ta 8 As 3039.52 mm2


Tulte 4 As' 1519.76 mm2

T 1185413 N
Cs 568679 N
Cc 4743 a
a 130.03 mm

Mn 5.5E+08 Nmm
55018 kgm > 52209.808 kgm [ ok ]

You might also like